Disclosable Version of the ISR - Timor Leste Road Climate Resilience Project - P125032 - Sequence No : 16 (English)

Implementation Status and Results Report ISR34648 NOV 12, 2018

Archondo-Callao,Rodrigo Disclosed

China - EAST ASIA AND PACIFIC- P132621- Yunnan Highway Asset Management Project - Procurement Plan (English)

Procurement Plan STEP14342 NOV 09, 2018

Kun GUI Disclosed

Bangladesh - SOUTH ASIA- P098151- Clean Air and Sustainable Environment Project - Procurement Plan (English)

Procurement Plan STEP14337 NOV 08, 2018

Mohammad Sirajul Islam Disclosed

Georgia - Secondary Road Asset Management Project : Environmental Assessment : Environmental and Social Management Plan : Rehabilitation of Chrebalo - Nikortsminda Road Sectionkm 1 – km 25.8 (English)

Some of the negative impacts and mitigation measures include: construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; Waste collection and disposal pathways and sites will be identified for all major waste types expected from excavation, demolition and construction activities; mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers; there will be no unregulated extraction of groundwater, nor uncontrolled discharge of process waters, cement slurries, or any other contaminated waters into the ground or adjacent streams or rivers; contractor should obtain all necessary licenses and permits for water extraction and for further pouring out of used water in state current water system; there will be proper storm water drainage systems installed and care taken not to silt, pollute, block or otherwise negatively impact natural streams, rivers, ponds and lakes by construction activities; and the site will establish appropriate erosion and sediment control measures such as e.g. hay bales and / or silt fences to prevent sediment from moving off site and causing excessive turbidity in canalization and nearby streams and rivers. ... See More +

Environmental Assessment SFG4763 NOV 07, 2018

Disclosed

Georgia - Secondary Road Asset Management Project : Environmental Assessment (Vol. 2) : Environmental and Social Management Plan : Rehabilitation of Secondary khidistavi-Ateni-Boshuri Road Section km12- km22 (English)

Some of the negative impacts and mitigation measures include: construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; Waste collection and disposal pathways and sites will be identified for all major waste types expected from excavation, demolition and construction activities; mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers; there will be no unregulated extraction of groundwater, nor uncontrolled discharge of process waters, cement slurries, or any other contaminated waters into the ground or adjacent streams or rivers; contractor should obtain all necessary licenses and permits for water extraction and for further pouring out of used water in state current water system; there will be proper storm water drainage systems installed and care taken not to silt, pollute, block or otherwise negatively impact natural streams, rivers, ponds and lakes by construction activities; and the site will establish appropriate erosion and sediment control measures such as e.g. hay bales and / or silt fences to prevent sediment from moving off site and causing excessive turbidity in canalization and nearby streams and rivers. ... See More +

Environmental Assessment SFG4763 NOV 07, 2018

Disclosed

Georgia - Secondary Road Asset Management Project : Environmental Assessment (Vol. 3) : Environmental and Social Management Plan : Rehabilitation of Secondary Tianeti-Akhmeta-Kvareli-Ninigori Road Section km1- km30 (English)

The objectives of the Secondary Road Asset Management Project for Georgia are: (i) to improve road users’ access to social services andmarkets on the project roads in a safe and sustainable manner, and (ii) to enhance road assetmanagement for the secondary roads network in Georgia. ... See More +

Environmental Assessment SFG4763 NOV 07, 2018

Disclosed

Ethiopia - ET-RSDP Stage IV APL (FY09) (English)

Implementation Completion Report Review ICRR0021231 NOV 06, 2018

IEG Review Team Disclosed

Ethiopia - AFRICA- P151819- Ethiopia: Transport Systems Improvement Project (TRANSIP) - Procurement Plan (English)

Procurement Plan STEP14103 NOV 01, 2018

Banchialem Addis Disclosed

Colombia - LATIN AMERICA AND CARIBBEAN- P104687- Mainstreaming Sustainable Cattle Ranching - Procurement Plan (English)

Procurement Plan STEP14059 OCT 31, 2018

Marcela Modesto Disclosed

P131864 - Kabul Urban Transport Efficiency Improvement Project - AR (English)

Auditing Document AUD0017583 OCT 31, 2018

Mohammadi,Akbar Ali Disclosed

China - EAST ASIA AND PACIFIC- P148294- Wuhan Integrated Transport Development - Procurement Plan (English)

Procurement Plan STEP14081 OCT 31, 2018

Wang,Junming Disclosed

Uganda - AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)

Procurement Plan STEP14014 OCT 30, 2018

Charles Tumwebaze Disclosed

Uganda - AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)

Procurement Plan STEP13945 OCT 26, 2018

Charles Tumwebaze Disclosed

Colombia - LATIN AMERICA AND CARIBBEAN- P144271- Forest Conservation and Sustainability in the Heart of the Colombian Amazon - Procurement Plan (English)

Procurement Plan STEP13869 OCT 24, 2018

Fredy Mojica Disclosed

Disclosable Version of the ISR - CI-Infrastructure for Urban Development and Competitiveness of second cities - P151324 - Sequence No : 04 (English)

Implementation Status and Results Report ISR34349 OCT 23, 2018

Kim,Maria Deborah Disclosed

Maritime Networks, Port Efficiency, and Hinterland Connectivity in the Mediterranean (English)

For millennia, the Mediterranean has been one of the most active trading areas, supported by a transport network connecting riparian cities and beyond to their hinterland. ... See More +

Publication 131217 OCT 22, 2018

Arvis,Jean Francois; Vesin,Vincent; Carruthers,Robin C.; Ducruet,Cesar; De Langen,Peter Wubbe Disclosed

Concept Project Information Document-Integrated Safeguards Data Sheet - Timor Leste Branch Roads Project - P155203 (English)

Project Information and Integrated Safeguards Data Sheet ISDSC23947 OCT 20, 2018

Archondo-Callao,Rodrigo Disclosed

Colombia - LATIN AMERICA AND CARIBBEAN- P104687- Mainstreaming Sustainable Cattle Ranching - Procurement Plan (English)

Procurement Plan STEP13730 OCT 19, 2018

Tania Landler Disclosed

Pakistan - SOUTH ASIA- P124268- Economic Revitalization of Khyber Pakhtunkhwa and Federally Administered Tribal Areas - Procurement Plan (English)

Procurement Plan STEP13582 OCT 16, 2018

Shakir Dop Disclosed

Peru - LATIN AMERICA AND CARIBBEAN- P129647- Peru Strengthening Sustainable Management of the Guano Islands, Isles and Capes National Reserve System Project - Procurement Plan (English)

Procurement Plan STEP13553 OCT 15, 2018

Maria del Carmen Cerpa Sierralta Disclosed

Title Document Date Report No. Document Type Also available in
Disclosable Version of the ISR - Timor Leste Road Climate Resilience Project - P125032 - Sequence No : 16 (English)
See More +
NOV 12, 2018 ISR34648 Implementation Status and Results Report
China - EAST ASIA AND PACIFIC- P132621- Yunnan Highway Asset Management Project - Procurement Plan (English)
See More +
NOV 09, 2018 STEP14342 Procurement Plan
Bangladesh - SOUTH ASIA- P098151- Clean Air and Sustainable Environment Project - Procurement Plan (English)
See More +
NOV 08, 2018 STEP14337 Procurement Plan
Georgia - Secondary Road Asset Management Project : Environmental Assessment : Environmental and Social Management Plan : Rehabilitation of Chrebalo - Nikortsminda Road Sectionkm 1 – km 25.8 (English)
See More +
NOV 07, 2018 SFG4763 Environmental Assessment
Georgia - Secondary Road Asset Management Project : Environmental Assessment (Vol. 2) : Environmental and Social Management Plan : Rehabilitation of Secondary khidistavi-Ateni-Boshuri Road Section km12- km22 (English)
See More +
NOV 07, 2018 SFG4763 Environmental Assessment
Georgia - Secondary Road Asset Management Project : Environmental Assessment (Vol. 3) : Environmental and Social Management Plan : Rehabilitation of Secondary Tianeti-Akhmeta-Kvareli-Ninigori Road Section km1- km30 (English)
See More +
NOV 07, 2018 SFG4763 Environmental Assessment
Ethiopia - ET-RSDP Stage IV APL (FY09) (English)
See More +
NOV 06, 2018 ICRR0021231 Implementation Completion Report Review
Ethiopia - AFRICA- P151819- Ethiopia: Transport Systems Improvement Project (TRANSIP) - Procurement Plan (English)
See More +
NOV 01, 2018 STEP14103 Procurement Plan
Colombia - LATIN AMERICA AND CARIBBEAN- P104687- Mainstreaming Sustainable Cattle Ranching - Procurement Plan (English)
See More +
OCT 31, 2018 STEP14059 Procurement Plan
P131864 - Kabul Urban Transport Efficiency Improvement Project - AR (English)
See More +
OCT 31, 2018 AUD0017583 Auditing Document
China - EAST ASIA AND PACIFIC- P148294- Wuhan Integrated Transport Development - Procurement Plan (English)
See More +
OCT 31, 2018 STEP14081 Procurement Plan
Uganda - AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)
See More +
OCT 30, 2018 STEP14014 Procurement Plan
Uganda - AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)
See More +
OCT 26, 2018 STEP13945 Procurement Plan
Colombia - LATIN AMERICA AND CARIBBEAN- P144271- Forest Conservation and Sustainability in the Heart of the Colombian Amazon - Procurement Plan (English)
See More +
OCT 24, 2018 STEP13869 Procurement Plan
Disclosable Version of the ISR - CI-Infrastructure for Urban Development and Competitiveness of second cities - P151324 - Sequence No : 04 (English)
See More +
OCT 23, 2018 ISR34349 Implementation Status and Results Report
Maritime Networks, Port Efficiency, and Hinterland Connectivity in the Mediterranean (English)
See More +
OCT 22, 2018 131217 Publication
Concept Project Information Document-Integrated Safeguards Data Sheet - Timor Leste Branch Roads Project - P155203 (English)
See More +
OCT 20, 2018 ISDSC23947 Project Information and Integrated Safeguards Data Sheet
Colombia - LATIN AMERICA AND CARIBBEAN- P104687- Mainstreaming Sustainable Cattle Ranching - Procurement Plan (English)
See More +
OCT 19, 2018 STEP13730 Procurement Plan
Pakistan - SOUTH ASIA- P124268- Economic Revitalization of Khyber Pakhtunkhwa and Federally Administered Tribal Areas - Procurement Plan (English)
See More +
OCT 16, 2018 STEP13582 Procurement Plan
Peru - LATIN AMERICA AND CARIBBEAN- P129647- Peru Strengthening Sustainable Management of the Guano Islands, Isles and Capes National Reserve System Project - Procurement Plan (English)
See More +
OCT 15, 2018 STEP13553 Procurement Plan