Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,000,000 All 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 1,500,000 All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Procurement Manual of CJC Project 5. Any Other Special Procurement Arrangements: Not Applicable July 9, 2010 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 200,000 and $300,000 (engineering contracts)_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Ethiopia : Ethiopia Competitiveness and Job Creation Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2017-03-08 2020-02-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143302 GPN Date: Project Name: Ethiopia Competitiveness and Job Creation Project Loan / Credit No: IDA / 54510, IDA / 62630 Executing Agency(ies): Industrial Parks Development Corporation WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-IPDC-9345-CW-RFB / Component 2: Support for Open - Single Stage - One Construction of Kilinto IDA / 54510 Prior Request for Bids 249,175,403.27 245,415,267.83 Signed 2015-05-22 2015-08-07 2015-08-07 2015-05-27 2016-11-16 2016-12-13 2017-01-20 2018-03-19 Industrial Infrastructure International Envelope Industrial Park CJC/NCB/W-02/08 / Component 4: Project Pending Single Stage - One Construction of Kindergarten IDA / 54510 Management and Monitoring Post Request for Bids Open - National 600,000.00 0.00 Implementati 2017-02-02 2017-02-04 2017-03-18 2017-04-17 2017-05-22 2017-11-18 Envelope for Bole Lemi PAPs and Evaluation on IPDC/CJC/NCB/W-02/09 / Construction of Livestock Development - Establishing 1 Poultry enterprise Component 4: Project Pending Single Stage - One Construction of :1 Poultry IDA / 54510 Management and Monitoring Post Request for Bids Open - National 450,000.00 0.00 Implementati 2017-02-26 2017-07-01 2017-08-12 2017-09-11 2017-10-16 2018-04-14 Envelope shed and Evaluation on 3 Fattening sheds and grain mills for Kilinto PAPs ET-IPDC-9347-CW-RFB / Component 2: Support for Open - Single Stage - One Construction of Bole-Lemi IDA / 54510 Prior Request for Bids 157,758,001.59 127,382,453.78 Signed 2015-05-05 2015-07-21 2015-07-21 2015-05-10 2015-07-21 2016-10-30 2017-01-20 2018-09-27 Industrial Infrastructure International Envelope Phase II Industrial Park GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Enhancing IZ Pending CJC/SH/G-01/09 / Goods for Request for Single Stage - One IDA / 54510 linkages to the local Post Limited 150,000.00 0.00 Implementati 2017-06-07 2017-06-07 2017-06-07 skill TrainingCenter Quotations Envelope economy on Component 1: Institutional Pending CJC/SH/G-04/09 / Vehicle Request for Single Stage - One IDA / 54510 and Regulatory Framework Post Limited 200,000.00 0.00 Implementati 2017-05-23 2017-05-23 2017-05-23 for EIC 4WD Quotations Envelope and Capacity Building on Component 4: Project Pending CJC/SH/G-02/09 / Uniform Request for Single Stage - One IDA / 54510 Management and Monitoring Post Limited 5,000.00 0.00 Implementati 2017-06-07 2017-06-07 2017-06-07 for PIU drivers and janitors Quotations Envelope and Evaluation on CJC/SH/G-01/10 / Component 4: Project Pending Stationary items, sanitary Request for Single Stage - One IDA / 54510 Management and Monitoring Post Limited 50,000.00 0.00 Implementati 2017-10-24 2017-12-19 2018-06-17 materials and other Quotations Envelope and Evaluation on miscellaneous goods for PIU Page 1 CJC/SH/S-01/09 / Printing, Component 4: Project Pending promotional and branding Request for Single Stage - One IDA / 54510 Management and Monitoring Post Limited 75,000.00 0.00 Implementati 2017-10-23 2017-12-18 2018-06-16 items for IPDC and CJC- Quotations Envelope and Evaluation on PIU ET-IPDC-41013-GO-RFQ / Component 4: Project Pending Request for Single Stage - One Procurement of Equipment IDA / 54510 Management and Monitoring Post Limited 50,000.00 0.00 Implementati 2018-01-03 2018-02-28 2018-08-27 Quotations Envelope for Bole Lemi KG and Evaluation on CJC/SH/G-03/09 / Component 4: Project Pending Procurement of Furniture for Request for Single Stage - One IDA / 54510 Management and Monitoring Post Limited 70,000.00 0.00 Implementati 2017-10-17 2017-12-12 2018-06-10 Kindergarten at Bole Lemi Quotations Envelope and Evaluation on PAPs and IPDC ET-IPDC-42523-GO-RFQ / Documentation of different Component 1: Institutional Pending industrial parks (Printing, Request for Single Stage - One IDA / 54510 and Regulatory Framework Post Limited 50,000.00 0.00 Implementati 2018-01-23 2018-03-20 2018-09-16 Binding, Scanning, and CD Quotations Envelope and Capacity Building on burning of documents for 9 industrial parks) ET-IPDC-65788-GO-RFQ / Component 1: Institutional Pending Single Stage - One Procurement of Furniture for IDA / 54510 and Regulatory Framework Post Request for Bids Open - National 150,000.00 0.00 Implementati 2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-04-03 Envelope IPDC and Capacity Building on ET-IPDC-40618-GO-RFB / Component 1: Institutional Procurement of IT Single Stage - One IDA / 54510 and Regulatory Framework Post Request for Bids Open - National 150,000.00 0.00 Canceled 2018-06-21 2018-06-26 2018-08-07 2018-09-06 2018-10-11 2019-04-09 equipment and accessories Envelope and Capacity Building for IPDC NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-IPDC-40700-NC-RFP / Component 4: Project Under Preparation of Documentary Request for Single Stage - Two IDA / 54510 Management and Monitoring Post Open - National 20,000.00 0.00 Implementati 2018-02-15 2018-02-20 2018-04-03 2018-06-16 2018-07-21 2019-01-17 Film for CJC Project Proposals Envelope and Evaluation on achievements. ET-IPDC-153598-NC-RFQ / Production of a video and Component 4: Project Pending photograph documentary on Request for Single Stage - One IDA / 62630 Management and Monitoring Post Limited 20,000.00 0.00 Implementati 2020-02-15 2020-04-11 2020-10-08 the achievements registered Quotations Envelope and Evaluation on By competiveness and job creation project office (CJCP) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-IPDC-11323-CS-QCBS / Consultancy Service of Detailed Engineering Design & Tender Document Component 2: Support for Quality And Cost- Open - Pending Preparation (LS) and IDA / 54510 Prior 6,000,000.00 0.00 2014-07-31 2014-09-25 2014-11-24 2014-12-09 2014-12-19 2015-01-28 2015-04-01 2016-03-31 Industrial Infrastructure Based Selection International Implementation Supervision & Contract Administration (TB) for Bole- Lemi II and Kilinto Industrial Parks Page 2 CJC/C-04/09 / Consultancy service for training Component 3: Enhancing IZ Quality And Cost- Pending provision for the skills IDA / 54510 linkages to the local Post Open - National 200,000.00 0.00 2017-05-19 2017-05-19 2017-05-19 2017-05-19 2017-05-19 2017-05-19 2017-05-19 2017-05-19 Based Selection Implementation center at bole lemi economy Industrial Park CJC/C-06/09 / Consultancy Component 1: Institutional Quality And Cost- Open - Pending Service for class one IDA / 54510 and Regulatory Framework Post 400,000.00 0.00 2017-06-27 2017-06-27 2017-06-27 2017-06-27 2017-06-27 2017-06-27 2017-06-27 2017-06-27 Based Selection International Implementation consulting firm and Capacity Building ET-IPDC-40694-CS-QCBS / Component 4: Project Quality And Cost- Open - Under Studying Baseline Survey IDA / 54510 Management and Monitoring Post 100,000.00 0.00 2018-01-29 2018-02-19 2018-04-04 2018-05-02 2018-06-01 2018-07-06 2018-08-10 2019-08-10 Based Selection International Implementation For CJC Project and Evaluation Component 3: Enhancing IZ CJC/C-18/08 / B2B Linkage Quality And Cost- Pending IDA / 54510 linkages to the local Post Open - National 150,000.00 0.00 2016-08-11 2016-08-11 2016-08-11 2016-08-11 2016-08-11 2016-08-11 2016-08-11 2016-08-11 MARKETING FIRM Based Selection Implementation economy ET-IPDC-64114-CS-QCBS / Component 1: Institutional Consultancy Service for Quality And Cost- Open - Under IDA / 54510 and Regulatory Framework Post 300,000.00 0.00 2018-05-25 2018-06-15 2018-07-29 2018-08-26 2018-09-25 2018-10-30 2018-12-04 2019-12-04 Preparation of Road Map Based Selection International Implementation and Capacity Building and 10 years Strategic Plan ET-IPDC-40726-CS-QCBS / Consultancy Service for Component 2: Support for Quality And Cost- Open - Under IDA / 54510 Post 50,000.00 0.00 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 Design of Industrial Parks Industrial Infrastructure Based Selection International Implementation Housing Project ET-IPDC-73825-CS-LCS / Component 4: Project Competitiveness and Job Least Cost Pending IDA / 54510 Management and Monitoring Post Open - National 40,000.00 0.00 2018-08-21 2018-09-11 2018-10-25 2018-11-22 2018-12-22 2019-01-26 2019-03-02 2019-08-29 Creation Project Financial Selection Implementation and Evaluation Statement Audit ET-IPDC-93273-CS-QCBS / Consultancy Services for Component 3: Enhancing IZ provision of Sourcing, Quality And Cost- Under IDA / 54510 linkages to the local Post Open - National 200,000.00 0.00 2018-12-31 2019-01-21 2019-03-06 2019-04-03 2019-05-03 2019-06-07 2019-07-12 2020-07-11 Screening , Training and Based Selection Implementation economy allocation for Bole Lemi industrial Park ET-IPDC-97530-CS-CQS / Component 1: Institutional Consultant Procurement of Consulting Open - IDA / 54510 and Regulatory Framework Post Qualification 200,000.00 0.00 Canceled 2019-01-31 2019-02-21 2019-04-06 2019-05-06 2019-06-10 2019-12-07 firm for Pharmaceutical IP- International and Capacity Building Selection Kilinto ET-IPDC-108081-CS-CQS / Consultancy procurement for Transaction Advisory Component 1: Institutional Quality And Cost- Open - Under Services-PPP for Operations IDA / 62630 and Regulatory Framework Prior 500,000.00 0.00 2019-04-08 2019-04-29 2019-06-12 2019-07-10 2019-08-09 2019-09-13 2019-10-18 2020-10-17 Based Selection International Implementation and Management of Bole and Capacity Building Lemi and Kilinto Industrial Parks and affiliated services. CJC/ICB/G-07/08 / Component 1: Institutional Quality And Cost- Open - Development of CRM and IDA / 54510 and Regulatory Framework Prior 1,000,000.00 0.00 Canceled 2017-09-20 2017-09-20 2017-09-20 2017-09-20 2017-09-20 2017-09-20 2017-09-20 2017-09-20 Based Selection International ERP for EIC and IPDC and Capacity Building ET-IPDC-110945-CS-QCBS / Component 1: Institutional Supply, Installation and Quality And Cost- Open - IDA / 54510 and Regulatory Framework Prior 600,000.00 0.00 Under Review 2019-05-06 2019-05-27 2019-07-10 2019-08-07 2019-09-06 2019-10-11 2019-11-15 2020-11-14 Commissioning of ERP Based Selection International and Capacity Building system for IPDC ET-IPDC-113651-CS-QCBS / Environmental and Social Component 4: Project Audit for Bole Lemi II & Quality And Cost- IDA / 54510 Management and Monitoring Post Open - National 100,000.00 12,564.88 Signed 2019-05-07 2019-05-28 2019-07-11 2019-08-08 2019-09-07 2019-10-12 2019-11-16 2020-11-15 Kilinto IPs and sector Based Selection and Evaluation specific ESSA for each tenant Page 3 ET-IPDC-113653-CS-QCBS / Component 4: Project Environmental and Social Quality And Cost- Under IDA / 54510 Management and Monitoring Post Open - National 50,000.00 0.00 2019-05-07 2019-05-28 2019-07-11 2019-08-08 2019-09-07 2019-10-12 2019-11-16 2020-11-15 Audit for B2B linkage Based Selection Implementation and Evaluation beneficiary companies INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CJC/C-08/09 / Construction Individual Management Consultant for Component 2: Support for Pending IDA / 54510 Post Consultant Limited 100,000.00 0.00 2017-03-02 2017-03-02 2017-03-02 2017-03-02 2017-03-02 Bole Lemi 2 and Killinto Industrial Infrastructure Implementation Selection Industrial Parks Component 4: Project Individual CJC/H-08/09 / Environment Pending IDA / 54510 Management and Monitoring Post Consultant Open 100,000.00 0.00 2017-02-10 2017-02-10 2017-02-10 2017-02-10 2017-02-10 Specialist Implementation and Evaluation Selection CJC/C-09/09 / Individual Component 4: Project Individual Consultant -Data Analyst- ( Pending IDA / 54510 Management and Monitoring Post Consultant Limited 5,000.00 0.00 2017-04-15 2017-04-15 2017-04-15 2017-04-15 2017-04-15 organizing and documenting Implementation and Evaluation Selection procurement documents). Component 3: Enhancing IZ Individual CJC/C-07/09 / Skill Pending IDA / 54510 linkages to the local Post Consultant Limited 50,000.00 0.00 2017-02-24 2017-02-24 2017-02-24 2017-02-24 2017-02-24 Training Coordinator Implementation economy Selection ET-IPDC-19013-CS-INDV / Component 1: Institutional Individual Under National Financial IDA / 54510 and Regulatory Framework Post Consultant Limited 100,000.00 0.00 2017-06-01 2017-06-30 2017-07-21 2017-08-25 2018-08-25 Implementation Consultant and Capacity Building Selection ET-IPDC-19014-CS-INDV / Component 4: Project Individual Under Recruitment of assistant IDA / 54510 Management and Monitoring Post Consultant Open 25,000.00 0.00 2017-06-24 2017-08-12 2017-09-02 2017-10-07 2018-10-07 Implementation Project Engineer for Kilinto and Evaluation Selection ET-IPDC-19016-CS-INDV / Component 4: Project Individual Recruitment of assistant Under IDA / 54510 Management and Monitoring Post Consultant Open 25,000.00 0.00 2017-06-24 2017-08-12 2017-09-02 2017-10-07 2018-10-07 Project Engineer for Bole Implementation and Evaluation Selection Lemi II CJC/M-03/07 / Individual Component 4: Project Individual Consultant -Procurement IDA / 54510 Management and Monitoring Prior Consultant Open 100,000.00 0.00 Canceled 2017-04-15 2017-04-15 2017-04-15 2017-04-15 2017-04-15 Specialist and Evaluation Selection Component 4: Project Individual ET-IPDC-31289-CS-INDV / Under IDA / 54510 Management and Monitoring Prior Consultant Open 100,000.00 0.00 2017-01-12 2017-03-02 2017-03-23 2017-04-27 2017-10-24 Procurement Specialist Implementation and Evaluation Selection CJC/SSS/C-01/10 / Audit Component 4: Project Services for CJC project Under IDA / 54510 Management and Monitoring Post Direct Selection Direct 20,000.00 0.00 2017-10-27 2017-11-06 2018-01-10 2018-07-09 Account for the year ended Implementation and Evaluation July 8, 2017. ET-IPDC-40708-CS-INDV / Component 1: Institutional Individual National Procurement IDA / 54510 and Regulatory Framework Prior Consultant Open 50,000.00 17,225.54 Under Review 2018-01-10 2018-02-28 2018-03-21 2018-04-25 2018-10-22 Consultant for IPDC and Capacity Building Selection ET-IPDC-40715-CS-INDV / Component 4: Project Individual Under Recruitment of IDA / 54510 Management and Monitoring Post Consultant Open 15,000.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-10-27 Implementation Communication Specialist and Evaluation Selection ET-IPDC-40737-CS-INDV / Component 1: Institutional Individual Pending National Consultant for the IDA / 54510 and Regulatory Framework Post Consultant Open 100,000.00 0.00 2018-02-27 2018-04-17 2018-05-08 2018-06-12 2018-12-09 Implementation formulation of SPV at IPDC and Capacity Building Selection Page 4 ET-IPDC-49425-CS-INDV / Component 4: Project Individual Pending Contract Administration and IDA / 54510 Management and Monitoring Post Consultant Open 50,000.00 0.00 2018-03-15 2018-05-03 2018-05-24 2018-06-28 2019-06-27 Implementation Claim Consultant and Evaluation Selection ET-IPDC-64119-CS-INDV / Component 4: Project Individual Recruitment of Assistant IDA / 54510 Management and Monitoring Prior Consultant Open 20,000.00 1,159.65 Signed 2018-06-15 2018-08-03 2018-08-24 2018-09-28 2019-03-27 Procurement and Evaluation Selection ET-IPDC-81199-CS-INDV / Component 4: Project Individual Employment of Procurement IDA / 54510 Management and Monitoring Prior Consultant Limited 35,000.00 0.00 Canceled 2018-10-19 2018-10-24 2018-11-14 2018-12-19 2019-06-17 Specialist for CJCP and Evaluation Selection ET-IPDC-82663-CS-INDV / Individual Consultant to Support ERP, CRM tasks for Component 1: Institutional Individual Ethiopian Investment Pending IDA / 54510 and Regulatory Framework Post Consultant Direct 100,000.00 0.00 2018-11-02 2018-11-12 2018-12-03 2019-01-07 2019-07-06 Commission (EIC) and Implementation and Capacity Building Selection Industrial Parks Development Corporation (IPDC) ET-IPDC-81199-CS-INDV-2 / Component 4: Project Individual Under Hiring Procurement IDA / 54510 Management and Monitoring Prior Consultant Limited 35,000.00 0.00 2019-01-31 2019-02-05 2019-02-26 2019-04-02 2019-09-29 Implementation Management Specialist and Evaluation Selection ET-IPDC-18009-CS-INDV / International Individual Component 1: Institutional Individual Consultant for IDA / 54510 and Regulatory Framework Prior Consultant Limited 150,000.00 0.00 Canceled 2017-06-01 2017-06-06 2017-06-27 2017-08-01 2018-08-01 Pharmaceutical Industrial and Capacity Building Selection Park-- EIC ET-IPDC-98910-CS-INDV / Component 1: Institutional Individual Pending Redesign and Modification IDA / 54510 and Regulatory Framework Post Consultant Open 30,000.00 0.00 2019-02-28 2019-04-18 2019-05-09 2019-06-13 2019-12-10 Implementation of IPDC Website and Capacity Building Selection ET-IPDC-98911-CS-INDV / Component 1: Institutional Individual Under Hiring of Transformational IDA / 54510 and Regulatory Framework Post Consultant Limited 100,000.00 0.00 2019-02-28 2019-03-05 2019-03-26 2019-04-30 2019-10-27 Implementation advisor for IPDC and Capacity Building Selection ET-IPDC-108077-CS-INDV / Component 1: Institutional Individual Hiring of International Under IDA / 54510 and Regulatory Framework Post Consultant Limited 150,000.00 0.00 2019-04-01 2019-04-06 2019-04-27 2019-06-01 2019-11-28 Individual Consultant for Implementation and Capacity Building Selection Pharmaceutical IP -Kilinto ET-IPDC-108085-CS-INDV / Hiring of International Component 3: Enhancing IZ Individual Individual Consultant (TA) IDA / 62630 linkages to the local Post Consultant Open 100,000.00 8,000.00 Signed 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 for SME support under economy Selection B2B linkage ET-IPDC-64132-CS-INDV / Component 4: Project Individual Under Recruitment of Gender IDA / 54510 Management and Monitoring Post Consultant Open 20,000.00 0.00 2019-05-20 2019-07-08 2019-07-29 2019-09-02 2020-02-29 Implementation Specialist and Evaluation Selection ET-IPDC-113658-CS-INDV / Hiring of individual Individual Consultant for handing over Component 2: Support for Pending IDA / 62630 Post Consultant Open 40,000.00 0.00 2019-10-28 2019-12-16 2020-01-06 2020-02-10 2020-08-08 of Bole Lemi II to Industrial Infrastructure Implementation Selection establish operating procedures ET-IPDC-129680-CS-INDV / Hiring of individual Individual Component 2: Support for Pending Consultant for handing over IDA / 62630 Post Consultant Open 40,000.00 0.00 2019-09-01 2019-10-20 2019-11-10 2019-12-15 2020-06-12 Industrial Infrastructure Implementation of Kilinto IP to establish Selection operating procedures Page 5 ET-IPDC-153594-CS-INDV / Individual Consultant for Component 1: Institutional Individual assessing the need for Pending IDA / 62630 and Regulatory Framework Post Consultant Open 20,000.00 0.00 2020-01-24 2020-02-23 2020-03-04 2020-03-24 2020-05-23 affordable and accessible Implementation and Capacity Building Selection child care Programs In industrial parks ET-IPDC-158064-CS-INDV / Component 1: Institutional Individual Recruitment of Senior Pending IDA / 62630 and Regulatory Framework Post Consultant Limited 24,000.00 0.00 2020-02-10 2020-02-15 2020-03-07 2020-04-11 2020-10-08 Adviser to the IPDC CEO Implementation and Capacity Building Selection as part of Capacity Building. Page 6