Documentos e Relat�rios

Climate risk case study : first Khimti hydropower scheme Himal Power Limited, Nepal (Inglês)

Resumo

This report presents the outcomes of a study analyzing the potential risks from climate change for the first Khimti run of the river hydro-electric power scheme in Nepal. First Khimti is owned and operated by the Himal Power Ltd (HPL). The plant has a...  Exibir mais +

Detalhes

  • Colley, Michelle; Connell, Richenda; Firth, John; Stenek, Vladimir;
  • 2011/01/01 00:00:00
  • Documento de trabalho;
  • 62639
  • 1
  • 1
  • Nepal
  • Sul da Ásia
  • 2011/06/21 01:00:00
  • Disclosed
  • Climate risk case study : first Khimti hydropower scheme Himal Power Limited, Nepal
Exibir mais +

Downloads

Completar relat�rio em Inglês

Vers�o oficial do documento (pode conter assinaturas, etc.)

*A vers�o do texto � um OCR incorreto e est� inclu�do unicamente em benef�cio de usu�rios com conectividade lenta.