The World Bank Implementation Status & Results Report China: Gansu Rural-Urban Integration Project (P132775) China: Gansu Rural-Urban Integration Project (P132775) EAST ASIA AND PACIFIC | China | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2015 | Seq No: 10 | ARCHIVED on 08-Feb-2020 | ISR39508 | Implementing Agencies: Gansu Provincial Project Coordination Office, People’s Republic of China Key Dates Key Project Dates Bank Approval Date: 31-Mar-2015 Effectiveness Date: 14-Aug-2015 Planned Mid Term Review Date: 22-Oct-2018 Actual Mid-Term Review Date: 17-Nov-2017 Original Closing Date: 30-Jun-2021 Revised Closing Date: 30-Jun-2021 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective is to provide residents in Wuwei Municipality and Linxia Prefecture with improved connectivity between rural and urban areas. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component A: Wuwei Road Network Improvement:(Cost $132.02 M) Component B: Linxia Road Network Improvement:(Cost $68.28 M) Component C: Technical Assistance and Project Management:(Cost $3.31 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The project continues to make steady progress towards its Project Development Objective of providing residents in Wuwei Municipality and Linxia Prefecture with improved connectivity between rural and urban areas. Civil works for seven out of nine roads have been completed and one is almost completed in Wuwei; five of six project roads have been completed in Linxia. All three remaining roads are expected to commence construction in March 2020. Completed project roads are already playing important role in Wuwei and Linxia in facilitating urban-rural integration and poverty alleviation. The capacity building activities are progressing well, with a focus on road safety and road maintenance. 2/8/2020 Page 1 of 5 The World Bank Implementation Status & Results Report China: Gansu Rural-Urban Integration Project (P132775) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and -- Moderate Moderate Sustainability Fiduciary -- Moderate Moderate Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Moderate Moderate Results PDO Indicators by Objectives / Outcomes More people have access to an all-season road connecting rural and urban areas in Wuwei and Linxia IN00772320 ►1. Share of rural population with access to an all-season road in Wuwei and Linxia (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 62.00 79.00 79.00 83.00 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 This indicator measures the coverage aspect of the connectivity improvement between rural and urban areas. The definition and detailed method of calculation for this indicator is further clarified at the restructuring in October 2018. Baseline and target numbers and percentages are updated accordingly. Comments: This indicator does not count the additional population with access to all-season road because of road constructed outside the project, to ensure proper attribution. IN00772322 1.1 Number of rural people with access to an all-season road in Wuwei and Linxia (Number, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 1,121,751.00 1,420,887.00 1,420,887.00 1,510,000.00 IN00772323 2/8/2020 Page 2 of 5 The World Bank Implementation Status & Results Report China: Gansu Rural-Urban Integration Project (P132775) 1.2 Share of rural women with access to an all-season road in Wuwei and Linxia (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 62.00 79.00 79.00 83.00 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 People save significant time travelling between rural and urban areas in Wuwei and Linxia IN00772321 ►2. Average travel time savings on selected key project roads connecting rural and urban areas in Wuwei and Linxia (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 28.00 28.00 38.00 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 This indicator measures the efficiency aspect of the connectivity improvement between rural and urban areas. The definition and detailed method of calculation for this indicator is further clarified at the Comments: restructuring in October 2018. Baseline and target numbers and percentages are updated accordingly. Intermediate Results Indicators by Components Wuwei Road Network Improvement IN00772324 ►1. Length of roads rehabilitated or constructed in Wuwei (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 45.20 45.20 63.40 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 This intermediate indicator is revised at project restructuring in October 2018 to reflect the implementation progress in Component 1 Wuwei Road Network Improvement. Therefore the current value (length of Comments: roads rehabilitated or constructed in Wuwei) is not comparable to the previous indicator value before the project restructuring (length of rural road rehabilitated). Linxia Road Network Improvement IN00772325 ►2. Length of roads rehabilitated or constructed in Linxia (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 34.70 34.70 47.90 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 This intermediate indicator is revised at project restructuring in October 2018 to reflect the implementation Comments: progress in Component 2 Linxia Road Network Improvement. Therefore the current value (length of roads 2/8/2020 Page 3 of 5 The World Bank Implementation Status & Results Report China: Gansu Rural-Urban Integration Project (P132775) rehabilitated or constructed in Linxia) is not comparable to the previous indicator value before the project restructuring (length of non-rural road constructed). Technical Assistance and Project Management IN00772326 ►3. Preparation of long term maintenance strategies (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 Linxia County has completed a long-term road maintenance and management strategy. Comments: IN00772327 ►4. Number of counterpart staff who attended training and study tours (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 313.00 373.00 535.00 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 IN00772328 ►5. Length of ChinaRAP assessments undertaken with commitment to address road safety recommendations (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 33.30 33.30 100.00 Date 23-Sep-2014 30-Jun-2019 10-Jan-2020 30-Jun-2021 ChinaRAP has carried out assessment on all project roads and reviewed construction drawings of A5, A10, A11, and A12 in Wuwei, and B6 in Linxia. The design consultant has incorporated the road safety Comments: recommendations by ChinaRAP team in the engineering design of B6, A5, A10, A11, and A12. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P132775 IBRD-84800 Effective USD 150.00 150.00 0.00 128.70 21.30 86% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P132775 IBRD-84800 Effective 31-Mar-2015 25-May-2015 14-Aug-2015 30-Jun-2021 30-Jun-2021 2/8/2020 Page 4 of 5 The World Bank Implementation Status & Results Report China: Gansu Rural-Urban Integration Project (P132775) Cumulative Disbursements Restructuring History Level 2 Approved on 12-Oct-2018 Related Project(s) There are no related projects. 2/8/2020 Page 5 of 5