Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 5591 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects (33kv substations (English)

The objectives of the Grid Solar and Energy Efficiency Project for Nepal are to: (i) increase electricity supply to the NEA gridthrough grid-connected solar farms; and (ii) reduce NEA’s distribution losses in pilot distributioncenters. ... See More +

Environmental Assessment SFG4041 JUL 17, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)

The development objective of Business Models for Private Sector-led Mini-grid Energy Access Project for Nepal is to increase electricity delivery from renewable energy mini-grids by mobilizing private energy service company (ESCO). ... See More +

Environmental Assessment SFG4505 JUL 16, 2018

Disclosed

How would cross-border electricity trade stimulate hydropower development in South Asia ? (English)

This study examines the importance of enhancing the cross-border transmission interconnections and regional electricity trade to promote hydropower in the South Asia region and quantifies the potential of hydropower development and trade under alternative scenarios. ... See More +

Policy Research Working Paper WPS8513 JUL 10, 2018

Timilsina,Govinda R. Disclosed

Western Africa/AFRICA- P130888- Building Resilience through Innovation, Communication & Knowledge Svcs - Procurement Plan (English)

Procurement Plan STEP10809 JUL 09, 2018

Disclosed

Tunisia - Italy Power Interconnection Project - Project Preparation Technical Assistance : environmental assessment : Stakeholder engagement plan (English)

The objective of the Italy Power Interconnection Project - Project Preparation Technical Assistance is to support the Government of Tunisia in evaluating the feasibility of the Tunisia Italy interconnector. ... See More +

Environmental Assessment SFG4480 JUL 05, 2018

Disclosed

Kenya - Social and Economic Inclusion Project : indigenous peoples plan : Vulnerable and marginalised group framework (English)

The development objective of Social and Economic Inclusion Project for Kenya is to enhance access of poor and vulnerable to integrated social and economic inclusion as well as shock-responsive social protection. ... See More +

Indigenous Peoples Plan SFG4483 JUL 01, 2018

Disclosed

Nigeria - State Employment and Expenditure for Results Project : environmental assessment (Vol. 6) : Environmental and social management plan for renovation and equipment of workshops at the Port Harcourt and Ken Saro-Wiwa Polytechnics RiversState (English)

The development objective of the State Employment and Expenditure for Results Project for Nigeria is to enhance employment opportunities and access to socio-economic services, while improving the public expenditure management systems in the four states. ... See More +

Environmental Assessment SFG2386 JUN 29, 2018

Renteria Lozano,Nigeria Disclosed

Disclosable Version of the ISR - Power Recovery Project - P144029 - Sequence No : 06 (English)

Implementation Status and Results Report ISR33395 JUN 29, 2018

Chavapricha,Rome Disclosed

India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)

Procurement Plan STEP10663 JUN 28, 2018

K Sudhakar Shetty Disclosed

Where is the carbon tax after thirty years of research ? (English)

This paper takes a dive into the deep literature on the carbon tax accumulated through active and continuous research over the past 30 years. It also presents the ongoing debate and implementation of the carbon tax in practice. ... See More +

Policy Research Working Paper WPS8493 JUN 28, 2018

Timilsina,Govinda R. Disclosed

Disclosable Version of the ISR - Sustainable Land Management Project - P085621 - Sequence No : 10 (English)

Implementation Status and Results Report ISR32978 JUN 28, 2018

Papageorgiou,Stavros Disclosed

Disclosable Restructuring Paper - Pacific Islands Regional Oceanscape Program Forum Fisheries Agency - P131655 (English)

Project Paper RES30938 JUN 28, 2018

Cadman,Cary Anne Disclosed

Disclosable Version of the ISR - Climate Resilience Improvement Project (CRIP) - P146314 - Sequence No : 08 (English)

Implementation Status and Results Report ISR32998 JUN 27, 2018

Kahandawa,Suranga Sooriya Kumara Disclosed

Jordan - First Equitable Growth and Job Creation Programmatic Development Policy Financing : chair summary (English)

Board Summary 128051 JUN 27, 2018

Disclosed

Official Documents- Financing Agreement for Credit 6230-GN and Grant D304-GN (Closing Package) (English)

Financing Agreement JUN 27, 2018

LEGRL Disclosed

India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)

Procurement Plan STEP10531 JUN 25, 2018

Balamurali D Disclosed

Bhutan/SOUTH ASIA- P162196- PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT - Procurement Plan (English)

Procurement Plan STEP10525 JUN 25, 2018

Sonam Penjor Disclosed

Disclosable Version of the ISR - Shared Infrastructure for Solar Parks Project - P154283 - Sequence No : 03 (English)

Implementation Status and Results Report ISR32673 JUN 23, 2018

Goyal,Surbhi Disclosed

Disclosable Version of the ISR - Mali Obsolete Pesticides Disposal and Prevention Project - P146247 - Sequence No : 04 (English)

Implementation Status and Results Report ISR32900 JUN 23, 2018

Menang Evouna,Emeran Serge M. Disclosed

Title Document Date Report No. Document Type Also available in
Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects (33kv substations (English)
See More +
JUL 17, 2018 SFG4041 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)
See More +
JUL 16, 2018 SFG4505 Environmental Assessment
How would cross-border electricity trade stimulate hydropower development in South Asia ? (English)
See More +
JUL 10, 2018 WPS8513 Policy Research Working Paper
Western Africa/AFRICA- P130888- Building Resilience through Innovation, Communication & Knowledge Svcs - Procurement Plan (English)
See More +
JUL 09, 2018 STEP10809 Procurement Plan
Tunisia - Italy Power Interconnection Project - Project Preparation Technical Assistance : environmental assessment : Stakeholder engagement plan (English)
See More +
JUL 05, 2018 SFG4480 Environmental Assessment
Kenya - Social and Economic Inclusion Project : indigenous peoples plan : Vulnerable and marginalised group framework (English)
See More +
JUL 01, 2018 SFG4483 Indigenous Peoples Plan
Nigeria - State Employment and Expenditure for Results Project : environmental assessment (Vol. 6) : Environmental and social management plan for renovation and equipment of workshops at the Port Harcourt and Ken Saro-Wiwa Polytechnics RiversState (English)
See More +
JUN 29, 2018 SFG2386 Environmental Assessment
Disclosable Version of the ISR - Power Recovery Project - P144029 - Sequence No : 06 (English)
See More +
JUN 29, 2018 ISR33395 Implementation Status and Results Report
India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)
See More +
JUN 28, 2018 STEP10663 Procurement Plan
Where is the carbon tax after thirty years of research ? (English)
See More +
JUN 28, 2018 WPS8493 Policy Research Working Paper
Disclosable Version of the ISR - Sustainable Land Management Project - P085621 - Sequence No : 10 (English)
See More +
JUN 28, 2018 ISR32978 Implementation Status and Results Report
Disclosable Restructuring Paper - Pacific Islands Regional Oceanscape Program Forum Fisheries Agency - P131655 (English)
See More +
JUN 28, 2018 RES30938 Project Paper
Disclosable Version of the ISR - Climate Resilience Improvement Project (CRIP) - P146314 - Sequence No : 08 (English)
See More +
JUN 27, 2018 ISR32998 Implementation Status and Results Report
Jordan - First Equitable Growth and Job Creation Programmatic Development Policy Financing : chair summary (English)
See More +
JUN 27, 2018 128051 Board Summary
Official Documents- Financing Agreement for Credit 6230-GN and Grant D304-GN (Closing Package) (English)
See More +
JUN 27, 2018 Financing Agreement
India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)
See More +
JUN 25, 2018 STEP10531 Procurement Plan
Bhutan/SOUTH ASIA- P162196- PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT - Procurement Plan (English)
See More +
JUN 25, 2018 STEP10525 Procurement Plan
Disclosable Version of the ISR - Shared Infrastructure for Solar Parks Project - P154283 - Sequence No : 03 (English)
See More +
JUN 23, 2018 ISR32673 Implementation Status and Results Report
Disclosable Version of the ISR - Mali Obsolete Pesticides Disposal and Prevention Project - P146247 - Sequence No : 04 (English)
See More +
JUN 23, 2018 ISR32900 Implementation Status and Results Report