Sample Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan Original: March, 2016 : Revision: March, 2017 3. Date of General Procurement Notice: February 23, 2016 4. Period covered by this procurement plan: The procurement period of project covered from year May 1, 2016 to April 30, 2021 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Procurement method Prior Review Threshold Threshold US$ US$ 1 NCB (Goods) ; IT and Non-consulting Equivalent and Below US$ Above USD 2 mil. services 1,000,000 2 NCB (Works) Equivalent and Below US$ Above USD 10 mil. 10 million 3 Shopping (Goods) Equivalent and Below US$ None 100,000 4 Shopping (Works) Equivalent and Below US$ None 200,000 2. Prequalification. Bidders for Not applicable 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual, including the Matching Grants manual, for implementation of the Bank’s funded Loan Project P152441 is developed by GITA on June , 2016. 5. Any Other Special Procurement Arrangements: The project include the provision of matching grants to the Georgian firms and individuals to Broadband for Development program (increasing of the innovation activity). 6. Summary of the Procurement Packages planned during the entire project implementation period (as of March, 2017) 1 2 3 4 5 6 7 Ref. Description Estim Packag Domest Review Comments No. ated es ic Cost Prefere by US$ nce Bank millio (yes/no) (Prior / n Post) Summary of the ICB (Goods) 2.3 6 No Post Summary of the NCB (Works) 0.27 5 No Post Summary of the NCB (Goods) 0.62 4 No Post Summary of the Shopping 0.5 21 No Post (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comment Threshold 1. Competitive Methods Above US$ (Firms) 1,000,000 2. CQS Applicable for assignments with estimation below USD 300K 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packag Review Comments Assignment Cost es by Bank US$ (Prior / million Post) Summary of number of contracts 10.1 5 Prior that will be let under QCBS Summary of number of contracts 1.25 17 Post LCS, FB, CQS that will be let under other methods Summary of number of contracts 5.3 98 Prior/Post The contracts with the staff that will be let under IC positions were signed on the bases of the Prior review Summary of number of contracts 0.005 1 Post that will be let under SSS PROCUREMENT Georgia : Georgia National Innovation Ecosystem (GENIE) Project PLAN General Information Country: Georgia Bank’s Approval Date of the Original Procurement Plan: 2016-08-11 2018-11-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152441 GPN Date: Project Name: Georgia National Innovation Ecosystem (GENIE) Project Loan / Credit No: IBRD / 85950 Executing Agency(ies): Georgias Innovation & Technology Agency WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-GITA-2036-CW-RFQ / Pending Request for Single Stage - One Renovation Works for 5 pilot IBRD / 85950 Post Open - National 0.00 Implementati 2019-04-06 2019-05-04 2019-08-02 Quotations Envelope RIH on GE-GITA-2016-CW-RFB / Pending Single Stage - One Renovation Works for 40 IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-06-01 2018-06-06 2018-07-06 2018-08-05 2018-09-04 2018-11-03 Envelope CICs on GE-GITA-2013-CW-RFQ / Pending Request for Single Stage - One Renovation Works for IC- IBRD / 85950 Post Open - National 0.00 Implementati 2017-11-04 2017-12-09 2018-02-07 Quotations Envelope Location One on GE-GITA-19083-CW-RFQ / Pending Request for Single Stage - One Renovation Works for IC- IBRD / 85950 Post Open - National 0.00 Implementati 2017-11-04 2017-12-30 2018-01-29 Quotations Envelope Location Two on GE-GITA-19084-CW-RFQ / Pending Request for Single Stage - One Renovation Works for IC- IBRD / 85950 Post Open - National 0.00 Implementati 2017-11-04 2017-12-30 2018-02-13 Quotations Envelope Location three on GE-GITA-2014-CW-RFQ / Pending Request for Single Stage - One Renovation Works for 6 IBRD / 85950 Post Open - National 0.00 Implementati 2018-01-27 2018-02-24 2018-03-26 Quotations Envelope CICs on GE-GITA-2037-CW-RFQ / Pending Request for Single Stage - One Renovation Works for 2 pilot IBRD / 85950 Post Open - National 0.00 Implementati 2018-02-05 2018-03-05 2018-06-03 Quotations Envelope RIH on GE-GITA-2015-CW-RFQ / Under Request for Single Stage - One Renovation Works for IBRD / 85950 Post Open - National 0.00 Implementati 2018-02-20 2018-04-03 2018-07-02 Quotations Envelope Akhmeta CIC on GE-GITA-24405-CW-RFQ / Under Request for Single Stage - One Renovation Works for Telavi IBRD / 85950 Post Open - National 0.00 Implementati 2018-02-20 2018-04-17 2018-07-16 Quotations Envelope RIH on GE-GITA-52392-CW-RFQ / Pending Request for Single Stage - One Minor Renovation Works for IBRD / 85950 Post Open - National 0.00 Implementati 2018-03-17 2018-04-12 2018-05-12 Quotations Envelope Rukhi IC on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 GE-GITA-2022-GO-RFQ / Pending Equipment Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2020-02-28 2020-03-27 2020-04-26 replacement/upgrades for Quotations Envelope on CICs GE-GITA-2023-GO-RFB / Pending Single Stage - One Equipment replacement for IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2019-03-28 2019-04-02 2019-05-14 2019-06-13 2019-06-20 2019-07-20 Envelope RIHs on GE-GITA-2002-GO-RFQ / Request for Single Stage - One Computers and associated IT IBRD / 85950 Post Open - National 0.00 Canceled 2017-01-20 2017-02-17 2017-03-04 Quotations Envelope equipment for 5 CICs GE-GITA-2042-GO-RFB / Pending Single Stage - One Specialized Lab equipment IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2017-12-01 2017-12-06 2018-01-05 2018-02-04 2018-03-06 2018-06-04 Envelope for RIHs on Pending GE-GITA-2011-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2017-09-06 2017-10-11 2017-12-10 Media equipment for 5 CICs Quotations Envelope on Pending GE-GITA-2031-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2019-07-06 2019-08-03 2019-09-02 Software for 5 RIH Quotations Envelope on Pending GE-GITA-2033-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2019-05-06 2019-06-03 2019-08-02 Furniture for 5 RIH Quotations Envelope on GE-GITA-2005-GO-RFB / Pending Single Stage - One Computers and associated IT IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-06-01 2018-06-06 2018-07-06 2018-08-05 2018-09-04 2018-11-03 Envelope equipment for 40 CICs on Pending GE-GITA-2009-GO-RFB / Single Stage - One IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-07-01 2018-07-06 2018-08-05 2018-09-04 2018-10-04 2018-11-18 Furniture for 40 CICs Envelope on GE-GITA-2030-GO-RFB / Pending Single Stage - One Computers and associated IT IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2019-02-01 2019-02-06 2019-03-08 2019-04-07 2019-05-07 2019-08-05 Envelope equipment for 5 RIH on GE-GITA-2041-GO-RFB / Pending Single Stage - One Fabrication materials for 5 IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2019-04-01 2019-04-06 2019-05-06 2019-06-05 2019-07-05 2019-09-03 Envelope remaining RIH on GE-GITA-2025-GO-RFQ / Pending Request for Single Stage - One Basic equipment for maker- IBRD / 85950 Post Open - National 0.00 Implementati 2017-09-06 2017-10-04 2017-12-03 Quotations Envelope space for 8 CICs on GE-GITA-2003-GO-RFQ / Under Request for Single Stage - One Computers and associated IT IBRD / 85950 Post Open - National 0.00 Implementati 2017-05-27 2017-07-08 2017-07-23 Quotations Envelope equipment for 2 CICs on GE-GITA-5753-GO-RFB / Single Stage - One Fablab equipment for 3 pilot IBRD / 85950 Post Request for Bids Open - National 0.00 Canceled 2017-11-01 2017-11-06 2017-12-06 2018-01-05 2018-02-04 2018-04-05 Envelope RIH - phase II GE-GITA-2039-GO-RFB / Pending Single Stage - One FabLab equipment for 5 IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-05-01 2018-05-06 2018-06-17 2018-07-17 2018-07-24 2019-07-24 Envelope RIH on GE-GITA-14002-GO-RFQ / Pending Request for Single Stage - One Mini FabLab equipment for IBRD / 85950 Post Open - National 0.00 Implementati 2017-07-05 2017-08-30 2018-02-26 Quotations Envelope Mestia IC on Page 2 GE-GITA-2024-GO-RFQ / Pending Request for Single Stage - One Basic equipment for maker- IBRD / 85950 Post Open - National 0.00 Implementati 2017-01-20 2017-02-17 2017-03-19 Quotations Envelope space for 2 CICs on Pending GE-GITA-12175-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-02-04 2018-03-18 2018-05-02 Furniture for 3 CICs Quotations Envelope on GE-GITA-2007-GO-RFQ / Pending Request for Single Stage - One Furniture for 5 CICs - IBRD / 85950 Post Open - National 0.00 Implementati 2018-03-20 2018-04-17 2018-06-01 Quotations Envelope Phase II on Pending GE-GITA-2032-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-09-08 2018-10-06 2018-11-20 Furniture for 2 pilot RIH Quotations Envelope on Pending GE-GITA-24408-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2017-10-07 2017-12-02 2018-01-16 Furniture for 1 RIH Quotations Envelope on GE-GITA-2648-GO-RFB / Pending Computers and associated IT Single Stage - One IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-01-22 2018-01-27 2018-02-26 2018-03-28 2018-04-27 2018-06-26 equipment for 5 CICs and 2 Envelope on pilot RIH GE-GITA-24411-GO-RFB / Pending Single Stage - One Computers and associated IT IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2017-09-20 2017-09-25 2017-11-06 2017-12-06 2018-01-10 2018-07-09 Envelope equipment for 1 pilot RIH on GE-GITA-18050-GO-RFQ / Pending Request for Single Stage - One High end computers for IBRD / 85950 Post Open - National 0.00 Implementati 2017-10-22 2017-11-20 2018-01-19 Quotations Envelope Mestia mini fab-lab on Pending GE-GITA-2029-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-01-20 2018-02-17 2018-03-19 Software for 2 pilot RIH Quotations Envelope on Pending GE-GITA-24418-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2017-10-21 2017-12-16 2018-02-14 Software for 1 pilot RIH Quotations Envelope on GE-GITA-2143-GO-RFQ / Pending Request for Single Stage - One Fabrication materials for 2 IBRD / 85950 Post Open - National 0.00 Implementati 2018-03-25 2018-04-22 2018-06-21 Quotations Envelope pilot RIH on GE-GITA-2040-GO-RFQ / Pending Request for Single Stage - One Fabrication materials for 1 IBRD / 85950 Post Open - National 0.00 Implementati 2018-01-27 2018-02-24 2018-04-25 Quotations Envelope pilot RIH on GE-GITA-2038-GO-RFB / Pending Single Stage - One FabLab equipment for 2 IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2018-01-22 2018-01-27 2018-03-10 2018-04-09 2018-04-16 2018-06-15 Envelope pilot RIH on GE-GITA-12163-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Canceled 2017-08-06 2017-09-03 2017-10-03 Media equipment for 3 CICs Quotations Envelope GE-GITA-24590-GO-RFB / Pending Single Stage - One FabLab equipment for 1 IBRD / 85950 Post Request for Bids Open - National 0.00 Implementati 2017-09-29 2017-10-04 2017-11-15 2017-12-15 2018-01-19 2018-07-18 Envelope pilot RIH on GE-GITA-2006-GO-RFQ / Request for Single Stage - One IBRD / 85950 Post Open - National 8,631.58 Signed 2018-03-12 2018-04-16 2018-06-15 Furniture for 1 IC (Rukhi) Quotations Envelope Page 3 GE-GITA-2010-GO-RFQ / Pending Request for Single Stage - One Media equipment for 1 IC IBRD / 85950 Post Open - National 0.00 Implementati 2018-03-19 2018-04-16 2018-06-15 Quotations Envelope (Rukhi) on GE-GITA-2004-GO-RFQ / Pending Request for Single Stage - One Computers and associated IT IBRD / 85950 Post Open - National 0.00 Implementati 2018-04-04 2018-05-16 2018-07-15 Quotations Envelope equipment for 1 IC (Rukhi) on GE-GITA-52510-GO-RFQ / Preparation and Insalation Pending of Desing Elemnets Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-03-19 2018-04-16 2018-07-25 (decorative maps, sign Quotations Envelope on boards, signs and outdoor signs stand boxes with logo) GE-GITA-61402-GO-RFQ / Pending Provision catering services Request for Single Stage - One IBRD / 85950 Post Limited 0.00 Implementati 2018-05-05 2018-05-15 2018-06-14 for the events planned under Quotations Envelope on Matching Grant Program GE-GITA-2026-GO-RFQ / Basic equipment for maker- Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Canceled 2018-05-24 2018-06-11 2018-08-10 space, for Telavi RIH, Quotations Envelope Akhmeta IC and Rukhi IC. GE-GITA-2012-GO-RFQ / Media Equipment for Telavi Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Canceled 2018-06-09 2018-07-07 2018-09-05 RIH, Akhmeta IC and Rukhi Quotations Envelope IC GE-GITA-68546-GO-RFQ / Request for Single Stage - One Supply of Telavi RIH and IBRD / 85950 Post Open - National 16,761.16 Signed 2018-07-13 2018-08-08 2018-09-22 Quotations Envelope Akhmeta CIC with furniture GE-GITA-2012-GO-RFQ-1 / Media Equipment for Telavi Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Canceled 2018-07-25 2018-08-22 2018-10-21 (RIH), Akhmeta (CIC) and Quotations Envelope Rukhi (CIC) GE-GITA-2026-GO-RFQ-1 / Basic equipment for maker- Request for Single Stage - One space, for Telavi RIH, IBRD / 85950 Post Open - National 36,162.35 Signed 2018-07-25 2018-08-18 2018-10-17 Quotations Envelope Akhmeta CIC and Rukhi CIC. GE-GITA-71541-GO-RFQ / Supply of Telavi RIH Request for Single Stage - One Akhmeta CIC and Rukhi IBRD / 85950 Post Open - National 0.00 Canceled 2018-08-05 2018-08-29 2018-10-28 Quotations Envelope CIC with Uninterruptible Power Supply (UPS) GE-GITA-71542-GO-RFQ / Supply of Telavi RIH Under Request for Single Stage - One Akhmeta CIC and Rukhi IBRD / 85950 Post Open - National 0.00 Implementati 2018-08-05 2018-08-29 2018-10-28 Quotations Envelope CIC with fabrication lab on tools GE-GITA-71543-GO-DIR / Supply of Telavi RIH with IBRD / 85950 Post Direct Selection Direct 6,472.76 Signed 2018-07-27 2018-08-01 2018-08-08 2018-10-07 Sewing Embroidery Machine GE-GITA-71544-GO-RFQ / Under Supply of Telavi RIH and Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-08-04 2018-08-28 2018-10-27 Akhmeta CIC with Personal Quotations Envelope on Computers for fabrication lab Page 4 GE-GITA-71545-GO-RFQ / Supply of Telavi RIH Akhmeta CIC and Rukhi Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Canceled 2018-08-05 2018-08-29 2018-10-28 CIC with CNC machine, 3D Quotations Envelope printers, 3D scanners, UV printers and heat presses GE-GITA-71546-GO-DIR / Pending Supply of Telavi RIH with IBRD / 85950 Post Direct Selection Direct 0.00 Implementati 2018-08-07 2018-08-12 2018-08-19 2018-10-18 laser engraving machine on GE-GITA-71545-GO-RFQ-1 / Supply of Telavi RIH Akhmeta CIC and Rukhi Request for Single Stage - One IBRD / 85950 Post Open - National 92,407.41 Signed 2018-09-05 2018-10-03 2018-12-02 CIC with CNC machine, 3D Quotations Envelope printers, 3D scanners, UV printers and heat presses GE-GITA-71541-GO-RFQ-1 / Supply of Telavi RIH Request for Single Stage - One Akhmeta CIC and Rukhi IBRD / 85950 Post Open - National 6,560.42 Signed 2018-09-05 2018-10-03 2018-12-02 Quotations Envelope CIC with Uninterruptible Power Supply (UPS) GE-GITA-81728-GO-RFQ / Supply of Telavi RIH, Request for Single Stage - One Akhmeta CIC and Rukhi IBRD / 85950 Post Open - National 45,389.51 Signed 2018-10-19 2018-11-09 2018-12-24 Quotations Envelope CIC with computer equipment GE-GITA-2012-GO-RFQ-2 / Pending Supply of Telavi RIH, Request for Single Stage - One IBRD / 85950 Post Open - National 0.00 Implementati 2018-10-21 2018-11-14 2019-01-13 Akhmeta CIC and Rukhi Quotations Envelope on CIC with Media Equipment. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GENIE/CS/CQS-10 / Consultant International market Open - Pending IBRD / 85950 Post Qualification 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-25 2018-04-25 assessment for Georgia's ICT International Implementation Selection and Innovation Consultant GENIE/CS/CQS-12 / RIH Open - Pending IBRD / 85950 Post Qualification 0.00 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-06-25 2018-08-24 evaluation expert International Implementation Selection Consultant GENIE/CS/CQS-13 / CIC Open - Pending IBRD / 85950 Post Qualification 0.00 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-06-25 2018-08-14 evaluation expert International Implementation Selection GENIE/CS/CQS-01 / Consultant Preparation of design Under IBRD / 85950 Post Qualification Open - National 33,907.39 2016-11-10 2016-12-01 2017-01-14 2017-02-13 2017-02-20 2017-07-20 documentation for 10 CICs + Implementation Selection 3 RIHs Page 5 GENIE/CS/CQS-05 / Consultant Assessment of Structural IBRD / 85950 Post Qualification Open - National 0.00 Canceled 2016-10-20 2016-11-10 2016-12-24 2017-01-23 2017-01-30 2017-07-29 Safety for 10 CICs + 3 Selection RIHs GE-GITA-2784-CS-CQS / Consultant Assesment of Structural Under IBRD / 85950 Prior Qualification Open - National 20,859.93 2016-10-30 2016-11-20 2017-01-03 2017-02-02 2017-02-09 2017-08-08 Safety for 10 CICs + 3 Implementation Selection RIHs GENIE/CS/LCS-02 / Project Least Cost Open - Under IBRD / 85950 Post 0.00 2017-10-25 2017-11-15 2017-12-29 2018-01-26 2018-02-25 2018-04-01 2018-04-15 2018-05-15 audit (2016 and 2017 years) Selection International Implementation GENIE/CS/CQS-09 / Consultant Assessment of regulatory Pending IBRD / 85950 Post Qualification Open - National 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-25 2018-03-26 framework and policy Implementation Selection recommendations GENIE/CS/QCBS-03 / PR Quality And Cost- Pending IBRD / 85950 Prior Open - National 0.00 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-13 2019-03-01 and Media Management Based Selection Implementation GENIE/CS/CQS-02 / Consultant Preparation of design Pending IBRD / 85950 Post Qualification Open - National 0.00 2017-12-01 2017-12-22 2018-02-04 2018-03-06 2018-03-13 2019-03-13 documentation for 40 CICs + Implementation Selection 5 RIHs GENIE/CS/CQS-04 / Consultant Pending RIH/CIC Management IBRD / 85950 Post Qualification Open - National 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-11 2021-01-10 Implementation Company 2 Selection GENIE/CS/LCS-01 / Least Cost Open - Pending Financial Auditor for MG IBRD / 85950 Post 0.00 2017-10-15 2017-11-05 2017-12-19 2018-01-16 2018-02-15 2018-03-22 2018-04-12 2021-04-11 Selection International Implementation recipients GENIE/CS/CQS-03 / Consultant Pending RIH/CIC Management IBRD / 85950 Post Qualification Open - National 0.00 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2017-12-26 2020-12-25 Implementation Company 1 Selection GENIE/CS/CQS-08 / Consultant Development of matching IBRD / 85950 Post Qualification Open - National 57,124.07 Signed 2017-04-15 2017-05-06 2017-06-19 2017-07-19 2017-08-09 2019-01-31 grants web portal IT system Selection GE-GITA-18188-CS-CQS / Consultant Pending Development of the GITA IBRD / 85950 Post Qualification Open - National 0.00 2017-06-20 2017-07-04 2017-08-17 2017-08-24 2017-08-26 2018-02-22 Implementation website Selection GE-GITA-18545-CS-CQS / Consultant Pending Consultancy for the IBRD / 85950 Post Qualification Open - National 0.00 2017-09-01 2017-09-15 2017-10-29 2017-11-03 2017-11-06 2018-05-05 Implementation Specialized lab Selection GENIE/CS/CQS-07 / Start- Consultant Pending up / Entrepreneurship IBRD / 85950 Post Qualification Open - National 0.00 2018-03-17 2018-04-07 2018-05-21 2018-05-28 2018-06-04 2018-12-21 Implementation bootcamps Selection GE-GITA-2643-CS-CQS / Consultant Open - Pending Impact evaluation for IBRD / 85950 Post Qualification 0.00 2019-12-05 2019-12-26 2020-02-08 2020-03-09 2020-03-30 2020-07-08 International Implementation eCommerce Selection GENIE/CS/CQS-11 / Consultant Development of RIH/CIC Pending IBRD / 85950 Post Qualification Open - National 0.00 2017-10-20 2017-11-10 2017-12-24 2018-01-23 2018-02-13 2020-02-13 beneficiary management Implementation Selection system GENIE/CS/QCBS-01 / Quality And Cost- Open - Pending IBRD / 85950 Prior 0.00 2017-12-01 2017-12-22 2018-02-04 2018-03-04 2018-04-03 2018-05-08 2018-05-29 2018-12-15 eCommerce training Based Selection International Implementation Page 6 GENIE/CS/QCBS-04 / Quality And Cost- Open - Pending Innovation acceleration IBRD / 85950 Prior 0.00 2018-09-03 2018-09-24 2018-11-07 2018-12-05 2019-01-04 2019-02-08 2019-03-01 2019-09-17 Based Selection International Implementation training GENIE/CS/QCBS-05 / IT Quality And Cost- Open - Pending skills training pilot/IT skills IBRD / 85950 Prior 0.00 2018-09-03 2018-09-24 2018-11-07 2018-12-05 2019-01-04 2019-02-08 2019-03-01 2019-09-17 Based Selection International Implementation training (first location) Consultant GE-GITA-18172-CS-CQS / Open - Pending IBRD / 85950 Post Qualification 0.00 2017-10-16 2017-10-30 2017-12-13 2017-12-20 2017-12-28 2018-12-28 IT skills training International Implementation Selection GENIE/CS/QCBS-06 / IT Quality And Cost- Open - Pending skills training pilot/IT skills IBRD / 85950 Prior 0.00 2019-09-02 2019-09-23 2019-11-06 2019-12-04 2020-01-03 2020-02-07 2020-02-28 2021-02-22 Based Selection International Implementation training (second location) GE-GITA-18546-CS-CQS / Consultant Pending Hackathons in current IBRD / 85950 Post Qualification Open - National 0.00 2017-10-02 2017-10-16 2017-11-29 2017-12-06 2017-12-14 2018-05-13 Implementation RIH/CIC locations Selection GE-GITA-18547-CS-CQS / Consultant Pending Competitions/Olympiads in IBRD / 85950 Post Qualification Open - National 0.00 2017-10-02 2017-10-16 2017-11-29 2017-11-30 2017-12-08 2018-05-07 Implementation microelectronics and robotics Selection Consultant GE-GITA-18557-CS-CQS / Open - IBRD / 85950 Post Qualification 0.00 Canceled 2017-09-01 2017-09-15 2017-10-29 2017-10-30 2017-11-08 2018-05-07 Fablab Hardware Hackathon International Selection Consultant GE-GITA-18558-CS-CQS / Open - Pending IBRD / 85950 Post Qualification 0.00 2017-09-01 2017-09-15 2017-10-29 2017-10-30 2017-11-07 2018-03-07 Fab Camp/Fablab Workshop International Implementation Selection Consultant GE-GITA-18548-CS-CQS / Pending IBRD / 85950 Post Qualification Open - National 0.00 2017-09-04 2017-09-18 2017-11-01 2017-11-02 2017-11-10 2018-03-10 TechPark Incubator Demoday Implementation Selection Consultant GE-GITA-18549-CS-CQS / Open - Pending IBRD / 85950 Post Qualification 0.00 2017-10-30 2017-11-13 2017-12-27 2017-12-28 2018-01-05 2018-04-05 Bootcamp for programmers International Implementation Selection GE-GITA-18550-CS-CQS / Consultant Open - Consultancy to organize IBRD / 85950 Post Qualification 0.00 Canceled 2017-09-01 2017-09-15 2017-10-29 2017-10-30 2017-11-08 2018-06-06 International Mentors Network Selection GE-GITA-18551-CS-CQS / Consultant Open - Travel Technology Startups IBRD / 85950 Post Qualification 0.00 Canceled 2017-09-04 2017-09-18 2017-11-01 2017-11-02 2017-11-10 2018-04-09 International Accelerator Selection GE-GITA-18553-CS-CQS / Consultant University Pre-accelerator Open - Pending IBRD / 85950 Post Qualification 0.00 2017-09-04 2017-09-18 2017-11-01 2017-11-02 2017-11-10 2018-05-09 Managers' Trainings - ToT, International Implementation Selection mentorship, ToT GE-GITA-24624-CS-CQS / Consultant Pending Outsourcing of the online IBRD / 85950 Post Qualification Open - National 0.00 2017-08-31 2017-09-21 2017-11-04 2017-12-04 2018-01-08 2022-02-06 Implementation training service platform Selection GE-GITA-5815-CS-CQS / Consultant Development and Under IBRD / 85950 Post Qualification Open - National 0.00 2018-02-05 2018-02-23 2018-03-23 2018-03-30 2018-04-01 2019-09-28 Maintenance of Online BfD Implementation Selection portal GE-GITA-52385-CS-CQS / Consultant Pending PR Campaign for BfD and IBRD / 85950 Post Qualification Open - National 0.00 2018-04-10 2018-05-01 2018-05-29 2018-06-12 2018-07-03 2019-07-03 Implementation Grants Selection Page 7 GE-GITA-18056-CS-CQS / Consultant Pending BfD Training Provider for IBRD / 85950 Post Qualification Open - National 0.00 2018-04-02 2018-04-16 2018-05-14 2018-05-21 2018-05-28 2019-01-03 Implementation Households Selection GE-GITA-61400-CS-CQS / Provision of broadcasting, video and photo shooting Consultant Under services for Matching Grants IBRD / 85950 Post Qualification Open - National 0.00 2018-05-02 2018-05-09 2018-05-18 2018-05-19 2018-05-20 2018-06-19 Implementation Program's pitching sessions Selection to be held on 24th and 25th of May, 2018. GE-GITA-64173-CS-CQS / Consultancy Services for Consultant Open - Provision of Business IBRD / 85950 Post Qualification 311,053.24 Signed 2018-05-30 2018-06-13 2018-07-04 2018-08-03 2018-08-17 2018-12-15 International Mentoring to Matching Selection Grants Beneficiaries. GE-GITA-5815-CS-CQS - Consultant Under 1 / Development and IBRD / 85950 Post Qualification Open - National 0.00 2018-06-11 2018-06-18 2018-07-05 2018-07-07 2018-07-09 2019-12-01 Implementation Maintenance of Online BfD Selection Portal GE-GITA-18058-CS-CQS / Consultant Georgian MSMEs' E- IBRD / 85950 Post Qualification Open - National 133,277.16 Signed 2018-06-19 2018-06-22 2018-07-20 2018-07-27 2018-07-29 2019-07-29 commerce Capacity Building Selection GE-GITA-69750-CS-FBS / Planning and Implementation of Fixed Budget IBRD / 85950 Post Open - National 0.00 Canceled 2018-07-18 2018-08-08 2018-08-22 2018-09-19 2018-09-26 2018-10-08 2018-10-15 2019-10-15 Communication Campaign for Selection Broadband-for-Development Program GE-GITA-70055-CS-CQS / Consultant Under Assessment of Structural IBRD / 85950 Post Qualification Open - National 0.00 2018-07-23 2018-08-13 2018-09-03 2018-09-10 2018-09-24 2019-03-23 Implementation Safety for 2 CICs. Selection GE-GITA-68550-CS-CQS / Provision of consultancy Consultant services for quality Open - Under IBRD / 85950 Post Qualification 0.00 2018-07-23 2018-08-13 2018-09-10 2018-09-24 2018-10-08 2019-04-06 evaluation and coaching International Implementation Selection services for startups under matching grants program. GE-GITA-71847-CS-CQS / Consultant Consultancy services for Open - Under IBRD / 85950 Post Qualification 0.00 2018-07-31 2018-08-21 2018-09-18 2018-10-02 2018-10-07 2019-12-31 development of pre- International Implementation Selection accelerator program GE-GITA-77617-CS-CQS / Consultant Digital Marketing Campaign IBRD / 85950 Post Qualification Open - National 0.00 Under Review 2018-09-17 2018-10-01 2018-10-20 2018-10-25 2018-10-30 2018-12-29 for Startup Matching Grants Selection Program GE-GITA-83806-CS-QCBS / Consultancy services for Quality And Cost- Open - Under evaluation of project IBRD / 85950 Post 0.00 2018-10-29 2018-11-12 2018-11-18 2018-12-16 2018-12-26 2019-01-01 2019-01-07 2021-01-06 Based Selection International Implementation proposals under Matching Grants program. GE-GITA-85469-CS-CQS / Planning and Consultant Implementation of Under IBRD / 85950 Post Qualification Open - National 0.00 2018-11-09 2018-11-16 2018-12-05 2018-12-10 2018-12-13 2019-12-13 Communication Campaign for Implementation Selection Broadband-for-Development Program INDIVIDUAL CONSULTANTS Page 8