The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Strengthening Disaster Risk Management Project (P166302) EUROPE AND CENTRAL ASIA | Romania | Social, Urban, Rural and Resilience Global Practice Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 3 | ARCHIVED on 01-Aug-2019 | ISR37092 | Implementing Agencies: Romania (through its Ministry of Public Finance), Ministry of Internal Affairs - Department of Emergency Situations and General Inspectorate for Emerg Key Dates Key Project Dates Bank Approval Date: 24-Jul-2018 Effectiveness Date: 20-Dec-2018 Planned Mid Term Review Date: -- Actual Mid-Term Review Date: -- Original Closing Date: 31-Dec-2024 Revised Closing Date: 31-Dec-2024 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to enhance the resilience of critical disaster and emergency response infrastructure and to strengthen the Borrower’s institutional capacities in disaster risk reduction and climate change adaptation. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Improving Resilience of Disaster and Emergency Response Infrastructure:(Cost $52.62 M) Enhancing Institutional Capacity for Risk Reduction Investment Planning:(Cost $5.02 M) Project Management:(Cost $2.84 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The Project aims to enhance the resilience of critical disaster and emergency response facilities and to strengthen institutional capacities for investment planning for disaster risk reduction and climate change adaptation. The Project became Effective on 20 December 2018, and implementation of key activities is underway. The first six facilities to be intervened under the project are located in Mizil, Tecuci, Obor (Bucharest), Piteşti, Calaraşi and Carei. Implementation progress is satisfactory. 8/1/2019 Page 1 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Low Low Low Institutional Capacity for Implementation and Sustainability Moderate Moderate Moderate Fiduciary Substantial Substantial Substantial Environment and Social Moderate Moderate Moderate Stakeholders Low Low Low Other -- -- -- Overall Moderate Moderate Moderate Results PDO Indicators by Objectives / Outcomes Enhance the resilience of critical disaster and emergency response facilities IN00703146 ►Number of disaster and emergency response facilities that are upgraded to be resilient (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 25.00 Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703148 ►Number of rescue personnel, emergency and disaster management staff, volunteers and administrative staff with access to disaster resilient buildings (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,000.00 Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703150 ►Number of project beneficiaries in areas covered by resilient emergency and disaster response facilities (Number (Thousand), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3,000.00 8/1/2019 Page 2 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 Strengthen institutional capacities in investment planning for disaster risk reduction IN00703147 ►Enhanced Ro-Risk assessment supports enhanced risk reduction planning in other ministries (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Ro-Risk data is being used by at least two Ro-Risk Assessment Value Work is yet to start Work is yet to start ministries for disaster (2018 version) risk management decision making. Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703149 ►MOIA, through DES and GIES, has strengthened institutional capacity for risk reduction investment planning (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target GIES is systematically GIES has started a collecting data on process to collect data emergency and on vulnerable buildings disaster response and has a prioritization assets and their Value Work is yet to start Work is yet to start method for assessing potential vulnerability which buildings should to disasters, and has be strengthened for developed a plan for greater resilience. future resilience actions. Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 Intermediate Results Indicators by Components C1.Improving resilience of Disaster and Emergency Response Facilities IN00703151 ►Number of technical designs completed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 35.00 Date 02-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703154 ►Number of newly constructed emergency and response buildings with resilient structures and systems (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703157 ►Number of emergency and response buildings retrofitted to improve structural resilience (Number, Custom) 8/1/2019 Page 3 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 15.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703158 ►Number of communities reached out to via informative meetings and trainings (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703159 ►Number of direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,000.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703160 Female Project Beneficiaries (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 200.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 C2. Enhancing Institutional Capacity for Risk Reduction Investment Planning IN00703152 ►Number of reports on the impacts of disasters and climate change in Romania (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2023 IN00703155 ►Public Awareness Campaigns (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 01-Jul-2019 09-Nov-2018 09-Nov-2018 31-Dec-2024 C3. Project Management IN00703153 ►Institutional capacity in engineering, procurement and contract management is in place (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target 8/1/2019 Page 4 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Value No No No Yes Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 IN00703156 ►Percentage of grievances responded to in the stipulated time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 01-Jul-2018 09-Nov-2018 09-Nov-2018 31-Dec-2024 Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P166302 IBRD-88920 Effective USD 60.48 60.48 0.00 0.00 60.48 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P166302 IBRD-88920 Effective 24-Jul-2018 01-Aug-2018 20-Dec-2018 31-Dec-2024 31-Dec-2024 Cumulative Disbursements 8/1/2019 Page 5 of 6 The World Bank Implementation Status & Results Report Strengthening Disaster Risk Management Project (P166302) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 8/1/2019 Page 6 of 6