NSHIP Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: 2013] 2. Date of General Procurement Notice: 2013 3. Period covered by this procurement plan: The procurement period of project covered from year January 2013 to December 2013 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by NSHIP July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of NA the ICB (Works) Summary of NA the ICB (Goods) Summary of NA the NCB (Works) Summary of NA the NCB (Goods) Summary of NA the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of NA number of contracts that will be let under QCBS Summary of NA number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Nigeria : Nigeria States Health Investment Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2017-09-08 2020-01-31 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P120798 GPN Date: Project Name: Nigeria States Health Investment Project Loan / Credit No: IDA / 50940, IDA / 58510 Executing Agency(ies): NATIONAL PRIMARY HEALTH CARE DEV AGENCY WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/103 / reforms; institutional Supply and Installation of strengthening; Request for Single Stage - One Power Generator Set for IDA / 50940 Post Open - National 50,820.00 49,310.27 Signed 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope NSHIP PIU Office DLI at th e state, L GA Accommodation. and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/107 / reforms; institutional Supply of NSHIP strengthening; Request for Single Stage - One communication awareness IDA / 50940 Post Open - National 87,188.00 0.00 Canceled 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope toolkit and tools for health DLI at th e state, L GA workers and facility levels; and monitoring and evaluation. Component 2: Technical NPHCDA/NSHIP/NS/G/108 / Support that will support Procurement of additional reforms; institutional Laptops for PIU, Tablets & strengthening; Request for Single Stage - One mobile devices, Furniture & IDA / 50940 Post Open - National 104,850.00 0.00 Canceled 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope Equipment for PIU, DLI at th e state, L GA Installation of Internet and facility levels; and facilities. monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/109 / reforms; institutional Procurement of Video strengthening; Request for Single Stage - One conferencing facilities IDA / 50940 Post Open - National 88,830.00 7,661.50 Completed 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope /equipment, Installation of DLI at th e state, L GA Inter-com. and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support PROCUREMENT OF reforms; institutional VIDEO CONFERENCING strengthening; Request for Single Stage - One FACILI / Procurement of 4 IDA / 50940 Post Open - National 288,000.00 262,350.00 Completed 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope units of Utility Vehicles for DLI at th e state, L GA Technical Assistant (TA). and facility levels; and monitoring and evaluation. Page 1 Component 2: Technical Support that will support reforms; institutional NPHCDA/AF/NSHIP/GO/RFQ/ strengthening; Request for Single Stage - One IDA / 58510 Post Open - National 24,590.16 0.00 Canceled 2018-06-10 2018-08-05 2019-02-01 201 / Printing of newsletter implementation of PBF and Quotations Envelope DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/GO/RFQ/ reforms; institutional 202 / Development and strengthening; Request for Single Stage - One IDA / 58510 Post Open - National 24,590.16 0.00 Canceled 2018-09-06 2019-03-05 Printing of Communication implementation of PBF and Quotations Envelope Infographics DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/AF/NSHIP/GO/RFQ/ strengthening; Request for Single Stage - One 204 / Printing of IDA / 58510 Post Limited 18,442.62 0.00 Canceled 2018-06-10 2018-08-05 2019-02-01 implementation of PBF and Quotations Envelope Communication Posters DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/GO/RFQ/101 strengthening; Request for Single Stage - One IDA / 50940 Post Limited 24,590.16 0.00 Canceled 2018-03-10 2018-05-05 2018-11-01 / Printing of Newsletter implementation of PBF and Quotations Envelope DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/GO/RFQ/102 reforms; institutional / Development and Printing strengthening; Request for Single Stage - One IDA / 50940 Post Limited 24,590.16 0.00 Canceled 2018-03-10 2018-05-05 2018-11-01 of communication implementation of PBF and Quotations Envelope Infographics DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/GO/RFQ/103 strengthening; Request for Single Stage - One IDA / 50940 Post Limited 1,377.05 0.00 Canceled 2018-03-10 2018-05-05 2018-11-01 / Printing of Roller Banner implementation of PBF and Quotations Envelope DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/GO/RFQ/104 strengthening; Request for Single Stage - One / Printing of communication IDA / 50940 Post Limited 18,442.62 0.00 Canceled 2018-03-10 2018-05-05 2018-11-01 implementation of PBF and Quotations Envelope Posters DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/GO/RFQ/ reforms; institutional Under 207 / Procurement of Project strengthening; Request for Single Stage - One IDA / 58510 Prior Limited 919,393.44 0.00 Implementati 2018-06-10 2018-08-05 2019-02-01 Vehicles for CMVA's & implementation of PBF and Quotations Envelope on IVA's for AF-NSHIP States DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 2 Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/GO/RFQ/106 strengthening; Request for Single Stage - One / Procurement of additional IDA / 50940 Post Limited 20,250.00 0.00 Canceled 2018-02-19 2018-04-16 2018-10-13 implementation of PBF and Quotations Envelope Laptops for PIU DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/GO/2019/001 reforms; institutional / Production of Data strengthening; Request for Single Stage - One IDA / 50940 Post Limited 4,918.00 0.00 Canceled 2019-04-07 2019-06-02 2019-11-29 Infographics for the Project implementation of PBF and Quotations Envelope (NSHIP/AF) DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical NPHCDA/NSHIP/GO/2019/002 Support that will support / Production of Leaflets, reforms; institutional Portable/table Calendar for strengthening; Request for Single Stage - One IDA / 50940 Post Limited 14,754.00 0.00 Canceled 2019-03-16 2019-05-11 2019-11-07 FY2019 & Year implementation of PBF and Quotations Envelope Planner/Activity Tracker for DLI at th e state, L GA FY2019 and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/GO/2019/003 strengthening; Request for Single Stage - One / Procurement of Tablets for IDA / 50940 Post Limited 16,262.00 0.00 Canceled 2019-03-16 2019-05-11 2019-11-07 implementation of PBF and Quotations Envelope Verifiers under CMVA DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional NSHIP/GO/2019/001 / strengthening; Request for Single Stage - One Production of Data IDA / 58510 Post Limited 4,918.00 0.00 Canceled 2019-04-07 2019-06-02 2019-11-29 implementation of PBF and Quotations Envelope Infographics for the Project DLI at th e state, L GA (NSHIP/AF) and facility levels; and monitoring and evaluation. Component 2: Technical NPHCDA/AF- Support that will support NSHIP/GO/2019/002 / reforms; institutional Production of Leaflets, strengthening; Request for Single Stage - One Portable/table Calendar for IDA / 58510 Post Limited 14,754.00 0.00 Canceled 2019-03-23 2019-05-18 2019-11-14 implementation of PBF and Quotations Envelope FY2019 & Year DLI at th e state, L GA Planner/Activity Tracker for and facility levels; and FY2019 monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional Pending NSHIP/GO/2019/003 / strengthening; Request for Single Stage - One IDA / 58510 Post Limited 22,125.00 0.00 Implementati 2019-03-09 2019-05-04 2019-10-31 Procurement of Additional implementation of PBF and Quotations Envelope on Laptops for the PIU DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/GO/2019/004 reforms; institutional / Procurement of Project strengthening; Request for Single Stage - One IDA / 50940 Prior Limited 295,082.00 0.00 Canceled 2019-04-27 2019-06-22 2019-12-19 Vehicles for NSHIP CMVAs implementation of PBF and Quotations Envelope & IVAs DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 3 Component 2: Technical Support that will support NG-NPHCDA-120422-GO- reforms; institutional RFQ / Procurement of 4 strengthening; Request for Single Stage - One IDA / 50940 Post Limited 295,082.00 248,514.17 Completed 2019-07-02 2019-08-27 2020-02-23 Project Vehicles for NSHIP implementation of PBF and Quotations Envelope CMVAs and IVAs DLI at th e state, L GA and facility levels; and monitoring and evaluation. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/101 / reforms; institutional NSHIP PIU Office strengthening; Request for Single Stage - One Accommodation (Cleaning IDA / 50940 Post Open - National 12,207.00 9,862.24 Completed 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope Services) One (1) yr DLI at th e state, L GA engagement and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/4/102 reforms; institutional / NSHIP PIU Office strengthening; Request for Single Stage - One Accommodation (Security IDA / 50940 Post Open - National 10,984.00 9,273.60 Completed 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope Services) One (1) yr DLI at th e state, L GA engagement and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/104 / reforms; institutional NSHIP PIU Office Pending strengthening; Request for Single Stage - One Accommodation (Generator IDA / 50940 Post Open - National 3,115.00 0.00 Implementati 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope Maintenance) One (1) yr on DLI at th e state, L GA engagement and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/105 / reforms; institutional NSHIP PIU Office Under strengthening; Request for Single Stage - One Accommodation (Installation IDA / 50940 Post Open - National 7,975.00 6,385.94 Implementati 2017-09-03 2017-10-29 2018-04-27 implementation of PBF and Quotations Envelope of CCTV and security on DLI at th e state, L GA systems) and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/NS/G/106 / reforms; institutional Pending Renewal of fleet insurance strengthening; Request for Single Stage - One IDA / 50940 Post Open - National 22,956.00 0.00 Implementati 2017-09-03 2017-10-29 2018-04-27 coverage for 12 unit NSHIP implementation of PBF and Quotations Envelope on Vehicles DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/NC/RFP/ reforms; institutional 201 / Engagement of Artist strengthening; Request for Single Stage - Two IDA / 58510 Post Limited 32,786.89 0.00 Canceled 2018-06-05 2018-06-10 2018-07-22 2018-10-04 2018-11-08 2019-05-07 for the Production of implementation of PBF and Proposals Envelope Promotional Drama DLI at th e state, L GA and facility levels; and monitoring and evaluation. CONSULTING FIRMS Page 4 Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Support that will support NPHCDA/NSHIP/QCBS/C/102 reforms; institutional / Procurement of strengthening; Quality And Cost- Independent Verification IDA / 50940 Prior Open - National 1,200,000.00 0.00 Canceled 2017-08-29 2017-09-19 2017-11-02 2017-11-30 2017-12-30 2018-02-03 2018-03-10 2019-03-10 implementation of PBF and Based Selection Agents (IVA) for AF states. DLI at th e state, L GA (3) and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/QCBS/C/101 reforms; institutional / Procurement of Contract strengthening; Quality And Cost- Management and Verification IDA / 50940 Prior Open - National 4,550,000.00 0.00 Canceled 2017-08-29 2017-09-19 2017-11-02 2017-11-30 2017-12-30 2018-02-03 2018-03-10 2019-03-10 implementation of PBF and Based Selection Agents (CMVA) for AF DLI at th e state, L GA states. (7) and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/CQS/ reforms; institutional Consultant 202 / Engagement of strengthening; IDA / 58510 Post Qualification Open - National 346,311.48 0.00 Canceled 2018-06-05 2018-06-26 2018-08-09 2018-09-08 2018-10-13 2019-04-11 Accredited Quality implementation of PBF and Selection Improvement Firm DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/CQS/ reforms; institutional 207 / Engagement of iCloud Consultant strengthening; Pending Consultant for Project IDA / 58510 Post Qualification Open - National 4,918.03 0.00 2018-06-05 2018-06-07 2018-08-02 2018-09-06 2019-03-05 implementation of PBF and Implementation Documents (real time Selection DLI at th e state, L GA sharing & editing) and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/CQS/ reforms; institutional 209 / Engagement of IT Consultant strengthening; Firm for the development of IDA / 58510 Post Qualification Open - National 10,655.74 17,918.68 Completed 2018-06-05 2018-06-26 2018-08-09 2018-09-08 2018-10-13 2019-04-11 implementation of PBF and PNR Code for NSHIP Asset Selection DLI at th e state, L GA Tagging for iCloud Storage and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/CQS/ reforms; institutional Consultant 211 / Engagement of Media strengthening; IDA / 58510 Post Qualification Open - National 19,672.13 0.00 Canceled 2018-06-05 2018-06-26 2018-08-09 2018-09-08 2018-10-13 2019-04-11 Houses for Press Conference implementation of PBF and Selection & TV/Radio talk DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CQS/104 reforms; institutional / Engagement of icloud Consultant strengthening; Pending Consultant for project IDA / 50940 Post Qualification Open - National 21,311.48 0.00 2018-01-30 2018-02-20 2018-04-05 2018-05-05 2018-06-09 2018-12-06 implementation of PBF and Implementation documents (real time sharing Selection DLI at th e state, L GA & editing) and facility levels; and monitoring and evaluation. Page 5 Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CQS/106 reforms; institutional / Engagement of IT Firm for Consultant strengthening; the development of PNR IDA / 50940 Post Qualification Open - National 10,655.74 17,918.68 Completed 2018-01-30 2018-02-20 2018-04-05 2018-05-05 2018-06-09 2018-12-06 implementation of PBF and Code for NSHIP Asset Selection DLI at th e state, L GA Tagging for iCloud Storage and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/CS/QCBS/11 reforms; institutional 0 / Engagement of CMVA's strengthening; Quality And Cost- and IVA's for the three IDA / 50940 Prior Open - National 965,800.00 2,120,404.09 Signed 2018-07-13 2018-08-03 2018-09-16 2018-10-14 2018-11-13 2018-12-18 2019-01-22 2020-01-22 implementation of PBF and Based Selection NSHIP States (Adamawa, DLI at th e state, L GA Nasarawa & Ondo) and facility levels; and monitoring and evaluation. Component 2: Technical NPHCDA/AF/NSHIP/CS/CDS/ Support that will support 2019/008 / Engagement of reforms; institutional Consultant Firm to support PIU for strengthening; Pending IDA / 58510 Post Qualification Open - National 35,000.00 0.00 2019-04-24 2019-05-15 2019-06-28 2019-07-28 2019-09-01 2020-02-28 Development of Psycho-social implementation of PBF and Implementation Selection Support Document & DLI at th e state, L GA Training and facility levels; and monitoring and evaluation. Results Based Financing using (i) PBF for outputs at NPHCDA/AF- health facilities and LGA Consultant NSHIP/CS/2020/001 / PHC Departments (ii) DLI Pending IDA / 58510 Post Qualification Open - National 26,885.00 0.00 2020-02-03 2020-02-24 2020-04-08 2020-05-08 2020-06-12 2020-12-09 Engagement of External at State and LGA l evels Implementation Selection Audit Firm (iii ) DFF at the health facility level to compare with PBF. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/IC/C/103 / Individual strengthening; Under Procurement of Verifiers for IDA / 50940 Post Consultant Open 144,396.00 0.00 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 implementation of PBF and Implementation the AF-states (7) Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/IC/C/109 / reforms; institutional Individual Engagement of Essential strengthening; IDA / 50940 Post Consultant Open 30,303.00 18,263.78 Completed 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 Drug Management consultant implementation of PBF and Selection (EDM) DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/IC/C/110 / Individual strengthening; Engagement of Office IDA / 50940 Post Consultant Open 7,273.00 4,399.99 Completed 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 implementation of PBF and Assistant Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 6 Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/IC/C/111 / Individual strengthening; Engagement of consultant to IDA / 50940 Post Consultant Open 15,000.00 58,666.74 Completed 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 implementation of PBF and strengthen PIU Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/DS/C/112 / reforms; institutional Consultancy to strengthening; Institutionalize Quality IDA / 50940 Post Direct Selection Direct 48,500.00 0.00 Canceled 2017-08-29 2017-09-08 2017-11-12 2018-05-11 implementation of PBF and improvement plan in NSHIP DLI at th e state, L GA HF's and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/DC/C/113 / strengthening; Engagement of External IDA / 50940 Post Direct Selection Direct 10,101.00 0.00 Canceled 2017-08-29 2017-09-08 2017-11-12 2018-05-11 implementation of PBF and Auditor DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/IC/C/108 / Individual strengthening; Engagement of PBF Master IDA / 50940 Post Consultant Open 42,705.00 24,000.00 Completed 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 implementation of PBF and Trainer Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/IC/C/105 / reforms; institutional Individual Engagement of PBF strengthening; IDA / 50940 Post Consultant Open 24,938.00 0.00 Canceled 2017-09-11 2017-10-30 2017-11-20 2017-12-25 2018-06-23 Communication Specialist implementation of PBF and Selection (CS) DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/IC/C/104 / reforms; institutional Individual Procurement of PBF strengthening; IDA / 50940 Post Consultant Open 288,000.00 15,855.14 Completed 2017-08-29 2017-10-17 2017-11-07 2017-12-12 2018-06-10 Technical Assistants (TA) for implementation of PBF and Selection AF states. (4) DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/DS/C/107 / reforms; institutional Engagement of Bluesquare strengthening; Pending IDA / 50940 Post Direct Selection Direct 52,343.00 0.00 2017-08-29 2017-09-08 2017-11-12 2018-05-11 for ICT application in PBF implementation of PBF and Implementation and DHIS 2 DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/AF/NSHIP/CS/INDV Individual strengthening; /203 / Engagement of PBF IDA / 58510 Post Consultant Limited 19,500.00 24,000.00 Completed 2018-06-05 2018-06-10 2018-07-01 2018-08-05 2019-02-01 implementation of PBF and Master Trainer Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 7 Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/INDV reforms; institutional Individual /205 / Engagement of strengthening; IDA / 58510 Post Consultant Limited 19,500.00 0.00 Canceled 2018-06-05 2018-06-10 2018-07-01 2018-08-05 2019-02-01 Capacity Assessment implementation of PBF and Selection Consultant DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/INDV reforms; institutional Individual /206 / Engagement of strengthening; IDA / 58510 Post Consultant Limited 21,311.48 18,263.78 Completed 2018-06-05 2018-06-10 2018-07-01 2018-08-05 2019-02-01 Essential Drug Management implementation of PBF and Selection (EDM) Consultant DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF/NSHIP/CS/CDS/ reforms; institutional 210 / Procurement of strengthening; IDA / 58510 Post Direct Selection Direct 27,868.85 23,432.12 Completed 2018-06-05 2018-06-15 2018-08-19 2019-02-15 Flexible Accounting Software implementation of PBF and Application DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CDS/101 reforms; institutional / Engagement of Bluesquare strengthening; IDA / 50940 Post Direct Selection Direct 245,000.00 294,010.00 Completed 2017-07-13 2017-07-23 2017-09-26 2018-03-25 for ICT application in PBF implementation of PBF and and DHIS 2 DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/CS/CDS/103 strengthening; / Engagement of Acrredited IDA / 50940 Post Direct Selection Direct 207,786.89 0.00 Canceled 2018-01-29 2018-02-08 2018-04-14 2018-10-11 implementation of PBF and Quality Improvement Firm DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/IC/C/106 / reforms; institutional Engagement of Individual strengthening; NPHCDA/NSHIP Health IDA / 50940 Post Consultant Open 23,939.00 17,940.00 Completed 2018-07-13 2018-08-31 2018-09-21 2018-10-26 2019-04-24 implementation of PBF and Care Waste Management Selection DLI at th e state, L GA (HCWM) consultant and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CDS/102 reforms; institutional / Engagement of BMJ PACK strengthening; Under for scale up of adult PACK IDA / 50940 Prior Direct Selection Direct 437,000.00 0.00 2018-01-29 2018-02-08 2018-04-14 2018-10-11 implementation of PBF and Implementation Nigeria and development DLI at th e state, L GA PACK Child and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/CS/2019/005 Individual strengthening; / Engagement of Pharmacy IDA / 50940 Post Consultant Limited 5,508.00 0.00 Canceled 2019-02-18 2019-02-23 2019-03-16 2019-04-20 2019-10-17 implementation of PBF and Consultant Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 8 Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/CS/2019/006 Individual strengthening; / Engagement of IDA / 50940 Post Consultant Limited 5,508.00 0.00 Canceled 2019-03-11 2019-03-16 2019-04-06 2019-05-11 2019-11-07 implementation of PBF and Communications Consultant Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support reforms; institutional NPHCDA/NSHIP/CS/2019/007 Individual strengthening; / Engagement of Contract IDA / 50940 Post Consultant Limited 47,400.00 0.00 Canceled 2019-03-18 2019-03-23 2019-04-13 2019-05-18 2019-11-14 implementation of PBF and Management Consultant Selection DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional Individual NSHIP/CS/2019/005 / strengthening; IDA / 58510 Post Consultant Limited 5,508.00 0.00 Canceled 2019-03-11 2019-03-16 2019-04-06 2019-05-11 2019-11-07 Engagement of implementation of PBF and Selection Communications Consultant DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional Individual NSHIP/CS/2019/006 / strengthening; IDA / 58510 Post Consultant Limited 47,400.00 0.00 Canceled 2019-03-18 2019-03-23 2019-04-13 2019-05-18 2019-11-14 Engagement of Contract implementation of PBF and Selection Management Consultant DLI at th e state, L GA and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional NSHIP/CS/2019/004 / Individual strengthening; Engagement of Pharmacist IDA / 58510 Post Consultant Limited 11,016.00 775.60 Signed 2019-04-15 2019-04-20 2019-05-11 2019-06-15 2019-12-12 implementation of PBF and to support the PIU in Drug Selection DLI at th e state, L GA Management and facility levels; and monitoring and evaluation. Component 2: Technical NPHCDA/NSHIP/CS/INDV/20 Support that will support 19/009 / Engagement of 5 reforms; institutional Individual RBF TA's for Technical strengthening; IDA / 50940 Prior Consultant Open 162,000.00 136,951.40 Signed 2019-04-15 2019-06-03 2019-06-24 2019-07-29 2020-01-25 Support to NSHIP States of implementation of PBF and Selection Nasarawa, Adamawa & DLI at th e state, L GA Ondo States and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/AF- reforms; institutional NSHIP/CS/INDV/2019/007 / Individual strengthening; Engagement of 3 RBF TA's IDA / 58510 Prior Consultant Open 97,200.00 82,170.84 Signed 2019-04-15 2019-06-03 2019-06-24 2019-07-29 2020-01-25 implementation of PBF and to Support AF/NSHIP States Selection DLI at th e state, L GA of Gombe and Yobe and facility levels; and monitoring and evaluation. Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CDS/201 reforms; institutional 9/001 / Renewal of Contract strengthening; IDA / 50940 Prior Direct Selection Direct 1,889,853.92 1,522,797.14 Signed 2019-04-15 2019-04-25 2019-06-29 2019-12-26 for 8 CMVA firms for the implementation of PBF and AF-NSHIP States DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 9 Component 2: Technical Support that will support NPHCDA/NSHIP/CS/CDS/201 reforms; institutional 9/002 / Renewal of Contract strengthening; IDA / 50940 Prior Direct Selection Direct 2,855,402.29 1,402,070.88 Signed 2019-04-15 2019-04-25 2019-06-29 2019-12-26 for 3 IVA firms for the AF- implementation of PBF and NSHIP States DLI at th e state, L GA and facility levels; and monitoring and evaluation. Page 10