Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 823 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Creating markets in Turkey’s power sector (English)

The World Bank Group’s engagement in Turkey’s power sector, which began in the 1990s and continues today, has helped to expand independent power production and privatize electricity distribution in the country. ... See More +

Brief 113247 MAR 01, 2017

Disclosed

Ukraine - Second Power Transmission Project : procurement plan (English)

Procurement Plan 113162 FEB 08, 2017

Disclosed

Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project : additional financing - resettlement plan : Terms of reference for the resettlement action plan - Technical assistance for development of St Paul river and WAPP integration (English)

The development objectives West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project are (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase the technical integration of the WAPP network. ... See More +

Resettlement Plan SFG3087 FEB 01, 2017

Torres De Mastle,Clemencia Disclosed

Vietnam - Distribution Efficiency Project : procurement plan (English)

Procurement Plan 112190 JAN 06, 2017

Disclosed

Cote d'Ivoire - Electricity Transmission and Access Project : environmental assessment : Cadre de gestion environnementale et sociale (French)

Environmental Assessment SFG2947 JAN 01, 2017

Bah,Dite Eulalie Marcelle Disclosed

Mobilizing risk capital to unlock the global potential of geothermal power (English)

Geothermal heat is increasingly being used around the world to produce electricity in an environmentally friendly way. Current technology could potentially produce more than 70 GW of power, but only about 15 percent of that capacity is currently developed and operating. ... See More +

Brief 113111 JAN 01, 2017

La Rocca,Roberto; Johansen,Peter; Berman,Laura Wendell; Jayawardena,Migara Disclosed

Vietnam - Distribution Efficiency Project : procurement plan (English)

Procurement Plan 112142 DEC 30, 2016

Disclosed

Ukraine - Power Transmission Project (English)

Ratings for the Power Transmission Project for Ukraine were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was satisfactory, and Borrower performance was moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR3763 DEC 21, 2016

Disclosed

Ukraine - Second Power Transmission Project : procurement plan (English)

Procurement Plan 111820 DEC 19, 2016

Disclosed

Turkey - Towards improving the service quality of electricity distribution companies : Türkiye cumhuriyeti : elektrik dağıtım şirketlerinin hizmet kalitesinin iyileştirilmesine yönelik adımlar (Turkish)

The objective of this review is to analyze the current status on achievement of targeted benefits from distribution privatization and identify the gaps between expectations and realizations, with a key task of proposing concrete procedures and methodologies to ensure that EMRA and other government agencies involved in monitoring and enforcing quality in electricity distribution and retail have timely access to reliable information on service actually provided by the DISCOMs to their customers. ... See More +

ESMAP Paper ACS20668 NOV 01, 2016

Orucu,Ayse Yasemin; Antmann,Pedro English Disclosed

Turkey - Poyraz Wind Power Plant Project : environmental assessment (Vol. 4) : Environmental management plan for Solentegre Solar Power Plant (English)

The development objective of the Poyraz Wind Power Plant (WPP) Project for Turkey is to help increase privately owned and operated energy production from indigenous renewable sources within the market-based framework of the Turkish electricity market law, enhance demand-side energy efficiency, and thereby help reduce greenhouse gas emissions. ... See More +

Environmental Assessment SFG1130 OCT 26, 2016

Ruscuklu,Selcuk Disclosed

Proven delivery models for led public lighting : super-ESCO delivery model in Vizag, India (English)

Vizag at night is illuminated with 91,000 streetlights that are owned by GVMC. Before Cyclone Hudhud, most of the streetlights used high-pressure sodium-vapor (HPS) or tubular fluorescent lamp (TFLs) technologies. ... See More +

ESMAP Paper 109580 OCT 01, 2016

Makumbe,Pedzisayi; Weyl,Debbie K.; Eil,Andrew; Li,Jie Disclosed

Lebanon - PCB Management In The Power Sector Project : procurement plan (English)

Procurement Plan 108364 SEP 19, 2016

Disclosed

China - Shandong Energy Efficiency Project : restructuring (English)

The development objective of the Shandong Energy Efficiency Project for China is to improve energy efficiency in selected enterprises in the Borrower's Shandong Province, particularly through financial leasing arrangements, and increase use of biomass for power and heat generation. ... See More +

Project Paper RES21572 SEP 13, 2016

Disclosed

Bangladesh - Siddhirganj Peaking Power Project : environmental assessment : Cumulative environmental impact assessment study for Siddhirganj power hub (package no. S-07) (English)

The development objectives of the Siddhirganj Peaking Power Project for Bangladesh are to support investments in peaking power supply capability in Bangladesh such that unmet demand for energy is reduced by at least 1,000-million Kilowatt hour (kWh) per year, and to build capacity in Bangladesh to manage effectively and efficiently complex power generation technology. ... See More +

Environmental Assessment SFG2746 SEP 03, 2016

Hossain,Md. Tafazzal Disclosed

Nepal - Power Development Project : first progress report on the implementation of management's action plan in response to the Inspection Panel investigation report (English)

The Power Development Project (PDP) aimed to build capacity to manage the development of Nepal’s hydropower potential in a prudent and sustainable manner; increase access to electricity services in rural areas; and promote private participation in the power sector. ... See More +

Investigation Report 107668 AUG 05, 2016

Disclosed

Options for Extractive Industries Transparency Initiative (EITI) data reporting and access : the good, the better and the best : Opciones para la iniciativa de transparencia de las industrias extractivas (ITIE) comunicación de datos y acceso : el bueno, el mejor y el mejor (Spanish)

The Extractive Industries Transparency Initiative (EITI) is an international standard to promote open and accountable management of natural resources. ... See More +

Working Paper 103452 AUG 01, 2016

Russian, French, English Disclosed

Indonesia - Second Power Transmission Development Project : environmental assessment : Rencana pengelolaan lingkungan di Pengembangan gardu induk group II (Bahasa (Indonesian))

Environmental Assessment SFG2492 AUG 01, 2016

Oktorini,Sri English Disclosed

Vietnam - First, Second and Third Power Sector Reform Development Policy Operation Project (English)

Ratings for the First, Second and Third Power Sector Reform Development Policy Operation Project for Vietnam were as follows: outcomes were moderately satisfactory, the risk to development outcome was significant, the Bank performance was moderately satisfactory, and the Borrower performance was also moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR3360 JUL 07, 2016

Disclosed

Distribution automation : an opportunity to improve reliability and quality (English)

The control systems of today’s smart power-distribution grids have evolved significantly. Such systems improve system reliability by reducing the frequency and duration of outages. ... See More +

Brief 107122 JUL 01, 2016

Nangia,Varun Ravi; Oguah,Samuel Kwesi Ewuah; Gaba,Kwawu Mensan Disclosed

Title Document Date Report No. Document Type Also available in
Creating markets in Turkey’s power sector (English)
See More +
MAR 01, 2017 113247 Brief
Ukraine - Second Power Transmission Project : procurement plan (English)
See More +
FEB 08, 2017 113162 Procurement Plan
Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project : additional financing - resettlement plan : Terms of reference for the resettlement action plan - Technical assistance for development of St Paul river and WAPP integration (English)
See More +
FEB 01, 2017 SFG3087 Resettlement Plan
Vietnam - Distribution Efficiency Project : procurement plan (English)
See More +
JAN 06, 2017 112190 Procurement Plan
Cote d'Ivoire - Electricity Transmission and Access Project : environmental assessment : Cadre de gestion environnementale et sociale (French)
See More +
JAN 01, 2017 SFG2947 Environmental Assessment
Mobilizing risk capital to unlock the global potential of geothermal power (English)
See More +
JAN 01, 2017 113111 Brief
Vietnam - Distribution Efficiency Project : procurement plan (English)
See More +
DEC 30, 2016 112142 Procurement Plan
Ukraine - Power Transmission Project (English)
See More +
DEC 21, 2016 ICR3763 Implementation Completion and Results Report
Ukraine - Second Power Transmission Project : procurement plan (English)
See More +
DEC 19, 2016 111820 Procurement Plan
Turkey - Towards improving the service quality of electricity distribution companies : Türkiye cumhuriyeti : elektrik dağıtım şirketlerinin hizmet kalitesinin iyileştirilmesine yönelik adımlar (Turkish)
See More +
NOV 01, 2016 ACS20668 ESMAP Paper English
Turkey - Poyraz Wind Power Plant Project : environmental assessment (Vol. 4) : Environmental management plan for Solentegre Solar Power Plant (English)
See More +
OCT 26, 2016 SFG1130 Environmental Assessment
Proven delivery models for led public lighting : super-ESCO delivery model in Vizag, India (English)
See More +
OCT 01, 2016 109580 ESMAP Paper
Lebanon - PCB Management In The Power Sector Project : procurement plan (English)
See More +
SEP 19, 2016 108364 Procurement Plan
China - Shandong Energy Efficiency Project : restructuring (English)
See More +
SEP 13, 2016 RES21572 Project Paper
Bangladesh - Siddhirganj Peaking Power Project : environmental assessment : Cumulative environmental impact assessment study for Siddhirganj power hub (package no. S-07) (English)
See More +
SEP 03, 2016 SFG2746 Environmental Assessment
Nepal - Power Development Project : first progress report on the implementation of management's action plan in response to the Inspection Panel investigation report (English)
See More +
AUG 05, 2016 107668 Investigation Report
Options for Extractive Industries Transparency Initiative (EITI) data reporting and access : the good, the better and the best : Opciones para la iniciativa de transparencia de las industrias extractivas (ITIE) comunicación de datos y acceso : el bueno, el mejor y el mejor (Spanish)
See More +
AUG 01, 2016 103452 Working Paper Russian, French, English
Indonesia - Second Power Transmission Development Project : environmental assessment : Rencana pengelolaan lingkungan di Pengembangan gardu induk group II (Bahasa (Indonesian))
See More +
AUG 01, 2016 SFG2492 Environmental Assessment English
Vietnam - First, Second and Third Power Sector Reform Development Policy Operation Project (English)
See More +
JUL 07, 2016 ICR3360 Implementation Completion and Results Report
Distribution automation : an opportunity to improve reliability and quality (English)
See More +
JUL 01, 2016 107122 Brief