Annex 4 PROCUREMENT PLAN General 1. Project Information: Nigeria: Transforming Irrigation Management in Nigeria 2. Bank’s approval Date of the Procurement Plan: May 2014 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Method Threshold Prior Review Procurement Method US$ Threshold ICB (Goods and Non-consulting Equal to and above 1. services) 5,000,000 All NCB (Goods and Non- Equal to or above 2. Consulting Services) Below 5,000,000 US$ 1,000,000 Equal to or above 3 ICB (Works) 20,000,000 All Equal to or above 4. NCB (Works) Below 20,000,000 10,000,000 Shopping (Goods) Below US$ 100,000 None Shopping (Vehicles) - From 1st line distributors Below US$ 500,000 None 5. Shopping (Works) Below US$ 200,000 None 2. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 3. Procurement Packages with Methods 1 2 3 4 5 6 7 Ref Description Estimated Procureme Domestic Review Comments . Cost nt Preferen by Bank No. US$ Method ce (Prior / million (yes/no) Post) 01 Rehabilitation of 115 ICB No Prior Bakalori Dam and Rehabilitation/Impr ovement of Bakalori Irrigation Scheme 02 Rehabilitation and 85 ICB No Prior Improvement of Kano Irrigation Scheme 03 Rehabilitation and 60 ICB No Prior Extension of Hadejia Valley Irrigation Scheme 04 Rehabilitation of 6 40 ICB No Prior No. Dams 05 Supply and 0.6 NCB No Post Installation of Hydrometric Equipment for Sokoto Rima Basin 06 Flood Plain 1.35 NCB No Prior Mapping for EPP (BIP & MRVIP) 07 Bathymetric Survey 0.20 NCB No Post of Goronyo, Zobe and Bakolori Dams 08 Procurement of 0.3 Shopping No Post Field and Operational Vehicles 09 Procurement of 0.1 Shopping No Post Computers 10 Procurement of 0.1 Shopping No Post Office Equipment III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Method Threshold Prior Review (USD) Threshold (USD) 1. Competitive Methods (Firms); Equal to or above All QCBS, QBS, LCS, FCS 300,000 2. Consultant Qualification Below 300,000 None 3. Single Source Selection (Firms & N/A All Individuals) 4. Individuals N/A Above 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods 1 2 3 4 5 6 Ref. No. Description of Assignment Estimated Selection Review Comments Cost Method by Bank US$ (Prior / Post) Million 01 Engineering Supervision 2.7 QCBS Prior of the Rehabilitation of Bakalori Dam and Irrigation Scheme 02 Technical Assistance for 2.0 QCBS Prior Dam Safety Assurance & Training for Dam & Reservoir Dept. and RBDA Staff 03 Dam Safety Panel of 1.0 IC Prior Series of Experts individual consultant contracts on specific aspects of dam 04 Technical Feasibility and 2.0 QCBS Prior detailed Design of Dadin Kowa Irrigation Scheme 05 Engineering Supervision 1.5 QCBS Prior of Rehabilitation and Extension of Kano Rima Irrigation Scheme 06 Engineering Supervision 0.65 QCBS Prior of Rehabilitation and Extension of Hadejia Valley Irrigation Scheme 07 Elaboration of 1.0 QCBS Prior Resettlement Action Plan for Kano River and Hadejia Valley Irrigation Schemes 08 Technical Assistance for 1.5 QCBS Prior WUA in Bakalori and Middle Rima Valley Irrigation Schemes 09 Technical Assistance for 1.0 QCBS Prior WUA in Kano River and Hadejia Valley Irrigation Schemes. 10 Technical Assistance on 4.0 QCBS Prior Farmers-Market Linkages and for the Establishment of FMCs 11 Support to RBDAs; 1.5 QCBS Prior Assessment, capacity Building and Strategic Planning 12 Development of 1.0 QCBS Prior Information Database and information System 13 Development of an 1.0 QCBS Prior Electronic and Document Management System 14 ESIA for Kano River and 0.6 QCBS Prior Hadejia Valley Irrigation Schemes 15 ESIA for Dadin Kowa 0.5 QCBS Prior Irrigation Scheme 16 ESIA for Middle Rima 0.1 IC Prior Valley Irrigation Scheme 17 Development of M&E 0.06 IC Post Manual 18 Development of Financial 0.06 IC Post Management Manual 19 Applied Research Grant 2.3 N/A Prior Grantees will on Irrigated Agriculture be selected competitively on the bases of Call for Research Proposals PROCUREMENT Nigeria : Transforming Irrigation Management in Nigeria PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2017-04-05 2019-09-13 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P123112 GPN Date: Project Name: Transforming Irrigation Management in Nigeria Loan / Credit No: IDA / 55060 Executing Agency(ies): Transforming Irrigation Management In Nigeria Federal Coordinating Office WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-12728- CW-RFB / River Training Component 1: Water Works in the Hadejia- Resources Management and Single Stage - One IDA / 55060 Prior Request for Bids Open - National 5,100,000.00 3,663,272.09 Signed 2017-02-09 2017-02-09 2017-05-04 2017-06-19 2017-07-31 2020-06-29 Jama’are River Basin Dam Operation Envelope Located in Jigawa State, Improvement. Nigeria NG-TRIMING NCO-12726- Component 1: Water CW-RFB / Works for Resources Management and Open - Single Stage - One Rehabilitation and IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Canceled 2017-03-23 2017-03-23 2017-05-18 2017-07-17 2017-09-13 2021-09-06 Dam Operation International Envelope Expansion of Irrigation Improvement. Scheme in KRIS and HVIS NG-TRIMING NCO-14084- CW-RFB / Works for Component 2: Irrigation Open - Single Stage - One Rehabilitation and IDA / 55060 Development and Prior Request for Bids 79,920,874.00 73,941,076.47 Signed 2016-02-01 2016-02-23 2016-05-03 2016-08-06 2017-03-29 2021-03-08 International Envelope Conversion of Bakolori Management. Irrigation Scheme NG-TRIMING NCO-19039- CW-RFB / Rehabilitation of Component 4: Institutional Pending Single Stage - One 4Nos Houses for TRIMING IDA / 55060 Development and Project Post Request for Bids Open - National 239,862.00 0.00 Implementati 2015-11-11 2015-11-11 2015-12-15 2016-01-08 2016-01-18 2016-07-16 Envelope field officers at Bunkure Management. on under KRIP in Kano State FMWR/TRIMING/2018/ICB/ Component 1: Water W/01 / Dam Safety Pending Resources Management and Open - Single Stage - One improvement works of IDA / 55060 Prior Request for Bids 96,000,000.00 0.00 Implementati 2018-06-29 2018-07-27 2018-10-05 2018-11-02 2019-01-25 2022-02-25 Dam Operation International Envelope Bakolori, Zobe and Goronyo on Improvement. dams in two lots FMWR/TRIMING/2018/SH/W/ 01 / Rehabilitation of additional 3 Nos House for Housing of community radio Component 2: Irrigation Under at Hadejia Valley Irrigation Request for Single Stage - One IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-31 2018-05-04 2018-10-15 Scheme, Dadinkkowa and Quotations Envelope Management. on Goronyo Irrigation Schemes and Remodeling of Studio rooms at Bakolori and Kano Scheme FMWR/TRIMING/2018/SH/W/ 02 / Upgrading and Securing of 4nos Component 3: Enhancing Pending Agricultural Development Agricultural Productivity Request for Single Stage - One IDA / 55060 Post Open - National 70,000.00 0.00 Implementati 2018-04-25 2018-05-28 2018-09-12 Projects offices allocated for and Support to Value Quotations Envelope on TRIMING project Farmers Chains. Field and Business School activities FMWR/TRIMING/2018/NCB/ Component 3: Enhancing W/01 / Construction of Pending Agricultural Productivity Single Stage - One Farmers Management and IDA / 55060 Post Request for Bids Open - National 4,000,000.00 0.00 Implementati 2018-03-23 2018-04-13 2018-05-25 2018-06-13 2018-07-18 2019-02-22 and Support to Value Envelope Service Delivery Center in on Chains. 4 TRIMING project schemes Page 1 FMWR/TRIMING/2018/NCB/ W/02 / Construction of Tomato Collection Centers in Kano River Irrigation Component 3: Enhancing Pending Scheme to support tomato Agricultural Productivity Single Stage - One IDA / 55060 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2018-03-21 2018-03-26 2018-05-02 2018-05-23 2018-07-20 2018-11-17 farmers in their productive and Support to Value Envelope on alliances with Dangote Chains. tomato processing company and other offtakers in Nigeria FMWR/TRIMING/2018/SH/W/ 04 / Additional works at Kano River Irrigation Scheme, Hadejia Valley Component 2: Irrigation Pending Request for Single Stage - One Irrigation Scheme and IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-24 2018-05-03 2018-09-24 Quotations Envelope Bakolori Irrigation Scheme Management. on including one block, fence, gate houses, landscaping and BTC security wire FMWR/TRIMING/2016/ICB/ W/002 / Rehabilitation & Expansion of Kano River Component 1: Water Under Irrigation Scheme (KRIS) Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Implementati 2017-03-17 2017-03-23 2017-06-29 2017-12-18 2018-05-16 2022-04-29 and Hadejia Valley Irigation Dam Operation International Envelope on Scheme (HVIS) and Dam Improvement. Safety Remedial Works in Kano and Hadejia NG-TRIMING NCO-76567- CW-RFQ / Rehabilitation of Adjourning Structures, Fencing and Landscapping Component 2: Irrigation Pending Request for Single Stage - One of Farmers Meeting Hall, IDA / 55060 Development and Post Open - National 95,000.00 0.00 Implementati 2018-09-13 2018-10-17 2018-12-16 Quotations Envelope and Provisions of 8 Nos Management. on 1,000litres Water Tanks and Distribution to Residential Apartments at BIS NG-TRIMING NCO-76571- CW-RFQ / Emergency Component 1: Water Pending repairs of Goronyo dam Resources Management and Request for Single Stage - One IDA / 55060 Post Open - National 200,000.00 0.00 Implementati 2018-09-07 2018-10-15 2018-12-14 Spillway Radial Gate and Dam Operation Quotations Envelope on Gantry Cranes (as advised Improvement. by DPoEs) NG-TRIMING NCO-76533- CW-RFQ / Emergency Component 1: Water repairs of Goronyo dam Toe Resources Management and Request for Single Stage - One IDA / 55060 Post Open - National 150,000.00 122,802.17 Signed 2018-09-20 2018-10-19 2018-12-18 Drain Pump House and Dam Operation Quotations Envelope Pumps (as strongly advised Improvement. by DPoE) NG-TRIMING NCO-76528- CW-RFQ / Emergency Rehabilitation of 3No. 3- Component 2: Irrigation Pending Request for Single Stage - One Bedroom Houses and IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-09-07 2018-10-11 2018-12-10 Quotations Envelope Construction of Securing Management. on Fencing at Service Center No. 1 for the Army NG-TRIMING NCO-76583- CW-RFQ / Emergency Rehabilitation of 3No. Component 2: Irrigation Pending Junior Officers quarters at Request for Single Stage - One IDA / 55060 Development and Post Open - National 150,000.00 0.00 Implementati 2018-09-25 2018-11-04 2018-12-19 Yarkofoji and Construction Quotations Envelope Management. on of Securing Fencing at Service Center No. 1 for security personnel. FMWR/TRIMING/2019/ICB/ W/01 / Rehabilitation and Component 2: Irrigation Under expansion of Dadinkowa Single Stage - One IDA / 55060 Development and Prior Request for Bids Open - National 50,000,000.00 0.00 Implementati 2019-04-25 2019-04-30 2019-06-11 2019-07-11 2019-08-22 2020-11-05 Irrigation Scheme (Quick Envelope Management. on Wins of 2000ha) in Gombe State FMWR/TRIMING/2019/ICB/ W/02 / Additional Component 2: Irrigation Pending Open - Single Stage - One construction works of IDA / 55060 Development and Prior Request for Bids 20,000,000.00 0.00 Implementati 2019-05-23 2019-06-06 2019-07-18 2019-08-17 2019-09-28 2021-09-27 International Envelope 1000ha at Bakolori Management. on Irrigation Scheme(BIS) and 400ha at Jakaranwa Page 2 FMWR/TRIMING/2019/RFQ/ W/01 / Fencing, lanscaping Component 4: Institutional Pending and securing of schemes Request for Single Stage - One IDA / 55060 Development and Project Post Open - National 150,000.00 0.00 Implementati 2018-02-25 2018-04-04 2018-07-03 radio houses and equipment Quotations Envelope Management. on at MRVIS, DKIS, KRIS and HVIS FMWR/TRIMING/2019/ICB/ Component 1: Water Under W/03 / Rehabilitation and Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 45,000,000.00 0.00 Implementati 2019-03-20 2019-04-03 2019-05-15 2019-06-14 2019-07-22 2024-05-30 Improvement works for Dam Operation International Envelope on Bakolori and Zobe dams Improvement. FMWR/TRIMING/2019/ICB/ Component 1: Water W/04 / Rehabilitation and Pending Resources Management and Open - Single Stage - One Improvement works for IDA / 55060 Prior Request for Bids 35,000,000.00 0.00 Implementati 2019-03-20 2019-04-03 2019-05-15 2019-06-14 2019-07-26 2024-06-20 Dam Operation International Envelope Goronyo and River Training on Improvement. at MRVIS FMWR/TRIMING/2019/NCB/ W/01 / Removal of Typa grasses and acquatic weeds Component 1: Water Pending for restoration of Ruwan Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 3,000,000.00 0.00 Implementati 2019-04-20 2019-05-04 2019-06-15 2019-07-06 2019-08-13 2022-08-09 Kanyan Reservoir and the Dam Operation International Envelope on Hadejia Barrage for optima Improvement. performance under Dam Safety Improvement FMWR/TRIMING/2019/RFQ/ W/02 / Rehabilitation of 6 Component 2: Irrigation Pending Request for Single Stage - One nos. Project Managers IDA / 55060 Development and Post Limited 120,000.00 0.00 Implementati 2019-04-15 2019-05-20 2019-09-09 Quotations Envelope Offices of TRIMING Management. on intervention Schemes NG-TRIMING NCO-133311- CW-RFQ / Additional rehabilitation and reconstruction of Component 2: Irrigation Pending Request for Single Stage - One office/residential block, IDA / 55060 Development and Post Limited 100,000.00 0.00 Implementati 2019-09-30 2019-11-04 2019-12-16 Quotations Envelope fencing and landscaping at Management. on DKIS Colony and other works at Bakolori Community radio GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-11056- GO-RFB / PROCUREMENT Component 3: Enhancing OF SECOND PHASE Under Agricultural Productivity Single Stage - One 25,000 UNITS TOMATO IDA / 55060 Post Request for Bids Open - National 240,000.00 0.00 Implementati 2017-03-27 2017-04-01 2017-05-01 2017-05-31 2017-07-05 2018-01-01 and Support to Value Envelope PLASTIC CRATES TO on Chains. ANOTHER 500 TARGETTED FARMERS OF KRIP NG-TRIMING NCO-19047- GO-RFB / Procurement of Component 1: Water Pending customised boats and Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 830,079.00 0.00 Implementati 2016-03-08 2016-03-17 2016-04-16 2016-08-16 2016-12-07 2017-12-02 associated equipment for Dam Operation International Envelope on bathymetric survey of Improvement. Nigeria dams & reservoirs NG-TRIMING NCO-19040- GO-RFB / Procurement of various office equipment Component 4: Institutional Pending Single Stage - One and furniture for office and IDA / 55060 Development and Project Post Request for Bids Open - National 315,000.00 0.00 Implementati 2017-07-20 2017-07-25 2017-09-05 2017-09-19 2017-10-10 2018-01-08 Envelope residential appartments for Management. on 12nos houses in BIS, Zamfara State. NG-TRIMING NCO-18975- GO-RFQ / Procurement of personal protective Component 2: Irrigation Pending equipment for the Project Request for Single Stage - One IDA / 55060 Development and Post Open - National 40,000.00 0.00 Implementati 2017-08-01 2017-08-18 2017-09-11 site and safe use of Quotations Envelope Management. on chemicals e.g (Nose mask, Safety boots, glooves e.t.c) Phase 3 Page 3 NG-TRIMING NCO-18966- Component 3: Enhancing GO-RFB / Procurement of Pending Agricultural Productivity Single Stage - One agricultural equipment to IDA / 55060 Post Request for Bids Open - National 400,000.00 0.00 Implementati 2017-03-03 2017-03-07 2017-04-04 2017-05-15 2017-07-14 2017-10-12 and Support to Value Envelope support farmers organisation on Chains. on technology transfer NG-TRIMING NCO-18964- GO-RFQ / Procurement of additional 6nos Field and Operational Vehicles for Component 4: Institutional Pending Request for Single Stage - One Project Management IDA / 55060 Development and Project Post Open - National 400,000.00 0.00 Implementati 2017-10-25 2017-11-29 2017-12-27 Quotations Envelope logistics (1nos -18 seaters Management. on bus, 2nos Salon cars and 3nos 4WD for Project Managers). NG-TRIMING NCO-19034- GO-RFB / Procurement of various office equipment and furniture for office and Component 4: Institutional Pending residential apartments for Single Stage - One IDA / 55060 Development and Project Post Request for Bids Open - National 600,000.00 0.00 Implementati 2017-08-31 2017-09-05 2017-11-02 2017-11-16 2017-12-15 2018-03-15 BIS, DIS, HVIS and and Envelope Management. on Goronyo in Zamfara, Gombe, Jigawa and Sokoto State respectively under the TRIMING project (in lots) NG-TRIMING NCO-14025- GO-RFB / Procurement and Installation of Electronic Component 4: Institutional Under Open - Single Stage - One Records & Documents IDA / 55060 Development and Project Prior Request for Bids 2,000,000.00 0.00 Implementati 2018-01-30 2018-02-20 2018-04-03 2018-05-03 2018-06-19 2019-04-23 International Envelope Management System Management. on (ERDMS) Equipment and Associated Services FMWR/TRIMING/2018/NCB/ G/03 / Procurement of 20T Component 1: Water Pending Low Bed trailer with Crane Resources Management and Single Stage - One IDA / 55060 Post Request for Bids Open - National 480,000.00 0.00 Implementati 2018-04-02 2018-04-07 2018-04-30 2018-05-14 2018-06-18 2018-12-15 and 3,000litres Mobil fuel Dam Operation Envelope on dump for use by National Improvement. Water Resources Institute FMWR/TRIMING/2018/SH/G/ 01 / Procurement of Component 2: Irrigation Pending personal protective Request for Single Stage - One IDA / 55060 Development and Post Open - National 50,000.00 0.00 Implementati 2018-03-05 2018-04-03 2018-05-03 equipment and integrated Quotations Envelope Management. on pest management and safe use of chemical commodities Phase 4 FMWR/TRIMING/2018/NCB/ G/02 / Procurement of 65,000nos Additional Plastic Crates to Kano mRiver Component 3: Enhancing Pending Irrigation Scheme Tomato Agricultural Productivity Single Stage - One IDA / 55060 Post Request for Bids Open - National 950,000.00 0.00 Implementati 2018-04-16 2018-04-21 2018-05-19 2018-06-09 2018-07-21 2019-01-17 Farmers Association and and Support to Value Envelope on other Beneficiaries along Chains. Tomato Value Chains and Productive Alliance in all TRIMING project Schemes FMWR/TRIMING/2018/NCB/ G/01 / Additional Procurement of Agricultural Technology Land Leveling Component 3: Enhancing Pending and other Agricultural Agricultural Productivity Single Stage - One IDA / 55060 Post Request for Bids Open - National 750,000.00 0.00 Implementati 2018-03-19 2018-03-19 2018-04-16 2018-04-23 2018-05-28 2018-10-16 Equipment for Introduction and Support to Value Envelope on to Farmers and others Chains. Beneficiaries towards establishment of Farmers Management Centers FMWR/TRIMING/2018/SH/G/ 03 / Procurement of Protective Riding Gears and Component 3: Enhancing Pending High way Code for Agricultural Productivity Request for Single Stage - One IDA / 55060 Post Open - National 90,000.00 0.00 Implementati 2018-02-05 2018-04-02 2018-09-29 Motorcycle/Vehicles for and Support to Value Quotations Envelope on Extension officers and sign Chains. post for TRIMING Farmers Field and Business School Page 4 FMWR/TRIMING/2018/SH/G/ 04 / Procurement and Installation of Solar Panels Component 4: Institutional Pending and Inverters for TRIMING Request for Single Stage - One IDA / 55060 Development and Project Post Open - National 95,000.00 0.00 Implementati 2018-03-07 2018-04-09 2018-05-09 project Office/Residencies in Quotations Envelope Management. on Kano and three (3nos) field offices at Auyo, Dadin Kowa and Goronyo FMWR/TRIMING/2018/SH/G/ 05 / Procurement of Component 4: Institutional Request for Single Stage - One Laptops, Deskstops, IDA / 55060 Development and Project Post Open - National 90,000.00 74,197.20 Completed 2018-04-07 2018-05-08 2018-06-07 Quotations Envelope Scanners and printers for Management. PMU Kano and Abuja Offices FMWR/TRIMING/2018/SH/G/ 06 / Support to FMWR Component 4: Institutional Pending (Irrigation & Drainage Request for Single Stage - One IDA / 55060 Development and Project Post Open - National 50,000.00 0.00 Implementati 2018-04-07 2018-05-04 2018-06-04 Department) through Quotations Envelope Management. on procurement of required ICT Equipment. FMWR/TRIMING/2018/SH/G/ 07 / Procurement of various office equipment and Component 2: Irrigation Pending furniture for office and Request for Single Stage - One IDA / 55060 Development and Post Open - National 100,000.00 0.00 Implementati 2018-02-17 2018-04-07 2018-05-07 residential apartments for Quotations Envelope Management. on Bunkure, Kano River Irrigation Scheme in Kano State FMWR/TRIMING/2018/SH/G/ Component 3: Enhancing 08 / Procurement of 350nos Pending Agricultural Productivity Request for Single Stage - One signpost for Farmers Field IDA / 55060 Post Open - National 50,000.00 0.00 Implementati 2018-02-12 2018-03-16 2018-04-30 and Support to Value Quotations Envelope and Business School on Chains. Training school FMWR/TRIMING/2018/NCB/ G/04 / Procurement of Component 3: Enhancing services provider for Pending Agricultural Productivity Single Stage - One provision of Famers Field IDA / 55060 Post Request for Bids Open - National 400,000.00 0.00 Implementati 2018-02-26 2018-03-03 2018-03-17 2018-03-24 2018-04-05 2018-10-02 and Support to Value Envelope Business School training on Chains. materials and agricultural inputs for running of FFS FMWR/TRIMING/2018/SH/G/ 11 / Furnishing of four (4) Component 3: Enhancing Pending no. Agricultural Agricultural Productivity Request for Single Stage - One IDA / 55060 Post Open - National 100,000.00 0.00 Implementati 2018-04-28 2018-05-29 2018-06-28 Development Project offices and Support to Value Quotations Envelope on allocated for TRIMING Chains. Project activities NG-TRIMING NCO-54492- GO-RFB / Procurement and Installation of Hydrometric Component 1: Water Equipment and Related Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 4,500,000.00 4,497,263.29 Signed 2018-03-19 2018-03-19 2018-03-19 2018-04-06 2018-05-11 2021-04-25 Services for Sokoto Rima Dam Operation International Envelope and Hadejia Jama'are Basin Improvement. for Hydrometric Improvement FMWR/TRIMING/2016/ICB/G /001 / Procurement and Installation of Hydromet Component 1: Water Equipment and Provision of Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 4,500,000.00 0.00 Canceled 2017-10-12 2017-10-12 2017-11-30 2018-02-28 2018-04-20 2021-04-04 Related Services at Sokoto Dam Operation International Envelope Rima and Hadejia Jama’are Improvement. River Basins for Hydrometric Improvement FMWR/TRIMING/2018/SS/G/ Component 1: Water 01 / Bathymetric Survey of Under Resources Management and Tiga, Ruwankayan, Hadejia, IDA / 55060 Prior Direct Selection Direct 2,000,000.00 0.00 Implementati 2018-06-11 2018-06-16 2018-07-21 2019-01-17 Dam Operation Goronyo, Zobe, Dadin- on Improvement. 0Kowa, Challawa Dams/Reservoirs NG-TRIMING NCO-76576- GO-RFQ / Support to FMWR (Department of Component 4: Institutional Request for Single Stage - One Dams & Reservoir IDA / 55060 Development and Project Post Open - National 50,000.00 41,125.17 Signed 2018-09-15 2018-10-27 2018-11-26 Quotations Envelope Operations) through Management. procurement of required ICT Equipment. Page 5 NG-TRIMING NCO-76525- GO-RFQ / Purchase of 4 No Component 1: Water Generators for TRIMING Resources Management and Request for Single Stage - One Project Sites at the Four IDA / 55060 Post Open - National 100,000.00 82,495.88 Signed 2018-09-15 2018-10-19 2018-11-18 Dam Operation Quotations Envelope Schems (BIS- 100KVA, Improvement. HVIS - 60KVS, DKIS - 30KVA, & MRVIS - 50KVA) NG-TRIMING NCO-76524- GO-RFQ / Purchase of 3 No Component 2: Irrigation 4WD Utility vehicle for Request for Single Stage - One IDA / 55060 Development and Post Open - National 250,000.00 207,574.26 Completed 2018-09-30 2018-11-03 2018-12-03 Consultant Field Operation Quotations Envelope Management. for Bakolori Irrigation Civil Works NG-TRIMING NCO-76529- GO-RFQ / Modest furnishing and provision of Component 2: Irrigation Pending Request for Single Stage - One Solar Pannels and Inverters IDA / 55060 Development and Post Open - National 100,000.00 0.00 Implementati 2018-09-04 2018-10-30 2018-11-29 Quotations Envelope for the newly renovated Management. on Houses for Security Agencies covering BIS NG-TRIMING NCO-76530- GO-RFQ / Procurement of microsoft office applications Component 4: Institutional Pending and other relevant software Request for Single Stage - One IDA / 55060 Development and Project Post Open - National 65,000.00 0.00 Implementati 2018-10-05 2018-11-08 2018-12-08 for PMU, TRIMING project Quotations Envelope Management. on MIS Centers at FMWR, RBDAs and TRIMING Schemes NG-TRIMING NCO-76522- GO-RFQ / Support to Component 4: Institutional Under Request for Single Stage - One FPFMD through IDA / 55060 Development and Project Post Open - National 50,000.00 0.00 Implementati 2018-09-15 2018-10-10 2018-10-24 Quotations Envelope procurement of required ICT Management. on Equipment. NG-TRIMING NCO-91445- GO-RFQ / Procurement and installation of Component 2: Irrigation Pending Request for Single Stage - One communication Gadgets on IDA / 55060 Development and Post Limited 100,000.00 0.00 Implementati 2018-12-19 2019-01-16 2019-01-30 Quotations Envelope vehicles and for field works Management. on in TRIMING intervention sites as securities measures (BIS) FMWR/TRIMING/2019/NCB/ Component 3: Enhancing G/01 / Provision of Office Pending Agricultural Productivity Single Stage - One Furniture and Equipment IDA / 55060 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2019-03-18 2019-03-25 2019-04-22 2019-05-13 2019-06-24 2019-09-22 and Support to Value Envelope for the FMCs at BIS, KRIS on Chains. and MRVIS. FMWR/TRIMING/2019/NCB/ G/02 / Procurement of Agricultural Technology Component 3: Enhancing Equipment for the Pending Agricultural Productivity Single Stage - One Establishment and IDA / 55060 Post Request for Bids Open - National 950,000.00 0.00 Implementati 2019-04-24 2019-05-01 2019-05-29 2019-06-19 2019-07-31 2020-01-27 and Support to Value Envelope Development of on Chains. Mechanization in the FMCs at BIS, HVIS, KRIS and MRVIS. - LOT 1 FMWR/TRIMING/2019/NCB/ G/03 / Procurement and Component 3: Enhancing Installation of (FM Radio) Pending Agricultural Productivity Single Stage - One Equipment and associated IDA / 55060 Post Request for Bids Open - National 400,000.00 0.00 Implementati 2019-05-01 2019-05-08 2019-06-05 2019-06-26 2019-08-07 2019-11-05 and Support to Value Envelope furnishing for TRIMING on Chains. Project FM stations at BIS, HVIS, KRIS and MRVIS. FMWR/TRIMING/2019/NCB/ G/04 / Procurement and Installation of Solar Panels, Component 1: Water Inverters, Hybrid Batteries Pending Resources Management and Single Stage - One with solar inverters for IDA / 55060 Post Request for Bids Open - National 195,000.00 0.00 Implementati 2019-03-11 2019-03-16 2019-04-13 2019-04-27 2019-06-04 2019-10-02 Dam Operation Envelope TRIMING Project on Improvement. Office/Residences and Hydrometry observation stations Page 6 FMWR/TRIMING/2019/NCB/0 5 / Procurement of Services Provider for provision of Component 3: Enhancing Famers Field Business Pending Agricultural Productivity Single Stage - One School (FFSBS) Training IDA / 55060 Post Request for Bids Open - National 750,000.00 0.00 Implementati 2019-02-20 2019-02-27 2019-03-27 2019-04-17 2019-05-22 2021-05-21 and Support to Value Envelope Materials for Running of on Chains. FFBS in Wet and Dry Season for 2019/2020 and 2020/2021 FMWR/TRIMING/2019/NCB/ G/06 / Procurement and Installation, commissioning Component 1: Water Pending and Training of flow Resources Management and Single Stage - One IDA / 55060 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2019-03-10 2019-03-17 2019-04-14 2019-05-05 2019-06-16 2019-10-14 measurment devices in the Dam Operation Envelope on irrigation supply canal of Improvement. TRIMING dams and reservoirs FMWR/TRIMING/2019/ICB/G /01 / Procurement and Component 1: Water Pending Installation of Hydrometric Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 2,800,000.00 0.00 Implementati 2019-06-27 2019-07-11 2019-08-22 2019-09-21 2019-11-02 2021-11-01 Equipment and Related Dam Operation International Envelope on services for Upper Benue Improvement. River Basin FMWR/TRIMING/2019/RFQ/ G/07 / Procurement of 6Nos. Operational field vehicles Component 4: Institutional Pending for use by TRIMING Project Request for Single Stage - One IDA / 55060 Development and Project Post Limited 450,000.00 0.00 Implementati 2019-04-04 2019-05-09 2019-06-08 Managers, Basin Level Quotations Envelope Management. on Coordinators and for FMCs takeoff operation at BIS,HVIS,KRIS and MRVIS FMWR/TRIMING/2019/NCB/ G/08 / Procurement and Installations of ICT equipment & related services as Additional Component 4: Institutional Pending Support to Irrigation & Single Stage - One IDA / 55060 Development and Project Post Request for Bids Open - National 300,000.00 0.00 Implementati 2019-05-30 2019-06-06 2019-07-04 2019-07-25 2019-09-05 2019-12-04 Drainage Department, Dam Envelope Management. on & Reservoirs Operations Dept., Honourable Minister Office and the Project Change Management Committee FMWR/TRIMING/2019/RFQ/ G/02 / Procurement and installtion of communication Component 2: Irrigation Pending Gadgets on vechiles and for Request for Single Stage - One IDA / 55060 Development and Post Limited 100,000.00 0.00 Implementati 2019-02-20 2019-03-27 2019-04-26 field works in TRIMING Quotations Envelope Management. on intervention sites as securities measures (KRIS & HVIS) FMWR/TRIMING/2019/NCB/ G/09 / Supply and Installations including Component 4: Institutional Pending Single Stage - One provision of base platform IDA / 55060 Development and Project Post Request for Bids Open - National 140,000.00 0.00 Implementati 2019-05-09 2019-05-14 2019-06-11 2019-06-25 2019-07-30 2019-10-28 Envelope for the 5Nos Generators Management. on (60KVA) in 5Nos Radio Houses FMWR/TRIMING/2019/NCB/ G/10 / Procurement of Large Multipurpose Printers and GIS for use by the PMU and for the Component 4: Institutional Pending Single Stage - One establishment of GIS Units IDA / 55060 Development and Project Post Request for Bids Open - National 190,000.00 0.00 Implementati 2019-05-20 2019-05-27 2019-06-24 2019-07-15 2019-08-26 2019-12-24 Envelope in I & D-FMWR, TRIMING Management. on head offices in Abuja & Kano, TRIMING RBDA headquarters, and TRIMING scheme offices FMWR/TRIMING/2019/RFQ/ G/03 / Purchase of personal protective equipment and Component 3: Enhancing integrated pest management Pending Agricultural Productivity Request for Single Stage - One and safe use of chemical IDA / 55060 Post Limited 60,000.00 0.00 Implementati 2019-09-25 2019-10-30 2019-11-29 and Support to Value Quotations Envelope commodity and Waste on Chains. Seperation and Segregation Containers for TRIMING use Page 7 FMWR/TRIMING/2019/RFQ/ G/04 / Furnishing of 6nos Component 4: Institutional Pending Project Managers offices at Request for Single Stage - One IDA / 55060 Development and Project Post Limited 100,000.00 0.00 Implementati 2019-10-07 2019-11-11 2019-12-11 all TRIMING Project Quotations Envelope Management. on Schemes and TRIMING Library office in Kano NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-14028- Component 2: Irrigation Under NC-RFB / Detailed aerial Open - Single Stage - One IDA / 55060 Development and Prior Request for Bids 1,173,600.00 0.00 Implementati 2016-04-14 2016-04-14 2016-05-26 2016-06-25 2017-03-03 2017-10-29 topograhical survey of Dadin- International Envelope Management. on Kowa and Guyuk CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-14068- CS-QCBS / Technical Component 3: Enhancing Assistance on Farmers - Agricultural Productivity Quality And Cost- Open - Market Linkages,value chain IDA / 55060 Prior 5,179,190.00 4,732,203.54 Signed 2015-06-09 2015-06-09 2016-03-07 2016-04-25 2016-07-21 2017-04-28 2017-05-19 2021-04-28 and Support to Value Based Selection International development and for the Chains. establishment of FMC in 4 irrigation schemes NG-TRIMING NCO-14090- CS-QCBS / Design and Construction Supervision of Component 2: Irrigation Quality And Cost- Open - Dadin Kowa Irrigation IDA / 55060 Development and Prior 4,029,884.00 3,964,523.32 Signed 2015-04-10 2015-04-17 2015-12-08 2016-09-09 2016-10-09 2017-05-05 2017-06-16 2020-09-28 Based Selection International Scheme and feasibility Management. studies of Guyuk Irrigation Scheme NG-TRIMING NCO-14034- CS-QCBS / Consultancy Service for Construction Supervision for Rehabilitation and Component 1: Water Expansion of Kano River Resources Management and Quality And Cost- Open - IDA / 55060 Prior 5,000,000.00 5,275,353.25 Signed 2016-08-03 2016-08-10 2017-05-25 2017-07-06 2017-08-05 2017-09-09 2017-10-14 2022-09-18 Irrigation Scheme (KRIS) Dam Operation Based Selection International And Hadejia Valley Improvement. Irrigation Scheme (HVIS), Dam Safety / River Training Works in The Hadejia-Jama’are Basin. NG-TRIMING NCO-14022- CS-QCBS / Engineering Component 2: Irrigation Supervision of the Quality And Cost- Open - IDA / 55060 Development and Prior 4,043,083.00 3,442,767.00 Signed 2015-04-17 2015-04-17 2016-07-15 2016-09-09 2016-10-19 2017-04-28 2017-06-02 2020-09-30 Rehabilitation/conversion Based Selection International Management. area of Bakolori Irrigation Scheme NG-TRIMING NCO-14031- Component 1: Water CS-QCBS / Technical Resources Management and Quality And Cost- Open - IDA / 55060 Prior 2,500,000.00 4,130,477.74 Signed 2016-02-09 2016-03-01 2016-10-28 2016-12-23 2017-05-08 2017-06-12 2017-07-17 2020-07-01 Assistance for WUA in Dam Operation Based Selection International KRIS and HVIS Improvement. NG-TRIMING NCO-14076- CS-QCBS / Technical Component 1: Water Assistance for Dam Safety Resources Management and Quality And Cost- Open - Under IDA / 55060 Prior 1,421,626.00 0.00 2015-04-17 2015-04-17 2015-12-16 2016-02-10 2016-05-06 2016-07-21 2016-09-21 2019-09-06 Assurance & Training for Dam Operation Based Selection International Implementation Dam and Reservoir Dept. Improvement. and RBDA staff NG-TRIMING NCO-14092- CS-QCBS / Consulting Component 1: Water services for dams safety, Resources Management and Quality And Cost- Open - Pending IDA / 55060 Prior 1,500,000.00 0.00 2016-10-04 2016-10-11 2017-06-08 2017-07-20 2017-08-19 2017-09-16 2017-10-21 2019-04-14 improved hydrometry and Dam Operation Based Selection International Implementation IWRM Dadin Kowa Improvement. Irrigation Scheme Page 8 NG-TRIMING NCO-19031- CS-QCBS / Technical Component 2: Irrigation Assistance for WUA in Quality And Cost- Open - Under IDA / 55060 Development and Prior 2,156,440.00 0.00 2014-12-12 2015-01-30 2015-04-14 2015-05-12 2015-07-11 2016-02-02 2016-03-08 2019-06-19 Bakolori Irrigation Schemes Based Selection International Implementation Management. and Middle Rima valley Irrigation Scheme NG-TRIMING NCO-19048- CS-CQS / Consultancy Component 2: Irrigation Consultant Services for preparation of Pending IDA / 55060 Development and Post Qualification Open - National 286,040.00 0.00 2014-09-23 2014-10-14 2014-11-27 2014-12-27 2015-01-31 2015-07-30 ESIA for MRVIS with Implementation Management. Selection Goronyo Dam in Sokoto State NG-TRIMING NCO-19044- CS-CQS / Consultancy Component 2: Irrigation Consultant Pending Services for Preparation of IDA / 55060 Development and Post Qualification Open - National 127,700.00 0.00 2016-03-18 2016-04-08 2016-05-22 2016-06-21 2016-07-26 2017-01-22 Implementation Environmental and Social Management. Selection Assessment for Zobe Dam NG-TRIMING NCO-18972- Component 2: Irrigation Consultant Open - Pending CS-CQS / Elaboration of IDA / 55060 Development and Post Qualification 222,240.00 0.00 2016-02-01 2016-02-09 2016-06-03 2016-06-21 2016-08-19 2017-01-20 International Implementation RAP for KRIS Management. Selection NG-TRIMING NCO-19043- Component 2: Irrigation Consultant Pending CS-CQS / Elaboration of IDA / 55060 Development and Post Qualification Open - National 245,300.00 0.00 2016-02-09 2016-03-01 2016-04-14 2016-06-17 2016-08-19 2017-02-15 Implementation RAP for HVIS Management. Selection NG-TRIMING NCO-18962- Component 2: Irrigation Consultant Pending CS-CQS / ESIA Dadin IDA / 55060 Development and Post Qualification Open - National 271,899.00 0.00 2016-04-08 2016-10-07 2017-03-02 2017-04-27 2017-06-23 2018-03-12 Implementation Kowa Irrigation Scheme Management. Selection FWMR/TRIMING/2018/CQ/C S/01 / Elaboration and implementation of Component 2: Irrigation Consultant Pending resettlement action plan IDA / 55060 Development and Post Qualification Open - National 200,000.00 0.00 2018-07-03 2018-07-24 2018-08-10 2018-08-14 2018-08-28 2019-02-24 Implementation (RAP) for Jankarawa Management. Selection Irrigation and other Projects. FMWR/TRIMING/2018/QCBS Component 1: Water /CS/01 / Supervision of Dam Resources Management and Quality And Cost- Open - Under safety improvement works IDA / 55060 Prior 7,000,000.00 0.00 2018-04-10 2018-05-01 2018-06-14 2018-07-05 2018-07-12 2018-08-14 2018-10-19 2022-02-22 Dam Operation Based Selection International Implementation at Bakolori, Zobe and Improvement. Goronyo dams FWMR/TRIMING/2018/CQ/C S/02 / TA for review of existing studies and identification of development options for Zobe Irrigation Component 2: Irrigation Consultant Pending Scheme and prefeasibility IDA / 55060 Development and Post Qualification Open - National 295,000.00 0.00 2018-04-05 2018-04-19 2018-06-02 2018-07-02 2018-08-06 2018-12-28 Implementation studies of Dutse and Management. Selection Mairuwa Dams for the development of gravity irrigation potentials in Katsina State. FWMR/TRIMING/2018/CQ/C S/03 / Elaboration and Implementation of Component 2: Irrigation Consultant Under Resettlement Action Plan IDA / 55060 Development and Post Qualification Open - National 200,000.00 0.00 2018-04-05 2018-04-26 2018-06-09 2018-07-09 2018-08-13 2019-02-09 Implementation (RAP) for the Middle Rima Management. Selection Valley Irrigation Scheme, Sokoto State FMWR/TRIMING/2018/CS/C Q/04 / Review and Upgrade Component 2: Irrigation Consultant Pending of feasibility studies on IDA / 55060 Development and Post Qualification Open - National 295,000.00 0.00 2018-02-13 2018-03-06 2018-04-19 2018-05-19 2018-06-23 2018-12-20 Implementation Hadejia Valley Irrigation Management. Selection Project, Phase 1 stage 2 FMWR/TRIMING/QCBS/2016 /01 / TA for Construction Supervision of Kano River Component 1: Water and Hadejia Valley Resources Management and Quality And Cost- Open - Under IDA / 55060 Prior 5,000,000.00 0.00 2016-08-10 2016-08-10 2017-08-18 2017-10-30 2018-04-13 2018-05-17 2018-06-07 2022-06-07 Irrigation Schemes, Dams Dam Operation Based Selection International Implementation Safety and Rivers Training Improvement. in Hadejia-Jama’are River Basins Page 9 NG-TRIMING NCO-60760- CS-QCBS / Consultancy Services for Construction Component 1: Water Supervision of Kano River Resources Management and Quality And Cost- Open - Under and Hadejia Valley IDA / 55060 Prior 5,000,000.00 0.00 2016-08-10 2016-08-10 2017-08-18 2017-10-30 2018-04-26 2018-05-17 2018-05-31 2022-05-31 Dam Operation Based Selection International Implementation Irrigation Schemes, Dams Improvement. Safety and Rivers Training in Hadejia-Jama’are River Basins NG-TRIMING NCO-76564- CS-CQS / Recruitment of Component 4: Institutional Consultant Scheme Safeguards Officer Under IDA / 55060 Development and Project Post Qualification Open - National 20,000.00 0.00 2018-09-20 2018-09-27 2018-10-11 2018-10-25 2018-11-08 2019-11-03 in Bakolori irrigation Implementation Management. Selection Project (BIP) (Social Safeguards) FMWR/TRIMING/2019/QCBS /CS/01 / Consultancy contract for works Component 2: Irrigation Quality And Cost- Pending supervision of additional IDA / 55060 Development and Prior Open - National 1,000,000.00 0.00 2019-03-18 2019-04-01 2019-04-29 2019-05-27 2019-06-17 2019-07-08 2019-08-12 2022-08-11 Based Selection Implementation works (1400ha) at Bakolori Management. Irrigation Scheme (BIS) including Jankarawa FMWR/TRIMING/2019/CQS/ CS/02 / Feasibility studies Component 1: Water and technical specification Consultant Resources Management and Under for removal of aquatic IDA / 55060 Post Qualification Open - National 295,000.00 0.00 2019-03-18 2019-04-01 2019-05-06 2019-05-20 2019-06-17 2019-12-14 Dam Operation Implementation weeds from TRIMING dams Selection Improvement. and Reservoirs in Ruwan Kanya and Hadejia Barrage FMWR/TRIMING/2019/QCBS /CS/02 / Consultancy Service Component 1: Water for the Review and Resources Management and Quality And Cost- Open - Pending Completion of the IDA / 55060 Prior 900,000.00 0.00 2019-03-18 2019-04-01 2019-05-06 2019-05-20 2019-06-03 2019-07-01 2019-07-29 2021-07-28 Dam Operation Based Selection International Implementation Catchment Management Improvement. Area (CMA) in Hydrological Area 1. (Sokoto Rima Basin FMWR/TRIMING/2019/CQS/ CS/03 / Consultancy Component 1: Water Consultant Services for improved Resources Management and Under IDA / 55060 Post Qualification Open - National 290,000.00 0.00 2019-03-30 2019-04-13 2019-05-18 2019-06-01 2019-06-22 2019-12-19 hydrometry and IWRM of Dam Operation Implementation Selection the Gongola sub-Basin in Improvement. the Upper Benue Basin. FMWR/TRIMING/2019/CQS/ CS/04 / Technical Assistance on Integrated Pest Component 3: Enhancing Management and safe use Consultant Agricultural Productivity Under of chemicals for the IDA / 55060 Post Qualification Open - National 150,000.00 0.00 2019-02-28 2019-03-14 2019-04-18 2019-05-02 2019-05-30 2019-11-26 and Support to Value Implementation Farmers Field Business Selection Chains. School facilitators and step down trainings for farmer facilitators FMWR/TRIMING/2018/QCBS Component 4: Institutional /CS/02 / Periodic M & E Quality And Cost- Open - IDA / 55060 Development and Project Prior 350,000.00 0.00 Canceled 2018-02-20 2018-03-13 2018-04-26 2018-05-24 2018-06-23 2018-07-28 2018-09-01 2019-09-01 data collection and midterm Based Selection International Management. Impact evaluation FMWR/TRIMING/2019/CQS/ CS/01 / Gender Based Violence mapping of Component 2: Irrigation Consultant Under TRIMING Project IDA / 55060 Development and Prior Qualification Open - National 120,000.00 0.00 2019-03-28 2019-04-11 2019-05-16 2019-05-30 2019-06-16 2019-10-14 Implementation participating schemes and Management. Selection development of a proactive prevention response plan NG-TRIMING NCO-114549- CS-QCBS / Consultancy Services for Periodic M&E Component 4: Institutional Quality And Cost- Open - Under Data Collection, Impact IDA / 55060 Development and Project Prior 900,000.00 0.00 2019-05-30 2019-06-13 2019-07-11 2019-08-08 2019-08-22 2019-09-19 2019-10-17 2022-03-31 Based Selection International Implementation Evaluations and Completion Management. Report for the TRIMING Project INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Page 10 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-14061- Component 3: Enhancing CS-CDS / Supervision of Agricultural Productivity ADP on Extension service IDA / 55060 Prior Direct Selection Direct 450,000.00 447,571.03 Signed 2016-11-11 2016-12-14 2017-05-26 2018-01-21 and Support to Value delivery in all TRIMING Chains. Project Schemes by IFDC NG-TRIMING NCO-19036- CS-CDS / Technical Assistance on Quality Component 2: Irrigation Assuarance and Quality Under IDA / 55060 Development and Post Direct Selection Direct 90,000.00 0.00 2017-06-20 2017-07-01 2017-07-14 2018-03-11 Control of aerial(LiDar) Implementation Management. survey for Dadin-Kowa and Guyuk proposed scheme (Gongola Sub-Basin) NG-TRIMING NCO-19809- CS-CDS / Third phase of Technical Assistance and Capacity Building on Integrated Pest Management Component 3: Enhancing and Safe use of Chemicals Agricultural Productivity Pending IDA / 55060 Post Direct Selection Direct 100,000.00 0.00 2017-09-29 2017-10-09 2017-12-13 2018-06-11 targeted at the staffs of the and Support to Value Implementation proposed consultancy on the Chains. Establishment of Farmers Management Service Centers and retraining of the ADPs FWMR/TRIMING/2018/IC/CS/ 01 / Preparation of site- specific Environmental & Component 2: Irrigation Individual Pending Social Management Plan IDA / 55060 Development and Post Consultant Open 100,000.00 0.00 2018-07-03 2018-08-21 2018-09-11 2018-10-16 2019-04-14 Implementation (ESMP) for Jankarawa Management. Selection Irrigation and other Projects. FWMR/TRIMING/2018/SS/CS /01 / Consultancy services Component 3: Enhancing for demonstration of small Agricultural Productivity Pending laser leveling IDA / 55060 Prior Direct Selection Direct 100,000.00 0.00 2018-04-28 2018-05-08 2018-07-12 2018-09-18 and Support to Value Implementation equipment/Technique for Chains. farm irrigation practices for TRIMING project sites. FWMR/TRIMING/2018/SS/CS /02 / 4th phase of TA and Capacity Building on Integrated Pest Management Component 3: Enhancing and Safe use of Chemicals Agricultural Productivity Pending targeted at the staffs of the IDA / 55060 Prior Direct Selection Direct 100,000.00 0.00 2018-09-05 2018-09-15 2018-10-31 2019-04-29 and Support to Value Implementation proposed consultancy on the Chains. Establishment of Farmers Management Service Centers and retraining of the ADPs FWMR/TRIMING/2018/SS/CS /03 / Consultancy Services Component 4: Institutional Pending for computerized Accounting IDA / 55060 Development and Project Post Direct Selection Direct 35,000.00 0.00 2018-10-01 2018-10-11 2018-12-15 2019-06-13 Implementation software upgrade for Management. TRIMING project stores FWMR/TRIMING/2018/IC/CS/ 02 / Technical backstop Component 4: Institutional Individual Pending services for the IDA / 55060 Development and Project Post Consultant Open 90,000.00 0.00 2018-06-13 2018-07-18 2018-08-01 2018-08-29 2019-02-25 Implementation implementation of TRIMING Management. Selection M&E system FWMR/TRIMING/2018/SS/CS /04 / Consultancy Services Component 4: Institutional Pending for Training of FMWR/PMU IDA / 55060 Development and Project Prior Direct Selection Direct 95,000.00 0.00 2018-04-23 2018-05-07 2018-06-25 2018-08-24 Implementation on FIDIC contract Management. management FWMR/TRIMING/2018/IC/CS/ Component 4: Institutional Individual Under 03 / Techanical Assistance IDA / 55060 Development and Project Post Consultant Open 100,000.00 0.00 2018-03-12 2018-04-30 2018-05-21 2018-06-25 2018-12-22 Implementation _Irrigation Specialist Management. Selection FWMR/TRIMING/2018/IC/CS/ Component 4: Institutional Individual 04 / Techanical Under IDA / 55060 Development and Project Post Consultant Open 100,000.00 0.00 2018-03-12 2018-04-09 2018-04-13 2018-04-27 2019-04-27 Assistance_Dam Safety Implementation Management. Selection Specialist Page 11 FWMR/TRIMING/2018/IC/CS/ Component 4: Institutional Individual 05 / Techanical Under IDA / 55060 Development and Project Post Consultant Open - National 100,000.00 0.00 2018-03-12 2018-04-09 2018-04-12 2018-04-23 2019-04-23 Assistance_Contract Implementation Management. Selection Management Specialist FMWR/TRIMING/2018/IC/CS/ 06 / Engagement of IT Component 4: Institutional Individual Under Consultant for the IDA / 55060 Development and Project Post Consultant Limited 100,000.00 0.00 2018-06-15 2018-06-20 2018-07-11 2018-08-15 2019-02-11 Implementation supervision of ERDMS Management. Selection Implementation/Roll out NG-TRIMING NCO-75569- CS-CDS / Innovative Research and Development on Participatory Soil Component 3: Enhancing Salinity/Sodicity Agricultural Productivity Under IDA / 55060 Prior Direct Selection Direct 400,000.00 0.00 2018-09-12 2018-09-22 2018-10-07 2021-09-21 Management for Sustainable and Support to Value Implementation Crop Productivity under Chains. Irrigation and Improved Livelihood in Kano River Irrigation Scheme (KRIS) NG-TRIMING NCO-76575- CS-CDS / Addendun No. 1 Component 3: Enhancing to Supervision of ADP on Agricultural Productivity IDA / 55060 Prior Direct Selection Direct 495,000.00 837,681.69 Signed 2018-09-23 2018-10-14 2018-11-18 2019-11-13 Extension service delivery in and Support to Value all TRIMING Project Chains. Schemes by IFDC NG-TRIMING NCO-76531- CS-INDV / Recruitment of Component 4: Institutional Individual Scheme Safeguards Officer Under IDA / 55060 Development and Project Post Consultant Open 20,000.00 0.00 2018-09-20 2018-10-11 2018-10-25 2018-11-08 2019-11-03 in Hadejia Jamare sub Implementation Management. Selection Basin with KRIS and HVIS (Social Safeguards) NG-TRIMING NCO-76569- CS-INDV / Recruitment of Component 4: Institutional Individual Scheme Safeguards Officer Under IDA / 55060 Development and Project Post Consultant Open 20,000.00 0.00 2018-09-20 2018-10-11 2018-10-25 2018-11-08 2019-11-03 in Hadejia Valley irrigation Implementation Management. Selection Project (HVIP) (Social Safeguards) NG-TRIMING NCO-76582- CS-INDV / Recruitment of Component 4: Institutional Individual Under Scheme Safeguards Officer IDA / 55060 Development and Project Post Consultant Open 20,000.00 0.00 2018-09-20 2018-10-11 2018-10-25 2018-11-08 2019-11-03 Implementation in dadinkowa Irrigation Management. Selection Scheme (Social Safeguards) NG-TRIMING NCO-76566- CS-CDS / Engagement of Component 2: Irrigation Third Party NGO through Under IDA / 55060 Development and Post Direct Selection Direct 50,000.00 0.00 2018-09-15 2018-09-27 2018-10-14 2021-09-28 an MOU (RAP Implementation Management. Implementation) for Bakolori Irrigation Scheme (BIS) NG-TRIMING NCO-76526- CS-CDS / Engagement of Third Party NGO through Component 2: Irrigation Under an MOU (RAP IDA / 55060 Development and Post Direct Selection Direct 50,000.00 0.00 2018-09-15 2018-09-27 2018-10-14 2020-10-03 Implementation Implementation) for Management. Hadejia Valley Irrigation Scheme (HVIS) NG-TRIMING NCO-76584- CS-CDS / Addendum No. 1 - TA for Dam Safety Assurance- Emergency Component 1: Water Preparedness Plan and Resources Management and Under Action Plan Framework and IDA / 55060 Prior Direct Selection Direct 1,200,000.00 0.00 2018-09-30 2018-10-21 2018-12-16 2020-12-05 Dam Operation Implementation detailed studies of the effect Improvement. of Dam Break on Downstream settlement for TRIMING Project Dams (7. Nos) NG-TRIMING NCO-76532- Component 1: Water CS-INDV / Technical Resources Management and Under Assistance for IDA / 55060 Prior Direct Selection Direct 100,000.00 0.00 2018-09-25 2018-10-14 2018-12-09 2020-11-28 Dam Operation Implementation Implementation Support of Improvement. WUA regulations Page 12 NG-TRIMING NCO-75571- CS-CDS / Innovative Research and Development for Identification and Component 3: Enhancing Implementation of Land Agricultural Productivity Under IDA / 55060 Prior Direct Selection Direct 400,000.00 0.00 2018-09-12 2018-09-22 2018-10-07 2021-09-21 Administration and and Support to Value Implementation Consolidation Approaches for Chains. Sustainable Development of Dadin-Kowa Irrigation Project (DKIP) NG-TRIMING NCO-77750- CS-CDS / Additional Studies Component 2: Irrigation and Design for the IDA / 55060 Development and Prior Direct Selection Direct 300,000.00 240,321.94 Signed 2018-11-20 2018-12-11 2019-01-08 2019-09-05 Jankarawa Intervention as Management. Part of the Bakolori Irrigation Scheme NG-TRIMING NCO-83840- CS-CDS / Consultancy Component 4: Institutional Services for Periodic M & E Under IDA / 55060 Development and Project Prior Direct Selection Direct 250,000.00 0.00 2018-10-31 2018-11-28 2019-01-09 2019-04-17 data collection and Mid - Implementation Management. Term Impact Evaluation Review NG-TRIMING NCO-76523- CS-CDS / Engagement of Third Party NGO through Component 2: Irrigation Pending an MOU (RAP IDA / 55060 Development and Prior Direct Selection Direct 65,000.00 0.00 2018-09-15 2018-09-25 2018-10-06 2021-09-20 Implementation Implementation) for Kano Management. River Irrigation Scheme (KRIS) NG-TRIMING NCO-88280- CS-INDV / Recruitment of Component 4: Institutional Individual Under TRIMING Project Secretary IDA / 55060 Development and Project Post Consultant Open 20,000.00 0.00 2018-12-10 2019-01-14 2019-01-21 2019-02-04 2020-02-04 Implementation with particular focus to the Management. Selection Project Coordinator’s Office NG-TRIMING NCO-88279- Component 4: Institutional Individual CS-INDV / Recruitment of Under IDA / 55060 Development and Project Post Consultant Open 20,000.00 0.00 2018-12-10 2019-01-21 2019-01-28 2019-02-11 2020-02-11 TRIMING Project Front Implementation Management. Selection Desk Officer / Receptionist NG-TRIMING NCO-91462- Component 2: Irrigation Individual Under CS-INDV / TRIMING IDA / 55060 Development and Post Consultant Limited 100,000.00 0.00 2018-12-14 2018-12-19 2018-12-26 2019-01-09 2020-01-09 Implementation Security Coordinator for BIS Management. Selection FMWR/TRIMING/2019/INDV/ CS/01 / Elaboration and Component 2: Irrigation Individual implementation of Pending IDA / 55060 Development and Post Consultant Limited 50,000.00 0.00 2019-03-28 2019-04-11 2019-04-25 2019-05-16 2019-11-12 Resettlement Action Plan Implementation Management. Selection For additional works in Bakolori Irrigation Scheme FMWR/TRIMING/2019/INV/C S/02 / Engagement of Component 2: Irrigation Individual TRIMING Security Pending IDA / 55060 Development and Post Consultant Limited 100,000.00 0.00 2019-02-25 2019-03-02 2019-03-09 2019-04-06 2021-04-05 Coordinator for BIS for Implementation Management. Selection initial period of two (2) years FMWR/TRIMING/2019/INV/C S/03 / TA on Mentoring of Component 1: Water SRBDA staff attached to Individual Resources Management and Under Bakolori dam on dam safety IDA / 55060 Post Consultant Limited 100,000.00 0.00 2019-02-25 2019-03-11 2019-03-25 2019-04-29 2021-04-28 Dam Operation Implementation operations and Selection Improvement. instrumentation for two (2) years FMWR/TRIMING/2019/INV/C S/04 / TA on Mentoring of Component 1: Water UBRDA staff attached to Individual Resources Management and Under Dadin Kowa dam on dam IDA / 55060 Post Consultant Limited 100,000.00 0.00 2019-02-25 2019-03-04 2019-03-18 2019-04-15 2021-04-14 Dam Operation Implementation safety operations and Selection Improvement. instrumentation for two (2) years FMWR/TRIMING/2019/INDV/ Component 4: Institutional Individual CS/02 / Engagement of two Pending IDA / 55060 Development and Project Post Consultant Limited 20,000.00 0.00 2019-04-15 2019-04-29 2019-05-13 2019-06-10 2020-06-09 (2Nos) Procurement Implementation Management. Selection Asssitant Page 13 NG-TRIMING NCO-101094- CS-CDS / Engagement of Component 2: Irrigation Third Party NGO through Pending IDA / 55060 Development and Prior Direct Selection Direct 50,000.00 0.00 2019-03-18 2019-04-15 2019-05-13 2022-04-27 an MOU (RAP Implementation Management. Implementation) for Bakolori Irrigation Scheme (BIS) NG-TRIMING NCO-101098- CS-CDS / Engagement of Third Party NGO through Component 2: Irrigation Pending an MOU (RAP IDA / 55060 Development and Prior Direct Selection Direct 50,000.00 0.00 2019-03-18 2019-04-15 2019-05-13 2021-05-02 Implementation Implementation) for Hadejia Management. Valley Irrigation Scheme (HVIS) NG-TRIMING NCO-102152- CS-CDS / TA for Component 1: Water Consultancy Services for Resources Management and Under IDA / 55060 Prior Direct Selection Direct 350,000.00 0.00 2019-03-15 2019-04-08 2019-05-13 2019-11-09 Dam Safety of Dadinkowa Dam Operation Implementation Irrigation Scheme (DKIS) in Improvement. upper Benue River Basin FMWR/TRIMING/2019/CDS/ CS/01 / Consultancy Services for engagement of PSC-1 Secuirty firm for Component 2: Irrigation Under Provision of Project Risk IDA / 55060 Development and Prior Direct Selection Direct 1,200,000.00 0.00 2019-08-10 2019-08-24 2019-10-05 2020-10-04 Implementation Manager (PRM) and Management. Security Coordinators at BIS, KRIS, HVIS and DKIS at TRIMING sites NG-TRIMING NCO-129623- CS-INDV / Upgrade of the Monitoring and Evaluation Component 4: Institutional Individual Under (M&E) Application of the IDA / 55060 Development and Project Post Consultant Limited 80,000.00 0.00 2019-09-25 2019-10-02 2019-10-16 2019-11-13 2020-05-11 Implementation Transforming Irrigation Management. Selection Management in Nigeria (TRIMING) Project Page 14