PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 PROCUREMEN Bolivia : Bolivia Climate Resilience - Integrated Basin Management T PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 2020-01-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies): Fondo Nacional de Inversión Productiva y Social WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C. Design and FPS OBRAS 2 / implementation of Actualizacion de Sistema Solicitud de Single Stage - 2017-04- 2017-04- 2017-06- 2017-07- 2017-08- 2018-02- TF / 16083 subprojects that improve Posterior Open - National 501,722.32 434,237.46 Firmado de riego y Galeria ofertas One Envelope 24 29 10 10 14 10 climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin C. Design and FPS OBRAS 3 / implementation of Solicitud de Single Stage - 2017-04- 2017-04- 2017-06- 2017-07- 2017-08- 2018-02- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 345,349.41 318,513.58 Firmado ofertas One Envelope 24 29 10 10 14 10 Riego Pilpina Vila Vila climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 5 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 2017-03- 2017-03- 2017-04- 2017-05- 2017-07- 2017-12- TF / 16083 subprojects that improve Posterior Open - National 499,997.50 389,198.31 Firmado Riego Tucma Alta Tucma ofertas One Envelope 11 16 27 27 01 28 climate resilience in the Centro Mizque Rio Grande River Basin C. Design and FPS OBRAS 6 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 2017-03- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 156,896.31 137,081.73 Firmado Microriego La Yunga cotizaciones One Envelope 16 11 07 climate resilience in the Pasorapa Rio Grande River Basin C. Design and FPS OBRAS 7 / implementation of Solicitud de Single Stage - 2017-03- 2017-05- 2017-11- Ampliacion sistema de TF / 16083 subprojects that improve Posterior Open - National 154,151.16 143,048.63 Firmado cotizaciones One Envelope 16 11 07 riego Villa Florida Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 8 / implementation of Solicitud de Single Stage - 2017-04- 2017-04- 2017-05- 2017-06- 2017-07- 2018-01- Mejoramiento Canal de TF / 16083 subprojects that improve Posterior Open - National 263,789.22 256,953.67 Firmado ofertas One Envelope 06 11 23 22 27 23 riego Villa Esperanza Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 9 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 2017-05- 2017-05- 2017-06- 2017-07- 2017-09- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 279,301.85 Firmado aduccion por tuberia Riego ofertas One Envelope 14 19 30 30 03 02 climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS OBRAS 10 / C. Design and Ampliacion canales implementation of Solicitud de Single Stage - 2017-03- 2017-05- 2017-11- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Open - National 219,672.36 193,383.88 Firmado cotizaciones One Envelope 16 11 07 LahuaChama-Ayalitas zona climate resilience in the 3 Totora Rio Grande River Basin C. Design and FPS OBRAS 11 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 2017-03- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 150,856.17 127,504.41 Firmado Riego Tecnificado Chijmuri cotizaciones One Envelope 16 11 07 climate resilience in the Totora Rio Grande River Basin C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - 2017-03- 2017-03- 2017-04- 2017-05- 2017-07- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 219,598.34 Firmado ofertas One Envelope 11 16 27 27 01 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 13 / AMPL. implementation of Solicitud de Single Stage - 2018-06- 2018-06- 2018-08- 2018-08- 2018-10- 2019-04- SIST. DE RIEGO TIPA TF / 16083 subprojects that improve Posterior Open - National 376,095.98 317,830.45 Firmado ofertas One Envelope 15 20 01 31 05 03 TIPA MIZQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 14 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- SIST. RIEGO POTRERA TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado cotizaciones One Envelope 20 15 11 TIRAQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 15 / implementation of CONST. CANAL DE Solicitud de Single Stage - 2018-06- 2018-06- 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 254,862.09 Firmado RIEGO COMUNIDAD ofertas One Envelope 15 20 01 31 05 03 climate resilience in the ESPINAL PASORAPA Rio Grande River Basin C. Design and FPS OBRAS 16 / implementation of CONST. SIST. DE Solicitud de Single Stage - 2018-06- 2018-06- 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 341,275.74 269,586.44 Firmado RIEGO URA PIRHUA ofertas One Envelope 15 20 01 31 05 03 climate resilience in the AIQUILE Rio Grande River Basin C. Design and FPS OBRAS 17 / implementation of CONST. SIST. RIEGO Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 210,167.26 166,910.43 Firmado CHURU MAMA HUASI cotizaciones One Envelope 20 15 11 climate resilience in the POCONA Rio Grande River Basin C. Design and FPS OBRAS 18 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 147,800.25 114,349.12 Firmado TECNIFICADO V. NUEVA cotizaciones One Envelope 20 15 11 climate resilience in the Y LA MAICA TARATA Rio Grande River Basin C. Design and FPS OBRAS 20 / MEJ. implementation of SIST. RIEGO POR Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 199,213.13 158,867.09 Firmado ASPERCIoN CONDOR cotizaciones One Envelope 20 15 11 climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS OBRAS 21 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- SIST. RIEGO TF / 16083 subprojects that improve Posterior Open - National 166,217.31 129,748.14 Firmado cotizaciones One Envelope 20 15 11 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 22 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 2018-06- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 182,621.37 149,390.43 Firmado SAUCEVADO cotizaciones One Envelope 20 15 11 climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS OBRAS 23 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-06- 2018-08- 2018-08- 2018-10- 2019-04- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 577,595.67 492,723.03 Firmado ofertas One Envelope 15 20 01 31 05 03 MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin FPS OBRAS 24 / C. Design and CONST. CANALIZACION implementation of Solicitud de Single Stage - 2018-06- 2018-06- 2018-08- 2018-08- 2018-10- 2019-04- SIST. RIEGO SUPAY TF / 16083 subprojects that improve Posterior Open - National 290,630.01 279,929.63 Firmado ofertas One Envelope 15 20 01 31 05 03 CALLE DIST. E climate resilience in the COLCAPIRHUA Rio Grande River Basin C. Design and FPS OBRAS 1 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - Ejecución 2017-03- 2017-03- 2017-04- 2017-05- 2017-07- 2017-12- TF / 16083 subprojects that improve Posterior Open - National 478,249.31 0.00 Riego Comunidad ofertas One Envelope pendiente 11 16 27 27 01 28 climate resilience in the Concepcion Aiquile Rio Grande River Basin FPS OBRAS 25 / C. Design and CONST. CANAL ZONA implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- CEMENTERIO TF / 16083 subprojects that improve Posterior Open - National 338,863.79 0.00 ofertas One Envelope pendiente 07 12 23 25 29 26 FRANCISCO DEL climate resilience in the RIVERO CLIZA Rio Grande River Basin C. Design and FPS OBRAS 26 / MEJ. implementation of CANAL DE RIEGO Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 428,183.64 0.00 KANCHA WASA LARK A ofertas One Envelope pendiente 07 12 23 25 29 26 climate resilience in the CLIZA Rio Grande River Basin C. Design and FPS OBRAS 27 / MEJ. implementation of CANALES RIEGO DON Solicitud de Single Stage - En 2019-01- 2019-03- 2019-06- TF / 16083 subprojects that improve Posterior Open - National 187,966.85 0.00 BOSCO COLCAPIRHUA cotizaciones One Envelope ejecución 12 09 07 climate resilience in the COLCAPIRHUA Rio Grande River Basin FPS OBRAS 28 / MEJ. C. Design and REG. ENCUACE implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-09- HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 483,051.45 0.00 ofertas One Envelope pendiente 07 12 23 25 29 26 COLQUEAMAYU T 1 climate resilience in the DIST. A COLCAPIRHUA Rio Grande River Basin FPS OBRAS 29 / MEJ. C. Design and Y REG. ENCAUCE implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-09- HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 483,271.72 0.00 ofertas One Envelope pendiente 07 12 23 25 29 26 COLQUEMAYU T II climate resilience in the DIST. A COLCAPIRHUA Rio Grande River Basin C. Design and FPS OBRAS 30 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-09- SIST. RIEGO COM. TF / 16083 subprojects that improve Posterior Open - National 469,842.64 0.00 ofertas One Envelope pendiente 07 12 23 25 29 26 SUNCHU PAMPA POJO climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 31 / implementation of CONST. DEFENSIVOS Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 444,902.98 0.00 RiO ARQUE Z. CENTRAL ofertas One Envelope pendiente 07 12 23 25 29 25 climate resilience in the SICAYA Rio Grande River Basin Page 1 C. Design and FPS OBRAS 32 / implementation of CONST. DEFENSIVOS Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 449,129.06 0.00 RiO ARQUE Z. NORTE ofertas One Envelope pendiente 07 12 23 25 29 25 climate resilience in the SICAYA Rio Grande River Basin C. Design and FPS OBRAS 33 / implementation of CONST. DEFENSIVOS Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 447,568.61 0.00 RiO ARQUE Z. SUD ofertas One Envelope pendiente 07 12 23 25 29 25 climate resilience in the OESTE SICAYA Rio Grande River Basin FPS OBRAS 34 / MEJ. C. Design and CANAL DE RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- SIVINGA AnUCHIRI TF / 16083 subprojects that improve Posterior Open - National 296,621.10 0.00 ofertas One Envelope pendiente 07 12 23 25 29 26 DIST. RAMADAS climate resilience in the TAPACARI Rio Grande River Basin FPS OBRAS 35 / MEJ. C. Design and CANAL RIEGO implementation of PUCAVINTO AUKALARI Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 360,413.86 0.00 KOCHIMARCA ALTO Y ofertas One Envelope pendiente 07 12 23 25 29 26 climate resilience in the BAJO DIST.RAMADAS Rio Grande River Basin TAPACARI C. Design and FPS OBRAS 36 / AMPL. implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-11- SIST. RIEGO D III FASE TF / 16083 subprojects that improve Posterior Open - National 421,657.49 0.00 ofertas One Envelope pendiente 07 12 23 25 29 25 1 TIQUIPAYA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 37 / AMPL. implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-11- SIST. RIEGO D III FASE TF / 16083 subprojects that improve Posterior Open - National 459,174.33 0.00 ofertas One Envelope pendiente 07 12 23 25 29 25 2 TIQUIPAYA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 38 / implementation of CONST. SIST. RIEGO Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 307,571.39 0.00 TECNIFICADO MOLINOS ofertas One Envelope pendiente 07 12 23 25 29 26 climate resilience in the TIQUIPAYA Rio Grande River Basin C. Design and FPS OBRAS 40 / implementation of CONST. RIEGO POR Solicitud de Single Stage - En 2019-01- 2019-03- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 161,539.88 0.00 ASPERCIoN UREY cotizaciones One Envelope ejecución 12 09 05 climate resilience in the RANCHO SAN BENITO Rio Grande River Basin FPS OBRAS 41 / C. Design and CONST. DEFENSIVOS implementation of Solicitud de Single Stage - En 2019-01- 2019-03- 2019-09- MILLU MAYU ZONA TF / 16083 subprojects that improve Posterior Open - National 141,676.09 0.00 cotizaciones One Envelope ejecución 12 09 05 SAN PEDRO BAJO climate resilience in the MIZQUE Rio Grande River Basin C. Design and FPS OBRAS 19 / implementation of CONST. CANAL DE Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Open - National 830,000.27 0.00 RIEGO V. CARMEN ofertas One Envelope pendiente 04 09 20 22 26 21 climate resilience in the ARANI D-1 ARANI Rio Grande River Basin C. Design and FPS OBRAS 42 / AMPL. implementation of Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-12- SIST. RIEGO QOLLPANI TF / 16083 subprojects that improve Posterior Open - National 342,945.34 0.00 ofertas One Envelope pendiente 07 12 23 25 29 25 SACACA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 43 / MEJ. implementation of CANALES DE RIEGO Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 319,703.37 0.00 COM. PALIZADA ofertas One Envelope pendiente 14 19 02 01 06 02 climate resilience in the COMARAPA Rio Grande River Basin C. Design and FPS OBRAS 44 / MEJ. implementation of CANALES DE RIEGO Solicitud de Single Stage - Ejecución 2019-01- 2019-01- 2019-03- 2019-04- 2019-05- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 447,499.99 0.00 PULQUINA ARRIBA B ofertas One Envelope pendiente 14 19 02 01 06 02 climate resilience in the COMARAPA Rio Grande River Basin FPS OBRAS 39 / C. Design and CONST. SIST. RIEGO implementation of Solicitud de Single Stage - En 2019-01- 2019-03- 2019-08- NUEVO AMANECER TF / 16083 subprojects that improve Posterior Open - National 237,688.57 0.00 cotizaciones One Envelope ejecución 12 09 06 PHUYU PHUYU GRANDE climate resilience in the Y LINDE CHICO VACAS Rio Grande River Basin FPS OBRAS 45 / C. Design and CONST. SIST. implementation of Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-10- MICRORIEGO TF / 16083 subprojects that improve Posterior Open - National 262,407.49 0.00 cotizaciones One Envelope pendiente 23 20 17 PRESURIZADO climate resilience in the COMUNIDAD DEL SUR - Rio Grande River Basin TOLATA FPS OBRAS 46 / MEJ. C. Design and SIST. RIEGO implementation of Solicitud de Single Stage - 2019-03- 2019-03- 2019-04- 2019-05- 2019-06- 2019-12- CHALLAQUE TF / 16083 subprojects that improve Posterior Open - National 300,370.77 242,362.58 Firmado ofertas One Envelope 01 06 17 17 21 18 SACABAMBA FASE II - climate resilience in the SACABAMBA Rio Grande River Basin C. Design and FPS OBRAS 47 / MEJ. implementation of SIST. RIEGO THAGO Solicitud de Single Stage - 2019-03- 2019-03- 2019-04- 2019-05- 2019-06- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 428,670.95 365,849.11 Firmado PAMPA ALIZAR ofertas One Envelope 01 06 17 17 21 18 climate resilience in the MOLINOS - POJO Rio Grande River Basin FPS OBRAS 48 / C. Design and CONST. REG. Y implementation of Solicitud de Single Stage - Ejecución 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-12- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 485,998.48 0.00 ofertas One Envelope pendiente 18 23 06 06 10 07 CHIJLLAWIRI TRAMO I climate resilience in the DIST. D - COLCAPIRHUA Rio Grande River Basin FPS OBRAS 49 / C. Design and CONST. REG. Y implementation of Solicitud de Single Stage - En 2019-02- 2019-02- 2019-04- 2019-05- 2019-06- 2019-12- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 484,244.64 401,472.48 ofertas One Envelope ejecución 18 23 06 06 10 07 CHIJLLAWIRI TRAMO II climate resilience in the DIST. D - COLCAPIRHUA Rio Grande River Basin FPS OBRAS 50 / C. Design and CONST. REG. Y implementation of Solicitud de Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-06- 2019-07- 2019-12- ENCAUCE HIDRICO TF / 16083 subprojects that improve Posterior Open - National 478,625.09 0.00 ofertas One Envelope pendiente 01 06 18 17 22 19 CANAL PAMPA MAYU climate resilience in the TRAMO I DIST. E - Rio Grande River Basin COLCAPIRHUA FPS OBRAS 51 / C. Design and CONST. REG. Y implementation of Solicitud de Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-06- 2019-07- 2019-11- ENCAUCE HIDRICO TF / 16083 subprojects that improve Posterior Open - National 324,007.26 0.00 ofertas One Envelope pendiente 01 06 18 17 22 19 CANAL PAMPA MAYU climate resilience in the TRAMO II DIST. E - Rio Grande River Basin COLCAPIRHUA C. Design and FPS OBRAS 110 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2020-04- CANALES DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 484,887.93 0.00 ofertas One Envelope pendiente 02 03 18 19 27 25 DISTRITO 5 - PUNATA climate resilience in the Rio Grande River Basin FPS OBRAS 111 / C. Design and CONST. REG. ENC. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- HIDRAULICO DEL RIO TF / 16083 subprojects that improve Posterior Open - National 423,030.87 0.00 ofertas One Envelope pendiente 02 03 27 28 06 04 PAJCHA MAYU LARATY climate resilience in the - SACABA Rio Grande River Basin C. Design and FPS OBRAS 112 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- OBRAS DE TOMA TF / 16083 subprojects that improve Posterior Open - National 357,729.61 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 DISTRITO 4 - PUNATA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 113 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-06- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 413,591.06 0.00 ofertas One Envelope pendiente 02 03 23 24 16 13 JATUN LARKa - CLIZA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 114 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2020-01- 2020-01- 2020-02- 2020-03- 2020-04- 2020-10- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 416,071.99 0.00 ofertas One Envelope pendiente 06 11 22 23 27 24 CHULLPAS - CLIZA climate resilience in the Rio Grande River Basin FPS OBRAS 115 / MEJ. C. Design and SIST. RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-06- TECNIFICADO RODEO TF / 16083 subprojects that improve Posterior Open - National 282,454.48 0.00 ofertas One Envelope pendiente 02 03 23 24 31 28 CHICO ZONA 2 - climate resilience in the TOTORA Rio Grande River Basin C. Design and FPS OBRAS 116 / implementation of CONST. DEFENSIVOS Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 477,266.78 0.00 RIO ARQUE Z. SUD ofertas One Envelope pendiente 02 03 23 24 02 30 climate resilience in the OESTE - ARQUE Rio Grande River Basin FPS OBRAS 117 / C. Design and CONST. MUROS implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- DEFENSIVOS VENTILLA TF / 16083 subprojects that improve Posterior Open - National 412,690.67 0.00 ofertas One Envelope pendiente 02 03 23 24 02 21 CONDORIRI Y CHAJWA climate resilience in the CHAJWA - TACOPAYA Rio Grande River Basin C. Design and FPS OBRAS 118 / implementation of CONST. MUROS Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 483,799.00 0.00 DEFENSIVOS CALASAYA ofertas One Envelope pendiente 02 03 23 24 02 31 climate resilience in the MIRO - TACOPAYA Rio Grande River Basin C. Design and FPS OBRAS 119 / implementation of CONST. MUROS Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 338,531.00 0.00 DEFENSIVOS ofertas One Envelope pendiente 02 03 23 24 02 06 climate resilience in the QOTUMAYU - TACOPAYA Rio Grande River Basin FPS OBRAS 120 / MEJ. C. Design and SIST. RIEGO implementation of TECNIFICADO SIND. Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 148,841.58 0.00 AGRARIO CAPORAYA cotizaciones One Envelope pendiente 03 28 26 climate resilience in the CANCOTANI - Rio Grande River Basin SANTIVAÑEZ Page 2 FPS OBRAS 121 / C. Design and CONST. REG. Y implementation of Solicitud de Single Stage - Ejecución 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-07- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 458,669.53 0.00 ofertas One Envelope pendiente 06 07 27 28 05 04 ANGELAMAYU DIST. A climate resilience in the - COLCAPIRHUA Rio Grande River Basin C. Design and FPS OBRAS 122 / implementation of CONST. OBRAS Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 385,792.80 0.00 HIDRAULICAS RIO ofertas One Envelope pendiente 02 03 23 24 02 31 climate resilience in the ROCHA - VINTO Rio Grande River Basin FPS OBRAS 123 / C. Design and CONST. OBRAS implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- HIDRAULICAS TF / 16083 subprojects that improve Posterior Open - National 473,940.56 0.00 ofertas One Envelope pendiente 02 03 23 24 02 31 REGULACION Y climate resilience in the ENCAUZAMIENTO RIO Rio Grande River Basin LINDERO - TIQUIPAYA C. Design and FPS OBRAS 124 / MEJ. implementation of SISTEMA DE RIEGO EN Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 301,620.09 0.00 LA COMUNIDAD DE ofertas One Envelope pendiente 02 03 23 24 15 12 climate resilience in the KURI ALTO - MIZQUE Rio Grande River Basin C. Design and FPS OBRAS 125 / MEJ. implementation of SIST. DE RIEGO EN LA Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 374,731.66 0.00 COMUNIDAD DE KURI ofertas One Envelope pendiente 02 03 23 24 02 30 climate resilience in the CENTRO - MIZQUE Rio Grande River Basin FPS OBRAS 127 / C. Design and CONST. SIST. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- MICRORIEGO TF / 16083 subprojects that improve Posterior Open - National 262,407.50 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 PRESURIZADO climate resilience in the COMUNIDAD DEL SUR - Rio Grande River Basin TOLATA C. Design and FPS OBRAS 128 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-12- 2019-12- SIST. RIEGO CHAUPI TF / 16083 subprojects that improve Posterior Open - National 125,212.56 0.00 cotizaciones One Envelope pendiente 03 04 19 MOLINO - ANZALDO climate resilience in the Rio Grande River Basin FPS OBRAS 129 / C. Design and CONST. SIST. DE RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- POR ASPERSION OTB TF / 16083 subprojects that improve Posterior Open - National 171,816.61 0.00 cotizaciones One Envelope pendiente 03 28 26 SAN MIGUEL D-7 - climate resilience in the QUILLACOLLO Rio Grande River Basin C. Design and FPS OBRAS 130 / MEJ. implementation of CANAL SISTEMA DE Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 335,129.10 0.00 RIEGO SULTI KASA ofertas One Envelope pendiente 02 03 23 24 02 30 climate resilience in the PATA - SAN BENITO Rio Grande River Basin C. Design and FPS OBRAS 131 / MEJ. implementation of SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 69,107.00 0.00 TECNIFICADO TUNAS cotizaciones One Envelope pendiente 03 28 27 climate resilience in the MAYU - TARATA Rio Grande River Basin FPS OBRAS 132 / MEJ. C. Design and SIST. RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TECNIFICADO CHIMPA TF / 16083 subprojects that improve Posterior Open - National 371,076.00 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 RANCHO YANA KOCHI - climate resilience in the SAN BENITO Rio Grande River Basin C. Design and FPS OBRAS 133 / MEJ. implementation of SISTEMA DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 161,813.81 0.00 TECNIFICADO PAJCHA cotizaciones One Envelope pendiente 03 28 26 climate resilience in the SAN MIGUEL - TARATA Rio Grande River Basin C. Design and FPS OBRAS 134 / MEJ. implementation of SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 467,684.67 0.00 CUENCA RIO LA LLAVE ofertas One Envelope pendiente 02 03 23 24 02 20 climate resilience in the - VINTO Rio Grande River Basin C. Design and FPS OBRAS 135 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-03- SIST. DE RIEGO TINTI TF / 16083 subprojects that improve Posterior Open - National 147,010.00 0.00 cotizaciones One Envelope pendiente 03 28 27 MOKo D-4 - TIQUIPAYA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 136 / implementation of CONST. SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 390,616.78 0.00 ALFALFA COTANI - ofertas One Envelope pendiente 02 03 23 24 02 20 climate resilience in the CAPINOTA Rio Grande River Basin C. Design and FPS OBRAS 137 / MEJ. implementation of SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 454,867.60 0.00 PIRIGALLO B - ofertas One Envelope pendiente 02 03 23 24 02 20 climate resilience in the CAPINOTA Rio Grande River Basin C. Design and FPS OBRAS 138 / implementation of CONST. SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 120,732.67 0.00 TECNIFICADO cotizaciones One Envelope pendiente 03 28 26 climate resilience in the CATACHILLA - ARANI Rio Grande River Basin C. Design and FPS OBRAS 139 / MEJ. implementation of SIST. DE RIEGO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 171,919.19 0.00 COMUNIDAD CONDORIRI cotizaciones One Envelope pendiente 03 28 26 climate resilience in the - TAPACARI Rio Grande River Basin FPS OBRAS 140 / C. Design and CONST. SIST. RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-12- 2020-04- TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 126,958.11 0.00 cotizaciones One Envelope pendiente 03 04 02 COMUNIDAD PHUYU climate resilience in the PHUYU CHICO - ARANI Rio Grande River Basin C. Design and FPS OBRAS 141 / implementation of AMPL. REVESTIMIENTO Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 415,592.85 0.00 CANALES DE RIEGO ofertas One Envelope pendiente 02 03 23 24 02 30 climate resilience in the VILLA CARMEN - ARANI Rio Grande River Basin FPS OBRAS 142 / C. Design and CONST. REVESTIMIENTO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- CANALES DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 393,587.81 0.00 ofertas One Envelope pendiente 02 03 23 24 31 29 GERMAN TARDIO - climate resilience in the ARANI Rio Grande River Basin C. Design and FPS OBRAS 143 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2020-04- SIST. RIEGO TICANI - TF / 16083 subprojects that improve Posterior Open - National 238,085.75 0.00 cotizaciones One Envelope pendiente 03 28 26 ALALAY climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 144 / MEJ. implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- SIST. RIEGO COCAPATA TF / 16083 subprojects that improve Posterior Open - National 340,040.04 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 - POCONA climate resilience in the Rio Grande River Basin FPS OBRAS 145 / C. Design and CONST. OBRAS DE implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- PROTECCIÓN DE TF / 16083 subprojects that improve Posterior Open - National 396,405.47 0.00 ofertas One Envelope pendiente 02 03 27 28 06 04 RIBERAS OTB climate resilience in the AYACUCHO RIO KHORA Rio Grande River Basin - VINTO FPS OBRAS 147 / C. Design and CONST. OBRAS DE implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2020-03- PROTECCION DE TF / 16083 subprojects that improve Posterior Open - National 415,396.31 0.00 ofertas One Envelope pendiente 02 03 23 24 30 29 RIBERAS OTB CENTRAL climate resilience in the RIO CHULLA - VINTO Rio Grande River Basin C. Design and FPS OBRAS 149 / MEJ. implementation of SIST. DE RIEGO J. Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 573,268.00 0.00 KANAUT - ofertas One Envelope pendiente 02 03 23 24 02 30 climate resilience in the COLCAPIRHUA Rio Grande River Basin C. Design and FPS OBRAS 150 / MEJ. implementation of SISTEMA DE RIEGO EN Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 576,971.00 0.00 LA COMUNIDAD DE ofertas One Envelope pendiente 02 03 23 24 02 29 climate resilience in the KURI BAJO - MIZQUE Rio Grande River Basin C. Design and FPS OBRAS 95 / implementation of MEJORAMIENTO Solicitud de Single Stage - 2019-08- 2019-09- 2020-02- TF / 16083 subprojects that improve Posterior Open - National 182,600.58 0.00 Cancelado SISTEMA DE RIEGO cotizaciones One Envelope 04 29 26 climate resilience in the CONDORIRI Rio Grande River Basin C. Design and FPS OBRAS 89 / implementation of MEJORAMIENTO Solicitud de Single Stage - 2019-08- 2019-09- 2020-01- TF / 16083 subprojects that improve Posterior Open - National 160,955.31 0.00 Cancelado SISTEMA DE RIEGO cotizaciones One Envelope 04 29 27 climate resilience in the TINTI MOKO D-4 Rio Grande River Basin FPS OBRAS 90 / CONSTRUCCION MURO C. Design and DEFENSIVO DE implementation of HORMIGON CICLOPEO Y Solicitud de Single Stage - 2019-08- 2019-09- 2020-01- TF / 16083 subprojects that improve Posterior Open - National 247,056.59 0.00 Cancelado RECUPERACION DE cotizaciones One Envelope 04 29 27 climate resilience in the SUELOS AGRICOLAS Rio Grande River Basin COMUNIDAD LONDO POQUERA FPS OBRAS 93 / C. Design and CONSTRUCCION implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2020-02- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 100,705.66 0.00 Cancelado cotizaciones One Envelope 04 29 26 TECNIFICADO climate resilience in the CATACHILLA Rio Grande River Basin FPS OBRAS 86 / C. Design and MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2019-10- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 145,240.67 0.00 Cancelado cotizaciones One Envelope 04 29 11 TECNIFICADO climate resilience in the SINDICATO AGRARIO Rio Grande River Basin VILLA FATIMA Page 3 FPS OBRAS 78 / C. Design and CONST. MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2020-02- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 185,461.13 0.00 Cancelado cotizaciones One Envelope 04 29 26 TECNIFICADO PAJCHA climate resilience in the SAN MIGUEL - TARATA Rio Grande River Basin FPS OBRAS 57 / C. Design and MEJORAMIENTO SIFON implementation of INVERTIDO OBRA Solicitud de Single Stage - 2019-08- 2019-09- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 35,813.83 0.00 Cancelado COMPLEMENTARIA cotizaciones One Envelope 04 29 27 climate resilience in the PANTEON PAMPA Rio Grande River Basin (SICAYA) FPS OBRAS 53 / C. Design and MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2020-03- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 236,690.42 0.00 Cancelado cotizaciones One Envelope 04 29 27 LINDE-KANARRANCHO D- climate resilience in the 6 (TIQUIPAYA) Rio Grande River Basin FPS OBRAS 79 / C. Design and MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2020-03- SISTEMA DE REIGO TF / 16083 subprojects that improve Posterior Open - National 169,753.44 0.00 Cancelado cotizaciones One Envelope 04 29 27 TECNIFICADO climate resilience in the SINDICATO AGRARIO Rio Grande River Basin CAPORAYA CANCOTANI C. Design and FPS OBRAS 73 / implementation of CONST. SISTEMA DE Solicitud de Single Stage - 2019-08- 2019-09- 2020-02- TF / 16083 subprojects that improve Posterior Open - National 180,407.45 0.00 Cancelado RIEGO POR ASPERSION cotizaciones One Envelope 04 29 26 climate resilience in the OTB SAN MIGUEL D-7 Rio Grande River Basin C. Design and FPS OBRAS 76 / implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2019-11- CONST. SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 108,437.35 0.00 Cancelado cotizaciones One Envelope 04 29 28 RIEGO TOTORAL climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 88 / implementation of MEJORAMIENTO Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 499,247.60 0.00 Cancelado SISTEMA DE RIEGO ofertas One Envelope 30 04 15 15 19 17 climate resilience in the J.KANAUT Rio Grande River Basin FPS OBRAS 94 / C. Design and MEJORAMIENTO DEL implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 499,874.71 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 13 MICRORIEGO climate resilience in the SUPRACOMUNAL Rio Grande River Basin CABRERA - MOLLINI B C. Design and FPS OBRAS 91 / implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-07- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 455,136.45 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 26 ALFALFA - COTANI climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 92 / implementation of MEJORAMIENTO Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-07- TF / 16083 subprojects that improve Posterior Open - National 495,257.41 0.00 Cancelado SISTEMA DE RIEGO ofertas One Envelope 30 04 15 15 19 26 climate resilience in the PIRIGALLO B Rio Grande River Basin FPS OBRAS 71 / C. Design and MEJORAMIENTO DE implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 433,468.19 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 16 COMUNIDAD DE KURI climate resilience in the BAJO Rio Grande River Basin FPS OBRAS 69 / C. Design and MEJORAMIENTO DE implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 387,334.45 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 30 COMUNIDAD DE KURI climate resilience in the ALTO Rio Grande River Basin C. Design and FPS OBRAS 84 / implementation of CONSTRUCCION Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 11248 subprojects that improve Posterior Open - National 499,883.72 0.00 Cancelado MEJORAMIENTO CANAL ofertas One Envelope 30 04 15 15 19 17 climate resilience in the DE RIEGO OPA LARKA Rio Grande River Basin C. Design and FPS OBRAS 74 / implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- CONST. SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 371,458.15 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 RIEGO SULTI KASAPATA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 85 / implementation of MEJORAMIENTO Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 499,930.96 0.00 Cancelado SISTEMA DE RIEGO ofertas One Envelope 30 04 15 15 19 17 climate resilience in the CUENCA RIO LA LLAVE Rio Grande River Basin FPS OBRAS 82 / C. Design and REENCAUZAMIENTO implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- HIDRAULICO DEL RIO TF / 16083 subprojects that improve Posterior Open - National 499,996.91 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 02 CLIZA COMUNIDAD DE climate resilience in the HUALLPERO Rio Grande River Basin FPS OBRAS 83 / C. Design and REENCAUZAMIENTO implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- HIDRAULICO DEL RIO TF / 16083 subprojects that improve Posterior Open - National 489,856.50 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 02 CLIZA COMUNIDAD climate resilience in the MOSOJ RANCHO B Rio Grande River Basin C. Design and FPS OBRAS 81 / implementation of CONSTRUCCION Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 469,293.54 0.00 Cancelado MEJORAMIENTO CANAL ofertas One Envelope 30 04 15 15 19 17 climate resilience in the DE RIEGO COMPUERTA Rio Grande River Basin C. Design and FPS OBRAS 72 / implementation of CONST. SISTEMA DE Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- TF / 11248 subprojects that improve Posterior Open - National 471,522.89 0.00 Cancelado RIEGO POR ASPERSION ofertas One Envelope 30 04 15 15 19 16 climate resilience in the OTB FALSURI D-7 Rio Grande River Basin C. Design and FPS OBRAS 55 / implementation of CONST. MEJORAMIENTO Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 579,889.50 0.00 Cancelado CANAL DE RIEGO ofertas One Envelope 30 04 15 15 19 17 climate resilience in the JATUN LARKA (CLIZA) Rio Grande River Basin C. Design and FPS OBRAS 54 / implementation of RECONSTRUCCION Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 392,563.07 0.00 Cancelado OBRAS DE TOMA ofertas One Envelope 30 04 15 15 19 17 climate resilience in the DISTRITO - 4 Rio Grande River Basin FPS OBRAS 70 / C. Design and MEJORAMIENTO DE implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-08- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 309,704.67 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 20 COMUNIDAD DE KURI climate resilience in the CENTRO Rio Grande River Basin FPS OBRAS 59 / C. Design and CONSTRUCCION MUROS implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-03- DEFENSIVOS VENTILLA TF / 16083 subprojects that improve Posterior Open - National 495,902.07 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 08 CONDORIRI Y CHAJWA climate resilience in the CHAJWA Rio Grande River Basin C. Design and FPS OBRAS 80 / implementation of CONSTRUCCION TOMA Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 351,653.53 0.00 Cancelado SISTEMA MICRORIEGO ofertas One Envelope 30 04 15 15 19 17 climate resilience in the SAN ANTONIO Rio Grande River Basin FPS OBRAS 66 / C. Design and REGULACION Y implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 512,922.86 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 CHIJLLAWIRI TRAMO III climate resilience in the DISTRITO D Rio Grande River Basin FPS OBRAS 77 / C. Design and CONST. MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 421,033.16 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 TECNIFICADO CHIMPA climate resilience in the RANCHO YANA KOCHI Rio Grande River Basin FPS OBRAS 68 / C. Design and REGULACION Y implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 507,565.16 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 CHIJLLAWIRI TRAMO climate resilience in the FINAL DISTRITO E Rio Grande River Basin FPS OBRAS 65 / C. Design and MEJORAMIENTO DE implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- OBRA DE TOMA TF / 16083 subprojects that improve Posterior Open - National 499,895.33 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 CAPTACION DEL climate resilience in the SISTEMA DE RIEGO Rio Grande River Basin PLAYA ANCHA TARIZA FPS OBRAS 56 / C. Design and MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-08- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 327,825.38 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 15 TECNIFICADO RODEO climate resilience in the CHICO ZONA 2 Rio Grande River Basin (TOTORA) FPS OBRAS 67 / C. Design and REGULACION Y implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- ENCAICE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 522,141.11 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 CHIJLLAWIRI TRAMO IV climate resilience in the DISTRITO D Rio Grande River Basin FPS OBRAS 62 / C. Design and REGULACION Y implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Open - National 461,610.06 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 ANGELAMAYU DISTRITO climate resilience in the A (COLCAPIRHUA) Rio Grande River Basin FPS OBRAS 64 / CONSTRUCCION DE C. Design and OBRAS HIDRAULICAS implementation of PARA LA REGULACION Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 500,000.00 0.00 Cancelado Y EL ENCAUZAMIENTO ofertas One Envelope 30 04 15 15 19 01 climate resilience in the HIDRAULICO EN EL Rio Grande River Basin CAUCE PRINCIPAL DEL RIO LINDERO Page 4 FPS OBRAS 60 / CONSTRUCCION MUROS C. Design and DEFENSIVOS DE implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- PROTECCION Y TF / 16083 subprojects that improve Posterior Open - National 494,457.25 0.00 Cancelado ofertas One Envelope 30 04 15 15 19 17 RECUPERACION DE climate resilience in the TIERRAS CALASAYA, Rio Grande River Basin MIRO FPS OBRAS 75 / C. Design and CONST. MEJORAMIENTO implementation of Solicitud de Single Stage - 2019-08- 2019-09- 2019-12- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 95,080.07 0.00 Cancelado cotizaciones One Envelope 04 29 28 TECNIFICADO TUNAS climate resilience in the MAYU - TARATA Rio Grande River Basin FPS OBRAS 58 / C. Design and CONSTRUCCION implementation of Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-11- 2020-01- 2020-06- DEFENSIVOS RIO TF / 11248 subprojects that improve Posterior Open - National 499,942.58 0.00 Cancelado ofertas Two Envelope 30 04 15 28 02 30 ARQUE ZONA SUD climate resilience in the OESTE Rio Grande River Basin C. Design and FPS OBRAS 52 / implementation of MEJORAMIENTO DE Solicitud de Single Stage - 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 571,255.51 0.00 Cancelado CANAL DE RIEGO ofertas One Envelope 30 04 15 15 19 17 climate resilience in the DISTRITO - 5 Rio Grande River Basin FPS OBRAS 148 / C. Design and CONST. OBRAS DE implementation of PROTECCIÓN DE Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 405,295.54 0.00 RIBERAS OTB NUESTRA ofertas One Envelope pendiente 02 03 23 24 04 02 climate resilience in the SEÑORA DEL ROSARIO Rio Grande River Basin RIO KHORA - VINTO FPS OBRAS 146 / C. Design and CONST. OBRAS DE implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- PROTECCION DE TF / 16083 subprojects that improve Posterior Open - National 417,269.97 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 RIBERAS OTB JUAN climate resilience in the VARGAS RIO CHULLA - Rio Grande River Basin VINTO FPS OBRAS 126 / C. Design and CONST. SIST. DE RIEGO implementation of Solicitud de Single Stage - Ejecución 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- POR ASPERSION OTB TF / 16083 subprojects that improve Posterior Open - National 439,890.24 0.00 ofertas One Envelope pendiente 02 03 23 24 02 30 FALSURI D-7 - climate resilience in the QUILLACOLLO Rio Grande River Basin GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. Estimated Actual Short List and Opening of Combined Loan / Market Contract Type Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Credit No. Approach Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual C. Design and FPS CF 1 / AUDITORiA implementation of Selección FINANCIERA DEL 2018-05- 2018-06- 2018-07- 2018-08- 2018-09- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior basada en el Open - National 13,000.00 12,934.88 Finalizado 2018-04-20 PROGRAMA GESTIoN 11 24 22 21 25 30 28 climate resilience in the menor costo 2017 Rio Grande River Basin BO-FPS-91703-CS-LCS / AUDITORÍA FINANCIERA DEL PROGRAMA PILOTO SOBRE RESILENCIA CLIMATICA PPCR C. Design and FINANCIADO implementation of Selección 2019-03- 2019-04- 2019-05- 2019-06- 2019-07- 2019-08- 2019-10- PARCIALMENTE POR EL TF / 16083 subprojects that improve Posterior basada en el Open - National 49,000.00 14,457.45 Firmado 2019-02-11 04 17 15 14 19 23 22 CONVENIO DE CREDITO climate resilience in the menor costo TF 16083 POR LOS Rio Grande River Basin COMPONENTES EJECUTADOS POR EL FPS POR LAS GESTIONES 2018,2019 Y 2020 CIERRE BO-FPS-152358-CS-CQS / “AUDITORÍA DEL PROGRAMA PILOTO C. Design and SOBRE RESILIENCIA implementation of Selección 2020-01- 2020-02- 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- CLIMÁTICA TF / 16083 subprojects that improve Posterior basada en el Open - National 34,000.00 0.00 Bajo Revision 2020-01-10 31 24 23 28 02 06 16 (RESILIENCIA climate resilience in the menor costo CLIMÁTICA EN BOLIVIA- Rio Grande River Basin PROYECTO DE MANEJO INTEGRADO DE CUENCAS) INDIVIDUAL CONSULTANTS Activity Reference No. Estimated Actual Invitation to Loan / Market Contract Type Process Draft Negotiated Contract / Description Component Review Type Method Amount Amount Terms of Reference Identified/Selected Signed Contract Credit No. Approach Status Contract Completion (US$) (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FPS CI 1 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-05- 2017-05- 2017-06- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-03-13 01 22 26 23 Riego Comunidad climate resilience in the Concepcion Aiquile Rio Grande River Basin FPS CI 2 / ASISTENCIA C. Design and TeCNICA Mejoramiento implementation of 2017-07- 2017-08- 2017-09- 2018-03- Sistema de Riego TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-29 17 07 11 10 Comunidad Concepcion climate resilience in the Aiquile Rio Grande River Basin FPS CI 3 / C. Design and SUPERVISIoN ATI implementation of 2017-07- 2017-07- 2017-09- 2018-03- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 10 31 04 03 Riego Comunidad climate resilience in the Concepcion Aiquile Rio Grande River Basin FPS CI 7 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-05- 2017-05- 2017-06- 2017-12- CMejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 18,746.36 18,610.71 Firmado 2017-03-13 01 22 26 23 Riego Tucma Alta Tucma climate resilience in the Centro Mizque Rio Grande River Basin FPS CI 8 / ASISTENCIA C. Design and TeCNICA Mejoramiento implementation of 2017-05- 2017-06- 2017-07- 2018-01- Sistema de Riego Tucma TF / 16083 subprojects that improve Posterior Individual Open 16,982.51 16,859.62 Firmado 2017-03-27 15 05 10 06 Alta Tucma Centro climate resilience in the Mizque Rio Grande River Basin FPS CI 9 / C. Design and SUPERVISIoN ATI implementation of 2017-05- 2017-06- 2017-07- 2018-01- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 16,982.51 16,859.62 Firmado 2017-03-31 19 09 14 10 Riego Tucma Alta Tucma climate resilience in the Centro Mizque Rio Grande River Basin FPS CI 10 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-06- 2017-07- 2017-08- 2018-02- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-04-24 12 03 07 03 Microriego La Yunga climate resilience in the Pasorapa Rio Grande River Basin FPS CI 11 / C. Design and ASISTENCIA TeCNICA implementation of 2017-05- 2017-06- 2017-07- 2018-01- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-03-27 15 05 10 06 Microriego La Yunga climate resilience in the Pasorapa Rio Grande River Basin FPS CI 12 / C. Design and SUPERVISIoN ATI implementation of 2017-07- 2017-07- 2017-09- 2018-03- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 10 31 04 03 Microriego La Yunga climate resilience in the Pasorapa Rio Grande River Basin FPS CI 13 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-07- 2017-07- 2017-09- 2018-03- Actualizacion de Sistema TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-05-22 10 31 04 03 de riego y Galeria climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin FPS CI 14 / C. Design and ASISTENCIA TeCNICA implementation of 2017-08- 2017-08- 2017-10- 2018-03- Actualizacion de Sistema TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-06-19 07 28 02 31 de riego y Galeria climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin FPS CI 15 / C. Design and SUPERVISIoN ATI implementation of 2017-07- 2017-07- 2017-09- 2018-03- Actualizacion de Sistema TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 10 31 04 03 de riego y Galeria climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin C. Design and FPS CI 16 / implementation of SUPERVISIoN TeCNICA 2017-08- 2017-09- 2017-10- 2018-04- TF / 16083 subprojects that improve Posterior Individual Open 7,580.17 7,525.33 Firmado 2017-07-11 Ampliacion sistema de 29 19 24 22 climate resilience in the riego Villa Florida Pojo Rio Grande River Basin C. Design and FPS CI 17 / implementation of ASISTENCIA TeCNICA 2017-08- 2017-08- 2017-10- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 6,851.31 6,801.74 Firmado 2017-06-19 Ampliacion sistema de 07 28 02 31 climate resilience in the riego Villa Florida Pojo Rio Grande River Basin C. Design and FPS CI 18 / implementation of SUPERVISIoN ATI 2017-08- 2017-09- 2017-10- 2018-04- TF / 16083 subprojects that improve Posterior Individual Open 6,851.31 6,801.74 Firmado 2017-07-11 Ampliacion sistema de 29 19 24 22 climate resilience in the riego Villa Florida Pojo Rio Grande River Basin Page 5 C. Design and FPS CI 19 / implementation of SUPERVISIoN TeCNICA 2017-08- 2017-08- 2017-10- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 12,973.76 12,879.88 Firmado 2017-06-19 Mejoramiento Canal de 07 28 02 31 climate resilience in the riego Villa Esperanza Pojo Rio Grande River Basin C. Design and FPS CI 20 / implementation of ASISTENCIA TeCNICA 2017-05- 2017-06- 2017-07- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-03-27 Mejoramiento Canal de 15 05 10 06 climate resilience in the riego Villa Esperanza Pojo Rio Grande River Basin C. Design and FPS CI 21 / implementation of SUPERVISIoN ATI 2017-08- 2017-08- 2017-10- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-06-19 Mejoramiento Canal de 07 28 02 31 climate resilience in the riego Villa Esperanza Pojo Rio Grande River Basin FPS CI 22 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-05- 2017-06- 2017-07- 2018-01- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2017-03-31 19 09 14 10 aduccion por tuberia Riego climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS CI 23 / C. Design and ASISTENCIA TeCNICA implementation of 2017-05- 2017-06- 2017-07- 2018-01- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 13,994.17 13,892.91 Firmado 2017-03-27 15 05 10 06 aduccion por tuberia Riego climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS CI 24 / C. Design and SUPERVISIoN ATI implementation of 2017-05- 2017-06- 2017-07- 2018-01- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 13,994.17 13,892.91 Rescindido 2017-03-31 19 09 14 10 aduccion por tuberia Riego climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS CI 25 / C. Design and SUPERVISIoN TeCNICA implementation of Ampliacion canales 2017-08- 2017-08- 2017-10- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2017-06-19 Terciarios sistema de riego 07 28 02 31 climate resilience in the LahuaChama-Ayalitas zona Rio Grande River Basin 3 Totora FPS CI 26 / C. Design and ASISTENCIA TeCNICA implementation of 2017-08- 2017-08- 2017-10- 2018-03- Ampliacion canales TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,683.07 Firmado 2017-06-19 07 28 02 31 Terciarios sistema de riego climate resilience in the LahuaChama-Ayalitas zona Rio Grande River Basin 3 Totora FPS CI 27 / C. Design and SUPERVISIoN ATI implementation of Ampliacion canales 2017-08- 2017-08- 2017-10- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,683.07 Firmado 2017-06-19 Terciarios sistema de riego 07 28 02 31 climate resilience in the LahuaChama-Ayalitas zona Rio Grande River Basin 3 Totora FPS CI 28 / C. Design and SUPERVISIoN TeCNICA implementation of 2017-08- 2017-08- 2017-10- 2018-03- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2017-06-19 07 28 02 31 Riego Tecnificado Chijmuri climate resilience in the Totora Rio Grande River Basin FPS CI 29 / C. Design and ASISTENCIA TeCNICA implementation of 2017-05- 2017-06- 2017-07- 2018-01- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Finalizado 2017-03-27 15 05 10 06 Riego Tecnificado Chijmuri climate resilience in the Totora Rio Grande River Basin FPS CI 30 / C. Design and SUPERVISIoN ATI implementation of 2017-08- 2017-08- 2017-09- 2018-03- Ampliacion Sistema de TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 9,406.66 Firmado 2017-06-16 04 25 29 28 Riego Tecnificado Chijmuri climate resilience in the Totora Rio Grande River Basin C. Design and FPS CI 31 / implementation of SUPERVISIoN TeCNICA 2017-07- 2017-07- 2017-09- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2017-05-22 Mejoramiento Sistema de 10 31 04 03 climate resilience in the Riego Pajcha Pata Vacas Rio Grande River Basin C. Design and FPS CI 32 / implementation of ASISTENCIA TeCNICA 2017-05- 2017-06- 2017-07- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 12,301.01 Firmado 2017-03-27 Mejoramiento Sistema de 15 05 10 06 climate resilience in the Riego Pajcha Pata Vacas Rio Grande River Basin C. Design and FPS CI 33 / implementation of SUPERVISIoN ATI 2017-07- 2017-07- 2017-09- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-05-22 Mejoramiento Sistema de 10 31 04 03 climate resilience in the Riego Pajcha Pata Vacas Rio Grande River Basin C. Design and FPS CI 34 / implementation of SUPERVISIoN TeCNICA 2017-07- 2017-07- 2017-09- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 17,201.17 17,076.70 Firmado 2017-05-22 Mejoramiento Sistema de 10 31 04 03 climate resilience in the Riego Pilpina Vila Vila Rio Grande River Basin C. Design and FPS CI 35 / implementation of ASISTENCIA TeCNICA 2017-05- 2017-06- 2017-07- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 15,262.39 15,151.95 Firmado 2017-03-27 Mejoramiento Sistema de 15 05 10 06 climate resilience in the Riego Pilpina Vila Vila Rio Grande River Basin C. Design and FPS CI 36 / implementation of SUPERVISIoN ATI 2017-07- 2017-07- 2017-09- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,262.39 15,151.95 Firmado 2017-05-22 Mejoramiento Sistema de 10 31 04 03 climate resilience in the Riego Pilpina Vila Vila Rio Grande River Basin C. Design and FPS CI 37 / implementation of SUPERVISIoN TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2018-06-20 AMPL. SIST. DE RIEGO 08 29 03 01 climate resilience in the TIPA TIPA MIZQUE Rio Grande River Basin C. Design and FPS CI 38 / implementation of SUPERVISIoN TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-20 MEJ. SIST. RIEGO 08 29 03 01 climate resilience in the POTRERA TIRAQUE Rio Grande River Basin FPS CI 39 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2018-06-20 08 29 03 01 RIEGO COMUNIDAD climate resilience in the ESPINAL PASORAPA Rio Grande River Basin FPS CI 40 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 14,471.78 Firmado 2018-06-20 08 29 03 01 RIEGO URA PIRHUA climate resilience in the AIQUILE Rio Grande River Basin FPS CI 41 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 13,748.19 Firmado 2018-06-20 08 29 03 01 CHURU MAMA HUASI climate resilience in the POCONA Rio Grande River Basin FPS CI 42 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-20 08 29 03 01 TECNIFICADO V. NUEVA climate resilience in the Y LA MAICA TARATA Rio Grande River Basin FPS CI 44 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-20 08 29 03 01 ASPERCIoN CONDOR climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS CI 45 / implementation of SUPERVISIoN TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 14,471.78 Firmado 2018-06-20 MEJ. SIST. RIEGO 08 29 03 01 climate resilience in the CHAJRAMAYU AIQUILE Rio Grande River Basin FPS CI 46 / C. Design and SUPERVISIoN TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 9,037.90 8,972.50 Firmado 2018-06-20 08 29 03 01 SAUCEVADO climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS CI 47 / implementation of SUPERVISIoN TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 26,049.20 Firmado 2018-06-20 MEJ. CANAL DE RIEGO 08 29 03 01 climate resilience in the MAIRA KASA MIZQUE Rio Grande River Basin FPS CI 48 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. CANALIZACION 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 11,422.30 11,339.65 Firmado 2018-06-20 SIST. RIEGO SUPAY 08 29 03 01 climate resilience in the CALLE DIST. E Rio Grande River Basin COLCAPIRHUA C. Design and FPS CI 49 / implementation of ASISTENCIA TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 AMPL. SIST. DE RIEGO 10 31 05 03 climate resilience in the TIPA TIPA MIZQUE Rio Grande River Basin C. Design and FPS CI 50 / implementation of ASISTENCIA TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 MEJ. SIST. RIEGO 10 31 05 03 climate resilience in the POTRERA TIRAQUE Rio Grande River Basin FPS CI 51 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2018-06-22 10 31 05 03 RIEGO COMUNIDAD climate resilience in the ESPINAL PASORAPA Rio Grande River Basin Page 6 FPS CI 52 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 10 31 05 03 RIEGO URA PIRHUA climate resilience in the AIQUILE Rio Grande River Basin FPS CI 53 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 10 31 05 03 CHURU MAMA HUASI climate resilience in the POCONA Rio Grande River Basin FPS CI 54 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-22 10 31 05 03 TECNIFICADO V. NUEVA climate resilience in the Y LA MAICA TARATA Rio Grande River Basin FPS CI 56 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-22 10 31 05 03 ASPERCIoN CONDOR climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS CI 57 / implementation of ASISTENCIA TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 MEJ. SIST. RIEGO 10 31 05 03 climate resilience in the CHAJRAMAYU AIQUILE Rio Grande River Basin FPS CI 58 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,997.08 6,946.45 Firmado 2018-06-22 10 31 05 03 SAUCEVADO climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS CI 59 / implementation of ASISTENCIA TeCNICA 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 21,865.89 21,707.67 Firmado 2018-06-22 MEJ. CANAL DE RIEGO 10 31 05 03 climate resilience in the MAIRA KASA MIZQUE Rio Grande River Basin FPS CI 60 / C. Design and ASISTENCIA TeCNICA implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. CANALIZACION TF / 16083 subprojects that improve Posterior Individual Open 9,511.66 9,442.84 Firmado 2018-06-22 10 31 05 03 SIST. RIEGO SUPAY climate resilience in the CALLE DIST. E Rio Grande River Basin COLCAPIRHUA FPS CI 65 / C. Design and SUPERVISIoN ATI MEJ. implementation of 2018-08- 2018-08- 2018-10- 2019-04- SIST. RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 10 31 05 03 ASPERCIoN CONDOR climate resilience in the KOCHI TACACHI Rio Grande River Basin FPS CI 66 / C. Design and SUPERVISIoN ATI implementation of CONST. CANALIZACIÓN 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,295.22 Firmado 2018-06-22 SIST. RIEGO SUPAY 10 31 05 03 climate resilience in the CALLE DIST. E Rio Grande River Basin COLCAPIRHUA FPS CI 64 / C. Design and SUPERVISIoN ATI MEJ. implementation of 2018-08- 2018-08- 2018-10- 2019-04- SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 3,498.54 8,972.50 Firmado 2018-06-22 10 31 05 03 SAUCEVADO climate resilience in the OMEREQUE Rio Grande River Basin FPS CI 63 / C. Design and SUPERVISIoN ATI implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,058.30 13,748.19 Firmado 2018-06-22 10 31 05 03 CHURU MAMA HUASI climate resilience in the POCONA Rio Grande River Basin BO-FPS-67251-CS-INDV / C. Design and SUPERVISION ATI MEJ. implementation of 2018-08- 2018-08- 2018-10- 2019-04- SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 10 31 05 03 TECNIFICADO V. NUEVA climate resilience in the Y LA MAICA TARATA Rio Grande River Basin C. Design and BO-FPS-67255-CS-INDV / implementation of SUPERVISION ATI 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 AMPL. SIST. RIEGO TIPA 10 31 05 03 climate resilience in the TIPA MIZQUE Rio Grande River Basin C. Design and BO-FPS-67256-CS-INDV / implementation of SUPERVISION ATI MEJ. 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 CANAL RIEGO MAIRA 10 31 05 03 climate resilience in the KASA MIZQUE Rio Grande River Basin C. Design and FPS CI 62 / implementation of SUPERVISIoN ATI 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2018-06-22 CONST. SIST. RIEGO 10 31 05 03 climate resilience in the URA PIRHUA AIQUILE Rio Grande River Basin C. Design and BO-FPS-67258-CS-INDV / implementation of SUPERVISION ATI MEJ. 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2018-06-22 SIST. RIEGO 10 31 05 03 climate resilience in the CHAJRAMAYU AIQUILE Rio Grande River Basin C. Design and BO-FPS-67249-CS-INDV / implementation of SUPERVISIÓN ATI MEJ. 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 5,830.90 0.00 Cancelado 2018-06-22 SIST. RIEGO POTRERA 10 31 05 03 climate resilience in the TIRAQUE Rio Grande River Basin FPS CI 61 / C. Design and SUPERVISIoN ATI implementation of 2018-08- 2018-08- 2018-10- 2019-04- CONST. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 Cancelado 2018-06-22 10 31 05 03 RIEGO COMUNIDAD climate resilience in the ESPINAL PASORAPA Rio Grande River Basin FPS CI 72 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-01- MEJ. CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 19,825.07 19,681.62 Firmado 2019-01-07 25 18 22 17 KANCHA WASA LARK A climate resilience in the CLIZA Rio Grande River Basin FPS CI 75 / C. Design and SUPERVISIoN TeCNICA implementation of MEJ. CANALES RIEGO 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 9,406.66 Firmado 2019-01-07 DON BOSCO 25 18 22 18 climate resilience in the COLCAPIRHUA Rio Grande River Basin COLCAPIRHUA FPS CI 77 / C. Design and SUPERVISIoN TeCNICA implementation of MEJ. REG. ENCUACE Ejecución 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 0.00 2019-01-07 HIDRICO RIO pendiente 25 18 22 18 climate resilience in the COLQUEAMAYU T 1 Rio Grande River Basin DIST. A COLCAPIRHUA FPS CI 78 / C. Design and SUPERVISIoN TeCNICA implementation of MEJ. Y REG. ENCAUCE 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 26,049.20 Firmado 2019-01-07 HIDRICO RIO 25 18 22 19 climate resilience in the COLQUEMAYU T II Rio Grande River Basin DIST. A COLCAPIRHUA C. Design and FPS CI 80 / implementation of SUPERVISIoN TeCNICA 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2019-01-07 MEJ. SIST. RIEGO COM. 25 18 22 18 climate resilience in the SUNCHU PAMPA POJO Rio Grande River Basin FPS CI 82 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-02- CONST. DEFENSIVOS TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2019-01-07 25 18 22 16 RiO ARQUE Z. CENTRAL climate resilience in the SICAYA Rio Grande River Basin FPS CI 83 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-02- CONST. DEFENSIVOS TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 En ejecución 2019-01-07 25 18 22 16 RiO ARQUE Z. NORTE climate resilience in the SICAYA Rio Grande River Basin FPS CI 84 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-02- CONST. DEFENSIVOS TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 En ejecución 2019-01-07 25 18 22 16 RiO ARQUE Z. SUD climate resilience in the OESTE SICAYA Rio Grande River Basin FPS CI 86 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-02- 2019-03- 2019-04- 2019-12- MEJ. CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 0.00 2019-01-07 pendiente 25 18 22 18 SIVINGA AnUCHIRI climate resilience in the DIST. RAMADAS Rio Grande River Basin TAPACARI FPS CI 89 / SUPERVISIoN TeCNICA C. Design and MEJ. CANAL RIEGO implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-01- PUCAVINTO AUKALARI TF / 16083 subprojects that improve Posterior Individual Open 16,399.42 0.00 2019-01-07 pendiente 25 18 22 17 KOCHIMARCA ALTO Y climate resilience in the BAJO DIST. RAMADAS Rio Grande River Basin TAPACARI C. Design and FPS CI 92 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 18,950.44 0.00 2019-01-07 AMPL. SIST. RIEGO D pendiente 25 18 22 16 climate resilience in the III FASE 1 TIQUIPAYA Rio Grande River Basin C. Design and FPS CI 94 / implementation of SUPERVISIoN ATI Ejecución 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 2019-01-07 AMPL. SIST. RIEGO D pendiente 25 18 22 16 climate resilience in the III FASE 2 TIQUIPAYA Rio Grande River Basin C. Design and FPS CI 95 / implementation of SUPERVISIoN TeCNICA 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2019-01-07 AMPL. SIST. RIEGO D 25 18 22 16 climate resilience in the III FASE 2 TIQUIPAYA Rio Grande River Basin Page 7 C. Design and FPS CI 98 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 0.00 2019-01-07 AMPL. SIST. RIEGO D pendiente 25 18 22 16 climate resilience in the III FASE 2 TIQUIPAYA Rio Grande River Basin FPS CI 101 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. SIST. RIEGO Ejecución 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-01-07 NUEVO AMANECER pendiente 25 18 22 18 climate resilience in the PHUYU PHUYU GRANDE Rio Grande River Basin Y LINDE CHICO VACAS FPS CI 104 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-02- CONST. RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2019-01-07 25 18 22 16 ASPERCIoN UREY climate resilience in the RANCHO SAN BENITO Rio Grande River Basin FPS CI 106 / C. Design and SUPERVISIoN TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-01- CONST. DEFENSIVOS TF / 16083 subprojects that improve Posterior Individual Open 23,932.36 0.00 En ejecución 2019-01-07 25 18 22 17 MILLU MAYU ZONA climate resilience in the SAN PEDRO BAJO Rio Grande River Basin MIZQUE FPS CI 43 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-04- CONST. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 0.00 2019-01-04 pendiente 22 15 19 13 RIEGO V. CARMEN climate resilience in the ARANI D-1 ARANI Rio Grande River Basin C. Design and FPS CI 107 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 17,525.83 0.00 2019-01-07 AMPL. SIST. RIEGO pendiente 25 18 22 18 climate resilience in the QOLLPANI SACACA Rio Grande River Basin FPS CI 110 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-03- 2019-03- 2019-04- 2020-01- MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 16,525.55 0.00 2019-01-14 pendiente 04 25 29 24 RIEGO COM. PALIZADA climate resilience in the COMARAPA Rio Grande River Basin FPS CI 113 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-03- 2019-03- 2019-04- 2020-01- MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 20,000.00 0.00 2019-01-14 pendiente 04 25 29 24 RIEGO PULQUINA climate resilience in the ARRIBA B COMARAPA Rio Grande River Basin BO-FPS-89123-CS-INDV / C. Design and SUPERVISIoN ATI implementation of 2019-02- 2019-03- 2019-04- 2019-10- RIEGO COMUNIDAD TF / 16083 subprojects that improve Posterior Individual Open 12,209.30 0.00 En ejecución 2019-01-07 25 18 22 19 ESPINAL PASORAPA - climate resilience in the RIEGO SAUCEVADO Rio Grande River Basin OMEREQUE FPS CI 85 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-02- 2019-03- 2019-04- 2019-12- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 2019-01-07 pendiente 25 18 22 18 MEJ. CANAL DE RIEGO climate resilience in the SIVINGA AnUCHIRI Rio Grande River Basin DIST. RAMADAS TAPACARI FPS CI 74 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Individual Open 5,830.90 0.00 2019-01-07 MEJ. CANALES RIEGO pendiente 25 18 22 19 climate resilience in the DON BOSCO Rio Grande River Basin COLCAPIRHUA COLCAPIRHUA FPS CI 88 / SUPERVISIoN AL ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-01- MEJ. CANAL RIEGO TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 0.00 2019-01-07 pendiente 25 18 22 17 PUCAVINTO AUKALARI climate resilience in the KOCHIMARCA ALTO Y Rio Grande River Basin BAJO DIST. RAMADAS TAPACARI FPS CI 91 / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y Ejecución 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 9,329.45 0.00 2019-01-07 ASISTENCIA TeCNICA pendiente 25 18 22 16 climate resilience in the AMPL. SIST. RIEGO D Rio Grande River Basin III FASE 1 TIQUIPAYA BO-FPS-67259-CS-INDV / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-04- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-01-04 pendiente 22 15 19 13 CONST. CANAL DE climate resilience in the RIEGO V. CARMEN Rio Grande River Basin ARANI D-1 ARANI FPS CI 103 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-02- 2019-03- 2019-04- 2019-10- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 2019-01-07 pendiente 25 18 22 19 CONST. RIEGO POR climate resilience in the ASPERCIoN UREY Rio Grande River Basin RANCHO SAN BENITO FPS CI 79 / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,122.92 Firmado 2019-01-07 ASISTENCIA TeCNICA 25 18 22 18 climate resilience in the MEJ. SIST. RIEGO COM. Rio Grande River Basin SUNCHU PAMPA POJO FPS CI 109 / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y Ejecución 2019-02- 2019-03- 2019-04- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 7,571.16 0.00 2019-01-07 ASISTENCIA TeCNICA pendiente 25 18 22 17 climate resilience in the AMPL. SIST. RIEGO Rio Grande River Basin QOLLPANI SACACA FPS CI 115 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-03- 2019-03- 2019-04- 2020-01- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 15,000.00 0.00 2019-01-14 pendiente 04 25 29 24 MEJ. CANALES DE climate resilience in the RIEGO PULQUINA Rio Grande River Basin ARRIBA B COMARAPA FPS CI 112 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-03- 2019-03- 2019-04- 2020-01- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 10,807.71 0.00 2019-01-14 pendiente 04 25 29 24 MEJ. CANALES DE climate resilience in the RIEGO COM. PALIZADA Rio Grande River Basin COMARAPA BO-FPS-107109-CS-INDV C. Design and / SUPERVISIoN TeCNICA implementation of Ejecución 2019-05- 2019-05- 2019-07- 2020-03- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-03-20 pendiente 08 29 03 29 CHALLAQUE climate resilience in the SACABAMBA FASE II Rio Grande River Basin SACABAMBA BO-FPS-107116-CS-INDV C. Design and / SUPERVISIoN TeCNICA implementation of CONST. REG. Y Ejecución 2019-05- 2019-05- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 0.00 2019-03-20 ENCAUCE HiDRICO RiO pendiente 08 29 03 29 climate resilience in the CHIJLLAWIRI TRAMO II Rio Grande River Basin DISTR. D (COLCAPIRHUA) BO-FPS-107118-CS-INDV / SUPERVISIoN TeCNICA C. Design and CONST. REG. Y implementation of Ejecución 2019-05- 2019-05- 2019-07- 2020-03- ENCAUCE HiDRICO RiO TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 0.00 2019-03-20 pendiente 08 29 03 29 CHIJLLAWIRI TRAMO I climate resilience in the DISTR. D Rio Grande River Basin (COLCAPIRHUA)VVVV BO-FPS-107119-CS-INDV / SUPERVISION TECNICA C. Design and CONST. SIST. implementation of Ejecución 2019-05- 2019-05- 2019-07- 2020-03- MICRORIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 2019-03-20 pendiente 08 29 03 29 PRESURIZADO climate resilience in the COMUNIDAD DEL SUR Rio Grande River Basin (TOLATA) BO-FPS-107127-CS-INDV C. Design and / ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-05- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 2019-03-20 MEJ. SIST. RIEGO pendiente 08 29 03 29 climate resilience in the THAGO PAMPA - ALIZAR Rio Grande River Basin MOLINOS POJO BO-FPS-107128-CS-INDV C. Design and / ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-05- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 0.00 2019-03-20 MEJ. SIST. RIEGO pendiente 08 29 03 29 climate resilience in the CHALLAQUE Rio Grande River Basin SACABAMBA FASE II SACABAMBA BO-FPS-107130-CS-INDV / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of CONST. SIST. Ejecución 2019-05- 2019-05- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 11,661.80 0.00 2019-03-20 MICRORIEGO pendiente 08 29 03 29 climate resilience in the PRESURIZADO Rio Grande River Basin COMUNIDAD DEL SUR TOLATA BO-FPS-107131-CS-INDV / SUPERVISIoN C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-05- 2019-05- 2019-07- 2020-03- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 2019-03-20 pendiente 08 29 03 29 MEJ. SIST. RIEGO climate resilience in the THAGO PAMPA - ALIZAR Rio Grande River Basin MOLINOS POJO Page 8 BO-FPS-107132-CS-INDV / SUPERVISIoN C. Design and ACOMPAnAMIENTO Y implementation of 2019-05- 2019-05- 2019-07- 2020-03- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2019-03-20 08 29 03 29 MEJ. SIST. RIEGO climate resilience in the CHALLAQUE Rio Grande River Basin SACABAMBA FASE II SACABAMBA BO-FPS-107135-CS-INDV / SUPERVISIoN ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of Ejecución 2019-05- 2019-05- 2019-07- 2020-03- CONST. SIST. TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 2019-03-20 pendiente 08 29 03 29 MICRORIEGO climate resilience in the PRESURIZADO Rio Grande River Basin COMUNIDAD DEL SUR TOLATA FPS CI 102 / C. Design and ASISTENCIA TeCNICA implementation of CONST. SIST. RIEGO 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 Cancelado 2019-01-07 NUEVO AMANECER 25 18 22 18 climate resilience in the PHUYU PHUYU GRANDE Rio Grande River Basin Y LINDE CHICO VACAS FPS CI 100 / C. Design and SUPERVISIoN ATI implementation of CONST. SIST. RIEGO 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2019-01-07 NUEVO AMANECER 25 18 22 18 climate resilience in the PHUYU PHUYU GRANDE Rio Grande River Basin Y LINDE CHICO VACAS FPS CI 102-2 / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of Ejecución 2019-05- 2019-06- 2019-07- 2020-03- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 2019-03-27 pendiente 15 05 10 06 NUEVO AMANECER climate resilience in the PHUYU PHUYU GRANDE Rio Grande River Basin Y LINDE CHICO VACAS FPS CI 100-2 / SUPERVISION AL C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-03-27 CONST. SIST. RIEGO pendiente 15 05 10 06 climate resilience in the NUEVO AMANECER Rio Grande River Basin PHUYU PHUYU GRANDE Y LINDE CHICO VACAS FPS CI 105 / C. Design and ASISTENCIA TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-02- CONST. RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 Cancelado 2019-01-07 25 18 22 16 ASPERCIoN UREY climate resilience in the RANCHO SAN BENITO Rio Grande River Basin C. Design and FPS CI 108 / implementation of ASISTENCIA TeCNICA 2019-02- 2019-03- 2019-04- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 10,515.50 0.00 Cancelado 2019-01-07 AMPL. SIST. RIEGO 25 18 22 17 climate resilience in the QOLLPANI SACACA Rio Grande River Basin FPS CI 111 / C. Design and ASISTENCIA TeCNICA implementation of 2019-03- 2019-03- 2019-04- 2020-01- MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 13,220.44 0.00 Cancelado 2019-01-14 04 25 29 24 RIEGO COM. PALIZADA climate resilience in the COMARAPA Rio Grande River Basin FPS CI 114 / C. Design and ASISTENCIA TeCNICA implementation of 2019-03- 2019-03- 2019-04- 2020-01- MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 17,500.00 0.00 Cancelado 2019-01-14 04 25 29 24 RIEGO PULQUINA climate resilience in the ARRIBA B COMARAPA Rio Grande River Basin FPS CI 55 / C. Design and ASISTENCIA TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-04- CONST. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 Cancelado 2019-01-04 22 15 19 13 RIEGO V. CARMEN climate resilience in the ARANI D-1 ARANI Rio Grande River Basin FPS CI 73 / C. Design and ASISTENCIA TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2020-01- MEJ. CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 17,842.57 0.00 Cancelado 2019-01-07 25 18 22 17 KANCHA WASA LARK A climate resilience in the CLIZA Rio Grande River Basin FPS CI 76 / C. Design and ASISTENCIA TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2019-10- MEJ. CANALES RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 Cancelado 2019-01-07 25 18 22 19 DON BOSCO climate resilience in the COLCAPIRHUA Rio Grande River Basin COLCAPIRHUA C. Design and FPS CI 81 / implementation of ASISTENCIA TeCNICA 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 Cancelado 2019-01-07 MEJ. SIST. RIEGO COM. 25 18 22 18 climate resilience in the SUNCHU PAMPA POJO Rio Grande River Basin FPS CI 87 / C. Design and ASISTENCIA TeCNICA implementation of 2019-02- 2019-03- 2019-04- 2019-12- MEJ. CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 11,734.69 0.00 Cancelado 2019-01-07 25 18 22 18 SIVINGA AnUCHIRI climate resilience in the DIST. RAMADAS Rio Grande River Basin TAPACARI FPS CI 90 / C. Design and ASISTENCIA TeCNICA implementation of MEJ. CANAL RIEGO 2019-02- 2019-03- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 13,192.42 0.00 Cancelado 2019-01-07 PUCAVINTO AUKALARI 25 18 22 17 climate resilience in the KOCHIMARCA ALTO Y Rio Grande River Basin BAJO DIST. RAMADAS TAPACARI C. Design and FPS CI 93 / implementation of ASISTENCIA TeCNICA 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 14,067.06 0.00 Cancelado 2019-01-07 AMPL. SIST. RIEGO D 25 18 22 16 climate resilience in the III FASE 1 TIQUIPAYA Rio Grande River Basin C. Design and FPS CI 99 / implementation of ASISTENCIA TeCNICA 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 10,386.30 0.00 Cancelado 2019-01-07 AMPL. SIST. RIEGO D 25 18 22 16 climate resilience in the III FASE 2 TIQUIPAYA Rio Grande River Basin C. Design and FPS CI 96 / implementation of ASISTENCIA TeCNICA 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 Cancelado 2019-01-07 AMPL. SIST. RIEGO D 25 18 22 16 climate resilience in the III FASE 2 TIQUIPAYA Rio Grande River Basin FPS CI 105 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 2019-03-29 CONST. RIEGO POR pendiente 17 07 12 07 climate resilience in the ASPERCIoN UREY Rio Grande River Basin RANCHO - SAN BENITO FPS CI 108 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA 2019-05- 2019-06- 2019-07- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,515.50 0.00 En ejecución 2019-03-29 AMPL. SIST. RIEGO 17 07 12 06 climate resilience in the QOLLPANI SACACA - C. Rio Grande River Basin VILLA SACACA FPS CI 111 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 13,220.44 0.00 2019-03-29 MEJ. CANALES DE pendiente 17 07 12 07 climate resilience in the RIEGO COM. PALIZADA - Rio Grande River Basin COMARAPA FPS CI 114 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 17,500.00 0.00 2019-03-29 MEJ. CANALES DE pendiente 17 07 12 07 climate resilience in the RIEGO PULQUINA Rio Grande River Basin ARRIBA B - COMARAPA FPS CI 55 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-07- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-03-29 CONST. CANAL DE pendiente 17 07 12 06 climate resilience in the RIEGO V. CARMEN Rio Grande River Basin ARANI D-1 - ARANI FPS CI 73 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA 2019-05- 2019-06- 2019-07- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 17,842.57 0.00 Bajo Revision 2019-03-29 MEJ. CANAL DE RIEGO 17 07 12 07 climate resilience in the KANCHA WASA LARKA - Rio Grande River Basin CLIZA FPS CI 76 - 2 / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of Ejecución 2019-05- 2019-06- 2019-07- 2020-01- MEJ. CANALES RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 2019-03-29 pendiente 17 07 12 08 COM. DON BOSCO- climate resilience in the COLCAPIRHUA - Rio Grande River Basin COLCAPIRHUA FPS CI 81 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-05- 2019-06- 2019-07- 2020-03- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2019-03-29 17 07 12 08 MEJ. SIST. RIEGO COM. climate resilience in the SUNCHU PAMPA - POJO Rio Grande River Basin FPS CI 90 - 2 / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA implementation of MEJ. CANAL RIEGO Ejecución 2019-05- 2019-06- 2019-07- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 13,192.42 0.00 2019-03-29 PUCAVINTO-AUKALARI- pendiente 17 07 12 07 climate resilience in the KOCHIMARCA ALTO Y Rio Grande River Basin BAJO DIST. RAMADAS - TAPACARI FPS CI 93 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-05- 2019-06- 2019-07- 2020-05- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 14,067.06 0.00 2019-03-29 pendiente 17 07 12 07 AMPL. SIST. RIEGO D-III climate resilience in the FASE 1 - TIQUIPAYA Rio Grande River Basin Page 9 FPS CI 96 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-05- 2019-06- 2019-07- 2020-05- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 13,199.53 0.00 2019-03-29 pendiente 17 07 12 07 AMPL. SIST. RIEGO D- climate resilience in the III FASE-2 - TIQUIPAYA Rio Grande River Basin FPS CI 116 / C. Design and SUPERVISION TECNICA implementation of CONST. REG. Y Ejecución 2019-05- 2019-06- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 0.00 2019-04-01 ENCAUCE HIDRICO pendiente 20 10 15 11 climate resilience in the CANAL PAMPA MAYU Rio Grande River Basin TRAMO I DIST. E - COLCAPIRHUA FPS CI 117 / C. Design and SUPERVISION TECNICA implementation of CONST. REG. Y Ejecución 2019-05- 2019-06- 2019-07- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 0.00 2019-04-01 ENCAUCE HIDRICO pendiente 20 10 15 10 climate resilience in the CANAL PAMPA MAYU Rio Grande River Basin TRAMO II DIST. E - COLCAPIRHUA FPS CI 87 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-05- 2019-06- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 11,734.69 0.00 2019-03-29 MEJ. CANAL DE RIEGO pendiente 17 07 12 08 climate resilience in the SIVINGA, AnUCHIRI Rio Grande River Basin DIST. RAMADAS - TAPACARI BO-FPS-107108-CS-INDV C. Design and / SUPERVISiON TeCNICA implementation of 2019-05- 2019-05- 2019-07- 2020-03- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.98 0.00 En ejecución 2019-03-20 08 29 03 29 THAGO PAMPA - ALIZAR climate resilience in the MOLINOS POJO Rio Grande River Basin BO-FPS-89890-CS-INDV / C. Design and SUPERVISION ATI implementation of 2019-01- 2019-02- 2019-03- 2019-09- RIEGO CHURU MAMA TF / 16083 subprojects that improve Posterior Individual Open 15,843.02 0.00 Cancelado 2018-12-10 28 18 25 21 HUASI POCONA - climate resilience in the RIEGO POTRERA Rio Grande River Basin TIRAQUE BO-FPS-89122-CS-INDV / C. Design and SUPERVISIoN ATI implementation of 2019-02- 2019-03- 2019-04- 2019-10- RIEGO CHAJRAMAYU TF / 16083 subprojects that improve Posterior Individual Open 14,534.80 0.00 Cancelado 2019-01-07 25 18 22 19 AIQUILE - RIEGO URA climate resilience in the PIRHUA AIQUILE Rio Grande River Basin FPS CI 97 / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y Ejecución 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-01-07 ASISTENCIA TeCNICA pendiente 25 18 22 16 climate resilience in the AMPL. SIST. RIEGO D Rio Grande River Basin III FASE 2 TIQUIPAYA FPS CI 70 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-01- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 0.00 2019-01-07 pendiente 25 18 22 17 CONST. CANAL ZONA climate resilience in the CEMENTERIO Rio Grande River Basin FRANCISCO DEL RIVERO CLIZA FPS CI 71 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-02- 2019-03- 2019-04- 2020-01- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 6,705.53 0.00 2019-01-07 pendiente 25 18 22 17 MEJ. CANAL DE RIEGO climate resilience in the KANCHA WASA LARK A Rio Grande River Basin CLIZA BO-FPS-141846-CS-INDV / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of Ejecución 2019-11- 2019-11- 2019-12- 2020-05- ASISTENCIA TeCNICA TF / 16083 subprojects that improve Posterior Individual Open 7,725.95 0.00 2019-10-21 pendiente 16 23 01 29 CONST SIST RIEGO climate resilience in the TECNIFICADO MOLINOS Rio Grande River Basin - TIQUIPAYA BO-FPS-141848-CS-INDV C. Design and / SUPERVISIoN TeCNICA implementation of Ejecución 2019-11- 2019-12- 2019-12- 2020-06- CONST SIST RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.98 0.00 2019-10-21 pendiente 16 07 15 12 TECNIFICADO MOLINOS climate resilience in the - TIQUIPAYA Rio Grande River Basin BO-FPS-141849-CS-INDV C. Design and / ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-11- 2019-11- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,386.29 0.00 2019-10-21 CONST SIST RIEGO pendiente 16 23 28 26 climate resilience in the TECNIFICADO MOLINOS Rio Grande River Basin - TIQUIPAYA BO-FPS-141850-CS-INDV C. Design and / SUPERVISIoN TeCNICA implementation of Ejecución 2019-11- 2019-11- 2019-12- 2020-05- CONST. CANAL ZONA TF / 16083 subprojects that improve Posterior Individual Open 15,743.44 0.00 2019-10-21 pendiente 16 23 01 29 CEMENTERIO climate resilience in the FRANCISCO DEL Rio Grande River Basin RIVERO (CLIZA) FPS CI 150 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 0.00 2019-11-16 pendiente 09 16 24 22 MEJ. CANALES DE climate resilience in the RIEGO DISTRITO 5 - Rio Grande River Basin PUNATA FPS CI 151 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-11-16 pendiente 09 16 24 22 RIEGO DISTRITO 5 - climate resilience in the PUNATA Rio Grande River Basin FPS CI 152 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 0.00 2019-11-16 pendiente 09 16 24 22 CANALES DE RIEGO climate resilience in the DISTRITO 5 - PUNATA Rio Grande River Basin FPS CI 153 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. REG. ENC. Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-11-18 HIDRAULICO DEL RIO pendiente 11 18 26 24 climate resilience in the PAJCHA MAYU LARATY Rio Grande River Basin - SACABA FPS CI 154 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 0.00 2019-11-18 pendiente 11 18 26 23 OBRAS DE TOMA climate resilience in the DISTRITO 4 - PUNATA Rio Grande River Basin C. Design and FPS CI 155 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-11-16 MEJ. OBRAS DE TOMA pendiente 09 16 24 21 climate resilience in the DISTRITO 4 - PUNATA Rio Grande River Basin FPS CI 156 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-11-18 pendiente 11 18 26 23 OBRAS DE TOMA climate resilience in the DISTRITO 4 - PUNATA Rio Grande River Basin FPS CI 157 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 18,586.00 0.00 2019-11-18 pendiente 11 18 26 23 CANAL DE RIEGO climate resilience in the JATUN LARKa - CLIZA Rio Grande River Basin C. Design and FPS CI 158 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,641.40 0.00 2019-11-18 MEJ. CANAL DE RIEGO pendiente 11 18 26 23 climate resilience in the JATUN LARKa - CLIZA Rio Grande River Basin FPS CI 159 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 18,586.00 0.00 2019-11-16 pendiente 09 16 24 21 CANAL DE RIEGO climate resilience in the JATUN LARKa - CLIZA Rio Grande River Basin FPS CI 160 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 18,671.14 0.00 2019-11-18 pendiente 11 18 26 23 CANAL DE RIEGO climate resilience in the CHULLPAS - CLIZA Rio Grande River Basin C. Design and FPS CI 161 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,745.77 0.00 2019-11-18 MEJ. CANAL DE RIEGO pendiente 11 18 26 23 climate resilience in the CHULLPAS - CLIZA Rio Grande River Basin FPS CI 162 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 18,671.14 0.00 2019-11-18 pendiente 11 18 26 23 CANAL DE RIEGO climate resilience in the CHULLPAS - CLIZA Rio Grande River Basin FPS CI 163 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-16 MEJ. SIST. RIEGO pendiente 09 16 24 21 climate resilience in the TECNIFICADO RODEO Rio Grande River Basin CHICO ZONA 2 - TOTORA FPS CI 164 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 0.00 2019-11-18 pendiente 11 18 26 23 TECNIFICADO RODEO climate resilience in the CHICO ZONA 2 - Rio Grande River Basin TOTORA FPS CI 165 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-18 MEJ. SIST. RIEGO pendiente 11 18 26 23 climate resilience in the TECNIFICADO RODEO Rio Grande River Basin CHICO ZONA 2 - TOTORA Page 10 FPS CI 166 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- CONST. DEFENSIVOS TF / 16083 subprojects that improve Posterior Individual Open 12,682.21 0.00 2019-11-16 pendiente 09 16 24 21 RIO ARQUE Z. SUD climate resilience in the OESTE - ARQUE Rio Grande River Basin FPS CI 167 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. MUROS Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 8,253.81 0.00 2019-11-16 DEFENSIVOS VENTILLA pendiente 09 16 24 12 climate resilience in the CONDORIRI Y CHAJWA Rio Grande River Basin CHAJWA - TACOPAYA FPS CI 168 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- CONST. MUROS TF / 16083 subprojects that improve Posterior Individual Open 9,675.98 0.00 2019-11-18 pendiente 11 18 26 24 DEFENSIVOS CALASAYA climate resilience in the MIRO - TACOPAYA Rio Grande River Basin FPS CI 169 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-03- CONST. MUROS TF / 16083 subprojects that improve Posterior Individual Open 6,770.61 0.00 2019-11-18 pendiente 11 18 26 30 DEFENSIVOS climate resilience in the QOTUMAYU - TACOPAYA Rio Grande River Basin FPS CI 170 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO MEJ. implementation of SIST. RIEGO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 11,078.71 0.00 2019-11-16 TECNIFICADO SIND. pendiente 09 16 24 22 climate resilience in the AGRARIO CAPORAYA Rio Grande River Basin CANCOTANI - SANTIVAÑEZ FPS CI 171 / SUPERVISIoN TeCNICA C. Design and MEJ. SIST. RIEGO implementation of Ejecución 2020-02- 2020-03- 2020-04- 2020-05- TECNIFICADO SIND. TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 0.00 2020-01-06 pendiente 24 16 20 17 AGRARIO CAPORAYA climate resilience in the CANCOTANI - Rio Grande River Basin SANTIVAÑEZ FPS CI 172 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO MEJ. implementation of SIST. RIEGO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 TECNIFICADO SIND. pendiente 11 18 26 24 climate resilience in the AGRARIO CAPORAYA Rio Grande River Basin CANCOTANI - SANTIVAÑEZ FPS CI 173 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. REG. Y Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 0.00 2019-11-16 ENCAUCE HIDRICO RIO pendiente 09 16 24 21 climate resilience in the ANGELAMAYU DIST. A Rio Grande River Basin - COLCAPIRHUA FPS CI 174 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- CONST. OBRAS TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-16 pendiente 09 16 24 22 HIDRAULICAS RIO climate resilience in the ROCHA - VINTO Rio Grande River Basin FPS CI 175 / SUPERVISIoN TeCNICA C. Design and CONST. OBRAS implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- HIDRAULICAS TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-16 pendiente 09 16 24 22 REGULACION Y climate resilience in the ENCAUZAMIENTO RIO Rio Grande River Basin LINDERO - TIQUIPAYA FPS CI 176 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 15,072.89 0.00 2019-11-18 MEJ. SISTEMA DE pendiente 11 18 26 23 climate resilience in the RIEGO EN LA Rio Grande River Basin COMUNIDAD DE KURI ALTO - MIZQUE FPS CI 177 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SISTEMA DE TF / 16083 subprojects that improve Posterior Individual Open 16,588.92 0.00 2019-11-18 pendiente 11 18 26 23 RIEGO EN LA climate resilience in the COMUNIDAD DE KURI Rio Grande River Basin ALTO - MIZQUE FPS CI 178 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2020-01- 2020-07- TF / 16083 subprojects that improve Posterior Individual Open 15,072.89 0.00 2019-11-16 SISTEMA DE RIEGO EN pendiente 09 16 07 05 climate resilience in the LA COMUNIDAD DE Rio Grande River Basin KURI ALTO - MIZQUE FPS CI 179 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,294.46 0.00 2019-11-16 SIST. DE RIEGO EN LA pendiente 09 16 24 21 climate resilience in the COMUNIDAD DE KURI Rio Grande River Basin CENTRO - MIZQUE FPS CI 180 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 18,680.76 0.00 2019-11-16 pendiente 09 16 24 22 EN LA COMUNIDAD DE climate resilience in the KURI CENTRO - MIZQUE Rio Grande River Basin FPS CI 181 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,294.46 0.00 2019-11-18 SIST. DE RIEGO EN LA pendiente 11 18 26 23 climate resilience in the COMUNIDAD DE KURI Rio Grande River Basin CENTRO - MIZQUE FPS CI 182 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-16 pendiente 09 16 24 22 POR ASPERSION OTB climate resilience in the FALSURI D-7 - Rio Grande River Basin QUILLACOLLO FPS CI 183 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. SIST. DE RIEGO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 12,244.90 0.00 2019-11-18 POR ASPERSION OTB pendiente 11 18 26 24 climate resilience in the FALSURI D-7 - Rio Grande River Basin QUILLACOLLO FPS CI 184 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 9,183.67 0.00 2019-11-16 pendiente 09 16 24 22 POR ASPERSION OTB climate resilience in the FALSURI D-7 - Rio Grande River Basin QUILLACOLLO FPS CI 185 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO implementation of CONST. SIST. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-18 MICRORIEGO pendiente 11 18 26 23 climate resilience in the PRESURIZADO Rio Grande River Basin COMUNIDAD DEL SUR - TOLATA FPS CI 186 / SUPERVISIoN TeCNICA C. Design and CONST. SIST. implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MICRORIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-18 pendiente 11 18 26 23 PRESURIZADO climate resilience in the COMUNIDAD DEL SUR - Rio Grande River Basin TOLATA FPS CI 187 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO implementation of CONST. SIST. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 MICRORIEGO pendiente 11 18 26 23 climate resilience in the PRESURIZADO Rio Grande River Basin COMUNIDAD DEL SUR - TOLATA FPS CI 188 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-16 pendiente 09 16 24 22 SIST. RIEGO CHAUPI climate resilience in the MOLINO - ANZALDO Rio Grande River Basin FPS CI 189 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-18 pendiente 11 18 26 24 CHAUPI MOLINO - climate resilience in the ANZALDO Rio Grande River Basin FPS CI 190 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 pendiente 11 18 26 24 SIST. RIEGO CHAUPI climate resilience in the MOLINO - ANZALDO Rio Grande River Basin FPS CI 191 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-11-16 pendiente 09 16 24 22 POR ASPERSION OTB climate resilience in the SAN MIGUEL D-7 - Rio Grande River Basin QUILLACOLLO FPS CI 192 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. SIST. DE RIEGO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-16 POR ASPERSION OTB pendiente 09 16 24 22 climate resilience in the SAN MIGUEL D-7 - Rio Grande River Basin QUILLACOLLO FPS CI 193 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,559.76 0.00 2019-11-18 pendiente 11 18 26 24 POR ASPERSION OTB climate resilience in the SAN MIGUEL D-7 - Rio Grande River Basin QUILLACOLLO Page 11 FPS CI 194 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 0.00 2019-11-16 CANAL SISTEMA DE pendiente 09 16 24 21 climate resilience in the RIEGO SULTI KASA Rio Grande River Basin PATA - SAN BENITO FPS CI 195 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJ. CANAL SISTEMA TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-11-18 pendiente 11 18 26 23 DE RIEGO SULTI KASA climate resilience in the PATA - SAN BENITO Rio Grande River Basin FPS CI 196 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 CANAL SISTEMA DE pendiente 11 18 26 23 climate resilience in the RIEGO SULTI KASA Rio Grande River Basin PATA - SAN BENITO FPS CI 197 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 8,309.04 0.00 2019-11-16 SIST. DE RIEGO pendiente 09 16 24 22 climate resilience in the TECNIFICADO TUNAS Rio Grande River Basin MAYU - TARATA FPS CI 198 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,495.63 0.00 2019-11-16 pendiente 09 16 24 22 TECNIFICADO TUNAS climate resilience in the MAYU - TARATA Rio Grande River Basin FPS CI 199 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 6,297.38 0.00 2019-11-16 SIST. DE RIEGO pendiente 09 16 24 22 climate resilience in the TECNIFICADO TUNAS Rio Grande River Basin MAYU - TARATA FPS CI 200 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO MEJ. implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 0.00 2019-11-16 pendiente 09 16 24 22 TECNIFICADO CHIMPA climate resilience in the RANCHO YANA KOCHI - Rio Grande River Basin SAN BENITO FPS CI 201 / C. Design and SUPERVISIoN TeCNICA implementation of MEJ. SIST. RIEGO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 0.00 2019-11-18 TECNIFICADO CHIMPA pendiente 11 18 26 24 climate resilience in the RANCHO YANA KOCHI - Rio Grande River Basin SAN BENITO FPS CI 202 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO MEJ. implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-16 pendiente 09 16 24 22 TECNIFICADO CHIMPA climate resilience in the RANCHO YANA KOCHI - Rio Grande River Basin SAN BENITO FPS CI 203 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-16 SISTEMA DE RIEGO pendiente 09 16 24 22 climate resilience in the TECNIFICADO PAJCHA Rio Grande River Basin SAN MIGUEL - TARATA FPS CI 204 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. SISTEMA DE TF / 11248 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-16 pendiente 09 16 24 22 RIEGO TECNIFICADO climate resilience in the PAJCHA SAN MIGUEL - Rio Grande River Basin TARATA FPS CI 205 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 7,871.72 0.00 2019-11-18 MEJ. SISTEMA DE pendiente 11 18 26 24 climate resilience in the RIEGO TECNIFICADO Rio Grande River Basin PAJCHA SAN MIGUEL - TARATA FPS CI 206 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 0.00 2019-11-18 pendiente 11 12 20 08 SIST. DE RIEGO climate resilience in the CUENCA RIO LA LLAVE Rio Grande River Basin - VINTO FPS CI 207 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-16 pendiente 09 16 24 12 CUENCA RIO LA LLAVE climate resilience in the - VINTO Rio Grande River Basin FPS CI 208 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 7,725.95 0.00 2019-11-16 pendiente 09 16 24 12 SIST. DE RIEGO climate resilience in the CUENCA RIO LA LLAVE Rio Grande River Basin - VINTO FPS CI 209 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 9,475.21 0.00 2019-11-18 pendiente 11 18 26 24 SIST. DE RIEGO TINTI climate resilience in the MOKo D-4 - TIQUIPAYA Rio Grande River Basin FPS CI 210 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-16 pendiente 09 16 24 22 TINTI MOKo D-4 - climate resilience in the TIQUIPAYA Rio Grande River Basin FPS CI 211 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 0.00 2019-11-18 pendiente 11 18 26 24 SIST. DE RIEGO TINTI climate resilience in the MOKo D-4 - TIQUIPAYA Rio Grande River Basin FPS CI 212 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-18 CONST. SIST. DE RIEGO pendiente 11 18 26 13 climate resilience in the ALFALFA COTANI - Rio Grande River Basin CAPINOTA FPS CI 213 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 0.00 2019-11-16 pendiente 09 16 24 11 ALFALFA COTANI - climate resilience in the CAPINOTA Rio Grande River Basin FPS CI 214 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-18 CONST. SIST. DE RIEGO pendiente 11 18 26 13 climate resilience in the ALFALFA COTANI - Rio Grande River Basin CAPINOTA FPS CI 215 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 0.00 2019-11-18 pendiente 11 18 26 13 SIST. DE RIEGO climate resilience in the PIRIGALLO B - Rio Grande River Basin CAPINOTA FPS CI 216 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 19,825.07 0.00 2019-11-18 pendiente 11 18 26 13 PIRIGALLO B - climate resilience in the CAPINOTA Rio Grande River Basin FPS CI 217 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-18 pendiente 11 18 26 13 SIST. DE RIEGO climate resilience in the PIRIGALLO B - Rio Grande River Basin CAPINOTA FPS CI 218 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,017.49 0.00 2019-11-18 CONST. SIST. DE RIEGO pendiente 11 18 26 24 climate resilience in the TECNIFICADO Rio Grande River Basin CATACHILLA - ARANI FPS CI 219 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 2019-11-16 pendiente 09 16 24 22 TECNIFICADO climate resilience in the CATACHILLA - ARANI Rio Grande River Basin FPS CI 220 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 6,559.76 0.00 2019-11-16 CONST. SIST. DE RIEGO pendiente 09 16 24 22 climate resilience in the TECNIFICADO Rio Grande River Basin CATACHILLA - ARANI FPS CI 221 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-16 SIST. DE RIEGO pendiente 09 16 24 22 climate resilience in the COMUNIDAD CONDORIRI Rio Grande River Basin - TAPACARI FPS CI 222 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-16 pendiente 09 16 24 22 COMUNIDAD CONDORIRI climate resilience in the - TAPACARI Rio Grande River Basin FPS CI 223 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 SIST. DE RIEGO pendiente 11 18 26 24 climate resilience in the COMUNIDAD CONDORIRI Rio Grande River Basin - TAPACARI Page 12 FPS CI 224 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 0.00 2019-11-18 pendiente 11 18 26 08 TECNIFICADO climate resilience in the COMUNIDAD PHUYU Rio Grande River Basin PHUYU CHICO - ARANI FPS CI 225 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. SIST. RIEGO Ejecución 2020-02- 2020-03- 2020-04- 2020-10- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2020-01-06 TECNIFICADO pendiente 24 16 20 17 climate resilience in the COMUNIDAD PHUYU Rio Grande River Basin PHUYU CHICO - ARANI FPS CI 226 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 5,539.36 0.00 2019-11-16 pendiente 09 16 24 22 TECNIFICADO climate resilience in the COMUNIDAD PHUYU Rio Grande River Basin PHUYU CHICO - ARANI FPS CI 227 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-16 AMPL. REVESTIMIENTO pendiente 09 16 24 22 climate resilience in the CANALES DE RIEGO Rio Grande River Basin VILLA CARMEN - ARANI FPS CI 228 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- AMPL. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-16 pendiente 09 16 24 22 CANALES DE RIEGO climate resilience in the VILLA CARMEN - ARANI Rio Grande River Basin FPS CI 229 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-11-16 AMPL. REVESTIMIENTO pendiente 09 16 24 22 climate resilience in the CANALES DE RIEGO Rio Grande River Basin VILLA CARMEN - ARANI FPS CI 230 / ASIST. TECNICA Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 2019-11-18 pendiente 11 18 26 24 CANALES DE RIEGO climate resilience in the GERMAN TARDIO - Rio Grande River Basin ARANI FPS CI 231 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. REVESTIMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 2019-11-16 CANALES DE RIEGO pendiente 09 16 24 22 climate resilience in the GERMAN TARDIO - Rio Grande River Basin ARANI FPS CI 232 / SUPERVISIoN AT Y C. Design and ACOMPAÑAMIENTO implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- CONST. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-11-16 pendiente 09 16 24 22 CANALES DE RIEGO climate resilience in the GERMAN TARDIO - Rio Grande River Basin ARANI FPS CI 233 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-18 pendiente 11 18 26 24 SIST. RIEGO TICANI - climate resilience in the ALALAY Rio Grande River Basin C. Design and FPS CI 234 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-18 MEJ. SIST. RIEGO pendiente 11 18 26 24 climate resilience in the TICANI - ALALAY Rio Grande River Basin FPS CI 235 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 2019-11-16 pendiente 09 16 24 22 SIST. RIEGO TICANI - climate resilience in the ALALAY Rio Grande River Basin FPS CI 236 / ASIST. C. Design and TECNICA Y implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-18 pendiente 11 18 26 24 SIST. RIEGO COCAPATA climate resilience in the - POCONA Rio Grande River Basin C. Design and FPS CI 237 / implementation of SUPERVISIoN TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 0.00 2019-11-18 MEJ. SIST. RIEGO pendiente 11 18 26 24 climate resilience in the COCAPATA - POCONA Rio Grande River Basin FPS CI 238 / C. Design and SUPERVISIoN AT Y implementation of Ejecución 2020-01- 2020-01- 2020-01- 2020-06- ACOMPAÑAMIENTOMEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 2019-11-16 pendiente 07 14 22 20 SIST. RIEGO COCAPATA climate resilience in the - POCONA Rio Grande River Basin FPS CI 239 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. OBRAS DE Ejecución 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-18 PROTECCIÓN DE pendiente 11 18 26 24 climate resilience in the RIBERAS OTB Rio Grande River Basin AYACUCHO RIO KHORA - VINTO FPS CI 240 / SUPERVISIoN TeCNICA C. Design and CONST. OBRAS DE implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-05- PROTECCION DE TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-16 pendiente 09 16 24 22 RIBERAS OTB JUAN climate resilience in the VARGAS RIO CHULLA - Rio Grande River Basin VINTO FPS CI 241 / C. Design and SUPERVISIoN TeCNICA implementation of CONST. OBRAS DE Ejecución 2019-12- 2019-12- 2020-01- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-18 PROTECCION DE pendiente 11 18 09 07 climate resilience in the RIBERAS OTB CENTRAL Rio Grande River Basin RIO CHULLA - VINTO FPS CI 242 / SUPERVISIoN TeCNICA C. Design and CONST. OBRAS DE implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-04- PROTECCIÓN DE TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 2019-11-16 pendiente 09 16 24 22 RIBERAS OTB NUESTRA climate resilience in the SEÑORA DEL ROSARIO Rio Grande River Basin RIO KHORA - VINTO FPS CI 243 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-11-16 SISTEMA DE RIEGO EN pendiente 09 16 24 21 climate resilience in the LA COMUNIDAD DE Rio Grande River Basin KURI BAJO - MIZQUE FPS CI 244 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SISTEMA DE TF / 16083 subprojects that improve Posterior Individual Open 25,510.20 0.00 2019-11-18 pendiente 11 18 26 23 RIEGO EN LA climate resilience in the COMUNIDAD DE KURI Rio Grande River Basin BAJO - MIZQUE FPS CI 245 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO MEJ. Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-11-16 SISTEMA DE RIEGO EN pendiente 09 16 24 21 climate resilience in the LA COMUNIDAD DE Rio Grande River Basin KURI BAJO - MIZQUE FPS CI 246 / ASIST. C. Design and TECNICA Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-11-18 MEJORAMIENTO pendiente 11 18 26 23 climate resilience in the SISTEMA DE RIEGO Rio Grande River Basin J.KANAUT - COLCAPIRHUA FPS CI 247 / C. Design and SUPERVISIoN TeCNICA implementation of Ejecución 2019-12- 2019-12- 2019-12- 2020-06- MEJORAMIENTO TF / 16083 subprojects that improve Posterior Individual Open 25,510.20 0.00 2019-11-16 pendiente 09 16 24 21 SISTEMA DE RIEGO climate resilience in the J.KANAUT - Rio Grande River Basin COLCAPIRHUA FPS CI 248 / C. Design and SUPERVISIoN AT Y implementation of ACOMPAÑAMIENTO Ejecución 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 2019-11-16 MEJORAMIENTO pendiente 09 16 24 21 climate resilience in the SISTEMA DE RIEGO Rio Grande River Basin J.KANAUT - COLCAPIRHUA FPS CD 1 / CAPACITACION Y C. Design and ASISTENCIA TECNICA implementation of Selección PARA LA GESTION DEL 2019-11- 2019-12- 2020-02- TF / 16083 subprojects that improve Posterior directa de Direct 5,484.00 0.00 Cancelado 2019-11-18 TRAMITE DE 24 13 06 climate resilience in the consultores CAPACIDAD DE Rio Grande River Basin ENDEUDAMIENTO REFERENCIAL PARA CONTRAPARTES LOCALES BO-FPS-141851-CS-INDV C. Design and / ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA Ejecución 2019-12- 2019-12- 2019-12- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 2019-12-06 CONST. CANAL ZONA pendiente 08 08 10 16 climate resilience in the CEMENTERIO Rio Grande River Basin FRANCISCO DEL RIVERO (CLIZA) FPS CD 1A / CAPACITACION PARA LA C. Design and GESTION DEL TRAMITE implementation of Selección Ejecución 2020-01- 2020-02- 2020-03- DE CAPACIDAD DE TF / 16083 subprojects that improve Posterior directa de Direct 5,484.00 0.00 2020-01-22 pendiente 25 03 24 ENDEUDAMIENTO climate resilience in the consultores REFERENCIAL PARA Rio Grande River Basin CONTRAPARTES LOCALES Page 13