PE Support to the Subnational Transport Program Project (P132515) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 11-Dec-2015 General Procurement Notice published on: 30-Nov-2016 July 9, 2010 PROCUREMENT Peru : Support to the Subnational Transport Program Project PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2016-12-22 2019-08-09 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132515 GPN Date: 2016-11-30 Project Name: Support to the Subnational Transport Program Project Loan / Credit No: IBRD / 85620 Executing Agency(ies): Descentralized Provias WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-9711-CW-RFB / Rehabilitacion y Mejoramiento del Camino Vecinal de Talavera- Infrastructure for Solicitud de Single Stage - One Mulacancha-Taramba-Nueva IBRD / 85620 Integration and Social Posterior Open - National 1,354,815.84 1,705,419.84 Firmado 2017-07-03 2017-07-08 2017-08-19 2017-09-18 2017-10-23 2018-03-22 ofertas Envelope Esperanza -Ap-510 , Inclusion Long. 14.28 km Prov. Andahuaylas, APURIMAC PE-PROVIAS-9712-CW-RFB / Mejoramiento de Camino Vecinal Pacobamba-Huironay- Infrastructure for Solicitud de Single Stage - One Ccerabamba-Abra Cusqueña, IBRD / 85620 Integration and Social Posterior Open - National 5,456,251.32 6,187,924.11 Firmado 2017-07-03 2017-07-08 2017-08-19 2017-09-18 2017-10-23 2018-05-21 ofertas Envelope Long. 28.83 km Inclusion Prov. Andahuaylas,APURIMAC PE-PROVIAS-4678-CW-RFB Infrastructure for Solicitud de Single Stage - One / Chuchin - Esccana - Rumi IBRD / 85620 Integration and Social Posterior Open - National 3,023,521.00 0.00 Cancelado 2017-07-03 2017-07-17 2017-08-16 2017-08-30 2017-09-13 2018-11-07 ofertas Envelope Rumi -Huinche - Moyorcco Inclusion PE-PROVIAS-4679-CW-RFB / Paquete N° 1 obras de Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 1,348,397.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-19 2017-08-02 2017-08-16 2018-05-13 mantenimiento periodico en Maintenance ofertas Envelope 40 km PE-PROVIAS-11812-CW-RFB / Servicio de gestión y conservación vial por niveles Rural Road Infrastructure Solicitud de Open - Single Stage - One IBRD / 85620 Previa 15,042,761.00 0.00 Cancelado 2018-08-13 2018-09-10 2018-10-26 2018-11-02 2018-12-11 2022-01-09 de servicio de los caminos Maintenance ofertas International Envelope vecinales de la provincia de Chanchamayo - Junín. PE-PROVIAS-77540-CW-RFB / Rehabilitación y Infrastructure for Mejoramiento del Camino Solicitud de Single Stage - One IBRD / 85620 Integration and Social Posterior Open - National 3,790,304.00 3,550,630.76 Firmado 2018-09-27 2018-09-28 2018-10-29 2018-11-05 2018-11-19 2019-07-17 Vecinal Chuchín - Esccana - ofertas Envelope Inclusion Rumirumi - Huinche - Moyorcco PE-PROVIAS-106437-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One periodico del camino Palo IBRD / 85620 Posterior Open - National 2,148,246.18 0.00 En ejecución 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-10-28 Maintenance ofertas Envelope Seco - Parobamba Viejo, Ancash PE-PROVIAS-106438-CW- RFB / Mantenimiento periódico del Camino vecinal: Rural Road Infrastructure Solicitud de Single Stage - One Circuito de Produccion Km IBRD / 85620 Posterior Open - National 3,442,055.92 0.00 En ejecución 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-12-27 Maintenance ofertas Envelope 15.5 Carretera Mazamari - Puerto Ocopa - A Dos de Mayo, Junin Page 1 PE-PROVIAS-106440-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One Periódico del Camino Vecinal IBRD / 85620 Posterior Open - National 1,659,562.10 0.00 En ejecución 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-11-12 Maintenance ofertas Envelope Puente Mirador - Boca Satipo, Ancash PE-PROVIAS-106436-CW- RFB / Mantenimiento Periódico del Camino Vecinal Rural Road Infrastructure Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 2,001,461.10 0.00 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-09-28 Dv. Saywite - Cachora, Maintenance ofertas Envelope pendiente ubicado en el Departamento de Apurímac. GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-80037-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One LICENCIA PARA EQUIPO IBRD / 85620 Posterior Open - National 51,618.81 49,118.99 Firmado 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-11-25 Management ofertas Envelope DE SEGURIDAD PERIMETRAL PE-PROVIAS-80038-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One RENOVACIÓN DE IBRD / 85620 Posterior Open - National 109,957.24 0.00 En ejecución 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-12-03 Management ofertas Envelope LICENCIAS DE SOFTWARE CAD PE-PROVIAS-80039-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 138,668.30 133,317.44 Firmado 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-12-03 LICENCIAS DE SOFTWARE Management ofertas Envelope DE GEOREFERENCIACION PE-PROVIAS-105434-GO- RFB / Adquisición de Decentralized Road Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 801,116.74 0.00 2019-04-15 2019-04-20 2019-05-18 2019-06-02 2019-07-07 2019-09-05 Camionetas Doble Cabina Management ofertas Envelope pendiente 4x4 PE-PROVIAS-118756-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 26,865.67 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente DE BACKUP PARA SERVIDORES PE-PROVIAS-118892-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 49,253.73 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente ANTISPAM EN EL MARCO DE PATS NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PE-PROVIAS-9697-CS-QCBS / Estudio definitivo del Infrastructure for camino vecinal Emp. Ruta Selección basada IBRD / 85620 Integration and Social Posterior Open - National 87,962.42 141,685.18 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 16 - Inkacancha en calidad y costo Inclusion Long. 10.70 km Prov. Paucartambo, CUSCO PE-PROVIAS-9700-CS-QCBS / Estudio definitivo del camino vecinal Puente Checca - Puente Asunción - Infrastructure for Selección basada Chitibamba - Emp. CU-126 IBRD / 85620 Integration and Social Posterior Open - National 240,869.05 225,734.90 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 en calidad y costo (Comunidad Huinchiri - Inclusion Quehue), Long. 29.30 km Prov. Canas, CUSCO PE-PROVIAS-9702-CS-QCBS / Estudio definitivo del Infrastructure for camino vecinal Emp. CU-129 Selección basada IBRD / 85620 Integration and Social Posterior Open - National 184,145.63 219,353.28 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 (Chapina) - Quille, en calidad y costo Inclusion Long. 22.40 km Prov. Paruro, CUSCO PE-PROVIAS-9704-CS-QCBS / Estudio definitivo del Infrastructure for camino vecinal Puente Selección basada IBRD / 85620 Integration and Social Posterior Open - National 246,376.98 0.00 Cancelado 2017-04-21 2017-05-05 2017-05-24 2017-06-21 2017-06-26 2017-07-17 2017-07-31 2018-09-24 Quesccañuma - en calidad y costo Inclusion Huaynahuarco - Ccarapampa - Huisala PE-PROVIAS-4909-CS-QCBS / Estudio definitivo del camino vecinal Puente Infrastructure for Angasmayo Millpo Dv Selección basada IBRD / 85620 Integration and Social Posterior Open - National 200,341.00 226,347.48 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 Huariperja - Huariperja, en calidad y costo Inclusion Long. 24.40 km Prov. Huamanga, AYACUCHO PE-PROVIAS-4914-CS-QCBS / Estudio definitivo del camino vecinal Vinchos- Infrastructure for Selección basada Paccha-Andabamba, IBRD / 85620 Integration and Social Posterior Open - National 186,612.00 170,361.24 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 en calidad y costo Long. 22.70 km Inclusion Prov. Huamanga, AYACUCHO PE-PROVIAS-11172-CS- QCBS / Supervision de la Infrastructure for Selección basada obra Pacobamba - Huironay IBRD / 85620 Integration and Social Posterior Open - National 545,625.00 498,120.01 Firmado 2017-04-03 2017-04-24 2017-06-07 2017-07-05 2017-08-04 2017-09-08 2017-10-13 2018-06-10 en calidad y costo - Ccerabamba - Abra Inclusion Cusqueña PE-PROVIAS-11174-CS- QCBS / Supervision de la Infrastructure for Selección basada obra Talavera - Mulacancha IBRD / 85620 Integration and Social Posterior Open - National 135,482.00 245,634.66 Firmado 2017-04-03 2017-04-24 2017-06-07 2017-07-05 2017-08-04 2017-09-08 2017-10-13 2018-04-11 en calidad y costo - Taramba - Nueva Inclusion Esperanza - AP-510 PE-PROVIAS-4917-CS-QCBS / Elaboracion de Plan Vial Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 322,959.48 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2017-12-10 Provincial Participativo de 10 Management en calidad y costo GLP PE-PROVIAS-4690-CS-QCBS Selección basada IBRD / 85620 Project Management Posterior Open - National 694,245.00 0.00 Cancelado 2017-09-04 2017-09-18 2017-10-07 2017-10-28 2017-11-02 2017-11-23 2017-12-07 2021-11-16 / Auditoria financiera en calidad y costo PE-PROVIAS-4915-CS-QCBS / Implementación del plan de Decentralized Road Selección basada acción de VDL en 4 IBRD / 85620 Posterior Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management en calidad y costo provincias . Region de Cusco y Puno Page 3 PE-PROVIAS-4691-CS-FBS / Infrastructure for Selección basada Paquete N° 2 de 10 IBRD / 85620 Integration and Social Posterior en calificaciones Open - National 1,644,157.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-08 2017-07-22 2017-08-05 2018-09-29 Estudios definitivos de Inclusion de consultores camino vecinales en 200 km PE-PROVIAS-4916-CS-QCBS / Implementación del plan de Decentralized Road Selección basada acción de VDL en 4 IBRD / 85620 Posterior Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management en calidad y costo provincias . Region de Cajamarca y Amazonas PE-PROVIAS-4918-CS-QCBS Infrastructure for / Paquete N° 2 de Estudio Selección basada IBRD / 85620 Integration and Social Posterior Open - National 2,466,236.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 definitivo en 5 corredores en calidad y costo Inclusion logisticos PE-PROVIAS-4689-CS-QCBS / Sistema de Informacion , Decentralized Road Selección basada Open - monitoreo y evaluación IBRD / 85620 Posterior 293,599.53 0.00 Cancelado 2017-05-24 2017-06-07 2017-06-26 2017-07-24 2017-07-29 2017-08-19 2017-09-02 2017-12-31 Management en calidad y costo International diseñado e implementado, mantenido y de acceso libre PE-PROVIAS-63578-CS- QCBS / PAQ.ANCASH: Perfil y est def rehab y mejoramiento CV Tr1:Emp.PE-1N-Dv.Fundo Pto Viejo-Pto. Santa, Tr2:Emp.PE- Infrastructure for Selección basada Open - 1N-Emp.PE-1N Q,Emp.PE- IBRD / 85620 Integration and Social Posterior 444,794.14 407,580.09 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 en calidad y costo International 1NQ-Emp.AN-924,Emp.AN- Inclusion 921 (Nepeña)-Dv.AN- 925,Dv.San José(Nepeña)-San José-Emp.AN- 104(Morteros),Tr3: Emp. An101(Alto Pusha PE-PROVIAS-63580-CS- QCBS / PAQ.APURIMAC:Perfil y est def rehab y mejoramiento CV Tr1:AP-855-Emp.PE-109 (Ccoriray)- Infrastructure for Selección basada Open - Vito,Tr2:Emp.PE3SF-Pta. IBRD / 85620 Integration and Social Posterior 432,486.73 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 en calidad y costo International Carretera(Casanacocha),Tr3:D Inclusion v Puca Puca-Molinopata- Trujipata-Emp.AP 103,Tr4:Emp. PE03A(Puente Huayquipa)-Huayquipa,Tr5: Emp.AP-768(Dv.Chalhuan PE-PROVIAS-63587-CS- QCBS / PAQ.LA LIBERTAD:Perfil y est def rehab y mejoramiento CV Tr1:Emp.LI-111- Lucma-La Represita-Penintay- Infrastructure for Selección basada Open - Huachacual-Samamuy,Emp.LI- IBRD / 85620 Integration and Social Posterior 433,134.49 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 en calidad y costo International 713-Recuaycito,Tr2: Inclusion Quiruvilca-Emp.LI-931,Emp.LI- 931-Huacampalda- Dv.Bado,Tr3:Emp.LI- 528(Pacanga)- Martín Sanches-Emp.LI-512 PE-PROVIAS-63588-CS- QCBS / PAQ.LAMBAYEQUE: Perfil y est. def. rehab. y mejoramiento CV Tr1:Emp.PE-1N- Manco Infrastructure for Capac 1-Emp.PE-1N,Emp.PE- Selección basada Open - IBRD / 85620 Integration and Social Posterior 344,391.58 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1N-Manco Capac 2-Emp.PE- en calidad y costo International Inclusion 1N,Tr2:Emp.PE-06-El Higo- Emp.LA-109,Tr3:Emp.LA-112- Emp.LA-111,Emp.LA-112- Pta.Carretera,Tr4:Emp.PE- 1NJ(El Puente)-Inverna Page 4 PE-PROVIAS-63581-CS- QCBS / PAQ. AYACUCHO:Perfil y estudio definitivo rehabilitación y Infrastructure for mejoramiento de los CV Tr Selección basada Open - IBRD / 85620 Integration and Social Posterior 428,816.10 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1: Emp. AY - 103 - en calidad y costo International Inclusion Allpaspina - Putacca - Raymina - Pitec, Tr 2: Huambo - Alcamenca - Emp. PE - 32A PE-PROVIAS-63591-CS- QCBS / PAQ.PUNO: Perfil y est. def.rehab. y mejoramiento CV Tr1:Emp. PE-3SG(Llalli)-Emp.PU- Infrastructure for 125,Tr2:Emp.PU-123-Dv.PU- Selección basada Open - IBRD / 85620 Integration and Social Posterior 621,157.18 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1005-Dv.PU-1006-Dv. Huayta en calidad y costo International Inclusion Pata, Emp.PU-1004-Huayta Pata-Coa Chico,Tr3:Emp.PE- 3S-Marcuyo-Emp.PU-1198(Río Zapatilla),Emp:PU-1198(Río Zapatilla PE-PROVIAS-63592-CS- QCBS / PAQ.TUMBES: Perfil y estudio definitivo rehabilitación y mejoramiento de los CV Tr 1: Emp. TU- Infrastructure for Selección basada Open - 101 (La Coja) - Emp. TU- IBRD / 85620 Integration and Social Posterior 392,325.71 744,355.60 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 en calidad y costo International 516, Dv La Coja - Emp. Inclusion TU-524 (Dv el Tutumo), Tr 2: Dv. Salado Grando - Plateritos - Emp.TU-516, Dv. Plateritos -Emp.TU-105 PE-PROVIAS-63590-CS- QCBS / PAQ.LORETO: Perfil y estudio definitivo rehabilitación y mejoramiento C.V. Emp. LO-103 (Nuevo Infrastructure for Selección basada San Juan) - Dv. San Juan IBRD / 85620 Integration and Social Posterior Open - National 176,751.69 257,454.74 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 en calidad y costo de Puritana - Villa Puerto Inclusion Cruz, Emp. Via No Clasificada - Nuevo Mundo - San Juan - San Juan de Puritana PE-PROVIAS-63589-CS- QCBS / PAQ.LIMA: Perfil y estudio definitivo rehabilitación y mejoramiento Infrastructure for CV Tr I: Emp. PE-1S-Emp. Selección basada IBRD / 85620 Integration and Social Posterior Open - National 235,481.79 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 LM-835 (DV. La Huaca) - en calidad y costo Inclusion San Antonio, Tr II: Emp. PE-1S - San Antonio, Tr 2: Emp. PE-1S - Huayhuanco - Emp. LM-878 (Roldan) PE-PROVIAS-63593-CS- QCBS / PAQ.UCAYALI: Perfil y estudio definitivo Infrastructure for rehabilitación y mejoramiento Selección basada IBRD / 85620 Integration and Social Posterior Open - National 233,754.44 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 del camino vecinal Emp UC en calidad y costo Inclusion 105 (Bolognesi) - Pta Carretera (A chambiral)-CC NN Sta Clara PE-PROVIAS-66683-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Huaraz, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 244,397.43 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Antonio Raymondi, Huari, Management en calidad y costo Huarmey, Huaylas, Ocros, Pomabamba, Santa, Sihuas y Yungay Page 5 PE-PROVIAS-66684-CS- QCBS / Elaboración de Planes Viales Provinciales Decentralized Road Selección basada Participativos de: Huamanga, IBRD / 85620 Posterior Open - National 195,235.76 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo Cangallo, Huanta, La Mar, Lucanas, Paucar del Sara Sara y Víctor Fajardo PE-PROVIAS-66685-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Abancay, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 290,334.35 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Andahuaylas, Cotabambas, Management en calidad y costo Grau, Caraveli, Castilla, Nazca, Pisco, Barranca, Huaral y Yauyos PE-PROVIAS-66703-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Cajamarca, Decentralized Road Selección basada Open - Cajabamba, Chota, IBRD / 85620 Posterior 313,447.03 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo International Contumazá, Cutervo, Hualgayoc, San Ignacio, San Marcos, San Pablo, Bellavista, Huallaga y Picota PE-PROVIAS-66709-CS- QCBS / Elaboración de Planes Viales Provinciales Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 108,683.10 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Participativos Management en calidad y costo de:Chanchamayo, Jauja, Oxapampa, Atalaya PE-PROVIAS-66712-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Chiclayo, Ferreñafe, Lambayeque, Decentralized Road Selección basada Open - Ascope, Bolivar, Chepén, IBRD / 85620 Posterior 361,532.15 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo International Julcán, Otuzco, Pacasmayo, Pataz, Sánchez Carrión, Santiago de Chuco, Gran Chimu, Virú y Contralmirante Villar PE-PROVIAS-66714-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Carabaya, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 221,424.37 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Chucuito, El Collao, Lampa, Management en calidad y costo Moho, San Antonio de Putina, Tambopata, Manu y Tacna PE-PROVIAS-66717-CS- QCBS / Elaboración de Decentralized Road Selección basada Planes Viales Provinciales IBRD / 85620 Posterior Open - National 47,132.58 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo Participativos de: Maynas y Ucayali. PE-PROVIAS-73704-CS- QCBS / PQT APURIMAC:Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp Infrastructure for PE-3S(Pte San Martin)- Selección basada Open - IBRD / 85620 Integration and Social Posterior 424,462.65 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Huancamarca-Chaccobamba- en calidad y costo International Inclusion Casabamba-Cayara-Morochuco- Orccorbamba-Emp AP-549 (Lte Dist),Tr2 Emp AP-108- Pachaconas, Tr3 Emp AP- 108-Huancaray, Tr4 Emp Page 6 PE-PROVIAS-73705-CS- QCBS / PQT LA LIBERTAD I:Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-1N(Manuel Infrastructure for Selección basada Open - Guarniz)-Faclo Chico -Nueva IBRD / 85620 Integration and Social Posterior 459,693.98 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 en calidad y costo International Esperanza-Faclo Grande -El Inclusion Ingenio-La Compuerta- Algodonal-Hda Flaco Grande Vieja-Cruz de Guayabo-La Barranca, Tr 2 Emp PE PE-PROVIAS-73706-CS- QCBS / PQT LA LIBERTAD II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-1N-Calunga, Infrastructure for Emp PE-1N-Chanquin Bajo- Selección basada Open - IBRD / 85620 Integration and Social Posterior 464,018.96 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Emp LI-119, Emp S/C- en calidad y costo International Inclusion Puente La Alameda, Tr2 Dv. Susanga(Huacapongo)- Condornada-Caray, Tr3 Emp PE-10A-Ayangay- Chugurpampa- C PE-PROVIAS-73707-CS- QCBS / PQT LA LIBERTAD III: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Santa Infrastructure for Rosa-El Alto San Idelfonso- Selección basada Open - IBRD / 85620 Integration and Social Posterior 385,356.14 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Nvo. Horizonte-Lomas de en calidad y costo International Inclusion Prieto, Tr2 Emp PE-1NH- Nvo Paraiso-Pta Carretera, Tr3 Quiruvilca-Emp LI- 931,Emp LI-931-Huacampalda- Dv. Bado PE-PROVIAS-73708-CS- QCBS / PQT MADRE DE DIOS: Perfil y estudio definitivo rehabilitación y Infrastructure for mejoramiento CV Tr1 Emp Selección basada Open - IBRD / 85620 Integration and Social Posterior 432,662.82 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 PE-30C (Dv. Piñal) - Piñal - en calidad y costo International Inclusion Nuevo San Juan, Tr2 Emp MD-101 (Boca Colorado) - Emp MD-518 (Nuevo San Juan Grande) PE-PROVIAS-73709-CS- QCBS / PQT PASCO: Perfil y estudio definitivo rehabilitación y mejoramiento Infrastructure for CV Tr I: Emp PE-5N (Dv. Selección basada IBRD / 85620 Integration and Social Posterior Open - National 254,655.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Villa Rica) - Cedro Pampa - en calidad y costo Inclusion Purus - Pte. Paucartambo - Emp PE-5N, Emp PA-691 - El Oconal - Puente Oconal - Emp. PA-691 PE-PROVIAS-73710-CS- QCBS / PQT PUNO I: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3S-Culuyo- Infrastructure for Chancachi-Aripa Ccoca Ruma- Selección basada Open - IBRD / 85620 Integration and Social Posterior 457,315.24 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Thunuhuaya-Emp PU-1130, en calidad y costo International Inclusion Tr2 Emp PE-3S(Pueblo Libre)-Emp PU-130, Emp PE- 3S(Crucero)-Ticaraya-Emp PU- 130, Emp PE-3S(Crucero)- Tuquin Page 7 PE-PROVIAS-73711-CS- QCBS / PQT SAN MARTIN II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp SM-113 Infrastructure for (Yantalo) - Pto Los Angeles Selección basada Open - IBRD / 85620 Integration and Social Posterior 395,736.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 (Rio Mayo), Tr2 Emp PE-5N en calidad y costo International Inclusion - Purus - Rioja, Emp PE-5N - Sector Winba, Tr3 Emp SM-116 - Dv. CCNN El Naranjal - Dv. Lamas - Chirap PE-PROVIAS-74170-CS- QCBS / PQT ANCASH: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3N(Caraz)- Infrastructure for Tarna-Dv. Miramar-Dv. Lluco- Selección basada Open - IBRD / 85620 Integration and Social Posterior 381,896.15 0.00 Cancelado 2018-08-16 2018-08-30 2018-09-18 2018-10-16 2018-10-21 2018-11-11 2018-11-25 2019-11-25 Dv. Culluna-Parón-Pta en calidad y costo International Inclusion Carretera(Pto Control ANP P.N. Huascarán), Emp AN- 836-Culluna-Emp AN-834 (Pte.Llacsho)-Llacsho,Tr2 Emp PE PE-PROVIAS-11816-CS- QCBS / Supervisión Rural Road Infrastructure Selección basada Open - Mantenimiento por niveles IBRD / 85620 Previa 1,504,276.00 0.00 Cancelado 2018-09-03 2018-09-24 2018-11-07 2018-12-05 2019-01-04 2019-02-08 2019-03-15 2020-03-14 Maintenance en calidad y costo International de servicio de la provincia de Chanchamayo - Junín. PE-PROVIAS-77544-CS- QCBS / Supervisión de Rehabilitación y Infrastructure for Selección basada Mejoramiento del Camino IBRD / 85620 Integration and Social Posterior Open - National 283,971.00 276,039.66 En ejecución 2018-09-14 2018-09-28 2018-10-02 2018-10-30 2018-11-02 2018-11-06 2018-11-18 2019-08-15 en calidad y costo Vecinal Chuchín - Esccana - Inclusion Rumirumi - Huinche - Moyorcco PE-PROVIAS-100356-CS- QCBS / REHABILITACION Y MEJORAMIENTO DEL CAMINO VECINAL Infrastructure for Selección basada Open - Ejecución SHOCOSH - MANTACOCHA IBRD / 85620 Integration and Social Posterior 372,390.88 0.00 2019-03-15 2019-04-05 2019-05-19 2019-06-16 2019-07-16 2019-08-20 2019-09-24 2020-09-23 en calidad y costo International pendiente - QUEPATUPE - Inclusion ACOBAMBILLA, DISTRITO DE HUACAR - AMBO - HUANUCO PE-PROVIAS-100357-CS- QCBS / MEJORAMIENTO DE LA CARRETERA VECINAL PUENTE CHICO - SANCARAGRA - Infrastructure for CUCHICANCHA - MAL Selección basada Open - Ejecución IBRD / 85620 Integration and Social Posterior 388,058.82 0.00 2019-05-15 2019-06-05 2019-07-19 2019-08-16 2019-09-15 2019-10-20 2019-11-24 2020-11-23 PASO - CHOQUICOCHA - en calidad y costo International pendiente Inclusion SANTA ROSA - TABLAHUASI - MILPO - QUIULACOCHA, DISTRITO DE CONCHAMARCA - AMBO - HUANUCO PE-PROVIAS-106710-CS- QCBS / Supervision de la obra: Mejoramiento periódico del camino vecinal Circuito Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 296,581.77 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-11 de Produccion Km 15.5 - Maintenance en calidad y costo pendiente carretera Mazamani - Puerto Ocopa - A dos de Mayo, Junin Page 8 PE-PROVIAS-106715-CS- QCBS / Supervisor de la obra: Mantenimiento Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 147,391.40 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-13 periódico del Camino vecinal Maintenance en calidad y costo pendiente Dv Saywite - Cachora, Apurimac PE-PROVIAS-106717-CS- QCBS / Supervision de la Rural Road Infrastructure Selección basada Ejecución obra: Mantenimiento IBRD / 85620 Posterior Open - National 184,726.51 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-15 Maintenance en calidad y costo pendiente periódico del camino vecinal Palo Seco - Parobamba viejo PE-PROVIAS-106718-CS- QCBS / Supervision de la Obra: Mantenimiento Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 206,710.73 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-09 periódico del camino vecinal Maintenance en calidad y costo pendiente Puente Mirador - Boca Satipo, Junin INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-4694-CS-INDV / Paquete N° 3 de 25 expedientes de Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 694,245.00 0.00 Cancelado 2017-06-05 2017-07-03 2017-07-17 2017-07-31 2017-11-28 mantenimiento periodico de Maintenance caminos vecinales por 500 km PE-PROVIAS-4693-CS-INDV / Elaboracion de Plan Vial Decentralized Road IBRD / 85620 Posterior Individual Open 17,616.00 0.00 Cancelado 2017-01-16 2017-02-13 2017-02-27 2017-03-13 2017-10-09 Departamental Participativo Management paquete 2 PE-PROVIAS-12057-CS- INDV / Consultoría para los Decentralized Road procedimiento de certificación IBRD / 85620 Posterior Individual Open 8,807.99 0.00 Cancelado 2017-05-02 2017-05-07 2017-05-07 2017-05-19 2017-08-17 Management ocupacional para el mantenimiento de caminos PE-PROVIAS-12307-CS- INDV / Consultoría para el Decentralized Road IBRD / 85620 Posterior Individual Open 16,441.57 0.00 Cancelado 2017-05-02 2017-05-16 2017-05-16 2017-05-28 2017-12-24 seguimiento y evaluación del Management Plan de Acción de la VDL PE-PROVIAS-28360-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,161.48 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de ICA PE-PROVIAS-28370-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,137.90 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de General Sánchez Cerro PE-PROVIAS-28372-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de Daniel Alcides Carrión PE-PROVIAS-28374-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de Candarave Page 9 PE-PROVIAS-39281-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 25,901.94 25,265.44 Firmado 2017-12-04 2017-12-11 2017-12-11 2017-12-26 2018-12-21 Management la gestión vial de gobiernos regionales PE-PROVIAS-39284-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 22,201.67 0.00 Cancelado 2017-12-04 2017-12-11 2017-12-11 2017-12-26 2018-12-21 Management la gestión vial de gobiernos locales PE-PROVIAS-39747-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,958.65 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Chupaca PE-PROVIAS-39752-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 20,448.05 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo Management - Cajatambo PE-PROVIAS-39753-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo Management - Tahuamanu PE-PROVIAS-39754-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 0.00 Cancelado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo Management -Ilo PE-PROVIAS-39756-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Huancané PE-PROVIAS-39757-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,060.44 27,339.64 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Melgar PE-PROVIAS-39759-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Sandia PE-PROVIAS-39771-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,936.16 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Rioja PE-PROVIAS-39772-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,360.16 23,734.41 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - San Martín PE-PROVIAS-39773-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo Management - Tocache PE-PROVIAS-39774-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo Management - Tarata Page 10 PE-PROVIAS-62410-CS- INDV / Expediente tecnico para el mantenimiento periodico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 58,967.72 57,699.86 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos: 1) Maintenance San Luis - Cardon - Canchabamba y 2) Tarica - Parihuanca - Aco PE-PROVIAS-62413-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure vecinales de los tramos 1) IBRD / 85620 Posterior Individual Open 64,410.80 63,025.92 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Maintenance Palo Seco - Parobamba Viejo, 2) Puente Tambillo - Runtujirca y 3) Emp. R548 (Huayllan) - Huanchacbamba PE-PROVIAS-62414-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 32,562.05 31,861.94 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos 1) Maintenance Dv. Saywite - Cachora y 2) Cementerio - San isidro de Chicón PE-PROVIAS-62415-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 49,428.95 48,366.18 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 periodico del camino vecinal Maintenance Puente Mirador - Boca Satipo PE-PROVIAS-62416-CS- INDV / Expediente Técnico para el mantenimiento periodico de los caminos Rural Road Infrastructure vecinales de los tramos 1) IBRD / 85620 Posterior Individual Open 70,928.31 0.00 Cancelado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Maintenance Emp R510 (Cerro Rico) - Mina San Juan de Chorunga y 2) Huanca - Pte. Pichiricma - Sector Suchocc PE-PROVIAS-62417-CS- INDV / Expediente tecnico para el mantenimiento periodico del camino vecinal Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 70,841.00 69,317.87 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Circuito de Produccion Km Maintenance 15.5 Carretera Mazamari - Puerto Ocopa - A Dos de Mayo PE-PROVIAS-62418-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 48,166.65 47,131.02 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos 1) Maintenance DV. Chapapampa - Jonsani y 2) DV. Pampa Blanca - Huanuara- Cairani PE-PROVIAS-62419-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 18,276.43 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Paijan - El Milagro PE-PROVIAS-62420-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 28,713.88 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Locuto - Callejones Page 11 PE-PROVIAS-62421-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 8,361.57 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 periodico del camino vecinal Maintenance Santa Rosa de Masisea - Laguna Santa María PE-PROVIAS-63005-CS- INDV / Elaboración de Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.00 20,292.15 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management de Asunción PE-PROVIAS-63490-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,177.80 22,679.46 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Casma PE-PROVIAS-63496-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,768.36 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Antabamba PE-PROVIAS-63497-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,438.22 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Aymaraes PE-PROVIAS-63502-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,381.04 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Camaná PE-PROVIAS-63503-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,872.64 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Condesuyos PE-PROVIAS-63507-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,672.08 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Arequipa PE-PROVIAS-63508-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 32,021.96 31,465.39 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management -Caylloma PE-PROVIAS-63510-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,475.28 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management -Parinacochas PE-PROVIAS-63512-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Sucre PE-PROVIAS-63513-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,092.71 23,755.83 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management -Santa Cruz PE-PROVIAS-63515-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management -San Miguel PE-PROVIAS-63517-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,972.25 28,468.68 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Celendin Page 12 PE-PROVIAS-63519-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 29,887.16 29,469.25 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Jaén PE-PROVIAS-63521-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.03 20,448.05 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management - Palpa PE-PROVIAS-75994-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,573.00 26,167.77 Firmado 2018-08-28 2018-09-04 2018-09-04 2018-09-22 2019-01-05 Vial Provincial Participativo Management - La Unión PE-PROVIAS-80036-CS- INDV / Actualización de la Metodología para la Decentralized Road IBRD / 85620 Posterior Individual Open 27,489.31 27,070.11 Firmado 2018-09-28 2018-10-05 2018-10-05 2018-10-23 2019-01-21 Elaboración de Planes Viales Management Departamentales Participativos - PVDP PE-PROVIAS-89108-CS- INDV / PAQUETE Nro.1 Expediente Técnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AN-104 - Tambillo - IBRD / 85620 Posterior Individual Open 59,179.77 60,149.93 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Maintenance Dv. Parcap - Huata, Tramo 2: Tramo 1: Emp. PE.-14C (Pomabamba) - Dv. Chuyas - Dv. Huayllan - Pte. Lucma (Límite Provincial). PE-PROVIAS-89109-CS- INDV / PAQUETE Nro. 2 Expediente Tecnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AP-113 - Hurihuiri - IBRD / 85620 Posterior Individual Open 75,182.42 76,414.92 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Maintenance Taribamba - Pichibamba - Sorconta - Dv. Sapsi - Paccaypata, Tramo 2: Emp. PE-30 A (Yaca) - Occobamba - Soccos - Lucmayoc - Circa. PE-PROVIAS-89114-CS- INDV / PAQUETE Nro. 3 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-108 (Huancapampa) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 111,343.90 113,169.21 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 - Dv. Chajama - Ayahuay - Maintenance Chilcahuay - Pachaconas, Tramo 2: Dv. Yauricocha (Tunapita) - Yanaca, Tramo 3: Emp. AY-105 - Dv. Yanasanja - Ccoña PE-PROVIAS-89115-CS- INDV / PAQUETE Nro. 4 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-102 - Socos - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 93,242.01 94,770.57 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Mitobamba - Dv. Ocobamba Maintenance - Escorno - Emp. AP-102 (Tres Cruces), Tramo 2: Emp. AP-102 (Comun Pampa) - Callapayoc - Dv. Mollepata - Quispimarca, T Page 13 PE-PROVIAS-89116-CS- INDV / PAQUETE Nro. 5 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. CA-109 - Pizon - Dv. Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 103,080.74 104,780.04 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 El Mirador - Chalan, Emp. Maintenance CA-992 - El Mirador, Tramo 2: Emp. CA-100 (San Gregorio) - Dv. Varapaccha - Agua Blanca - El Prado - Emp. CA-100. PE-PROVIAS-89117-CS- INDV / PAQUETE Nro. 6 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. CU-105 - Ipal - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 83,747.27 85,120.18 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Yanacacca - Arenalniyoc - Maintenance Santa Cruz - Dv. Combapata - Abra Bellavista, Tramo 2: Quebrada Honda - Selva Alegre - Sigasiato - Yuveni - Chuanq PE-PROVIAS-89118-CS- INDV / PAQUETE Nro. 7 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. PE-12G (Haquira) - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 115,386.53 117,278.11 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Orcopampa - Dv. Patabamba Maintenance - Chacamachay - Dv. Yuricancha - Emp. PE-3SY, Tramo 2: Emp. CU-118 (Ccapi) - Cajapacara - Cascas - Emp. CU-119 PE-PROVIAS-89119-CS- INDV / PAQUETE Nro. 8 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. CU-113 - Manzanares Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 83,817.76 85,191.82 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 - Sunchubamba - Jajahuana Maintenance - Challabamba - Dv. Mojopata - Dv. Chusa - Ichipia, Tramo 2: Emp. CU- 118 (Icura) - Dv. Chillahuane - Dv. Huach PE-PROVIAS-89120-CS- INDV / PAQUETE Nro. 9 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. PE-3N - Estaca Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 118,133.66 120,070.28 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Machay - Chuquis - Ninash Maintenance - Huancapampa - Dv. Tingo Chico - Huancan, Emp. HU- 717 (Chuquis) - Ucrumarca, Tramo 2: Emp. PE-18A - Pachachupan - PE-PROVIAS-89121-CS- INDV / PAQUETE Nro.10 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. JU-106 (Hornomachay) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 87,353.49 88,785.52 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 - Huancash - Yanañahui, Maintenance Tramo 2: Huasahuasi - Dv. Tambra - Dv. Pongo - San Juan de La Libertad - Cayan, Emp. JU-548 (San Juan de La Li Page 14