Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 548 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Africa - Hydropower and Energy Infrastructure Development Project : resettlement plan : Sommaire exécutif (French)

Environmental Assessment SFG2944 JAN 30, 2017

Tchoumba Bitnga,Natalie Disclosed

Indonesia - Dam Operational Improvement and Safety Project (English)

Ratings for the Dam Operational Improvement and Safety Project for Indonesia were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR3347 JAN 29, 2017

Disclosed

Egypt, Arab Republic of - Household Natural Gas Connection Project : environmental assessment : Environmental and social impact assessment : Aswan (Arabic)

Environmental Assessment SFG2893 JAN 23, 2017

Aboelleil,Hebatallah Mohamed Mady Abdelzaher Disclosed

Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 3) : Ethnic minorities development plan for Tham Giap Hydropower Construction Project (English)

The development objective of the Renewable Energy Development Project for Vietnam is to increase the supply of least-cost electricity to the national grid from renewable energy sources on a commercially sustainable basis in an environmentally and socially sustainable manner. ... See More +

Indigenous Peoples Plan SFG2178 JAN 23, 2017

Vu,Huong Thi Thu Disclosed

Vietnam - Muong Hung Hydropower Project : procurement plan (Vietnamese,English)

Procurement Plan 112634 JAN 10, 2017

Disclosed

Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment : Environmental and social impact assessment (English)

The development objectives of Nurek Hydropower Rehabilitation Project for Tajikistan are: (i) to restore the generation capacity of Nurek HPP through refurbishment of the generating units and the balance of the plant; (ii) to increase efficiency of the generating units through improved hydraulic design and installation of higher efficiency equipment; and (iii) to enhance the safety of the Nurek dam through rehabilitation of spillway tunnels, refurbishment of spillway gates or hoisting system, improvement of protection on permeable zone of the embankment dam above the core zone crest, measures to enhance safety against seism and hydrological risks. ... See More +

Environmental Assessment SFG2940 JAN 01, 2017

Kochnakyan,Artur Disclosed

Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 4) : Annexes of ethnic minorities development plan for Tham Giap Hydropower Construction Project (English)

The development objective of the Renewable Energy Development Project for Vietnam is to increase the supply of least-cost electricity to the national grid from renewable energy sources on a commercially sustainable basis in an environmentally and socially sustainable manner. ... See More +

Indigenous Peoples Plan SFG2178 JAN 01, 2017

Vu,Huong Thi Thu Disclosed

Vietnam - Renewable Energy Development Project : resettlement plan (Vol. 6) : Resettlement plan for Tham Giap Hydropower Construction Project (English)

The general objective of the Renewable Energy Development Project (REDP) for Vietnam is to increase the supply of least-cost electricity to the national grid from renewable energy sources on a commercially sustainable basis in an environmentally and socially sustainable manner. ... See More +

Resettlement Plan SFG2158 JAN 01, 2017

Vu,Huong Thi Thu Disclosed

Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment (Vol. 2) : Оценка экологического и социального воздействия (Russian)

The development objectives of Nurek Hydropower Rehabilitation Project for Tajikistan are: (i) to restore the generation capacity of Nurek HPP through refurbishment of the generating units and the balance of the plant; (ii) to increase efficiency of the generating units through improved hydraulic design and installation of higher efficiency equipment; and (iii) to enhance the safety of the Nurek dam through rehabilitation of spillway tunnels, refurbishment of spillway gates or hoisting system, improvement of protection on permeable zone of the embankment dam above the core zone crest, measures to enhance safety against seism and hydrological risks. ... See More +

Environmental Assessment SFG2940 JAN 01, 2017

Kochnakyan,Artur Disclosed

Vietnam - Renewable Energy Development Project : resettlement plan (Vol. 7) : Annexes of resettlement plan for Tham Giap Hydropower Construction Project (English)

The general objective of the Renewable Energy Development Project (REDP) for Vietnam is to increase the supply of least-cost electricity to the national grid from renewable energy sources on a commercially sustainable basis in an environmentally and socially sustainable manner. ... See More +

Resettlement Plan SFG2158 JAN 01, 2017

Vu,Huong Thi Thu Disclosed

Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment (Vol. 2) : Арзёбии таъсири экологию иҷтимоӣ (Tajik,Tagalog-TGL)

The development objectives of Nurek Hydropower Rehabilitation Project for Tajikistan are: (i) to restore the generation capacity of Nurek HPP through refurbishment of the generating units and the balance of the plant; (ii) to increase efficiency of the generating units through improved hydraulic design and installation of higher efficiency equipment; and (iii) to enhance the safety of the Nurek dam through rehabilitation of spillway tunnels, refurbishment of spillway gates or hoisting system, improvement of protection on permeable zone of the embankment dam above the core zone crest, measures to enhance safety against seism and hydrological risks. ... See More +

Environmental Assessment SFG2940 JAN 01, 2017

Kochnakyan,Artur Disclosed

Pakistan off-grid lighting consumer perceptions : study overview (English)

For the last decade, Pakistan has been in the grip of a severe energy crisis. The power shortfall has severely hampered economic development and job creation across the country and it has only become more severe over the last five years. ... See More +

Working Paper 112020 JAN 01, 2017

Disclosed

Ukraine - Hydropower Rehabilitation Project (English)

Ratings for the Hydropower Rehabilitation Project for Ukraine were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was satisfactory, and Borrower performance was moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR3733 DEC 21, 2016

Disclosed

Cameroon - Hydropower Development on the Sanaga River Project (English)

Project Information and Integrated Safeguards Data Sheet PIDISDSC16563 DEC 20, 2016

Disclosed

China - Poyang Lake Basin Town Water Environment Management Project : environmental assessment (Vol. 3) : Environmental assessment report of Jishui (English)

The objective of the Poyang Lake Basin Town Water Environment Management Project for China is to reduce the pollutant discharge into key selected waterways in the Poyang Lake Basin and to improve management of water quality. ... See More +

Environmental Assessment SFG2444 SEP 09, 2016

Xie,Dan Disclosed

Pakistan - Fourth Tarbela Extension Hydropower Project : additional financing (English)

The objective of the Additional Financing for the Tarbela Fourth Extension Hydropower Project is to facilitate a sustainable expansion of Pakistan’s electricity generation capacity.’ ... See More +

Project Paper PAD1728 AUG 25, 2016

Disclosed

Collaborative management of the Zambezi River Basin (English)

The Zambezi River accounts for half of the installed hydropower capacity in southern Africa and supports subsistence agriculture and fisheries for three quarters of the Zambezi Basin's 47 million people. ... See More +

Brief 107144 JUL 01, 2016

Disclosed

Pakistan - Tarbela Fourth Extension Hydropower Project : additional financing - environmental assessment (Vol. 3) : Environmental and social assessment : Executive summary : Addendum (English)

This report presents the potential environmental and social impacts of the T5HP project as described in the ESA. Mitigation measures are described and included in environmental and social management plan (ESMP) to address potential impacts as well as to enhance the environmental and social benefits of the project. ... See More +

Environmental Assessment SFG1900 MAY 23, 2016

Javed,Shaukat Disclosed

Pakistan - Tarbela Fourth Extension Hydropower Project : additional financing - environmental assessment (Vol. 4) : Environmental and social assessment : addendum (English)

This report presents the potential environmental and social impacts of the T5HP project as described in the ESA. Mitigation measures are described and included in environmental and social management plan (ESMP) to address potential impacts as well as to enhance the environmental and social benefits of the project. ... See More +

Environmental Assessment SFG1900 MAY 23, 2016

Javed,Shaukat Disclosed

India - Grid-connected Rooftop Solar Program : environmental assessment : Environment and social systems assessment (English)

The development objective of Grid-connected Rooftop Solar Program for India aims to support the achievement of Government of India's (GoI) Grid-connected Rooftop Solar Photovoltaic (GRPV) targets. ... See More +

Environmental Assessment 109556 MAY 01, 2016

Choudhary,Kumudni Disclosed

Title Document Date Report No. Document Type Also available in
Africa - Hydropower and Energy Infrastructure Development Project : resettlement plan : Sommaire exécutif (French)
See More +
JAN 30, 2017 SFG2944 Environmental Assessment
Indonesia - Dam Operational Improvement and Safety Project (English)
See More +
JAN 29, 2017 ICR3347 Implementation Completion and Results Report
Egypt, Arab Republic of - Household Natural Gas Connection Project : environmental assessment : Environmental and social impact assessment : Aswan (Arabic)
See More +
JAN 23, 2017 SFG2893 Environmental Assessment
Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 3) : Ethnic minorities development plan for Tham Giap Hydropower Construction Project (English)
See More +
JAN 23, 2017 SFG2178 Indigenous Peoples Plan
Vietnam - Muong Hung Hydropower Project : procurement plan (Vietnamese,English)
See More +
JAN 10, 2017 112634 Procurement Plan
Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment : Environmental and social impact assessment (English)
See More +
JAN 01, 2017 SFG2940 Environmental Assessment
Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 4) : Annexes of ethnic minorities development plan for Tham Giap Hydropower Construction Project (English)
See More +
JAN 01, 2017 SFG2178 Indigenous Peoples Plan
Vietnam - Renewable Energy Development Project : resettlement plan (Vol. 6) : Resettlement plan for Tham Giap Hydropower Construction Project (English)
See More +
JAN 01, 2017 SFG2158 Resettlement Plan
Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment (Vol. 2) : Оценка экологического и социального воздействия (Russian)
See More +
JAN 01, 2017 SFG2940 Environmental Assessment
Vietnam - Renewable Energy Development Project : resettlement plan (Vol. 7) : Annexes of resettlement plan for Tham Giap Hydropower Construction Project (English)
See More +
JAN 01, 2017 SFG2158 Resettlement Plan
Tajikistan - Nurek Hydropower Rehabilitation Project : environmental assessment (Vol. 2) : Арзёбии таъсири экологию иҷтимоӣ (Tajik,Tagalog-TGL)
See More +
JAN 01, 2017 SFG2940 Environmental Assessment
Pakistan off-grid lighting consumer perceptions : study overview (English)
See More +
JAN 01, 2017 112020 Working Paper
Ukraine - Hydropower Rehabilitation Project (English)
See More +
DEC 21, 2016 ICR3733 Implementation Completion and Results Report
Cameroon - Hydropower Development on the Sanaga River Project (English)
See More +
DEC 20, 2016 PIDISDSC16563 Project Information and Integrated Safeguards Data Sheet
China - Poyang Lake Basin Town Water Environment Management Project : environmental assessment (Vol. 3) : Environmental assessment report of Jishui (English)
See More +
SEP 09, 2016 SFG2444 Environmental Assessment
Pakistan - Fourth Tarbela Extension Hydropower Project : additional financing (English)
See More +
AUG 25, 2016 PAD1728 Project Paper
Collaborative management of the Zambezi River Basin (English)
See More +
JUL 01, 2016 107144 Brief
Pakistan - Tarbela Fourth Extension Hydropower Project : additional financing - environmental assessment (Vol. 3) : Environmental and social assessment : Executive summary : Addendum (English)
See More +
MAY 23, 2016 SFG1900 Environmental Assessment
Pakistan - Tarbela Fourth Extension Hydropower Project : additional financing - environmental assessment (Vol. 4) : Environmental and social assessment : addendum (English)
See More +
MAY 23, 2016 SFG1900 Environmental Assessment
India - Grid-connected Rooftop Solar Program : environmental assessment : Environment and social systems assessment (English)
See More +
MAY 01, 2016 109556 Environmental Assessment