Documentos e Relat�rios

Zambia - Electricity Transmission and Distribution System Rehabilitation Project : resettlement plan (Inglês)

Resumo

The objective of this Electricity Transmission and Distribution System Rehabilitation Project for Zambia is to increase the capacity and improve the reliability of electricity transmission and distribution system in the project target areas. Negative ...  Exibir mais +

Detalhes

  • 2013/03/18
  • Plano de reassentamento;
  • RP1418
  • 1
  • 1
  • Zâmbia
  • África
  • 2013/03/18
  • Disclosed
  • Zambia - Electricity Transmission and Distribution System Rehabilitation Project : resettlement plan
Exibir mais +

Downloads

Completar relat�rio em Inglês

Vers�o oficial do documento (pode conter assinaturas, etc.)

*A vers�o do texto � um OCR incorreto e est� inclu�do unicamente em benef�cio de usu�rios com conectividade lenta.