Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 3594 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Guyana - Cunha Canal Rehabilitation Project (English)

Integrated Safeguards Data Sheet 95537 APR 02, 2015

India - Third Eastern Dedicated Freight Corridor Project : environmental assessment (Vol. 4) : Scoping report on cumulative impact assessment of Eastern dedicated freight
corridor (Ludhiana to Mughalsarai section) (English)

The Third Eastern Dedicated Freight Corridor Project for India willis: a) provide additional rail transport capacity, improved service quality and higher freight throughput on the 401 km Ludhiana- Khurja section of the EDFC; and b) develop the institutional capacity of DFCCIL to build, maintain and manage the DFC infrastructure network. ... See More +

Environmental Assessment E4732 APR 01, 2015

India - Second Pradhan Mantri Gram Sadak Yojana Rural Roads Project : Tamil Nadu procurement plan (English)

Procurement Plan 95370 MAR 31, 2015

Lao People's Democratic Republic - Power Grid Improvement Project : environmental assessment (Vol. 2) : Environmental code of practices (English)

The objective of the Power Grid Improvement Project for Lao People's Democratic Republic is to help improve efficiency and reliability of power distribution in the selected load areas served by Electricite du Laos (EDL). ... See More +

Environmental Assessment E4780 MAR 25, 2015

Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 11) : environmental report - third solar power plant : environmental and social management guideline (English)

This Second and Third Phase of the Noor Concentrated Solar Power Project of Morocco aims to meet the needs of the process of energy production at the Ouarzazate solar raw water park from the Mansour Eddahbi dam. ... See More +

Environmental Assessment E4489 MAR 24, 2015

Bangladesh - Second Local Governance Support Project (English)

This paper seeks to restructure the Second Local Governance Support Project for Bangladesh. This level 1 restructuring proposes to: (i) revise the project development objective (PDO); (ii) amend one legal covenant in the financing agreement; (iii) update the results framework: modifying description and updating target values of intermediate result indicators based on the actual implementation progress; removing one intermediate result indicator. ... See More +

Project Paper RES18219 MAR 24, 2015

India - Second Gujarat State Highway Project (GSHP II) : P114827 - Implementation Status Results Report : Sequence 04 (English)

Implementation Status and Results Report ISR18377 MAR 19, 2015

0000A8056

China - Chongqing Urban-Rural Integration Project (CURIP) : environmental assessment (Vol. 14) : Environment impact report Wangliao road extenstion (English)

The objectives of the Chongqing Urban-Rural Integration Project (CURIP) for China is to: (a) increase access of rural residents in participating counties to improved basic public services (water supply, roads, sanitation, primary healthcare, and vocational education) towards achieving urban service levels in the Municipality; and (b) improve the administrative capacity of participating counties to design and manage facilities constructed under the project. ... See More +

Environmental Assessment E2247 MAR 17, 2015

Croatia - Sustainable Croatian Railways in Europe Project : environmental assessment : Environmental management framework (English)

The development objective of the Sustainable Croatian Railways in Europe Project for Croatia is to improve service and financial sustainability of the public rail sector. ... See More +

Environmental Assessment E4769 MAR 05, 2015

Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 10) : environmental report - third solar power plant : appendices (English)

This Second and Third Phase of the Noor Concentrated Solar Power Project of Morocco aims to meet the needs of the process of energy production at the Ouarzazate solar raw water park from the Mansour Eddahbi dam. ... See More +

Environmental Assessment E4489 MAR 01, 2015

Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 12) : environmental report - third tower CSP plant : NTS annex (English)

This Second and Third Phase of the Noor Concentrated Solar Power Project of Morocco aims to meet the needs of the process of energy production at the Ouarzazate solar raw water park from the Mansour Eddahbi dam. ... See More +

Environmental Assessment E4489 MAR 01, 2015

Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 6) : environmental report - third SPC plant : environmental and social management plan guidelines (English)

This Second and Third Phase of the Noor Concentrated Solar Power Project of Morocco aims to meet the needs of the process of energy production at the Ouarzazate solar raw water park from the Mansour Eddahbi dam. ... See More +

Environmental Assessment E4489 MAR 01, 2015

China - Wuhan Integrated Transport Development Project : environmental assessment (Vol. 3) : Environmental impact assessment : executive summary (English)

The objective of the Wuhan Integrated Transport Development Project for China is to improve the integration of transport services, improve reliability of the transport system, improve road safety, reduce travel times by public transport, and decrease operational costs of the transport system in Wuhan and Anlu. ... See More +

Environmental Assessment E4803 MAR 01, 2015

Chinese

Lao PDR - Health Governance and Nutrition Development Project : environmental code of practices (ECOP) (English)

The Health Governance and Nutrition Development Project for Lao People's Democratic Republic will help increase coverage of reproductive, maternal and child health, and nutrition services in target areas. ... See More +

Environmental Assessment E4810 MAR 01, 2015

Lao PDR

Armenia - Electricity Transmission Network Improvement Project : environmental assessment (Vol. 3) : Checklist EMP for new administrative building of high voltage electric networks (HVEN) CJSC (English)

The development objectives of the Electricity Transmission Network Improvement Project for Armenia are to enhance the readiness of the High Voltage Electric Networks (HVEN) and Yerevan Thermal Power Plant (TPP) to implement ETNIP, and to strengthen the capacity of HVEN and Yerevan TPP. ... See More +

Environmental Assessment E4738 JAN 30, 2015

Armenia - Electricity Transmission Network Improvement Project : environmental assessment (Vol. 4) : Checklist EMP for arrangement of premises for back-up dispatch center of the electric power system operator (EPSO) CJSC (English)

The development objectives of the Electricity Transmission Network Improvement Project for Armenia are to enhance the readiness of the High Voltage Electric Networks (HVEN) and Yerevan Thermal Power Plant (TPP) to implement ETNIP, and to strengthen the capacity of HVEN and Yerevan TPP. ... See More +

Environmental Assessment E4738 JAN 30, 2015

Uzbekistan - Uzbekistan Bukhara and Samarkand Sewerage Project : P112719 - Implementation Status Results Report : Sequence 08 (English)

Implementation Status and Results Report ISR16027 DEC 31, 2014

0000A8056

Yemen - Road Asset Management Project : environmental assessment (Vol. 17) : Executive summary for environmental and social management plan (English)

The Road Asset Management Project are to assist the Government of Yemen (GOY) in: (i) improving condition and safety of existing paved road infrastructure in 3-4 governorates, and (ii) putting in place institutional arrangements for efficient routine and emergency maintenance of paved roads in Yemen. ... See More +

Environmental Assessment E4075 DEC 21, 2014

Arabic

Nepal - Road Sector Development Project : P095977 - Implementation Status Results Report : Sequence 13 (English)

Implementation Status and Results Report ISR16903 DEC 19, 2014

0000A8056

China - Qinghai Xining Urban Transport Project : procurement plan (Chinese,English)

Procurement Plan 93380 DEC 19, 2014

Title Document Date Report No. Document Type Also available in
Guyana - Cunha Canal Rehabilitation Project (English)
See More +
APR 02, 2015 95537 Integrated Safeguards Data Sheet
India - Third Eastern Dedicated Freight Corridor Project : environmental assessment (Vol. 4) : Scoping report on cumulative impact assessment of Eastern dedicated freight
corridor (Ludhiana to Mughalsarai section) (English)

See More +
APR 01, 2015 E4732 Environmental Assessment
India - Second Pradhan Mantri Gram Sadak Yojana Rural Roads Project : Tamil Nadu procurement plan (English)
See More +
MAR 31, 2015 95370 Procurement Plan
Lao People's Democratic Republic - Power Grid Improvement Project : environmental assessment (Vol. 2) : Environmental code of practices (English)
See More +
MAR 25, 2015 E4780 Environmental Assessment
Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 11) : environmental report - third solar power plant : environmental and social management guideline (English)
See More +
MAR 24, 2015 E4489 Environmental Assessment
Bangladesh - Second Local Governance Support Project (English)
See More +
MAR 24, 2015 RES18219 Project Paper
India - Second Gujarat State Highway Project (GSHP II) : P114827 - Implementation Status Results Report : Sequence 04 (English)
See More +
MAR 19, 2015 ISR18377 Implementation Status and Results Report
China - Chongqing Urban-Rural Integration Project (CURIP) : environmental assessment (Vol. 14) : Environment impact report Wangliao road extenstion (English)
See More +
MAR 17, 2015 E2247 Environmental Assessment
Croatia - Sustainable Croatian Railways in Europe Project : environmental assessment : Environmental management framework (English)
See More +
MAR 05, 2015 E4769 Environmental Assessment
Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 10) : environmental report - third solar power plant : appendices (English)
See More +
MAR 01, 2015 E4489 Environmental Assessment
Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 12) : environmental report - third tower CSP plant : NTS annex (English)
See More +
MAR 01, 2015 E4489 Environmental Assessment
Morocco - Second and Third Phase of the Noor Concentrated Solar Power Project (Vol. 6) : environmental report - third SPC plant : environmental and social management plan guidelines (English)
See More +
MAR 01, 2015 E4489 Environmental Assessment
China - Wuhan Integrated Transport Development Project : environmental assessment (Vol. 3) : Environmental impact assessment : executive summary (English)
See More +
MAR 01, 2015 E4803 Environmental Assessment Chinese
Lao PDR - Health Governance and Nutrition Development Project : environmental code of practices (ECOP) (English)
See More +
MAR 01, 2015 E4810 Environmental Assessment
Armenia - Electricity Transmission Network Improvement Project : environmental assessment (Vol. 3) : Checklist EMP for new administrative building of high voltage electric networks (HVEN) CJSC (English)
See More +
JAN 30, 2015 E4738 Environmental Assessment
Armenia - Electricity Transmission Network Improvement Project : environmental assessment (Vol. 4) : Checklist EMP for arrangement of premises for back-up dispatch center of the electric power system operator (EPSO) CJSC (English)
See More +
JAN 30, 2015 E4738 Environmental Assessment
Uzbekistan - Uzbekistan Bukhara and Samarkand Sewerage Project : P112719 - Implementation Status Results Report : Sequence 08 (English)
See More +
DEC 31, 2014 ISR16027 Implementation Status and Results Report
Yemen - Road Asset Management Project : environmental assessment (Vol. 17) : Executive summary for environmental and social management plan (English)
See More +
DEC 21, 2014 E4075 Environmental Assessment Arabic
Nepal - Road Sector Development Project : P095977 - Implementation Status Results Report : Sequence 13 (English)
See More +
DEC 19, 2014 ISR16903 Implementation Status and Results Report
China - Qinghai Xining Urban Transport Project : procurement plan (Chinese,English)
See More +
DEC 19, 2014 93380 Procurement Plan