Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
See More +
  • Showing 1 - 20 of 2453 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Tonga - Cyclone Reconstruction and Climate Resilience Project : environmental management plan (English)

The development objective of the Cyclone Reconstruction and Climate Resilience for Tonga are to: (i) facilitate the provision of housing and basic services and restore and improve key community facilities to the affected population of Ha'apai; and (ii) strengthen institutional and executing capacity for disaster risk management in the Kingdom of Tonga. ... See More +

Environmental Assessment E4513 APR 14, 2014

Cameroon - Lom Pangar Hydropower Project : procurement plan : Plan de passation des marches simplifie (French)

Procurement Plan 86513 APR 03, 2014

Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (English)

A 2013 scientific assessment of black carbon emissions and impacts found that black carbon is second to carbon dioxide in terms of its climate forcing. ... See More +

Working Paper 86485 APR 02, 2014

Minjares, Ray; Wagner, David Vance; Baral, Anil; Chambliss, Sarah; Galarza, Sebastian; Posada, Francisco; Sharpe, Ben; Wu, Grace; Blumberg, Kate; Kamakate, Fanta; Lloyd, Alan; Kojima, Masami; Hamilton, Kirk; Johnson, Todd; Kopp, Andreas; Hosier, Richard; Akbar, Sameer

Incentive contracts for environmental services and their potential in REDD (English)

Implementation arrangements for Reducing Greenhouse Gas Emissions from Deforestation and Forest Degradation can be seen as contracts that could address some of the inherent problems with forest carbon credits that often lead to high transaction costs -- measuring, monitoring, and verification. ... See More +

Policy Research Working Paper WPS6829 APR 01, 2014

Fortmannm Lea; Salas, Paula Cordero; Sohngen, Brent; Roe, Brian

Belarus - Post-Chernobyl Recovery Project (English)

Ratings for the Post-Chernobyl Recovery Project for Belarus were as follows: outcomes were satisfactory, risk to development outcome was moderate, Bank performance was satisfactory, and Borrower performance was satisfactory. ... See More +

Implementation Completion and Results Report ICR3059 MAR 31, 2014

Kenya - Energy Sector Recovery Project (English)

Ratings for the Energy Sector Recovery Project for Kenya were as follows: outcomes were moderately satisfactory, risk to development outcome was substantial, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR2915 MAR 27, 2014

Yemen - Pilot Program for Climate Resilience Project : procurement plan (English)

Procurement Plan 86261 MAR 26, 2014

Egypt - Household Natural Gas Connection Project : environmental assessment (Vol. 1 of 2) : Environmental and social impact assessment framework (English)

The objective of the Household Natural Gas Connection Project is to support the Government of Egypt goal of reducing LPG subsidies through scaling up natural gas connections to households. ... See More +

Environmental Assessment E4502 MAR 24, 2014

Pakistan-Power Sector Reform: Development Policy Credit (English)

Project Information Document AB7535 MAR 22, 2014

Belarus - Biomass District Heating Project (English)

The development objective of the Biomass District Heating Project for Belarus is to scale up the efficient use of renewable biomass in heat and electricity generation in selected towns in Belarus. ... See More +

Project Appraisal Document PAD728 MAR 05, 2014

Kenya - Second Arid Lands Resource Management Project : procurement plan (English)

Procurement Plan 85718 MAR 04, 2014

Long-term mitigation strategies and marginal abatement cost curves : a case study on Brazil (English)

Decision makers facing abatement targets need to decide which abatement measures to implement, and in which order. This paper investigates the ability of marginal abatement cost (MAC) curves to inform this decision, reanalysing a MAC curve developed by the World Bank on Brazil. ... See More +

Policy Research Working Paper WPS6808 MAR 01, 2014

Vogt-Schilb, Adrien; Hallegatte, Stephane; de Gouvello Christophe

Lebanon - PCB Management in the Power Sector Project : Environmental assessment (Vol. 1 of 2) : Environmental and social impact assessment (English)

The development objective of the Polychlorinated Biphenyls (PCB) Management in the Power Sector Project for Lebanon is to assist in establishing a sound PCB management system that would minimize potential environmental and health risks from unmanaged PCB oils and equipment. ... See More +

Environmental Assessment E4498 MAR 01, 2014

Lebanon - PCB Management in the Power Sector Project : Environmental assessment (Vol. 2 of 2) : Environmental and social impact assessment appendices (English)

The development objective of the Polychlorinated Biphenyls (PCB) Management in the Power Sector Project for Lebanon is to assist in establishing a sound PCB management system that would minimize potential environmental and health risks from unmanaged PCB oils and equipment. ... See More +

Environmental Assessment E4498 MAR 01, 2014

Implementation of REDD+ mechanisms in Tanzania (English)

This paper explains the major issues and lessons derived from the national forest management program and REDD+ initiatives in Tanzania. It finds that addressing the most important drivers of forest degradation and deforestation, in particular the country energy needs and landownership, is essential for success in reducing emissions regardless of the type of program implemented. ... See More +

Policy Research Working Paper WPS6815 MAR 01, 2014

Salas, Paula Cordero

China - Shanxi Gas Utilization Project (English)

The objective of the Shanxi Gas Utilization Project for China is to increase gas utilization to reduce greenhouse gases emission in selected counties in Shanxi province. ... See More +

Project Appraisal Document PAD719 FEB 26, 2014

Title Document Date Report No. Document Type Also available in
Tonga - Cyclone Reconstruction and Climate Resilience Project : environmental management plan (English)
See More +
APR 14, 2014 E4513 Environmental Assessment
Europe and Central Asia - Second Program of European Neighborhood and Partnership Instrument East Countries Forest Law Enforcement and Governance Project : procurement plan (English)
See More +
APR 03, 2014 86501 Procurement Plan
Cameroon - Lom Pangar Hydropower Project : procurement plan : Plan de passation des marches simplifie (French)
See More +
APR 03, 2014 86513 Procurement Plan
Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (English)
See More +
APR 02, 2014 86485 Working Paper
Incentive contracts for environmental services and their potential in REDD (English)
See More +
APR 01, 2014 WPS6829 Policy Research Working Paper
Belarus - Post-Chernobyl Recovery Project (English)
See More +
MAR 31, 2014 ICR3059 Implementation Completion and Results Report
Kenya - Energy Sector Recovery Project (English)
See More +
MAR 27, 2014 ICR2915 Implementation Completion and Results Report
Yemen - Pilot Program for Climate Resilience Project : procurement plan (English)
See More +
MAR 26, 2014 86261 Procurement Plan
Yemen, Republic of - Climate Information System and Pilot Program for Climate Resilience Coordination Project : procurement plan (English)
See More +
MAR 26, 2014 86262 Procurement Plan
Egypt - Household Natural Gas Connection Project : environmental assessment (Vol. 1 of 2) : Environmental and social impact assessment framework (English)
See More +
MAR 24, 2014 E4502 Environmental Assessment
Pakistan-Power Sector Reform: Development Policy Credit (English)
See More +
MAR 22, 2014 AB7535 Project Information Document
Congo, Democratic Republic - Improved Forested Landscape Management Project : resettlement plan (Vol. 1 of 2) : Cadre de politique de reinstallation (French)
See More +
MAR 15, 2014 RP1634 Resettlement Plan
Congo, Democratic Republic - Improved Forested Landscape Management Project : resettlement plan (Vol. 2 of 2) : Cadre fonctionnel (French)
See More +
MAR 15, 2014 RP1634 Resettlement Plan
Belarus - Biomass District Heating Project (English)
See More +
MAR 05, 2014 PAD728 Project Appraisal Document
Kenya - Second Arid Lands Resource Management Project : procurement plan (English)
See More +
MAR 04, 2014 85718 Procurement Plan
Long-term mitigation strategies and marginal abatement cost curves : a case study on Brazil (English)
See More +
MAR 01, 2014 WPS6808 Policy Research Working Paper
Lebanon - PCB Management in the Power Sector Project : Environmental assessment (Vol. 1 of 2) : Environmental and social impact assessment (English)
See More +
MAR 01, 2014 E4498 Environmental Assessment
Lebanon - PCB Management in the Power Sector Project : Environmental assessment (Vol. 2 of 2) : Environmental and social impact assessment appendices (English)
See More +
MAR 01, 2014 E4498 Environmental Assessment
Implementation of REDD+ mechanisms in Tanzania (English)
See More +
MAR 01, 2014 WPS6815 Policy Research Working Paper
China - Shanxi Gas Utilization Project (English)
See More +
FEB 26, 2014 PAD719 Project Appraisal Document