PROCUREMENT PLAN Project information: Angola Commercial Agriculture Development Project P159052 Project Implementation Agency: Ministry of Agriculture (MINAGRI) – Office of Studies, Planning and Statistics (GEPE) Date of the Procurement Plan: March 22, 2017 Period covered by this Procurement Plan: March 22, 2017 to March 22, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. “National procurement legislation and applicable conditions under review by the Bank” When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works), Goods: is applicable for those contracts identified in the Procurement Plan tables; 1 Works: is applicable for those contracts identified in the Procurement Plan tables. Other Relevant Procurement Information. “Not Applicable” 2 PROCUREMENT Angola : Angola: Commercial Agriculture Development Project PLAN General Information Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2017-03-06 2019-09-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159052 GPN Date: 2019-07-09 Project Name: Angola: Commercial Agriculture Development Project Loan / Credit No: IBRD / P4860, / , IBRD / 88660, COFN / C1580 Executing Agency(ies): Ministry of Agriculture WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 003/W/CADP/18 / Pending Infrastructure for Production Open - Single Stage - One Rehabilitation of Irrigation IBRD / 88660 Post Request for Bids 2,500,000.00 0.00 Implementati 2019-06-03 2019-06-08 2019-07-20 2019-08-19 2019-09-23 2020-03-21 and Marketing International Envelope infrastrucure on Pending 001/W/CADP/18 / Infrastructure for Production Open - Single Stage - One IBRD / 88660 Prior Request for Bids 32,845,155.00 0.00 Implementati 2019-08-09 2019-08-14 2019-09-25 2019-10-25 2019-11-29 2020-05-27 Rehabilitation rural roads and Marketing International Envelope on 002/W/CADP/18 / Pending Infrastructure for Production Single Stage - One Maintenance of rural roads IBRD / 88660 Post Request for Bids Open - National 956,655.00 0.00 Implementati 2019-07-09 2019-07-14 2019-08-25 2019-09-24 2019-10-29 2020-04-26 and Marketing Envelope (1st and 2nd yr) on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 001/GD/ACDP/17 / Supply Project Management, Request for Single Stage - One / Post Open - National 180,000.00 0.00 Canceled 2017-03-18 2017-04-22 2017-07-21 of Vehicles (3) Monitoring and Evaluation Quotations Envelope 007/GD/ACDP/17 / Supply Project Management, UN Agencies of vehicles for the Project IBRD / P4860 Prior Direct 180,000.00 102,941.35 Completed 2017-10-16 2017-10-21 2017-11-25 2018-05-24 Monitoring and Evaluation (Direct) Implementation Unit 002/GD/ACDP/17 / Supply Project Management, Request for Single Stage - One of IT equipment for PIU IBRD / P4860 Post Limited 50,000.00 22,626.49 Signed 2017-11-27 2018-01-01 2018-01-08 Monitoring and Evaluation Quotations Envelope Office in Luanda 005/GD/ACDP/17 / Project Management, Request for Single Stage - One IBRD / P4860 Post Open - National 15,000.00 13,214.11 Completed 2017-11-06 2017-12-18 2017-12-25 Renovation of PIU office Monitoring and Evaluation Quotations Envelope 003/GD/ACDP/17 / Supply Project Management, Request for Single Stage - One of Office Furniture for PIU IBRD / P4860 Post Open - National 70,000.00 26,780.96 Completed 2017-11-25 2018-01-20 2018-02-10 Monitoring and Evaluation Quotations Envelope Office in Luanda 004/GD/ACDP/17 / Supply Project Management, Request for Single Stage - One of Accountant Software for IBRD / P4860 Post Open - National 15,000.00 19,462.35 Signed 2018-05-11 2018-06-15 2018-06-22 Monitoring and Evaluation Quotations Envelope the Project Under 006/GD/CADP/18 / Supply Project Management, UN Agencies IBRD / 88660 Post Direct 80,000.00 0.00 Implementati 2019-02-04 2019-02-09 2019-03-16 2019-09-12 of Vehicles (3) Monitoring and Evaluation (Direct) on Page 1 002/GD/ACDP/18 / Supply Project Management, Request for Single Stage - One IBRD / P4860 Post Open - National 5,000.00 0.00 Canceled 2017-11-25 2017-12-30 2018-01-06 of TC equipment for PIU Monitoring and Evaluation Quotations Envelope 011/GD/CADP/18 / Pending Project Management, Request for Single Stage - One Information Management IBRD / 88660 Post Limited 15,000.00 0.00 Implementati 2019-06-05 2019-07-31 2020-01-27 Monitoring and Evaluation Quotations Envelope System on 007/GD/CADP/18 / Supply Project Management, Request for Single Stage - One IBRD / 88660 Post Limited 65,000.00 29,221.33 Signed 2019-02-09 2019-04-06 2019-10-03 of IT equipment for PIU Monitoring and Evaluation Quotations Envelope Pending 008/GD/CADP/18 / Supply Project Management, Request for Single Stage - One IBRD / 88660 Post Limited 10,000.00 0.00 Implementati 2019-06-01 2019-07-27 2020-01-23 of TC equipment for PIU Monitoring and Evaluation Quotations Envelope on 009/GD/CADP/18 / Supply Project Management, Request for Single Stage - One of Office Furniture for PIU IBRD / 88660 Post Limited 75,000.00 17,250.93 Completed 2019-01-30 2019-03-27 2019-09-23 Monitoring and Evaluation Quotations Envelope Office 074/CS/CADP/19 / Portable Institutional Strengthening Pending IT Equipment for field Single Stage - One COFN / C1580 and Improved Business Post Request for Bids Open - National 800,000.00 0.00 Implementati 2019-09-13 2019-09-18 2019-10-30 2019-11-29 2020-01-03 2020-07-01 collection of primary Envelope Environment on information (Tablets) NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 010/CS/ACDP/16 / Consultancy to support value chain analysis/development for Poultry & Eggs, Corn Promotion and Support for Quality And Cost- Open - and Soy, and Coffee VCs. IBRD / P4860 Prior 500,000.00 159,585.00 Signed 2017-03-13 2017-04-03 2017-04-19 2017-04-24 2017-05-15 2017-06-03 2017-06-13 2017-12-20 Agribusiness Development Based Selection International This would include studies, strategy development, stakeohlder mobilization, build capacity at MINAGRI. 013/CS/ACDP/17 / Consultant to develop Consultant Promotion and Support for Open - environmental studies and IBRD / P4860 Post Qualification 150,000.00 156,310.00 Completed 2017-03-20 2017-04-03 2017-05-01 2017-05-08 2017-05-29 2017-07-28 Agribusiness Development International related safeguard Selection instruments 009/CS/ACDP/17 / Consultant Consultant to develop Social Promotion and Support for Open - / Post Qualification 120,000.00 0.00 Canceled 2017-03-20 2017-04-03 2017-05-01 2017-05-08 2017-05-29 2017-07-28 Safeguard studies and Agribusiness Development International Selection related Instruments 060/CS/CADP/18 / External Project Management, Least Cost Open - Under IBRD / 88660 Prior 200,000.00 0.00 2018-09-24 2018-10-15 2018-11-19 2018-12-17 2019-01-16 2019-02-13 2019-03-13 2019-09-09 Audit for PIU (first 3 years) Monitoring and Evaluation Selection International Implementation 061/CS/CADP/18 / Survey of Infrastructure for Production Quality And Cost- Open - Under supporting infrastructure IBRD / 88660 Post 350,000.00 0.00 2018-10-29 2018-11-19 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2020-05-09 and Marketing Based Selection International Implementation Phase 2 Page 2 036/CS/CADP/19 / Design and Supervision for Infrastructure for Production Quality And Cost- Open - Pending IBRD / 88660 Post 300,000.00 0.00 2019-02-08 2019-03-01 2019-04-14 2019-05-12 2019-06-11 2019-07-16 2019-08-20 2020-08-19 rehabilitation of Irrigation and Marketing Based Selection International Implementation infrastructure 035/CS/CADP/18 / Design Infrastructure for Production Quality And Cost- Open - Pending and Supervision for rural IBRD / 88660 Prior 2,500,000.00 0.00 2019-02-04 2019-02-25 2019-04-10 2019-05-08 2019-06-07 2019-07-12 2019-08-16 2020-08-15 and Marketing Based Selection International Implementation roads rehabilitation 053/CS/CADP/18 / Technical Institutional Strengthening assistance for capacity Quality And Cost- Open - Pending IBRD / 88660 and Improved Business Prior 500,000.00 0.00 2019-01-30 2019-02-20 2019-04-05 2019-05-03 2019-06-02 2019-07-07 2019-08-11 2020-08-10 building in research and Based Selection International Implementation Environment development 054/CS/CADP/18 / Technical Project Management, Quality And Cost- Open - Pending assistance for the investment IBRD / 88660 Prior 500,000.00 0.00 2019-04-01 2019-04-22 2019-06-05 2019-07-03 2019-08-02 2019-09-06 2019-10-11 2020-10-10 Monitoring and Evaluation Based Selection International Implementation committee 051/CS/CADP/18 / Technical Institutional Strengthening Quality And Cost- Open - Pending assistance for capacity IBRD / 88660 and Improved Business Post 350,000.00 0.00 2019-02-22 2019-03-15 2019-04-28 2019-05-26 2019-06-25 2019-07-30 2019-09-03 2020-09-02 Based Selection International Implementation building business intelligence Environment 050/CS/CADP/18 / Technical Institutional Strengthening Consultant Open - Pending assistance for capacity IBRD / 88660 and Improved Business Post Qualification 200,000.00 0.00 2019-07-08 2019-07-29 2019-09-11 2019-10-11 2019-11-15 2020-05-13 International Implementation building MINAGRIF Environment Selection 017/CS/ACDP/16 / Project Promotion and Support for Quality And Cost- Open - Pending IBRD / 88660 Post 300,000.00 0.00 2019-02-08 2019-03-01 2019-03-29 2019-04-03 2019-04-18 2019-05-08 2019-05-18 2019-08-16 Baseline Survey Agribusiness Development Based Selection International Implementation 064/CS/CADP/18 / TA on geospatial mapping, Infrastructure for Production Quality And Cost- Open - Under feasibility, demand and cost IBRD / 88660 Prior 900,000.00 0.00 2019-01-31 2019-02-21 2019-04-06 2019-05-04 2019-06-03 2019-07-08 2019-08-12 2020-08-11 and Marketing Based Selection International Implementation studies for rural electrifications 052/CS/CADP/18 / TECHNICAL SERVICES PROVIDERS TO SUPPORT Promotion and Support for Quality And Cost- Open - Under PROJECT INTERVENTIONS IBRD / 88660 Prior 1,000,000.00 0.00 2019-01-31 2019-02-21 2019-04-06 2019-05-04 2019-06-03 2019-07-08 2019-08-12 2020-08-11 Agribusiness Development Based Selection International Implementation FOR BUSINESS PLANS IMPLEMENTATION (TSP 1.1) 072/CS/CADP/19 / TECHNICAL SERVICES Institutional Strengthening PROVIDERS TO SUPPORT Quality And Cost- Open - Under IBRD / 88660 and Improved Business Post 120,000.00 0.00 2019-07-26 2019-08-16 2019-09-29 2019-10-27 2019-11-26 2019-12-31 2020-02-04 2021-02-03 THE SUB-COMPONENT OF Based Selection International Implementation Environment VALUE CHAIN STRATEGY DEVELOPMENT 069/CS/CADP/19 / Technical Services Providers to support Promotion and Support for Quality And Cost- Open - Financial Sector intervention IBRD / 88660 Post 200,000.00 0.00 Under Review 2019-07-14 2019-08-04 2019-09-17 2019-10-15 2019-11-14 2019-12-19 2020-01-23 2021-01-22 Agribusiness Development Based Selection International for partial credit guarantees (TSP 1.2) 070/CS/CADP/19 / Participatory process for Infrastructure for Production Quality And Cost- Open - Under IBRD / 88660 Post 120,000.00 0.00 2019-07-23 2019-08-13 2019-09-26 2019-10-24 2019-11-23 2019-12-28 2020-02-01 2021-01-31 identification of irrigation and Marketing Based Selection International Implementation schemes 071/CS/CADP/19 / Feasibility study on Infrastructure for Production Quality And Cost- Open - Under rehabilitation of small and IBRD / 88660 Post 120,000.00 0.00 2019-07-23 2019-08-13 2019-09-26 2019-10-24 2019-11-23 2019-12-28 2020-02-01 2021-01-31 and Marketing Based Selection International Implementation medium-sized irrigated perimeters Page 3 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 002/CS/ACDP/16 / Project Management, IBRD / P4860 Prior Consultant Open 130,000.00 447,029.44 Signed 2017-03-06 2017-04-04 2017-04-05 2017-04-20 2018-04-20 Procurement specialist Monitoring and Evaluation Selection 014/CS/ACDP/16 / Consultant to undertake analysis of infrastructure Promotion and Support for current status as well as IBRD / P4860 Post Direct Selection Direct 100,000.00 299,133.85 Completed 2017-03-13 2017-03-23 2017-05-20 2017-06-19 Agribusiness Development other services for the betterment of the value chains 003/CS/ACDP/16 / Individual Project Management, Agribusiness and Value IBRD / P4860 Post Consultant Open 150,000.00 143,205.72 Signed 2017-11-13 2017-12-16 2017-12-23 2018-01-13 2019-01-13 Monitoring and Evaluation Chain Analysis Specialist Selection 016/CS/ACDP/16 / Individual Project Management, Consultant to develop the IBRD / P4860 Post Consultant Open 70,000.00 45,200.00 Signed 2017-12-18 2018-02-05 2018-02-26 2018-03-08 2018-06-06 Monitoring and Evaluation project's manual Selection Individual 004/CS/ACDP/16 / Finance Project Management, IBRD / P4860 Prior Consultant Open 130,000.00 343,662.13 Signed 2017-10-30 2017-11-28 2017-12-12 2018-01-09 2019-01-09 management specialist Monitoring and Evaluation Selection 023/CS/ACDP/17 / Individual Contracting of an Project Management, IBRD / P4860 Post Consultant Open 70,000.00 143,062.00 Signed 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2019-04-30 Environmental Safeguards Monitoring and Evaluation Selection Specialist Individual 007/CS/ACDP/16 / Project Project Management, IBRD / P4860 Post Consultant Open 90,000.00 0.00 Canceled 2018-01-15 2018-03-05 2018-03-19 2018-04-07 2019-04-07 accountant Monitoring and Evaluation Selection 025/CS/ACDP/18 / Consultancy services for the Individual elaboration of a Diagnosis of Promotion and Support for IBRD / P4860 Post Consultant Open 90,000.00 0.00 Canceled 2017-06-25 2017-07-19 2017-07-24 2017-08-03 2018-01-30 Land Uses and Rights in Agribusiness Development Selection the Project Implementation Area 025/CS/CADP/17 / DIAGNOSTIC REVIEW OF Individual Promotion and Support for LAND RIGHTS AND LAND IBRD / P4860 Prior Consultant Open 90,000.00 80,000.00 Signed 2017-11-20 2017-12-12 2017-12-15 2018-01-10 2018-07-09 Agribusiness Development USES IN THE PROJECT Selection AREA Individual 005/CS/ACDP/16 / Junior Project Management, IBRD / P4860 Prior Consultant Open 70,000.00 84,092.64 Signed 2018-05-07 2018-06-05 2018-06-19 2018-07-10 2019-07-10 Procurement Officer 1 Monitoring and Evaluation Selection 026/CS/CADP/17 / Individual Project Management, Consultancy to prepare the IBRD / P4860 Post Consultant Open 30,000.00 0.00 Canceled 2018-01-29 2018-03-19 2018-04-09 2018-05-14 2018-11-10 Monitoring and Evaluation project manuals Selection Individual 034/CS/CADP/18 / Project Project Management, IBRD / P4860 Post Consultant Open 70,000.00 165,897.79 Signed 2018-06-04 2018-07-03 2018-07-13 2018-08-12 2019-02-08 Accountant Monitoring and Evaluation Selection Individual 006/CS/ACDP/16 / Assistant Project Management, IBRD / P4860 Post Consultant Open 75,000.00 0.00 Canceled 2017-03-06 2017-04-04 2017-04-18 2017-05-16 2018-05-16 Financial Management Monitoring and Evaluation Selection Page 4 Individual 047/CS/CADP/18 / Junior Project Management, Pending IBRD / 88660 Prior Consultant Open 70,000.00 0.00 2019-05-20 2019-06-18 2019-06-28 2019-07-28 2020-01-24 Procurement officer 2 Monitoring and Evaluation Implementation Selection Individual 028/CS/CADP/18 / Matching Project Management, IBRD / 88660 Post Consultant Open 150,000.00 192,070.35 Signed 2019-01-15 2019-03-05 2019-03-26 2019-04-30 2019-10-27 Grant Manager Monitoring and Evaluation Selection Individual 032/CS/CADP/18 / Matching Project Management, Under IBRD / 88660 Post Consultant Open 70,000.00 0.00 2019-01-15 2019-03-05 2019-03-26 2019-04-30 2019-10-27 Grant Specialist Monitoring and Evaluation Implementation Selection Individual 042/CS/CADP/18 / IT Project Management, Pending IBRD / 88660 Post Consultant Open 70,000.00 0.00 2019-07-25 2019-09-12 2019-10-03 2019-11-07 2020-05-05 Specialist Monitoring and Evaluation Implementation Selection 030/CS/CADP/18 / Junior Individual Project Management, Pending Agribusiness and Value IBRD / 88660 Post Consultant Open 70,000.00 0.00 2019-01-25 2019-03-15 2019-04-05 2019-05-10 2019-11-06 Monitoring and Evaluation Implementation Chain Analysis Specialist Selection Individual 033/CS/CADP/18 / Junior Project Management, IBRD / 88660 Post Consultant Open 70,000.00 84,092.64 Signed 2019-01-15 2019-03-05 2019-03-26 2019-04-30 2019-10-27 Financial Management officer Monitoring and Evaluation Selection Individual 031/CS/CADP/18 / Matching Project Management, Under IBRD / 88660 Post Consultant Open 70,000.00 80,942.93 2019-01-18 2019-03-08 2019-03-29 2019-05-03 2019-10-30 grant accountant Monitoring and Evaluation Implementation Selection 058/CS/CADP/18 / Individual Project Management, Under Monitoring and Evaluation IBRD / 88660 Post Consultant Open 70,000.00 0.00 2018-12-28 2019-02-15 2019-03-08 2019-04-12 2019-10-09 Monitoring and Evaluation Implementation specialist Selection Individual 057/CS/CADP/18 / Project Management, Under IBRD / 88660 Post Consultant Open 40,000.00 0.00 2019-01-09 2019-02-27 2019-03-20 2019-04-24 2019-10-21 Provincial Representative 3 Monitoring and Evaluation Implementation Selection Individual 056/CS/CADP/18 / Project Management, Under IBRD / 88660 Post Consultant Open 40,000.00 0.00 2019-01-09 2019-02-27 2019-03-20 2019-04-24 2019-10-21 Provincial Representative 2 Monitoring and Evaluation Implementation Selection Individual 055/CS/CADP/18 / Project Management, Under IBRD / 88660 Post Consultant Open 40,000.00 0.00 2019-01-09 2019-02-27 2019-03-20 2019-04-24 2019-10-21 Provincial Representative 1 Monitoring and Evaluation Implementation Selection Individual 043/CS/CADP/18 / Project Management, IBRD / 88660 Post Consultant Open 70,000.00 165,832.13 Signed 2019-01-11 2019-03-01 2019-03-22 2019-04-26 2019-10-23 Communication specialist Monitoring and Evaluation Selection Individual 044/CS/CADP/18 / Senior Project Management, IBRD / 88660 Post Consultant Open 150,000.00 154,686.12 Signed 2018-12-28 2019-02-15 2019-03-08 2019-04-12 2019-10-09 Infrastructure specialist Monitoring and Evaluation Selection Individual 045/CS/CADP/18 / Project Project Management, Under IBRD / 88660 Post Consultant Open 18,000.00 0.00 2019-01-24 2019-03-14 2019-04-04 2019-05-09 2019-11-05 Coordinator's Assistant Monitoring and Evaluation Implementation Selection 063/CS/CADP/18 / Expert Institutional Strengthening Individual Pending for Data collection and IBRD / 88660 and Improved Business Post Consultant Open 90,000.00 0.00 2019-01-31 2019-03-21 2019-04-11 2019-05-16 2019-11-12 Implementation analysis to support GEPE Environment Selection 021/CS/ACDP/17 / Individual Contracting of a Value chain Project Management, Pending IBRD / 88660 Post Consultant Open 70,000.00 0.00 2019-01-14 2019-03-04 2019-03-25 2019-04-29 2020-04-28 development/competitiveness Monitoring and Evaluation Implementation Selection expert Page 5 024/CS/ACDP/17 / Individual Project Management, Pending Contracting of a Social IBRD / 88660 Post Consultant Open 70,000.00 0.00 2019-10-28 2019-12-16 2020-01-06 2020-02-10 2021-02-09 Monitoring and Evaluation Implementation Safeguards Specialist Selection Individual 048/CS/CADP/18 / Impact Project Management, Pending IBRD / 88660 Post Consultant Open 50,000.00 0.00 2020-06-02 2020-07-21 2020-08-11 2020-09-15 2021-03-14 evaluation specialist Monitoring and Evaluation Implementation Selection 022/CS/ACDP/17 / Individual Project Management, Pending Contracting of a Junior IBRD / 88660 Post Consultant Open 50,000.00 0.00 2019-02-27 2019-04-17 2019-05-08 2019-06-12 2020-06-11 Monitoring and Evaluation Implementation Agribusiness Expert Selection 020/CS/ACDP/17 / Individual Project Management, Pending Contracting of a Land IBRD / 88660 Post Consultant Open 30,000.00 0.00 2019-03-27 2019-05-15 2019-06-05 2019-07-10 2020-07-09 Monitoring and Evaluation Implementation governance/social Assistant Selection 019/CS/ACDP/17 / Individual Project Management, Pending Contracting of a Land IBRD / 88660 Post Consultant Open 50,000.00 0.00 2019-02-05 2019-03-26 2019-04-16 2019-05-21 2020-05-20 Monitoring and Evaluation Implementation Administration specialist Selection 066/CS/CADP/18 / Individual Project Management, Administrative/Office IBRD / 88660 Post Consultant Open 30,000.00 36,781.82 Signed 2019-02-08 2019-03-29 2019-04-19 2019-05-24 2019-11-20 Monitoring and Evaluation Assistant Selection 065/CS/CADP/18 / Expert to Institutional Strengthening Individual provide TA on commissioning Pending IBRD / 88660 and Improved Business Post Consultant Open 97,500.00 0.00 2019-02-11 2019-04-01 2019-04-22 2019-05-27 2020-05-26 studies related to Implementation Environment Selection institutional support Individual 062/CS/CADP/18 / Internal Project Management, IBRD / 88660 Post Consultant Open 90,000.00 61,754.00 Signed 2018-12-14 2019-02-01 2019-02-22 2019-03-29 2019-09-25 Audit for PIU Monitoring and Evaluation Selection 067/CS/CADP/19 / External Project Management, IBRD / 88660 Post Direct Selection Direct 40,000.00 30,000.00 Signed 2019-04-30 2019-05-10 2019-06-13 2019-09-11 Audit for PIU (First Year) Monitoring and Evaluation 068/CS/CADP/19 / Technical Institutional Strengthening Individual support for agriculture policy Under IBRD / 88660 and Improved Business Post Consultant Open 80,000.00 0.00 2019-05-10 2019-06-28 2019-07-19 2019-08-23 2020-08-17 set up and analysis for Implementation Environment Selection GEPE/MINAGRIF Page 6