PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic of Congo, Transport and Connectivity Support Project(P161877) Project Implementation agency: Cellule Infrastructures Date of the Procurement Plan: January 10, 2020 Period covered by this Procurement Plan: January 2020 – June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. PROCUREMENT Congo, Democratic Republic of : TRANSPORT AND CONNECTIVITY SUPPORT PROJECT PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2020-01-12 2020-04-07 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161877 GPN Date: Project Name: TRANSPORT AND CONNECTIVITY SUPPORT PROJECT Loan / Credit No: / , IDA / V2970 Executing Agency(ies): Cellule Infrastructures WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-CI-151794-NC-DIR / Passation de En attente Mise à jour du logiciel / Monitoring and evaluation A posteriori marché de gré à Direct 50,000.00 0.00 2020-10-01 2020-10-06 2020-11-10 2020-11-25 d'exécution TOMPRO par TOMATE gré CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-CI-152090-CS-CQS / Etudes techniques et Sélection fondée économiqes et préparation du Transport infrastructure sur les Open - En attente / A posteriori 100,000.00 0.00 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-07-07 2020-10-20 DAO pour le bitumage de la works qualifications des International d'exécution RN2, tronçon Bukavu - consultants Walungu (38 km) ZR-CI-152092-CS-QCBS / Etudes techniques et Sélection fondée économiqes et préparation du Transport infrastructure Open - / A posteriori sur la qualité et 425,000.00 0.00 Annulé 2020-02-28 2020-03-20 2020-05-03 2020-05-31 2020-06-30 2020-08-04 2020-09-08 2021-02-07 DAO pour le bitumage de la works International le coût RN2, tronçon Mbuji Mayi - Kabinda (159 km) Page 1 ZR-CI-152088-CS-CQS / Etudes techniques et Sélection fondée économiqes ainsi que la Transport infrastructure sur les Open - préparation du DAO pour la / A posteriori 120,000.00 0.00 Annulé 2020-01-30 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-11-07 works qualifications des International réhabilitation et l'entretien consultants de la RN2, tronçon Walungu- Kamituga (142 km) ZR-CI-152139-CS-CQS / Etudes techniques et Sélection fondée économiqes et préparation du Transport infrastructure sur les Open - / A posteriori 125,000.00 0.00 Annulé 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-07-07 2020-10-20 DAO pour le bitumage de la works qualifications des International RN2, tronçon Butembo - consultants Beni (55 km) ZR-CI-152097-CS-QCBS / Etudes techniques et économiques ainsi que la Sélection fondée Transport infrastructure Open - En attente préparation du DAO pour la IDA / V2970 A posteriori sur la qualité et 300,000.00 0.00 2020-03-27 2020-04-17 2020-05-31 2020-06-28 2020-07-28 2020-09-01 2020-10-06 2021-03-07 works International d'exécution réhabilitation de la RN2, le coût tronçon Beni-Butembo- Rutshuru (306 km) ZR-CI-152087-CS-QCBS / Etudes de sauvegardes Sélection fondée (EIES, PAR et PPA) des Environmental, social, and Open - En attente IDA / V2970 A posteriori sur la qualité et 450,000.00 0.00 2020-03-27 2020-04-17 2020-05-31 2020-06-28 2020-07-28 2020-09-01 2020-10-06 2021-03-07 travaux de réhabilitation du GBV mitigations program International d'exécution le coût tronçon Beni-Butembo- Rutshuru ZR-CI-151795-CS-CQS / Evaluation des risques VBG Sélection fondée liés aux travaux de Environmental, social, and sur les En attente IDA / V2970 A posteriori Limited 200,000.00 0.00 2020-04-12 2020-04-26 2020-05-26 2020-06-30 2020-09-29 réhabilitation de la RN2, GBV mitigations program qualifications des d'exécution tronçon Mbuji Mayi-Kabinda- consultants Lubao ZR-CI-164527-CS-QCBS / Elaboration des cadres de Sélection fondée sauvegardes (CGES y Environmental, social, and Open - En attente IDA / V2970 A posteriori sur la qualité et 300,000.00 0.00 2020-04-06 2020-04-27 2020-06-10 2020-07-08 2020-08-07 2020-09-11 2020-10-16 2021-03-17 compris les risques VBG, GBV mitigations program International d'exécution le coût CPR et CPPA) des travaux des routes prioritaires ZR-CI-164534-CS-QCBS / Préparation des documents Sélection fondée Environmental, social, and Open - En attente de sauvegardes (EIES et IDA / V2970 A posteriori sur la qualité et 200,000.00 0.00 2020-04-10 2020-05-01 2020-06-14 2020-07-12 2020-08-11 2020-09-15 2020-10-20 2021-03-21 GBV mitigations program International d'exécution PAR) des travaux le coût aéroportuaires de Beni ZR-CI-164532-CS-CQS / Analyse technique et Sélection fondée économique pour Transport infrastructure sur les Open - En attente IDA / V2970 A posteriori 100,000.00 0.00 2020-04-30 2020-05-21 2020-07-04 2020-08-03 2020-09-07 2021-01-06 l'aménagement de la RP works qualifications des International d'exécution 1029 Sake-Masisi-Walikale consultants (287 km) ZR-CI-152089-CS-CQS / Sélection fondée Audit organisationnel, Capacity building, reforms, sur les Open - En attente technique, et financier du IDA / V2970 and private sector A posteriori 150,000.00 0.00 2020-05-11 2020-06-01 2020-07-15 2020-08-14 2020-09-18 2020-11-18 qualifications des International d'exécution Fonds National d'Entretien participation consultants Routier (FONER) ZR-CI-164603-CS-QCBS / Etudes techniques et Sélection fondée Transport infrastructure Open - En attente préparation du DAO des IDA / V2970 A posteriori sur la qualité et 350,000.00 0.00 2020-03-30 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-03-10 works International d'exécution travaux aéroportuaires le coût (Goma et Beni) Page 2 ZR-CI-164588-CS-CQS / Etude de faisabilité et Sélection fondée assistance technique sur Transport infrastructure sur les En attente IDA / V2970 A posteriori Limited 200,000.00 0.00 2020-04-13 2020-04-27 2020-05-27 2020-07-01 2020-12-28 l'intégration et la gestion de works qualifications des d'exécution la fibre optique dans les consultants routes du projet INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-CI-151569-CS-INDV / Mise à jour du manuel de Capacity building, reforms, En attente procédures administratives, / and private sector A posteriori Individuel Limited 35,000.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2020-10-28 d'exécution comptables, financières, et participation de passation des marchés ZR-CI-152128-CS-INDV / En attente Mise à jour du manuel / Monitoring and evaluation A posteriori Individuel Limited 35,000.00 0.00 2020-04-01 2020-04-06 2020-04-27 2020-06-01 2020-08-31 d'exécution d'exécution du projet ZR-CI-151728-CS-INDV / Elaboration des procédures Environmental, social, and En attente IDA / V2970 A posteriori Individuel Open 150,000.00 0.00 2020-04-27 2020-06-15 2020-07-06 2020-08-10 2020-11-08 de gestion de la main GBV mitigations program d'exécution d'oeuvre ZR-CI-152119-CS-INDV / Etude de marchés du projet En attente et préparation de la IDA / V2970 Monitoring and evaluation A posteriori Individuel Limited 75,000.00 0.00 2020-06-15 2020-06-20 2020-07-11 2020-08-15 2020-10-15 d'exécution stratégie de passation de marchés ZR-CI-164594-CS-CDS / Actualisation des études techniques et économiques Sélection de ainsi que du DAO pour la Transport infrastructure En attente IDA / V2970 A posteriori consultants par Direct 200,000.00 0.00 2020-03-30 2020-04-09 2020-06-13 2020-09-13 réhabilitation de la RN2, works d'exécution entente directe tronçon Mbuji Mayi - Kabinda - Lubao (332 km) par AIC PROGETTI ZR-CI-164593-CS-INDV / Analyse sécuritaire du projet Environmental, social, and En attente IDA / V2970 A posteriori Individuel Open 200,000.00 0.00 2020-04-27 2020-06-15 2020-07-06 2020-08-10 2021-02-06 et élaboration du plan de GBV mitigations program d'exécution gestion de la sécurité ZR-CI-164587-CS-INDV / Etudes économiques des Transport infrastructure En attente IDA / V2970 A posteriori Individuel Limited 40,000.00 0.00 2020-04-06 2020-04-11 2020-05-02 2020-06-06 2020-12-03 activités aéroportuaires works d'exécution (Goma et Beni) Page 3