Procurement Plan P159756 M2PATE I. General 2. Bank’s approval Date of the procurement Plan: 16 mars 2017 3. Date of General Procurement Notice: None 4. Period covered by this procurement plan: Nov 2016 à Nov 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [ not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: En cours de preparation 5. Any Other Special Procurement Arrangements: [Not applicable] 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] July 9, 2010 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) July 9, 2010 Summary of 1.40 4 Prior number of contracts that will be let under QCBS Summary of 0.11 4 Prior ICS number of contracts that will be let under other methods Summary of 0..30 4 Post ICS number of contracts that will be let under other methods Summary of 0.20 1 Prior SSS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Madagascar : Integrated Urban Development and Resilience Project for Greater Antananarivo PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-03-30 2019-09-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159756 GPN Date: Project Name: Integrated Urban Development and Resilience Project for Greater Antananarivo Loan / Credit No: IDA / V0550, / , IDA / 62450 Executing Agency(ies): Ministry to the Presidency for Presidential Projects, Planning and Equipment WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-61115-CW-DIR Project Management, Passation de / Aménagement de bureaux IDA / V0550 Coordination, Monitoring A posteriori marché de gré à Direct 19,977.98 Signé 2018-05-03 2018-05-08 2018-05-29 2018-08-27 pour l'Unité de Gestion de and Evaluation gré Projet (UGP) MG-M2PATE-103005-CW- Improving urban drainage, Open - Single Stage - One En cours RFB / Travaux sur canal C3 IDA / 62450 services and resilience in A priori Appel d'offres 0.00 2019-02-26 2019-05-15 2019-05-24 2019-03-22 2019-07-07 2019-08-01 2019-08-12 2021-11-13 International Envelope d'examen et confortement des digues targeted areas MG-M2PATE-103530-CW- RFB / Travaux Improving urban drainage, Open - Single Stage - One En cours d'aménagement du site de IDA / 62450 services and resilience in A posteriori Appel d'offres 0.00 2019-03-11 2019-05-29 2019-06-14 2019-04-05 2019-07-28 2019-08-17 2019-08-30 2020-02-26 International Envelope d'exécution confinement des boues de targeted areas curage MG-M2PATE-103532-CW- Improving urban drainage, Open - Single Stage - One En cours RFB / Travaux de site de IDA / 62450 services and resilience in A posteriori Appel d'offres 0.00 2019-03-04 2019-05-15 2019-07-22 2019-03-22 2019-09-24 2019-10-14 2019-10-25 2020-08-20 International Envelope d'exécution réinstallation C1.1 targeted areas MG-M2PATE-103581-CW- RFB / Travaux de construction et de Improving urban drainage, réhabilitation des Open - Single Stage - One En cours IDA / 62450 services and resilience in A posteriori Appel d'offres 0.00 2019-04-22 2019-07-05 2019-10-20 2019-05-17 2019-12-18 2020-01-02 2020-01-13 2021-05-07 infrastructures sanitaires et International Envelope d'exécution targeted areas de mobilité ( travaux quick Win - travaux facilement à exécuter) MG-M2PATE-126089-CW- Strenghtening institutional RFQ / Travaux Single Stage - One En attente IDA / 62450 capacity for resilient urban A posteriori Demande de prix Limited 0.00 2019-08-17 2019-10-05 2019-11-04 d'aménagement de la salle Envelope d'exécution governance de réunion de l'UGMP GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-13250-GO-RFQ Project Management, / Acquisition de Matériels Single Stage - One IDA / V0550 Coordination, Monitoring A posteriori Demande de prix Open - National 40,247.14 Signé 2017-04-25 2017-06-20 2017-12-17 informatiques et Envelope and Evaluation bureautiques MG-M2PATE-13261-GO-RFQ Project Management, / Acquisition de logiciels Single Stage - One IDA / V0550 Coordination, Monitoring A posteriori Demande de prix Open - National 32,630.27 Signé 2017-04-25 2017-06-20 2017-12-17 (Comptabilité, SIG, Envelope and Evaluation Techniques, Antivirus) Page 1 MG-M2PATE-13272-GO-RFQ Project Management, Single Stage - One / Acquisition d'équipements IDA / V0550 Coordination, Monitoring A posteriori Demande de prix Open - National 5,700.89 Signé 2017-04-25 2017-06-20 2017-12-17 Envelope et mobiliers de bureau and Evaluation MG-M2PATE-125027-GO-UN Passation de Project Management, / Acquisition de voitures marchés auprès En cours IDA / 62450 Coordination, Monitoring A posteriori Direct 0.00 2019-07-29 2019-08-13 2019-09-13 2019-11-12 pour le fonctionnement de des agences de d'exécution and Evaluation l'UGP l'ONU MG-M2PATE-125036-GO- Project Management, RFQ / Acquisition de motos Single Stage - One En cours IDA / 62450 Coordination, Monitoring A posteriori Demande de prix Limited 0.00 2019-08-03 2019-09-21 2019-10-21 pour le fonctionnement de Envelope d'exécution and Evaluation l'UGP MG-M2PATE-125037-GO- RFQ / Achat groupé de Project Management, Single Stage - One En cours matériel et équipement IDA / 62450 Coordination, Monitoring A posteriori Demande de prix Limited 0.00 2019-08-06 2019-09-24 2019-11-08 Envelope d'exécution informatique pour la mise and Evaluation en œuvre du Projet MG-M2PATE-125964-GO- Project Management, RFQ / Acquisition Single Stage - One En attente IDA / 62450 Coordination, Monitoring A posteriori Demande de prix Limited 0.00 2019-08-06 2019-09-24 2019-10-24 d'équipements et mobiliers Envelope d'exécution and Evaluation de bureau pour l'UGP MG-M2PATE-125972-GO- RFQ / Acquisition de Strenghtening institutional mobiliers de bureau pour Single Stage - One En cours IDA / 62450 capacity for resilient urban A posteriori Demande de prix Limited 0.00 2019-09-14 2019-10-19 2019-11-18 l'UGMP et mobilier Envelope d'exécution governance d'archivage des dossiers administratifs du personnel MG-M2PATE-125977-GO- Strenghtening institutional RFQ / acquisition de Single Stage - One En attente IDA / 62450 capacity for resilient urban A posteriori Demande de prix Limited 0.00 2019-09-14 2019-11-02 2019-12-02 matériels informatique pour Envelope d'exécution governance l'UGMP MG-M2PATE-125983-GO- Project Management, RFQ / Fournitures de Single Stage - One En attente IDA / 62450 Coordination, Monitoring A posteriori Demande de prix Limited 0.00 2019-08-07 2019-09-25 2019-10-10 bureau pour le Envelope d'exécution and Evaluation fonctionnement de l'UGP MG-M2PATE-126085-GO- Strenghtening institutional Passation de DIR / Acquisition d'une IDA / 62450 capacity for resilient urban A posteriori marché de gré à Direct 1,074.12 Signé 2019-08-12 2019-08-17 2019-09-01 2019-09-21 image Orthophoto dans le governance gré cadre des activités de l'OATF NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-102997-NC- RFQ / Mission Improving urban drainage, d'investigations physiques Single Stage - One En cours IDA / V0550 services and resilience in A posteriori Demande de prix Limited 0.00 2019-02-27 2019-03-06 2019-03-19 des sites de dépôt et de Envelope d'exécution targeted areas confinement des boues de curage MG-M2PATE-126092-NC- Project Management, Single Stage - One En attente RFQ / Prestation de IDA / 62450 Coordination, Monitoring A posteriori Demande de prix Limited 0.00 2019-09-21 2019-11-09 2019-11-12 Envelope d'exécution dédouanement des véhicules and Evaluation Page 2 MG-MAHTP-132997-NC-DIR / Recrutement d’un Strenghtening institutional Passation de En attente prestataire pour appui à la IDA / 62450 capacity for resilient urban A posteriori marché de gré à Direct 0.00 2019-09-11 2019-09-16 2019-10-01 2019-10-11 d'exécution logistique du Forum governance gré National Urbain 3è édition CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-12833-CS- QCBS / 1.1 Etudes Improving urban drainage, Sélection fondée Open - En cours d'urbanisme, de résorption IDA / V0550 services and resilience in A priori sur la qualité et 0.00 2017-05-03 2017-05-24 2017-07-07 2017-08-04 2017-09-03 2017-10-08 2017-11-12 2018-11-12 International d'exécution des quartiers précaires et targeted areas le coût d'ingénierie sur la zone d'intervention cible Sélection fondée MG-M2PATE-12509-CS-CQS Project Management, sur les / 5.8 - Recrutement d'un IDA / V0550 Coordination, Monitoring A posteriori Open - National 0.00 Annulé 2017-04-10 2017-05-01 2017-06-14 2017-07-14 2017-08-18 2018-02-14 qualifications des consultant comptable and Evaluation consultants MG-M2PATE-12854-CS- QCBS / 2.1 Etudes de techniques d'aménagement et Sélection fondée de définition des actions Open - / A priori sur la qualité et 0.00 Annulé 2017-04-14 2017-05-05 2017-06-18 2017-07-16 2017-08-15 2017-09-19 2017-10-24 2018-10-24 prioritaires et DAO des International le coût infrastructures d'hydraulique urbaine (drainage et protection) MG-M2PATE-12840-CS- QCBS / 1.3 Etudes pour l'élaboration du Cadre de Gestion Environnementale et Sociale (CGES), des Plans Sélection fondée Open - de Gestion Environnementale / A priori sur la qualité et 0.00 Annulé 2017-04-14 2017-05-05 2017-06-18 2017-07-16 2017-08-15 2017-09-19 2017-10-24 2018-10-24 International et Sociale (PGES), du cadre le coût de politique de réinstallation des Populations (CPR) et les Plans d'Action de Recasement (PAR) MG-M2PATE-61124-CS-LCS Project Management, Sélection au En cours / Sélection d'un cabinet de IDA / V0550 Coordination, Monitoring A posteriori Open - National 0.00 2018-04-30 2018-05-05 2018-05-15 2018-06-05 2018-06-15 2018-06-25 2018-07-14 2018-10-27 moindre coût d'exécution recrutement des consultants and Evaluation MG-M2PATE-61121-CS- QCBS / Etudes APS/APD/DAO (et Contrôle Improving urban drainage, Sélection fondée et Surveillance) des travaux Open - En cours IDA / V0550 services and resilience in A posteriori sur la qualité et 0.00 2018-04-30 2018-05-05 2018-06-25 2018-07-10 2018-07-20 2018-08-13 2018-09-17 2018-12-31 d'aménagement, de International d'exécution targeted areas le coût viabilisation et de construction sur les sites de réinstallation des PAPs (drainage) MG-M2PATE-13246-CS- Project Management, Sélection fondée INDV / 5.3 Audit externe Open - IDA / V0550 Coordination, Monitoring A priori sur la qualité et 0.00 Annulé 2017-10-23 2017-11-13 2017-12-27 2018-01-24 2018-02-23 2018-03-30 2018-05-04 2019-05-04 des comptes du la International and Evaluation le coût préparation du projet MG-M2PATE-74757-CS- QCBS / Maîtrise d'œuvre Improving urban drainage, Sélection fondée Open - En cours institutionnelle et sociale IDA / 62450 services and resilience in A posteriori sur la qualité et 0.00 2018-08-21 2018-08-31 2018-10-05 2018-11-19 2018-12-03 2018-12-19 2019-01-23 2022-01-07 International d'exécution (MOIS) pour la mise en targeted areas le coût œuvre du PAR et du PGES Page 3 MG-M2PATE-76352-CS-CQS Sélection fondée / Recrutement d'un opérateur Improving urban drainage, sur les En cours foncier (processus IDA / 62450 services and resilience in A posteriori Limited 0.00 2018-08-30 2018-09-26 2018-12-10 2019-01-14 2020-01-09 qualifications des d'exécution administratif, foncier, CAE, targeted areas consultants processus de paiement...) MG-M2PATE-103594-CS- QCBS / Supervision des Improving urban drainage, Sélection fondée Open - En cours travaux C3 et digue et du IDA / 62450 services and resilience in A posteriori sur la qualité et 0.00 2019-03-04 2019-03-21 2019-05-20 2019-07-03 2019-07-28 2019-08-22 2019-09-19 2021-12-07 International d'exécution site de dépôt des boues de targeted areas le coût curage MG-M2PATE-103604-CS- QCBS / Etudes APD-DAO et Improving urban drainage, Sélection fondée mission de supervision des Open - En attente IDA / 62450 services and resilience in A posteriori sur la qualité et 0.00 2019-03-06 2019-03-30 2019-05-26 2019-06-24 2019-07-16 2019-08-05 2019-08-28 2020-10-19 travaux : Augmentation de International d'exécution targeted areas le coût la capacité de pompage et aménagements connexes MG-M2PATE-103618-CS- QCBS / Préparation des Improving urban drainage, Sélection fondée Open - En attente instruments de sauvegarde : IDA / 62450 services and resilience in A posteriori sur la qualité et 0.00 2019-08-15 2019-09-08 2019-11-04 2019-12-04 2019-12-25 2020-01-14 2020-02-06 2020-07-05 International d'exécution EIES et PAR de la targeted areas le coût Composante Urbaine MG-M2PATE-117965-CS- QCBS / Recrutement d'un Project Management, Sélection fondée En cours vérificateur indépendant du IDA / 62450 Coordination, Monitoring A posteriori sur la qualité et Open - National 0.00 2019-07-26 2019-08-16 2019-09-05 2019-10-05 2019-10-20 2019-11-13 2019-12-02 2021-12-31 d'examen paiement des indemnités de and Evaluation le coût compensation MG-M2PATE-126094-CS- Improving urban drainage, Sélection fondée En attente QCBS / Evaluation des IDA / 62450 services and resilience in A posteriori sur la qualité et Open - National 0.00 2019-08-05 2019-08-20 2019-09-09 2019-10-09 2019-10-24 2019-11-24 2019-12-13 2020-03-12 d'exécution situations de référence targeted areas le coût MG-M2PATE-126095-CS- Project Management, Sélection fondée En attente QCBS / Recrutement d'une IDA / 62450 Coordination, Monitoring A posteriori sur la qualité et Open - National 0.00 2019-08-06 2019-08-27 2019-09-16 2019-10-16 2019-10-31 2019-12-01 2019-12-20 2023-02-12 d'exécution agence en communication and Evaluation le coût MG-M2PATE-126096-CS- Project Management, LCS / Recrutement auditeur Sélection au En attente IDA / 62450 Coordination, Monitoring A posteriori Open - National 0.00 2019-09-09 2019-09-30 2019-10-20 2019-11-19 2019-12-04 2020-01-04 2020-01-23 2021-06-06 externe pour les comptes moindre coût d'exécution and Evaluation 2019 et 2020 MG-M2PATE-130235-CS- Project Management, Sélection fondée QCBS / Audit externe des Open - En attente IDA / V0550 Coordination, Monitoring A posteriori sur la qualité et 0.00 2019-09-09 2019-09-10 2019-09-12 2019-09-13 2019-09-13 2019-10-13 2019-10-13 2019-10-14 comptes du la préparation International d'exécution and Evaluation le coût du projet INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-11285-CS-CDS Project Management, Sélection de / 5.4 Convention de Maîtrise IDA / V0550 Coordination, Monitoring A priori consultants par Direct 261,209.80 Signé 2017-03-30 2017-04-09 2017-06-13 2017-12-10 d'Ouvrage Délégué CMOD and Evaluation entente directe AGETIPA / M2PATE MG-M2PATE-13242-CS- Project Management, INDV / 5.1 Elaboration d'un IDA / V0550 Coordination, Monitoring A priori Individuel Open 24,324.80 Signé 2017-04-20 2017-06-08 2017-06-29 2017-08-03 2018-01-30 manuel de procédures and Evaluation Page 4 MG-M2PATE-14572-CS- INDV / 1.3 Etudes pour l'élaboration du Cadre de Improving urban drainage, Gestion Environnementale et IDA / V0550 services and resilience in A priori Individuel Limited 51,200.00 Signé 2017-05-16 2017-05-16 2017-06-06 2017-06-12 2017-07-12 Sociale (CGES) et du cadre targeted areas de politique de réinstallation des Populations (CPR) MG-M2PATE-15100-CS-CDS / Etudes techniques de remise en état des infrastructures de drainage et de protection contre les Improving urban drainage, Sélection de inondations : (i) Etudes IDA / V0550 services and resilience in A priori consultants par Direct 988,141.76 Signé 2017-05-16 2017-05-18 2017-06-01 2017-09-29 APS/APD/DAO, (ii) Etudes targeted areas entente directe d'Impacts Environnemental et Social (EIES), (iii) Elaboration du Plan de Gestion Environnementale et Soc MG-M2PATE-13072-CS-CQS Project Management, / 5.6 Recrutement d'un IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 0.00 Annulé 2017-04-19 2017-06-07 2017-06-28 2017-08-02 2018-01-29 assistant technique and Evaluation MG-M2PATE-12506-CS-CQS Project Management, / 5.5 - Recrutement du IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 0.00 Annulé 2017-04-19 2017-06-07 2017-06-28 2017-08-02 2018-01-29 Coordinateur de Projet and Evaluation MG-M2PATE-12508-CS-CQS Project Management, / 5.7 - Recrutement de IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 0.00 Annulé 2017-04-19 2017-06-07 2017-06-28 2017-08-02 2018-01-29 Responsable Administratif et and Evaluation Financier MG-M2PATE-35795-CS- Project Management, INDV / Recrutement du IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 24,679.30 Signé 2017-11-23 2017-12-15 2017-12-20 2018-01-24 2019-01-19 Coordonnateur de Projet and Evaluation MG-M2PATE-35794-CS- Project Management, INDV / Recrutement d'un IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 19,198.65 Achevé 2017-11-23 2017-12-15 2017-12-20 2018-01-24 2019-01-19 Assistant Technique and Evaluation MG-M2PATE-35788-CS-CQS Project Management, / Recrutement d'un IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 12,017.04 Signé 2017-11-23 2017-12-15 2017-12-20 2018-01-24 2019-01-19 consultant comptable and Evaluation MG-M2PATE-35792-CS- Project Management, INDV / Recrutement d'un IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 15,589.80 Signé 2017-11-23 2017-12-15 2017-12-20 2018-01-24 2019-01-19 consultant Responsable and Evaluation Administratif et financier MG-M2PATE-61122-CS- Improving urban drainage, INDV / Etudes IDA / V0550 services and resilience in A posteriori Individuel Limited 13,427.61 Signé 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-08-29 d'identification et de targeted areas présélection des sites de dépôt de boue de curage MG-M2PATE-61123-CS- INDV / Recrutement d'un consultant pour Strenghtening institutional l'identification des travaux IDA / V0550 capacity for resilient urban A posteriori Individuel Direct 6,496.35 Signé 2018-04-30 2018-05-10 2018-05-31 2018-07-05 2018-09-03 d'interventions facilement à governance exécuter (Travaux Quick Win) MG-M2PATE-61125-CS-CDS / Recrutement d'un Project Management, Sélection de consultant pour l'élaboration IDA / V0550 Coordination, Monitoring A posteriori consultants par Direct 39,897.67 Signé 2018-04-30 2018-05-10 2018-06-19 2018-08-18 d'un Plan de communication and Evaluation entente directe + Mise en œuvre 3 mois Page 5 MG-M2PATE-61116-CS-CDS / Etude de qualification et d'aménagement d'un site alternatif pour accueillir les Improving urban drainage, Sélection de produits de curage issus des IDA / V0550 services and resilience in A posteriori consultants par Direct 0.00 Annulé 2018-04-30 2018-05-10 2018-07-05 2018-10-03 canaux de drainage et du targeted areas entente directe bassin de laminage au niveau de l'agglomération d'Antananarivo MG-M2PATE-61120-CS-CDS / Mission de consultance (i) pour l'Evaluation des EIES et du PAR des travaux de remise en état des Improving urban drainage, Sélection de infrastructures de drainage IDA / V0550 services and resilience in A posteriori consultants par Direct 94,064.17 Signé 2018-05-07 2018-05-17 2018-07-21 2018-11-18 et (ii) pour la réalisation des targeted areas entente directe EIES et du PAR du site de confinement des des boues de curage et du site de réinstallation MG-M2PATE-69639-CS-CDS / Maîtrise d'œuvre relative à l'Extension du Schéma Directeur d'Assainissement Improving urban drainage, Sélection de En cours d'Antananarivo et la IDA / 62450 services and resilience in A posteriori consultants par Direct 0.00 2018-07-18 2018-07-25 2018-08-05 2019-06-01 d'exécution modélisation du risque targeted areas entente directe d'inondation au niveau de l'agglomération - Tranche conditionnelle Lot 2 MG-M2PATE-69644-CS- Project Management, INDV / Panel - Expert en IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 183,150.00 Signé 2018-07-13 2018-08-15 2018-08-26 2018-08-31 2020-04-22 sauvegardes and Evaluation environnementales MG-M2PATE-69648-CS- Project Management, INDV / Panel - Expert en IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 158,070.00 Signé 2018-07-13 2018-08-15 2018-08-26 2018-08-31 2020-04-22 sauvegardes sociales and Evaluation MG-M2PATE-69649-CS- Project Management, INDV / Panel - Spécialiste IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 144,350.00 Signé 2018-07-13 2018-08-15 2018-08-26 2018-08-31 2020-04-22 Infrastructures / Génie Civil and Evaluation MG-M2PATE-69651-CS- Project Management, INDV / UGP - Expert en IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 13,025.18 Signé 2018-07-30 2018-09-05 2018-09-08 2018-09-11 2018-12-10 sauvegardes and Evaluation environnementales MG-M2PATE-69686-CS- Project Management, INDV / UGP - Expert en IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 10,625.81 Signé 2018-07-30 2018-09-05 2018-09-08 2018-09-11 2018-12-10 sauvegardes sociales and Evaluation MG-M2PATE-69687-CS- Project Management, INDV / UGP - Assistant IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 9,571.87 Signé 2018-07-30 2018-09-05 2018-09-08 2018-09-11 2018-12-10 technique en passation de and Evaluation marchés Project Management, MG-M2PATE-69688-CS- En cours IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 0.00 2018-07-30 2018-09-05 2018-09-08 2018-09-11 2018-12-10 INDV / UGP - Audit interne d'exécution and Evaluation MG-M2PATE-69689-CS- Project Management, INDV / UGP - Assistant IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 10,625.81 Signé 2018-07-30 2018-09-05 2018-09-08 2018-09-11 2018-12-10 technique Assainissement and Evaluation MG-M2PATE-76341-CS- Project Management, INDV / UGP Spécialiste en IDA / V0550 Coordination, Monitoring A posteriori Individuel Open 10,666.60 Résilié 2018-08-30 2018-10-10 2018-10-15 2018-10-18 2018-12-31 Suivi-évaluation and Evaluation Page 6 MG-M2PATE-102967-CS- CDS / Convention de Project Management, Sélection de Maîtrise d'Ouvrage Délégué IDA / 62450 Coordination, Monitoring A priori consultants par Direct 2,461,293.59 Signé 2019-02-26 2019-02-28 2019-03-07 2024-02-09 (CMOD) de mise en œuvre and Evaluation entente directe AGETIPA / MAHTP MG-M2PATE-102990-CS- Project Management, INDV / Assistant Technique En cours IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 2019-03-04 2019-04-23 2019-04-28 2019-05-02 2019-10-29 de l'Unité d'Exécution du d'exécution and Evaluation Projet à la CUA MG-M2PATE-102993-CS- Project Management, INDV / UGP - Spécialiste IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 10,772.62 Achevé 2019-03-04 2019-04-23 2019-04-28 2019-05-02 2019-10-29 Suivi-évaluation 2 and Evaluation MG-M2PATE-103613-CS- INDV / Etudes de Improving urban drainage, En attente sauvegardes (EIES/PAR) pour IDA / 62450 services and resilience in A posteriori Individuel Open 0.00 2019-03-06 2019-05-08 2019-05-13 2019-06-03 2019-09-01 d'exécution la station de pompage et targeted areas aménagements connexes MG-M2PATE-117956-CS- INDV / Recrutement d'un Project Management, En cours Spécialiste en Suivi IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 2019-06-04 2019-07-08 2019-07-23 2019-08-11 2020-08-11 d'exécution Evaluation 3 auprès de and Evaluation l'UGP MG-M2PATE-117960-CS- INDV / Recrutement d'un Project Management, Assistant Technique en IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 4,628.05 Signé 2019-06-04 2019-07-08 2019-07-23 2019-08-11 2020-08-11 Urbanisme 2 auprès de and Evaluation l'UGP MG-M2PATE-118706-CS- Project Management, En cours INDV / Assistant IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-09-29 d'examen Administratif et Logistique and Evaluation MG-M2PATE-118652-CS- Project Management, INDV / Responsable IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 Annulé 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-09-29 Communication au sein de and Evaluation l'UGP MG-M2PATE-13245-CS- Project Management, INDV / 5.2 Recrutement IDA / V0550 Coordination, Monitoring A priori Individuel Open 0.00 Annulé 2017-04-20 2017-06-08 2017-06-29 2017-08-03 2018-01-30 d'un Consultant pour and Evaluation l'analyse économique du projet MG-M2PATE-13238-CS- INDV / 3.1 Audit Strenghtening institutional Organisationnel et IDA / V0550 capacity for resilient urban A priori Individuel Open 0.00 Annulé 2017-04-20 2017-06-08 2017-06-29 2017-08-03 2018-01-30 Institutionnel de la governance Commune Urbaine d'Antananarivo MG-M2PATE-118679-CS- Project Management, INDV / Conseiller Juridique IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 Annulé 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-09-29 au sein de l'UGP and Evaluation MG-MAHTP-132960-CS- Project Management, INDV / Recrutement d'un En attente IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 2019-09-11 2019-10-30 2019-11-04 2019-11-23 2020-11-23 coordonnateur au sein l'UGP d'exécution and Evaluation PRODUIR MG-MAHTP-132965-CS- INDV / Recrutement d'un Project Management, En attente Assistant Technique en IDA / 62450 Coordination, Monitoring A posteriori Individuel Open 0.00 2019-09-11 2019-10-30 2019-11-04 2019-11-23 2020-05-21 d'exécution Passation de Marchés au and Evaluation sein de l'UGP PRODUIR Page 7 MG-MAHTP-132966-CS- INDV / Recrutement d'un Strenghtening institutional En attente Consultant pour appui à IDA / 62450 capacity for resilient urban A posteriori Individuel Open 0.00 2019-09-11 2019-09-21 2019-09-26 2019-10-15 2019-12-14 d'exécution l'organisation de la table governance ronde des acteurs urbains. Page 8