Integrated Habitat and Housing Project (P159929) Argentina, IBRD/IDA Team Leader(s): Catherine Lynch, John Morton , PROCUREMENT Argentina : Integrated Habitat and Housing Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2018-01-29 2019-08-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159929 GPN Date: 2018-04-26 Project Name: Integrated Habitat and Housing Project Loan / Credit No: IBRD / 87120 Executing Agency(ies): Ministry of Home Affairs, Public Works and Housing WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MININTERIOR-123537- CW-RFB / Programa de Integrated Habitat Solicitud de Single Stage - One Ejecución IBRD / 87120 Posterior Open - National 4,402,758.25 0.00 2019-08-19 2019-08-24 2019-10-05 2019-11-04 2019-12-09 2020-12-03 Mejoramiento Barrial Villa Improvement ofertas Envelope pendiente El Libertador, Córdoba GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-MININTERIOR-116118- Solicitud de Single Stage - One Ejecución NC-RFQ / Foro de Vivienda IBRD / 87120 Institutional Strengthening Posterior Limited 2,130.00 0.00 2019-05-27 2019-06-03 2019-06-13 cotizaciones Envelope pendiente Sustentable AR-MININTERIOR-125960- NC-RFQ / Provisión de Solicitud de Single Stage - One Ejecución servicio de catering. IBRD / 87120 Institutional Strengthening Posterior Limited 600.00 0.00 2019-08-02 2019-08-06 2019-08-11 cotizaciones Envelope pendiente Capacitación Mejor Hogar Sustentable CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UEC-60404-CS-QCBS / Selección basada Open - Formulación Proyectos IBRD / 87120 Institutional Strengthening Previa 5,600,000.00 244,188.38 Firmado 2018-04-30 2018-05-15 2018-06-28 2018-07-26 2018-08-25 2018-09-29 2018-11-03 2020-11-02 en calidad y costo International Ejecutivos Integrales AR-UEC-40792-CS-QCBS / Servicio de Consultoría para Selección basada IBRD / 87120 Institutional Strengthening Posterior Open - National 360,000.00 0.00 En ejecución 2018-05-15 2018-06-05 2018-07-19 2018-08-16 2018-10-15 2018-11-19 2018-12-24 2019-09-20 el Apoyo a la en calidad y costo Implementación del SIGEBE Page 1 AR-UEC-58982-CS-CQS / Selección basada Servicio de Consultoría para IBRD / 87120 Institutional Strengthening Posterior en calificaciones Open - National 20,800.00 0.00 Cancelado 2018-04-25 2018-05-16 2018-08-14 2018-08-29 2018-10-13 2020-10-12 Facilitación de Mesa de de consultores Diálogo AR-MININTERIOR-103434- CS-QCBS / Formulación de Selección basada IBRD / 87120 Institutional Strengthening Posterior Open - National 350,000.00 0.00 En ejecución 2019-03-11 2019-04-01 2019-05-15 2019-06-12 2019-07-12 2019-08-25 2019-09-29 2021-09-18 Proyectos Ejecutivos de en calidad y costo Desarrollo Urbano AR-MININTERIOR-103429- CS-CQS / Capacitación de Selección basada IBRD / 87120 Institutional Strengthening Posterior Open - National 150,000.00 0.00 En ejecución 2019-03-07 2019-03-28 2019-05-11 2019-06-08 2019-07-08 2019-08-12 2019-09-16 2020-09-15 Técnicos y funcionarios en en calidad y costo Gestión de Suelo AR-MININTERIOR-103445- CS-CQS / Capacitación a Técnicos Diagnosticadores y Selección basada Sustentabilizadores del Plan IBRD / 87120 Institutional Strengthening Posterior Open - National 100,500.00 0.00 En ejecución 2019-03-07 2019-03-28 2019-05-11 2019-06-08 2019-07-08 2019-08-12 2019-09-16 2020-09-15 en calidad y costo Nacional de Sustentabilización de Viviendas AR-MININTERIOR-103499- CS-CQS / Evaluación de Selección basada Resultados en Hogares IBRD / 87120 Institutional Strengthening Posterior Open - National 156,500.00 0.00 En ejecución 2019-03-07 2019-03-28 2019-05-11 2019-06-08 2019-07-08 2019-08-12 2019-09-16 2020-09-15 en calidad y costo Beneficiarios de Proyectos de Vivienda Social AR-MININTERIOR-116378- CS-QCBS / Evaluación del Selección basada Ejecución IBRD / 87120 Institutional Strengthening Posterior Open - National 125,000.00 0.00 2019-05-30 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2020-12-03 Programa Mejor Hogar Gas en calidad y costo pendiente - Secretaría de Vivienda INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UEC-40795-CS-INDV / Consultor para Proyectos IBRD / 87120 Institutional Strengthening Posterior Individual Limited 40,500.00 14,311.74 Rescindido 2018-05-02 2018-05-03 2018-05-07 2018-05-15 2019-05-15 PPP- Especialista para Evaluación Socio- Económico AR-UEC-60577-CS-INDV / Consultor Especialista IBRD / 87120 Institutional Strengthening Posterior Individual Limited 17,223.40 29,023.38 Firmado 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 Ambiental AR-UEC-60581-CS-INDV / Ejecución IBRD / 87120 Institutional Strengthening Posterior Individual Limited 12,100.60 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 Consultor Especialista Obra pendiente AR-UEC-60585-CS-INDV / Ejecución Consultor Especialista IBRD / 87120 Institutional Strengthening Posterior Individual Limited 27,112.15 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 pendiente Contable AR-UEC-60602-CS-INDV / Ejecución Consultor Especialista IBRD / 87120 Institutional Strengthening Posterior Individual Limited 12,100.60 0.00 2018-04-25 2018-04-26 2018-04-27 2018-05-02 2018-12-31 pendiente Evaluación AR-UEC-40794-CS-INDV / IBRD / 87120 Institutional Strengthening Posterior Individual Limited 23,000.00 33,732.61 Firmado 2018-02-09 2018-02-10 2018-02-14 2018-03-01 2018-12-31 Consultor para el CAT AR-UEC-40796-CS-INDV / Ejecución Consultor Especialista IBRD / 87120 Institutional Strengthening Posterior Individual Limited 23,000.00 0.00 2018-02-09 2018-02-10 2018-02-14 2018-03-01 2018-12-31 pendiente Ambiental Page 2 AR-UEC-60614-CS-CDS / Evaluación Integral de Selección directa IBRD / 87120 Institutional Strengthening Posterior Direct 270,000.00 196,166.21 Firmado 2018-05-02 2018-05-14 2018-07-12 2019-04-08 Programa de la Secretaria de consultores de Vivienda AR-UEC-44113-CS-INDV / Consultor para la Ley IBRD / 87120 Institutional Strengthening Posterior Individual Limited 20,000.00 0.00 Cancelado 2018-01-19 2018-02-09 2018-02-16 2018-03-01 2018-10-31 Nacional de Vivienda - Arquitecto Urbanista Senior AR-UEC-44112-CS-INDV / Consultor para la Ley Nacional de Vivienda - IBRD / 87120 Institutional Strengthening Posterior Individual Limited 20,000.00 0.00 Cancelado 2018-01-19 2018-02-09 2018-02-16 2018-03-01 2018-10-31 Abogado de Derecho Urbanístico Senior AR-UEC-60620-CS-INDV / Consultor para Proyectos IBRD / 87120 Institutional Strengthening Posterior Individual Limited 37,125.00 0.00 En ejecución 2018-06-01 2018-06-02 2018-06-06 2018-06-15 2019-05-11 PPP- Especialista para Evaluación financiera AR-UEC-44114-CS-INDV / Integrated Habitat Especialista en Ingeniería IBRD / 87120 Posterior Individual Limited 23,000.00 45,819.21 Firmado 2018-05-15 2018-05-20 2018-05-23 2018-05-28 2019-04-23 Improvement Hidráulica AR-UEC-44800-CS-CDS / Consultoría para la Selección directa IBRD / 87120 Institutional Strengthening Posterior Direct 100,000.00 100,000.00 Firmado 2018-04-27 2018-05-06 2018-06-26 2018-12-23 Construcción del Índice de consultores Multidimensional del Hábitat AR-UEC-66562-CS-CDS / Servicio de Consultaría para Selección directa IBRD / 87120 Institutional Strengthening Posterior Direct 20,800.00 14,672.00 Firmado 2018-06-18 2018-06-28 2018-09-01 2019-02-28 Facilitación de Mesa de de consultores Diálogo AR-UEC-67616-CS-INDV / Responsable Técnico estructuración de proyectos IBRD / 87120 Institutional Strengthening Posterior Individual Limited 50,000.00 33,811.68 Firmado 2018-06-21 2018-06-25 2018-06-26 2018-07-02 2018-12-31 con Participación Público Privada AR-UEC-67617-CS-INDV / Especialista Legal para la elaboración, implementación IBRD / 87120 Institutional Strengthening Posterior Individual Limited 47,000.00 20,069.01 Firmado 2018-06-22 2018-06-25 2018-06-26 2018-07-02 2018-12-31 y seguimiento de la Ley Nacional de Vivienda AR-UEC-67618-CS-INDV / Especialista en Comunicación IBRD / 87120 Institutional Strengthening Posterior Individual Limited 47,000.00 36,415.49 Firmado 2018-06-22 2018-06-25 2018-06-26 2018-07-02 2018-12-31 Institucional AR-UEC-67619-CS-INDV / Responsable Técnico IBRD / 87120 Institutional Strengthening Posterior Individual Limited 38,000.00 28,124.46 Firmado 2018-06-22 2018-06-26 2018-06-27 2018-07-02 2018-12-31 Componentes 1 y 3 del Préstamo BIRF 8712-AR AR-UEC-67620-CS-INDV / Especialista en marketing IBRD / 87120 Institutional Strengthening Posterior Individual Limited 36,000.00 10,135.54 Rescindido 2018-06-22 2018-06-25 2018-06-26 2018-07-02 2018-12-31 digital y comunicación AR-UEC-67621-CS-INDV / Responsable de Seguimiento IBRD / 87120 Institutional Strengthening Posterior Individual Limited 31,000.00 7,845.02 Finalizado 2018-06-22 2018-06-25 2018-06-26 2018-07-02 2018-12-31 y Control de Proyectos de Vivienda Social AR-UEC-69404-CS-INDV / Analista de Planificación de IBRD / 87120 Project Management Posterior Individual Limited 82,363.69 28,587.22 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Programas Page 3 AR-UEC-69406-CS-INDV / Asistente en Gestión y IBRD / 87120 Project Management Posterior Individual Limited 58,459.89 22,894.22 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Administración de Recursos Humanos AR-UEC-69415-CS-INDV / IBRD / 87120 Project Management Posterior Individual Open 51,590.50 8,099.26 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Auxiliar Administrativo AR-UEC-69429-CS-INDV / IBRD / 87120 Project Management Posterior Individual Open 55,282.21 8,042.01 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Asistente Administrativo AR-UEC-69431-CS-INDV / Especialista en Formulación IBRD / 87120 Project Management Posterior Individual Limited 82,777.89 28,556.23 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 y Ejecución de Proyectos AR-UEC-69436-CS-INDV / Especialista en métodos cuali/cuantitativos de IBRD / 87120 Project Management Posterior Individual Limited 71,483.00 24,441.58 Firmado 2018-07-17 2018-07-21 2018-07-22 2018-08-01 2021-12-31 monitorio y evaluación del proyectos AR-UEC-69442-CS-INDV / Analista de Planificación y IBRD / 87120 Project Management Posterior Individual Limited 68,928.00 35,298.72 Rescindido 2018-07-17 2018-07-21 2018-07-22 2018-08-01 2021-12-31 Monitoreo de contratos AR-UEC-69448-CS-INDV / Integrated Habitat Ejecución IBRD / 87120 Posterior Individual Limited 14,375.00 0.00 2018-07-17 2018-07-23 2018-07-25 2018-08-01 2019-12-31 Auxiliar Social Improvement pendiente AR-UEC-69428-CS-INDV / Consultor de Apoyo en IBRD / 87120 Project Management Posterior Individual Limited 72,759.43 26,557.46 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Adquisiciones. Normativa Nacional AR-UEC-69677-CS-INDV / Auxiliar Contable. Consultor IBRD / 87120 Project Management Posterior Individual Limited 14,923.00 4,056.29 Rescindido 2018-07-17 2018-07-23 2018-07-25 2018-08-01 2019-12-31 de Apoyo - Normativa Nacional AR-UEC-69427-CS-INDV / Consultor de Apoyo en IBRD / 87120 Project Management Posterior Individual Limited 88,460.89 31,510.70 Firmado 2018-07-12 2018-07-13 2018-07-14 2018-07-16 2021-12-31 Adquisiciones. Normativa Nacional AR-UEC-71736-CS-CDS / Incorporación de la perspectiva de género en la Integrated Habitat Selección directa planificación urbana y el IBRD / 87120 Posterior Direct 68,000.00 73,740.00 Firmado 2018-07-26 2018-08-03 2018-08-18 2019-02-14 Improvement de consultores diseño de espacios públicos en comunidades vulnerables en Argentina AR-UEC-76004-CS-INDV / IBRD / 87120 Institutional Strengthening Posterior Individual Direct 41,300.00 13,505.92 Firmado 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2021-12-31 Auxiliar en Comunicación AR-UEC-76011-CS-INDV / IBRD / 87120 Institutional Strengthening Posterior Individual Direct 32,400.00 11,849.28 Firmado 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2021-12-31 Auxiliar Administrativo AR-UEC-76013-CS-INDV / IBRD / 87120 Institutional Strengthening Posterior Individual Direct 36,200.00 14,351.38 Firmado 2018-12-06 2018-12-09 2018-12-11 2018-12-15 2021-12-31 Auxiliar Administrativo AR-UEC-76023-CS-INDV / IBRD / 87120 Institutional Strengthening Posterior Individual Direct 38,900.00 9,276.01 Firmado 2018-12-06 2018-12-10 2018-12-12 2018-12-15 2021-12-31 Auxiliar Legal Page 4 AR-UEC-86872-CS-CDS / Consultoría para la Identificación de los Usos del Suelo Formal e Informal Selección directa IBRD / 87120 Institutional Strengthening Posterior Direct 18,852.46 0.00 En ejecución 2018-12-17 2018-12-30 2019-02-22 2019-04-23 en los Principales Áreas de consultores Urbanas de Argentina mediante Imágenes Satelitales AR-UEC-75983-CS-INDV / Analista en Planificación de IBRD / 87120 Project Management Posterior Individual Direct 61,900.00 21,725.18 Firmado 2018-12-17 2018-12-19 2018-12-20 2018-12-22 2022-01-07 Programas AR-UEC-69444-CS-INDV / IBRD / 87120 Project Management Posterior Individual Limited 82,020.00 0.00 Cancelado 2018-07-17 2018-07-21 2018-07-22 2018-08-01 2021-12-31 Especialista Legal AR-MININTERIOR-105964- CS-CDS / Servicio de Selección directa consultoría para el IBRD / 87120 Institutional Strengthening Posterior Direct 50,000.00 0.00 En ejecución 2019-04-01 2019-04-10 2019-05-31 2019-09-28 de consultores Asesoramiento en Diseño de Programas de Alquiler Social AR-MININTERIOR-107017- Selección directa CS-CDS / Identificación de IBRD / 87120 Institutional Strengthening Posterior Direct 80,000.00 0.00 En ejecución 2019-04-05 2019-04-14 2019-06-07 2019-11-04 de consultores Mejores Prácticas - SIU AR-MININTERIOR-110911- CS-INDV / Responsable de IBRD / 87120 Institutional Strengthening Posterior Individual Limited 15,000.00 12,768.69 Firmado 2019-04-17 2019-04-22 2019-04-27 2019-05-01 2019-12-31 Seguimiento de cartera de proyectos de Vivienda AR-MININTERIOR-123534- Ejecución CS-INDV / Refuerzo IBRD / 87120 Institutional Strengthening Posterior Individual Limited 12,500.00 0.00 2019-07-24 2019-07-29 2019-07-30 2019-08-01 2021-01-22 pendiente Administrativo UEM Cordoba AR-MININTERIOR-123538- Integrated Habitat Ejecución CS-INDV / Promotores IBRD / 87120 Posterior Individual Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement pendiente Ambientales - Córdoba AR-MININTERIOR-123541- Integrated Habitat Ejecución CS-INDV / Inspectores de IBRD / 87120 Posterior Individual Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement pendiente Obra - Córdoba AR-MININTERIOR-123543- Integrated Habitat Ejecución CS-INDV / Promotores IBRD / 87120 Posterior Individual Limited 25,000.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement pendiente Sociales - Córdoba AR-MININTERIOR-123544- Integrated Habitat Ejecución CS-INDV / Promotor Urbano IBRD / 87120 Posterior Individual Limited 12,500.00 0.00 2019-07-24 2019-07-27 2019-07-29 2019-08-01 2021-01-22 Improvement pendiente - Córdoba Page 5