Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Congo, Democratic Republic of : DRC Urban Development Project FY13 PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-02-08 2019-08-15 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P129713 GPN Date: Project Name: DRC Urban Development Project FY13 Loan / Credit No: IDA / H8420, IDA / 60340 Executing Agency(ies): Urban Development Project WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-30331-CW-RFB / TRAVAUX Single Stage - One REHABILITATION ET IDA / H8420 Primary Infrastructure Post Request for Bids Open - National 1,664,686.60 1,664,686.60 Signed 2017-09-27 2017-09-28 2017-09-29 2017-09-30 2017-10-02 2017-10-26 Envelope MODERNISATION AVENUE IRAMBO (Ville de Bukavu) ZR-PDU-72491-CW-RFB / PDU_FADD_TRAVAUX DE REH. ET DE MODERN. _AVENUE GAZUMBU & Single Stage - One IDA / 60340 Primary Infrastructure Post Request for Bids Open - National 4,500,000.00 2,711,326.95 Signed 2018-08-08 2018-08-13 2018-09-12 2018-10-12 2018-11-16 2019-07-14 ASSAINISSEMENT Envelope _AVENUE LDK_ VILLE KOLWEZI _PROVINCE LUALABA ZR-PDU-72498-CW-RFB / PDU_FADD_TRAVAUX DE REH. ET DE MODERN. Single Stage - One _PROLONGEMENT BLD 30 IDA / 60340 Primary Infrastructure Post Request for Bids Open - National 4,000,000.00 3,174,071.26 Signed 2018-08-02 2018-08-07 2018-09-06 2018-10-06 2018-10-11 2019-06-08 Envelope JUIN _ VILLE KISANGANI _PROVINCE DE LA TSHOPO ZR-PDU-75121-CW-RFB / FADD- TRAVAUX REHABILITATION ET Single Stage - One IDA / 60340 Primary Infrastructure Post Request for Bids Open - National 4,000,000.00 0.00 Canceled 2018-08-26 2018-08-26 2018-10-07 2018-11-06 2018-12-11 2019-08-08 MODERNISATION DE LA Envelope VOIRIE CCLK -Ville GOMA-PROV NORD KIVU ZR-PDU-98155-CW-RFB / SC 2A Travaux réhabilitation et Pending modernisation Lot 1_ EP 2 Urban Governance Single Stage - One IDA / H8420 Post Request for Bids Open - National 350,000.00 0.00 Implementati 2019-02-05 2019-02-10 2019-02-15 2019-02-25 2019-04-01 2019-09-28 KANZOMBI _ 14 Salles de (including PPA) Envelope on classe_ Bureau direction _ Aménagement cour_ Mur de clôture _Ville Kikwit ZR-PDU-98174-CW-RFB / SC 2A _ DAON 001 SP PDU TRVX _ Lot 2 Travaux réhabilitation et Pending Urban Governance Single Stage - One modernisation Ecole primaire IDA / H8420 Post Request for Bids Open - National 180,000.00 0.00 Implementati 2019-02-05 2019-02-10 2019-02-15 2019-02-25 2019-04-01 2019-09-28 (including PPA) Envelope VUKAMA 2 _6 Salles de on classe _Aménagement de la cour _ Construction Mur de clôture_ Ville de KIKWIT Page 1 ZR-PDU-107337-CW-RFB / SC 2A LOT 3 _ TRAVAUX REHABILITATION ET MODERNISATION INSTITUT KANGULUMBA_ Pending 18 SALLES DE CLASSE _ Urban Governance Single Stage - One IDA / H8420 Post Request for Bids Open - National 550,000.00 0.00 Implementati 2019-03-21 2019-03-21 2019-03-26 2019-03-31 2019-04-10 2019-10-07 SALLE POUR ATELIER (including PPA) Envelope on MECANIQUE_MUR CLOTURE_BATIMENT ADMINISTRATIF_AMENAGE MENT COUR _ Ville KIKWIT ZR-PDU-107563-CW-RFB / SC 2A LOT 1 Travaux réhabilitation et modernisation Institut Pending Urban Governance Single Stage - One LUFUNGULA_17 SALLES IDA / H8420 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2019-03-22 2019-03-22 2019-03-27 2019-04-01 2019-04-26 2019-10-23 (including PPA) Envelope CLASSES _BATIMENT on ADMINISTRATIF _MUR CLOTURE_VILLE DE KINDU ZR-PDU-107564-CW-RFB / SC 2A LOT 2 _TRAVAUX REHABILITATION ET MODERNISATION Pending INSTITUT KAMA2_12 Urban Governance Single Stage - One IDA / H8420 Post Request for Bids Open - National 350,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-26 2019-10-23 SALLES (including PPA) Envelope on CLASSE_BATIMENT ADMINISTRATIF_MUR DE CLOTURE_ VILLE DE KINDU ZR-PDU-107565-CW-RFB / SC 2A LOT 3 _TRAVAUX REHABILITATION ET MODERNISATION EP Pending Urban Governance Single Stage - One KAMA 2_ 13 SALLES DE IDA / H8420 Post Request for Bids Open - National 370,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-21 2019-10-18 (including PPA) Envelope CLASSE_BATIMENT on ADMINISTRATIF _ MUR DE CLOTURE_ VILLE DE KINDU ZR-PDU-107566-CW-RFB / SC 2A _ LOT 4 _TRAVAUX REHABILITATION ET MODERNISATION INSTITUT KANSILEMBO Pending Urban Governance Single Stage - One _12 SALLES CLASSE_ IDA / H8420 Post Request for Bids Open - National 450,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-26 2019-10-23 (including PPA) Envelope BATIMENT on ADMINISTARTIF _ PAVILLON SANITAIRE_ MUR DE CLOTURE _VILLE DE KINDU ZR-PDU-107567-CW-RFB / SC 2A LOT 1_ TRAVAUX REHABILITATION ET MODERNISATION EP BONZENGA_ 10 SALLES Pending Urban Governance Single Stage - One DE CLASSE_ 3 BUREAUX IDA / H8420 Post Request for Bids Open - National 400,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-21 2019-10-18 (including PPA) Envelope _ CIRCULATION on COUVERTE_ 3 BLOCS SANITAIRES_ AMENAGEMENT COUR _ Ville de MBANDAKA Page 2 ZR-PDU-107568-CW-RFB / SC 2A _ LOT 2 _ TRAVAUX REHABILITATION ET MODERNISATION EP Pending Urban Governance Single Stage - One MALEMBE_12 SALLES IDA / H8420 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-16 2019-10-13 (including PPA) Envelope CLASSE_3 BUREAUX _2 on BLOCS SANITATIRES _CIRCULATION COUVERTE _AMENANGEMENT COUR_VILLE MBANDAKA ZR-PDU-107569-CW-RFB / SC 2A _ LOT 3_ TRAVAUX DE REHABILITATION ET MODERNISATION INSTITUT MAINGOWA _8 Pending Urban Governance Single Stage - One SALLES DE CLASSES IDA / H8420 Post Request for Bids Open - National 380,000.00 0.00 Implementati 2019-03-22 2019-03-27 2019-04-01 2019-04-06 2019-04-26 2019-10-23 (including PPA) Envelope _BATIMENT on ADMINISTRATIF_2 BLOCS SANITAIRES_ AMENAGEMENT COUR_ Ville de MBANDAKA GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-52363-GO-RFQ / ACQUISITION UN GROUPE ELECTROGENE DE Under SECOURS DE 30 KVA Urban Governance Request for Single Stage - One IDA / H8420 Post Limited 18,000.00 0.00 Implementati 2018-03-09 2018-03-23 2018-03-26 SILENCIEUX POUR (including PPA) Quotations Envelope on BUREAUX DU SECRETARIAT PERMANENT DU PROJET ZR-PDU-122459-GO-RFB / SC 2 A FOURNITURE DES Pending Urban Governance Single Stage - One MOBILIERS SCOLAIRES IDA / H8420 Post Request for Bids Open - National 800,000.00 0.00 Implementati 2019-07-11 2019-07-11 2019-08-22 2019-09-21 2019-10-26 2020-04-23 (including PPA) Envelope POUR 3 ECOLES DE LA on VILLE DE KIKWIT ZR-PDU-122463-GO-RFB / S C 2 A FOURNITURE Pending Urban Governance Single Stage - One DES MOBILIERS IDA / H8420 Post Request for Bids Open - National 800,000.00 0.00 Implementati 2019-07-11 2019-07-11 2019-07-21 2019-07-26 2019-08-05 2019-11-03 (including PPA) Envelope SCOLAIRES POUR 3 on ECOLES DE LA VILLE DE MBANDAKA ZR-PDU-122464-GO-RFB / S C 2 A FOURNITURE Pending Urban Governance Single Stage - One DES MOBILIERS IDA / H8420 Post Request for Bids Open - National 1,000,000.00 0.00 Implementati 2019-07-11 2019-07-11 2019-07-16 2019-07-21 2019-07-31 2019-10-29 (including PPA) Envelope SCOLAIRES POUR 4 on ECOLES DE LA VILLE DE KINDU NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-65873-CS-CQS / Consultant (firme) -Etude Consultant sur la gestion des Urban Governance Open - Pending IDA / H8420 Post Qualification 200,000.00 0.00 2018-06-24 2018-07-15 2018-07-25 2018-08-04 2018-08-19 2018-11-17 équipements marchands (including PPA) International Implementation Selection dans les villes cibles du PDU ZR-PDU-72616-CS-QCBS / PDU ADD_MISSION DE CONTROLE DES TRAVAUX DE REHABILITATION ET Quality And Cost- Open - DE MODERNISATION DES IDA / 60340 Primary Infrastructure Prior 1,000,000.00 610,900.00 Signed 2018-08-02 2018-08-09 2018-08-21 2018-08-23 2018-08-30 2018-09-23 2018-10-07 2019-08-03 Based Selection International VOIRIES CIBLEES DES VILLES ADD GOMA_KISANGANI _KOLWEZI ZR-PDU-76691-CS-CQS / S/C 2A PDU -Mission d'Etudes tech & Contrôle travaux de réhabil. et de Consultant Urban Governance Pending modern. des 10 écoles IDA / H8420 Post Qualification Open - National 250,000.00 0.00 2018-09-12 2018-10-03 2018-11-16 2018-12-16 2019-01-20 2019-07-19 (including PPA) Implementation maternelles, de 2 Instituts , Selection de 2 Foyers sociaux et d'1 Centre des Jeunes de la ville de Bukavu. ZR-PDU-76692-CS-CQS / S/C 2A PDU -Mission d'Etudes tech & Contrôle travaux de réhabil. et de Consultant Urban Governance Pending modern.des 4 écoles IDA / H8420 Post Qualification Open - National 150,000.00 0.00 2018-09-15 2018-10-06 2018-11-19 2018-12-19 2019-01-23 2019-07-22 (including PPA) Implementation primaires de la ville de Selection Kalemie: MAENDELEO, MAHITO, ABATTOIR et KITUMAINI IV ZR-PDU-76693-CS-CQS / S/C 2A PDU -Missions d'Etudes tech & Contrôle travaux de réhabil. et de Consultant Urban Governance Pending modern.des 2 Instituts , des IDA / H8420 Post Qualification Open - National 150,000.00 0.00 2018-09-15 2018-10-06 2018-11-19 2018-12-19 2019-01-23 2019-07-22 (including PPA) Implementation 2 Ecoles primaires EP1 et Selection EP2 et d'1 bibliothèque de l'Instituit Boboto -Ville Matadi ZR-PDU-76697-CS-CQS / S/C 2A PDU -Missions d'Etudes tech & Contrôle Consultant Urban Governance Pending travaux de réhabil. et de IDA / 60340 Post Qualification Open - National 150,000.00 0.00 2018-09-17 2018-10-08 2018-11-21 2018-12-21 2019-01-25 2019-07-24 (including PPA) Implementation modern.des 2 Ecoles Selection primaires et 4 Instituts de la ville de Goma. ZR-PDU-76699-CS-CQS / S/C 2A PDU -Missions d'Etudes tech & Contrôle Consultant Urban Governance Pending travaux de réhabil. et de IDA / 60340 Post Qualification Open - National 50,000.00 0.00 2018-09-17 2018-10-08 2018-11-21 2018-12-21 2019-01-25 2019-07-24 (including PPA) Implementation modern.d'1 Institut et d'1 Selection Centre de Promotion Sociale de la ville de Kisangani Page 4 ZR-PDU-76701-CS-CQS / S/C 2A PDU -Missions d'Etudes tech & Contrôle Consultant travaux de réhabil. et de Urban Governance Pending IDA / 60340 Post Qualification Open - National 150,000.00 0.00 2018-09-18 2018-10-09 2018-11-22 2018-12-22 2019-01-26 2019-07-25 modern.de 2 Instituts , d'1 (including PPA) Implementation Selection Complexe scolaire et d'1 Ecole primaire de la ville de Kolwezi ZR-PDU-126981-CS-CQS / RECRUTEMENT CABINET Consultant PR ASSISTANCE Urban Governance Pending IDA / H8420 Post Qualification Open - National 400,000.00 0.00 2019-08-20 2019-09-03 2019-09-18 2019-09-28 2019-10-13 2019-12-12 TECHNIQUE AUX 4 VCP (including PPA) Implementation Selection PR MOBILISATION RECETTES PROPRES ZR-PDU-126983-CS-CQS / Consultant RECRUTEMENT ONG EN Urban Governance Pending IDA / H8420 Post Qualification Open - National 200,000.00 0.00 2019-08-30 2019-09-13 2019-09-28 2019-10-03 2019-10-23 2020-02-20 CHARGE ENGAGEMENT (including PPA) Implementation Selection CITOYEN DANS 4 VCP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-30323-CS-CDS / MISSION SURVEILLANCE ET CONTROLE TRAVAUX DE REHABILITATION ET Under IDA / H8420 Primary Infrastructure Prior Direct Selection Direct 500,335.00 0.00 2017-09-27 2017-09-28 2017-10-01 2018-05-29 MODERNISATION DES Implementation AVENUES IRAMBO(Ville Bukavu) ET ITELA (Ville de Mbandaka) ZR-PDU-65864-CS-INDV / Individual Urban Governance Pending Recrutement d'un Comptable IDA / H8420 Post Consultant Limited 40,000.00 0.00 2018-06-20 2018-06-25 2018-07-16 2018-08-20 2019-08-15 (including PPA) Implementation pour le SP-PDU Selection ZR-PDU-65866-CS-INDV / Recrutement Consultant ind -Revision Instruments Individual Urban Governance Pending sauvegardes environ. et IDA / H8420 Post Consultant Limited 50,000.00 0.00 2018-06-21 2018-06-26 2018-07-17 2018-08-21 2019-08-16 (including PPA) Implementation sociale - Elaboration Plan Selection renforcement capacités parties prenantes ZR-PDU-65868-CS-INDV / Consultant ind. pour audit de conformité et de Individual Urban Governance Pending gouvernance environ. et IDA / H8420 Post Consultant Limited 100,000.00 0.00 2018-06-13 2018-06-18 2018-07-09 2018-08-13 2018-09-27 (including PPA) Implementation sociale -chantiers travaux Selection modernisation voiries urbaines du PDU. ZR-PDU-65882-CS-INDV / Recrutement d'un Consultant Individual en charge d'assurer Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2018-06-18 2018-06-23 2018-07-03 2018-07-18 2019-07-13 l'Assistance à la Maitrise (including PPA) Implementation Selection d'Ouvrage (AMO)/ Ville de Bukavu ZR-PDU-65883-CS-INDV / Recrutement d'un Consultant Individual en charge d'assurer Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2018-06-20 2018-06-25 2018-07-05 2018-07-20 2019-07-15 l'Assistance à la Maitrise (including PPA) Implementation Selection d'Ouvrage (AMO)/ Ville de Kikwit Page 5 ZR-PDU-65885-CS-INDV / Recrutement d'un Consultant Individual en charge d'assurer Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2018-06-20 2018-06-25 2018-07-05 2018-07-20 2019-07-15 l'Assistance à la Maitrise (including PPA) Implementation Selection d'Ouvrage (AMO)/ Ville de Kindu ZR-PDU-65886-CS-INDV / Recrutement d'un Consultant Individual en charge d'assurer Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2018-06-17 2018-06-22 2018-07-02 2018-07-17 2019-07-12 l'Assistance à la Maitrise (including PPA) Implementation Selection d'Ouvrage (AMO)/ Ville de Matadi ZR-PDU-72617-CS-INDV / Mission d'assistance Individual Pending technique ponctuelle d'un IDA / 60340 Primary Infrastructure Post Consultant Limited 90,000.00 0.00 2018-08-07 2018-08-12 2018-08-27 2018-09-06 2019-07-03 Implementation consultant au SP.PDU Selection _Travaux des infrastructures ZR-PDU-72618-CS-CDS / Convention OVD _ Etudes tech. trx gare routière_ pavage artères Pending principales_tronçon route en IDA / 60340 Primary Infrastructure Post Direct Selection Direct 100,000.00 0.00 2018-08-10 2018-08-20 2018-09-14 2018-12-13 Implementation terre_Curage collecteurs_ rôle temporaire MdC voiries ciblées 3villes add avant mobilisation de la MdC....etc. ZR-PDU-72615-CS-CDS / MISSION EVRC DES 9 VILLES CIBLEES EN Urban Governance RDC_CONTRAT IDA / 60340 Post Direct Selection Direct 150,000.00 173,368.50 Signed 2018-08-12 2018-08-15 2018-08-20 2018-09-19 (including PPA) TECHNIPLAN INTERNATIONAL CONSULTING ZR-PDU-74563-CS-INDV / Individual CONSULTANT IND EN Urban Governance Under IDA / 60340 Post Consultant Limited 50,000.00 0.00 2018-08-26 2018-08-31 2018-09-21 2018-10-26 2019-10-26 CHARGE DE LA (including PPA) Implementation Selection COMMUNICATION ZR-PDU-75126-CS-CDS / MISSION EVRC DANS NEUF VILLES POUR UNE Urban Governance DUREE DE SIX MOIS - IDA / 60340 Prior Direct Selection Direct 1,000,000.00 0.00 Canceled 2018-08-26 2018-08-31 2018-09-25 2019-03-24 (including PPA) Cabinet TECHNIPLAN INTERNATIONAL CONSULTING ZR-PDU-107327-CS-INDV / RECRUTEMENT UN Individual CONSULTANT INDIVIDUEL Urban Governance Under IDA / H8420 Prior Consultant Open 300,000.00 0.00 2019-04-30 2019-05-26 2019-05-31 2019-06-26 2021-11-12 AU POSTE DE (including PPA) Implementation Selection COORDONNATEUR DU PDU ZR-PDU-113580-CS-CDS / RECRUTEMENT ENTENTE DIRECTE GROUPEMENT Urban Governance Under CABINETS BERD & SERF IDA / H8420 Post Direct Selection Direct 310,000.00 0.00 2019-05-09 2019-05-11 2019-05-24 2019-07-02 (including PPA) Implementation _MISSION EVALUATION ANNUELLE PERFORMANCES DES VCP ZR-PDU-65860-CS-INDV / Individual Urban Governance Pending Recrutement d'un Expert IDA / H8420 Post Consultant Limited 50,000.00 0.00 2019-05-12 2019-05-15 2019-05-18 2019-05-26 2020-05-20 (including PPA) Implementation infrastructures nº2 Selection Page 6 ZR-PDU-86047-CS-INDV / RECRUTEMENT CONSULTANT INDIVIDUEL Individual POUR ASSISTANCE Urban Governance Pending IDA / 60340 Post Consultant Limited 100,000.00 0.00 2019-05-26 2019-05-31 2019-06-10 2019-06-25 2019-10-13 TECHNIQUE EN GESTION (including PPA) Implementation Selection DES FINANCES PUBLIQUES DANS LES VCP ZR-PDU-117935-CS-INDV / Individual Recrutement d'un Spécialiste Urban Governance Pending IDA / H8420 Post Consultant Limited 50,000.00 0.00 2019-06-10 2019-06-15 2019-06-25 2019-07-05 2020-06-29 en Passation des marchés (including PPA) Implementation Selection nº2 pour le SP.PDU ZR-PDU-117936-CS-INDV / RECRUTEMENT Individual Urban Governance Pending INGENIEUR EN CHARGE IDA / H8420 Post Consultant Limited 50,000.00 0.00 2019-06-10 2019-06-15 2019-06-25 2019-07-05 2020-06-29 (including PPA) Implementation DES INFRASTRUCTURES Selection AU SP.PDU ZR-PDU-125714-CS-INDV / Recrutement un consultant Individual Urban Governance Pending individuel en charge de la IDA / H8420 Post Consultant Limited 30,000.00 0.00 2019-08-13 2019-08-18 2019-09-08 2019-10-13 2020-04-10 (including PPA) Implementation mission de VBG au sein du Selection SP PDU ZR-PDU-126060-CS-CQS / Recrutement d'un consultant individuel en violence basée sur le genre (VBG) Individual Urban Governance Pending Spécialiste en cartographie IDA / H8420 Post Consultant Limited 40,000.00 0.00 2019-08-18 2019-08-23 2019-08-28 2019-09-12 2019-12-11 (including PPA) Implementation des services de VBG en Selection République Démocratique du Congo (pour les villes de Matadi et Kikwit) ZR-PDU-126063-CS-INDV / Recrutement d'un consultant individuel en violence basée sur le genre (VBG) Individual Urban Governance Pending Spécialiste en cartographie IDA / H8420 Post Consultant Limited 40,000.00 0.00 2019-08-15 2019-08-20 2019-08-30 2019-09-14 2019-12-13 (including PPA) Implementation des services de VBG en Selection République Démocratique du Congo (pour les villes de Bukavu et Goma) ZR-PDU-126977-CS-INDV / Recrutement consultant Individual individuel pr élaboration Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2019-08-20 2019-08-25 2019-09-04 2019-09-14 2019-10-14 plan pluriannuel de (including PPA) Implementation Selection formation des 4 VCP , OSC, OC ZR-PDU-126980-CS-INDV / Recrutement consultant Individual individuel pr appuyer la Urban Governance Pending IDA / H8420 Post Consultant Limited 30,000.00 0.00 2019-08-15 2019-08-20 2019-08-25 2019-09-04 2019-10-04 mise en place et (including PPA) Implementation Selection opérationalisation outil de suivi dossiers du PDU ZR-PDU-126984-CS-INDV / RECRUTEMENT CONSULTANT INDIVIDUEL Individual POUR APPUYER OVD Pending IDA / H8420 Primary Infrastructure Post Consultant Limited 30,000.00 0.00 2019-08-20 2019-08-25 2019-09-04 2019-09-14 2019-10-14 DANS LES ETUDES Implementation Selection TECHNIQUES DES VOIRIES CIBLEES DU PDU Page 7 ZR-PDU-126985-CS-INDV / RECRUTEMENT CONSULTANT INDIVIDUEL Individual POUR APPUYER OVD Pending IDA / H8420 Primary Infrastructure Post Consultant Limited 30,000.00 0.00 2019-08-18 2019-08-23 2019-08-28 2019-09-07 2019-10-07 ETUDES TECHNIQUES Implementation Selection POUR VOIRIES CIBLEES DES VILLES DE MATADI ET KIKWIT Page 8