Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 644 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Regional program for hydromet services and resilience (English)

South Asia is highly prone to weather and water related disasters such as flooding, drought, thunderstorms and cyclones. The main objective of this Regional program for hydromet services and resilience is to strengthen institutions, facilitate knowledge exchange and enhance cooperation with respect to hydrometeorological risks and hydromet services between South Asian countries. ... See More +

Brief 117752 JUL 26, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des plans d’action environnementaux et sociaux (French)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transition compensation based on income losses (estimated for 6 months incomes of sand workers, and 3 months for canoe builders, and food sellers on sand mining sites; (2) establishment of a fund for affected councils, provisioned from royalties derived from industrial sand mining of the future reservoir; (3) implementation of an environmental management plan in the operational phase; and (4) community health plan to prevent, avoid, or when possible minimize negative impacts of the project on the health of local people during construction activities. ... See More +

Environmental Assessment 116788 JUN 01, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Summary of environmental and social action plans (English)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transition compensation based on income losses (estimated for 6 months incomes of sand workers, and 3 months for canoe builders, and food sellers on sand mining sites; (2) establishment of a fund for affected councils, provisioned from royalties derived from industrial sand mining of the future reservoir; (3) implementation of an environmental management plan in the operational phase; and (4) community health plan to prevent, avoid, or when possible minimize negative impacts of the project on the health of local people during construction activities. ... See More +

Environmental Assessment 116788 JUN 01, 2017

Disclosed

Results of collaboration for social inclusion in the Trung Son Hydro Power Project, Vietnam (English)

The Trung Son Hydropower Project (TSHP) was designed with a strong gender action plan for the implementation of its large livelihood, minority, and resettlement program. ... See More +

Brief 115334 MAY 26, 2017

Buchhave,Helle Disclosed

Solomon Islands - Tina River Hydro Development Project (English)

The development objective of the Tina River Hydro Development Project (TRHDP) is to increase the share of renewable energy through hydropower in Solomon Islands.The World Bank Group has mobilized a range of resources and instruments to enable the Government to attract an experienced international hydropower developer to construct and operate the hydropower facility (HPF), and to enhance the quality and viability of the Project. ... See More +

Project Appraisal Document PAD2258 MAY 24, 2017

Disclosed

Solomon Islands - Tina River Hydro Development Project (English)

The development objective of the Tina River Hydro Development Project (TRHDP) is to increase the share of renewable energy through hydropower in Solomon Islands.The World Bank Group has mobilized a range of resources and instruments to enable the Government to attract an experienced international hydropower developer to construct and operate the hydropower facility (HPF), and to enhance the quality and viability of the Project. ... See More +

Project Appraisal Document PAD2258 MAY 24, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des etudes environnementales et sociales (French)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transportation of equipment to the site can be done by rail. ... See More +

Environmental Assessment 116787 MAY 23, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment (English)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transportation of equipment to the site can be done by rail. ... See More +

Environmental Assessment 116787 MAY 23, 2017

Disclosed

Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project : procurement plan (English)

Procurement Plan 115086 MAY 16, 2017

Disclosed

Solomon Islands - Tina River Hydropower Development Project : indigenous peoples plan : Gender action plan (English)

The Tina River Hydropower Development Project (TRHDP) is a 15 megawatts hydropower scheme on the island of Guadalcanal, Solomon Islands, 30 km south of the capital Honiara. ... See More +

Indigenous Peoples Plan SFG3315 MAY 05, 2017

Johnson,Erik Caldwell Disclosed

Solomon Islands - Tina River Hydropower Development Project : indigenous peoples plan (Vol. 2) : Community development plan (English)

The Tina River Hydropower Development Project (TRHDP) is a 15 megawatts hydropower scheme on the island of Guadalcanal, Solomon Islands, 30 km south of the capital Honiara. ... See More +

Indigenous Peoples Plan SFG3315 MAY 05, 2017

Johnson,Erik Caldwell Disclosed

Solomon Islands - Tina River Hydropower Facility (TRHPF) : environmental assessment : Environmental and social review summary (English)

The development objective of the Tina River Hydropower Facility (TRHPF) for Solomon Islands is a 15 megawatts hydropower scheme on the island of Guadalcanal, Solomon Islands, 30 km south of the capital Honiara. ... See More +

Environmental Assessment SFG3325 MAY 04, 2017

Johnson,Erik Caldwell Disclosed

Cameroon - Hydropower Development on the Sanaga River Technical Assistance Project (English)

The development objective of Hydropower Development on the Sanaga River Technical Assistance Project for Cameroon is to improve the Recipient's institutional capacity for a sustainable development of hydroelectric resources on the Sanaga River Basin. ... See More +

Project Appraisal Document PAD2234 APR 20, 2017

Disclosed

Mali - Economic and Environmental Rehabilitation of the Niger River Project : environmental assessment (Vol. 3) : Rapport provisoire (French)

Environmental Assessment SFG3269 APR 18, 2017

Menang Evouna,Emeran Serge M. Disclosed

Lao People's Democratic Republic - Power Grid Improvement Project : implementation support mission - December 12-16, 2016 (English)

Aide Memoire 114377 APR 14, 2017

Phonepraseuth,Vilayvanh Disclosed

Tajikistan - First Phase of Nurek Hydropower Rehabilitation Project (English)

The objectives of the First Phase of Nurek Hydropower Rehabilitation Project for Tajikistan are to rehabilitate and restore the generating capacity of three power generating units of Nurek hydropower plant, improve their efficiency, and strengthen the safety of the Nurek dam. ... See More +

Project Appraisal Document PAD1565 APR 14, 2017

Disclosed

Practical guidance for defining a smart grid modernization strategy (English)

There is no one definition of the smart grid concept. Instead, smart grids are defined differently around the world to reflect local requirements and goals. ... See More +

Working Paper 113553 MAR 14, 2017

Madrigal,Marcelino; Uluski,Robert William; Gaba,Kwawu Mensan Disclosed

Cameroon - Hydropower Development on the Sanaga River Project : indigenous peoples plan : Pour l’elaboration Cadre de Planification des Peuples Autochtones (CPPA) (French)

Indigenous Peoples Plan SFG3097 MAR 02, 2017

Ha,Thanh Lu Disclosed

Title Document Date Report No. Document Type Also available in
Regional program for hydromet services and resilience (English)
See More +
JUL 26, 2017 117752 Brief
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des plans d’action environnementaux et sociaux (French)
See More +
JUN 01, 2017 116788 Environmental Assessment
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Summary of environmental and social action plans (English)
See More +
JUN 01, 2017 116788 Environmental Assessment
Results of collaboration for social inclusion in the Trung Son Hydro Power Project, Vietnam (English)
See More +
MAY 26, 2017 115334 Brief
Solomon Islands - Tina River Hydro Development Project (English)
See More +
MAY 24, 2017 PAD2258 Project Appraisal Document
Solomon Islands - Tina River Hydro Development Project (English)
See More +
MAY 24, 2017 PAD2258 Project Appraisal Document
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des etudes environnementales et sociales (French)
See More +
MAY 23, 2017 116787 Environmental Assessment
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment (English)
See More +
MAY 23, 2017 116787 Environmental Assessment
Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project : procurement plan (English)
See More +
MAY 16, 2017 115086 Procurement Plan
Solomon Islands - Tina River Hydropower Development Project : indigenous peoples plan : Gender action plan (English)
See More +
MAY 05, 2017 SFG3315 Indigenous Peoples Plan
Solomon Islands - Tina River Hydropower Development Project : indigenous peoples plan (Vol. 2) : Community development plan (English)
See More +
MAY 05, 2017 SFG3315 Indigenous Peoples Plan
Solomon Islands - Tina River Hydropower Facility (TRHPF) : environmental assessment : Environmental and social review summary (English)
See More +
MAY 04, 2017 SFG3325 Environmental Assessment
Cameroon - Hydropower Development on the Sanaga River Technical Assistance Project (English)
See More +
APR 20, 2017 PAD2234 Project Appraisal Document
Mali - Economic and Environmental Rehabilitation of the Niger River Project : environmental assessment (Vol. 3) : Rapport provisoire (French)
See More +
APR 18, 2017 SFG3269 Environmental Assessment
Lao People's Democratic Republic - Power Grid Improvement Project : implementation support mission - December 12-16, 2016 (English)
See More +
APR 14, 2017 114377 Aide Memoire
Tajikistan - First Phase of Nurek Hydropower Rehabilitation Project (English)
See More +
APR 14, 2017 PAD1565 Project Appraisal Document
Tajikistan - Hydrometeorology Modernization Project : procurement plan : Таджикистан - Проект модернизации гидрометеорологии : план закупок (Russian,English)
See More +
MAR 31, 2017 115191 Procurement Plan
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Plan de restauration des moyens d’existence lies aux carrieres desable affectees par le projet (French)
See More +
MAR 23, 2017 116794 Environmental Assessment
Practical guidance for defining a smart grid modernization strategy (English)
See More +
MAR 14, 2017 113553 Working Paper
Cameroon - Hydropower Development on the Sanaga River Project : indigenous peoples plan : Pour l’elaboration Cadre de Planification des Peuples Autochtones (CPPA) (French)
See More +
MAR 02, 2017 SFG3097 Indigenous Peoples Plan