PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY ASSESSMENT OF KAKAMEGA COUNTY, KENYA Final report November 2018 1 Kenya - Kakamega County Public Expenditure and Financial Accountability (PEFA) Assessment of Kakamega County, Kenya - Based on PEFA methodology 2016 The quality assurance process followed in the production of this report satisfies all the requirements of the PEFA Secretariat and hence receives the ‘PEFA CHECK’. PEFA Secretariat November 15, 2018 CURRENCY EQUIVALENTS1 Currency unit: Kenya shillings (Ksh) Euro 1 = Ksh 112 (as of end April 2017) US$1 = Ksh 103 (as of end April 2017) FISCAL YEAR July 1 - June 30 1 source: Central Bank of Kenya. Table of Contents Acronyms ....................................................................................................................................................... i Executive Summary ..................................................................................................................................... iii 1. Introduction ......................................................................................................................................... 1 1.1 Rationale and purpose ....................................................................................................................... 1 1.2 Assessment management and quality assurance .............................................................................. 2 1.3 Assessment methodology ............................................................................................................. 4 2. Background Information ...................................................................................................................... 6 2.1 Economic context.......................................................................................................................... 6 2.2 Fiscal and budgetary trends .......................................................................................................... 7 2.3 Legal and regulatory arrangements for PFM ................................................................................ 9 2.4 Institutional arrangements for PFM ................................................................................................. 12 3. Assessment of PFM Performance ...................................................................................................... 17 3.1 Subnational PEFA indicator HLG-1: Transfers from a higher level of government .......................... 17 3.2 Pillar I. Budget reliability .................................................................................................................. 18 3.3 Pillar II. Transparency of public finances .......................................................................................... 22 3.4 Pillar III. Management of assets and liabilities ................................................................................. 30 3.5 Pillar IV. Policy-based fiscal strategy and budgeting ........................................................................ 35 3.6 Pillar V. Predictability and control in budget execution ................................................................... 43 3.7 Pillar VI. Accounting and reporting .................................................................................................. 55 3.8 Pillar VII. External scrutiny and audit ............................................................................................... 59 4. Conclusions of the Analysis of PFM Systems ..................................................................................... 64 4.1 Integrated assessment of PFM performance ................................................................................... 64 4.2 Effectiveness of the internal control framework ............................................................................. 68 4.3. PFM strengths and weaknesses ...................................................................................................... 70 5. Government PFM Reform Process .................................................................................................... 73 5.1 Approach to PFM reforms ................................................................................................................ 73 5.2 Recent and ongoing reform actions ................................................................................................. 73 5.3 Institutional considerations.............................................................................................................. 74 Annex 1. Performance Indicator Summary ................................................................................................ 75 Annex 2. Summary of Observations on the Internal Control Framework .................................................. 83 Annex 3: Sources of Information by Indicator ............................................................................................ 86 Annex 3A: List of Persons Who Have Been Interviewed and Provided Information .................................. 92 Annex 4. Subnational Government Profile ................................................................................................. 93 Annex 5. Calculation Sheet Templates for PI-1, PI-2, and PI-3 .................................................................... 97 List of Tables Table 2.1: Basic economic data and indicators for Kakamega County ......................................................... 7 Table 2.2: Overview of selected fiscal indicators.......................................................................................... 7 Table 2 3: Aggregate fiscal performance data for the last three fiscal years (in percentage of total revenues) ...................................................................................................................................................... 8 Table 2.4: Actual budget allocations by sectors (as a percentage of total expenditure) ............................. 9 Table 2.5: Budget allocations by economic classification (as a percentage of total expenditures) ............. 9 Table 2.6: Structure of the public sector (turnover in Ksh, millions) - FY2015/16 ..................................... 12 Table 2.7: Financial structure of county government (estimate expenditure in Ksh, millions) - FY2015/16 .................................................................................................................................................................... 13 Table 2.8: Financial structure of county government (actual expenditure in Ksh, millions) - FY2015/16 . 13 Table 3.1: Estimate of actual transfers for the last 3 fiscal years (in Ksh, millions).................................... 17 Table 3.2: Aggregate expenditure outturn (percentage)............................................................................ 19 Table 3.3: Expenditure composition outturn by function (Ksh, millions) ................................................... 19 Table 3.4: Expenditure composition outturn by economic type (Ksh, millions)......................................... 20 Table 3.5: Aggregate revenue outturn (percentage) .................................................................................. 22 Table 3.6: Kakamega sources of revenue for the last 3 fiscal years (Ksh, millions) .................................... 22 Table 3.7:..................................................................................................................................................... 25 Table 3.8:..................................................................................................................................................... 25 Table 3.9:..................................................................................................................................................... 29 Table 3.10:................................................................................................................................................... 29 Table 3.11:................................................................................................................................................... 32 Table 3.12: Categories of nonfinancial assets............................................................................................. 33 Table 3.13: Budget calendar for Kakamega County.................................................................................... 39 Table 3.14:................................................................................................................................................... 44 Table 3.15: Public access to procurement information .............................................................................. 51 Table 3.16: Procurement complaints management ................................................................................... 52 Table 3.17: Timing of in-year budget reports ............................................................................................. 57 Table 3.18: Submission of audit reports to the legislature......................................................................... 60 Acronyms ACCES African Canadian Continuing Education Society ADP Annual Development Plan ADS Authorized Data Sheet AFROSAI-E African Organisation of English-speaking Supreme Audit Institutions AFS Annual Financial Statement(s) AIE Authority to Incur Expenditure BPS Budget Policy Statement CBAC County Budget and Appropriations Committee CBEF County Budget and Economic Forum CBK Central Bank of Kenya CES Canada Community Education Services Canada CPI Consumer Price Index CRA Commission on Revenue Allocation CRF County Revenue Fund CBIRR County Governments’ Budget Implementation Review Report CBROP County Budget and Review Outlook Paper CEC County Executive Committee CFSP County Fiscal Strategy Paper CIDP County Integrated Development Plan COSO Committee of Sponsoring Organization DANIDA Danish International Development Agency DFID U.K. Department for International Development ECDE Early Childhood Development and Education EU European Union GDP Gross Domestic Product GHRIS Government Human Resource Information System HRIS Human Resources Information System ICT Information and Communication Technology IDRC International Development Research Centre IFAC International Federation of Accounts IFMIS Integrated Financial Management Information System IFRS International Financial Reporting Standards IGRTC Intergovernmental Relations Technical Committee IMF International Monetary Fund IPPD Integrated Payroll Personnel Data IPPF International Professional Practice Framework IPSAS International Public Sector Accounting Standards ISSAIs International Standards of Supreme Audit Institutions KADP Kenya Accountable Devolution Program KDSP Kenya Devolution Support Programme KEEF Kenya Education Endowment Fund KENAO Kenya National Audit Office KIPPRA Kenya Institute for Public Policy Research and Analysis KNBS Kenya National Bureau of Statistics KRA Kenya Revenue Authority i MCA Member of the County Assembly MDA Ministry, Department, and Agency MoF Ministry of Finance MPL Medium-Term Plan MTEF Medium-Term Expenditure Framework NHIF National Hospital Insurance Fund NSSF National Social Security Fund OCOB Office of the Controller of Budget PAC Public Accounts Committee PBB Program-Based Budget PEFA Public Expenditure and Financial Accountability PFM Public Financial Management PFMR Public Financial Management Reforms PPDA Public Procurement and Asset Disposal Act PPARB Public Procurement Administrative Review Board PPOA Public Procurement Oversight Authority PPP Public-Private Partnership PPRA Public Procurement Regulatory Authority PSASB Public Sector Accounting Standards Board SAI Supreme Audit Institution SCOA Standard Chart of Accounts Sida Swedish International Development Cooperation Agency TSA Treasury Single Account USAID U.S. Agency for International Development ii Executive Summary Background The main rationale of this assessment is to give a better understanding of how the public financial management (PFM) systems work, how the processes and the institutions are organized, and to what extent they provide an entry point for PFM reform efforts at the level of Kakamega County. The assessment will become a benchmark for the upgrade of the PFM system in other counties in Kenya that were not assessed. This Public Expenditure and Financial Accountability (PEFA) assessment was organized and commissioned by the Kenya Institute for Public Policy Research and Analysis (KIPPRA) in collaboration with the World Bank and involves other organizations as outlined in Box 1.1. The assessment was managed and monitored by KIPPRA. They were also responsible for the collection the relevant data and to obtain evidence for the complete and appropriate assessment of all the 31 indicators. The specific indicator HLG-1 applicable to subnational government is also included in the assessment. The assessment period covered FY2013/14, FY2014/15, and FY2015/16 depending on the indicator and dimension of the assessment. The field work assessment took place in April 2017, which is the time of the assessment for those indicators that required more up-to-date assessment period. Main outputs of the assessment Fiscal discipline Overall revenue and expenditure performance were in line with budgeted amounts given that the equitable shares allocated as national transfers account for approximately 90 percent of the county revenue and they are a factor of stability in financial performance. Expenditure performance by both economic and functional classifications significantly deviated from the budgeted estimates. Conditional grants were also not realistic and the outturn of own source revenue was consistently overprojected. Generally, deviations in all budget categories were more pronounced in FY2013/14, which was the first year of county operation and was affected by unrealistic projections. Slow procurement process and shortage of technical staff to supervise projects also caused deviations. The county is establishing a County Revenue Authority to enhance revenue collection. The budget is prepared in accordance with National Treasury guidelines that require budget proposals to be presented using an administrative, economic, and the program-based approach. However, no information about revenue outside financial reports is produced. The County Treasury uses an integrated financial management information system (IFMIS) to facilitate transaction processes and reporting. IFMIS users have passwords and the system maintains a log of users together with their functions. Any changes to reports must be approved by departmental heads to enhance financial data integrity. Budget documents such as the County Fiscal Strategy Paper (CFSP), County Budget and Review Outlook Papers (CBROPs), Annual Development Plans (ADPs), and budgets are prepared on time. Quarterly budget reports are also available for the public, but not in good time, and they do not cover all public resources and expenditure. In addition, in-year reports do not present budget execution along with all the data with which they should be compared, which hampers the efficient follow-up of service delivery. iii Financial reports for budgetary units are prepared annually and budget implementation reports are prepared each quarter. Coverage and classification of data allow direct comparison to the original budget for the main administrative headings. They include information on revenue, expenditures, and cash balances. Financial reporting, however, for extrabudgetary units and public corporations is still not produced. The county of Kakamega is yet to establish systems to monitor the newly established public corporations and develop procedures and selection criteria for public investment. Currently, there are no standard procedures and rules for project selection, implementation, and monitoring. Contingent liabilities (related to car loan and mortgage scheme) are well managed and most of them are presented in financial reports, but the debt inherited from the defunct local authority is not disclosed. The county has not developed standard operating procedures for disposal of assets because the counties were prohibited from disposing of public assets until full transition is effected. Debt management capacity of the county government is weak due to lack of a debt management unit and strategy. The county operated a well-managed automated payroll control system, that is, the integrated payroll and personnel database (IPPD) that integrates personnel database and payroll. Changes to the personnel records and payroll are updated at least monthly, in time for the following month’s payments. Staff hiring and promotion are controlled by a list of approved staff positions and usually subject to payroll audit carried out only once during the assessment period. Only the County Public Service Board and the County Assembly Service Board are allowed to change personnel records and payroll for the County Executive and County Assembly through written approval of the County Secretary and the Clerk, respectively. The procurement at the county of Kakamega does not fully achieve value for money. There is no record of the procurement method used for selection of contractors for services, goods, and works. A major area of weakness in procurement is that procurement plans, contract awards, data on resolution of procurement complaints, and annual procurement statistics are not made available to the public. The independent procurement complaints body that exists at the national level can resolve procurement cases. Strategic resource allocation The budget preparation process is based on a comprehensive and clear budget circular. Ceilings are established during the CFSP preparation but are fixed only after the budget calendar has been issued. Some departments prepare medium-term strategic plans, but the budget documents do not present any evidence that proposals in the annual budget estimates are aligned with the strategic plans of these departments. The County Treasury does not prepare its own macroeconomic forecasts but adopts the macroeconomic indicators from the national government. The county government prepares forecasts of revenue and expenditure for the budget year and the two following fiscal years but does not present the underlying assumptions for the forecasts. Further, no fiscal impact analysis is performed in the CFSP. The CBROP briefly explains the reasons for deviation from the objectives and targets set but does not provide an explanation of the changes to expenditure estimates between the second year of the last medium-term budget and the first year of the current medium-term budget, even at the aggregate level. iv There are no procedures to assess the economic impact and viability of projects with regard to public investment. Neither cost-benefit analysis is performed, nor is monitoring mechanism for public investment projects in place. Public asset management is not fully established. While records of financial assets are published annually in financial statements, records of nonfinancial assets are not comprehensive. Efficient service delivery The Revenue Unit of Kakamega County does not provide taxpayers with clear access to information on the main revenue obligation areas, rights, redress processes, and procedures. Also, the county does not have a risk-based approach to maximize public revenue collection. In addition, no independent body has been put in place to carry out revenue audits and fraud investigations. In terms of expected reforms, the county of Kakamega is establishing a Tax Collection Agency. It will administer and enforce revenue law, assess, collect, and account for all applicable tax and fees. Budget execution is well managed and followed with the support of the computerized system, IFMIS. Responsibilities are clearly laid down for most key steps and the IFMIS is used in all departments for budget execution. Internal audit applies the International Professional Practice Framework (IPPF) as stipulated in the PFM Act, 2012, with a risk analysis approach and covers all the departments in the County Executive. Three levels of reviews are applied before reports are released. It was not possible to verify to what extent the audit plans have been implemented. Responses to internal audit reports are usually provided within one month after the report is issued, but this has not been evidenced by the internal audit function at the county. Hearings on external audit findings are supposed to be conducted in public but no evidence was provided. Committee reports are provided to the full chamber of the County Assembly. They are not published on an official website but are easily accessible to the public. The scrutiny is supposed to be completed over a period of six months, but no evidence was provided by the County Assembly. The County Assembly reviews budget documents covering fiscal policies, medium-term fiscal forecasts, and medium-term priorities as well as details of expenditure and revenue but cannot follow and issue recommendations on the efficiency of services delivery. The table below gives an overview of the scores for each of the PEFA indicators. Scoring Dimension Ratings Overall PFM Performance Indicator Method i. ii. iii. iv. Rating Subnational PEFA indicator: Transfers from a HGL-1 M1 A B D* D+ higher level of government Pillar I. Budget reliability Aggregate expenditure outturn M1 D D PI-2 Expenditure composition outturn M1 D D A D+ PI-3 Revenue outturn M1 D D D II. Transparency of public finances PI-4 Budget classification M1 C C PI-5 Budget documentation M1 D D v Scoring Dimension Ratings Overall PFM Performance Indicator Method i. ii. iii. iv. Rating Central government operations outside financial PI-6 M2 D* D* D D reports PI-7 Transfers to subnational governments M2 N/A PI-8 Performance information for service delivery M2 D D C D D PI-9 Public access to fiscal information M1 D D III. Management of assets and liabilities PI-10 Fiscal risk reporting. M2 N/A N/A D D PI-11 Public investment management M2 D D D D D PI-12 Public asset management M2 C D D D+ PI-13 Debt management M2 D N/A D D IV. Policy-based fiscal strategy and budgeting PI-14 Macroeconomic and fiscal forecasting M2 C C D D+ PI-15 Fiscal strategy M2 D D D D Medium-term Perspective in expenditure PI-16 M2 A D D D D+ Budgeting PI-17 Budget preparation process M2 D D A C PI-18 Legislative scrutiny of budgets M1 A C D C D+ V. Predictability and control in budget execution PI-19 Revenue administration M2 D D D D D PI-20 Accounting for revenue M1 A A D D+ PI-21 Predictability of in-year resource allocation M2 C A D B C+ PI-22 Expenditure arrears M1 C C C PI-23 Payroll controls M1 D A A D* D+ PI-24 Procurement management M2 D D* D* A D+ PI-25 Internal controls on non-salary expenditure M2 A A B A PI-26 Internal audit M1 D C D* D* D+ VI. Accounting and reporting PI-27 Financial data integrity M2 D N/A D A C PI-28 In-year budget reports M1 C D C D+ PI-29 Annual financial reports M1 C A D D+ VII. External scrutiny and audit PI-30 External audit M1 C D D* A D+ PI-31 Legislative scrutiny of audit reports M1 D* D* D* D* D vi 1. Introduction The subnational Public Expenditure and Financial Accountability (PEFA) assessment seeks to ascertain the performance of the public financial management (PFM) system of county governments using the PEFA methodology. So far, the Government of Kenya has gained experience in the application of the PEFA methodology by undertaking four national PEFA assessments over the years, the latest of which was carried out in 2017 and the report is due for completion in 2018. However, this is the first subnational assessment to be carried out in Kenya following the adoption of a devolved system of government. It is notable that the national and subnational PEFA assessments are being done almost concurrently, and this is important because both levels of government share the same PFM system, implying that an evidence- based reform agenda can be implemented simultaneously after areas of improvements are identified. The subnational assessments, which covered 6 out of 45 counties, have been jointly financed by the World Bank and the International Development Research Centre (IDRC) through the Kenya Institute for Public Policy Research and Analysis (KIPPRA). 1.1 Rationale and purpose The main rationale of this assessment is to give a better understanding of the PFM systems, processes and institutions that will provide an entry point for PFM reform efforts at the county level. This would then be used to leverage existing capacity building efforts, for example, the Public Financial Management Reform (PFMR) Strategy, National Capacity Building Framework, World Bank’s Kenya Accountable Devolution Program (KADP) and Kenya Devolution Support Programme (KDSP). The findings will further facilitate identification of capacity needs especially in terms of human capacity gaps in different components of the PFM system in the counties for which KIPPRA seeks to strengthen as part of its capacity-building and policy development mandates. The assessment will also be useful in identifying priorities for PFMR in the future to ensure a sustainable, effective and transparent allocation and use of public resources. The PEFA assessment will become a benchmark for the upgrade of the PFM system in Kenya’s counties that are still in the early stage of development. Currently, the fiscal discipline and the efficient allocation of resources according to the priorities of the county of Kakamega are viewed as the important prerequisites to deployment of well- functioning PFM system. Effective PFM institutions and systems in the county governments are important for the successful implementation of devolution. The PEFA assessments are founded on the principles of openness, accountability and public participation in public finance contained in Section 201 (a) of the Constitution of Kenya 2010. Therefore, the devolution is not only a cornerstone not only in the recent government development of Kenya but also a turning point for deployment of a subnational PFM assessment across all counties. This PEFA assessment will provide a baseline of current state of PFM within the county of Kakamega and for the entire financial management system and indicate areas of improvements. National and County PEFA assessments are almost being done concurrently. This is important because both levels of government share similar PFM system implying that evidence-based reform agenda can be implemented simultaneously in areas for which improvements are identified. This first subnational PEFA assessment has been undertaken in six counties in Kenya and Kakamega was one of the selected counties. The county expressed interest in undergoing a PEFA assessment and a commitment to design and implement a reform agenda based on the results of the assessment. An 1 important point to note regarding results of the assessment is that they will not be used for comparing the counties but to indicate the state of the PFM system in the assessed county. The specific objectives of the PEFA assessment in Kakamega County include the following: (a) Assess the state of financial management capacities in the county. (b) Identify gaps in terms of capacity, systems, policies, and processes in PFM. (c) Provide a basis for informing entry points for PFMR engagements in the county that will be used to leverage existing capacity-building efforts. (d) Facilitate and develop a self-assessment capacity at the county level and build capacities of key staff to carry out assessments in the future. 1.2 Assessment management and quality assurance This PEFA Report has been prepared as a collaboration of various persons and organizations who played diverse roles as part of the assessment: (a) the Oversight Team (members who are listed in Box 1.1. below)- who provided strategic guidance and the authorizing environment to facilitate the undertaking of assessments, (b) the assessment teams (members who are listed in Box 1.1) who were technical staff involved in the actual data collection and scoring across the indicators, and (c) reviewers (as listed in Box 1.1) who performed a quality assurance/peer review of both the concept note and versions of the draft reports. County governments formed part of each team, through representation from the Council of Governors Secretariat. KIPPRA and the World Bank led the process of the assessment. KIPPRA provided technical staff and the financial resources (to mobilize and facilitate the assessment teams to collect data in the counties) and procured venues to host workshops to write the draft reports. The World Bank then contracted four consultants that provided the technical expertise for the process (this included bearing the costs of their movement to and from the counties) and supported various sensitization/validation workshops with stakeholders. Development partners played a key role in the process as peer reviewers and as the source of funds used by the World Bank under the KADP. The Multi-Donor Trust Fund contributing partners include Sweden, Finland, the European Union (EU), the U.K. Department for International Development (DFID), Danish International Development Agency (DANIDA), and the U.S. Agency for International Development (USAID). The assessment teams collected the relevant data and to obtain evidence for the complete and appropriate assessment of all 31 indicators. The data gathering stage of the assignment was carried out as a field work in Kakamega County through meetings and interviews with local government officials. A detailed list of people met (with their position and organization) is presented in Annex 3A. The assessment is checked and quality assured by means of PEFA CHECK. It is a mechanism for confirming the adequacy of the quality assurance processes used in planning and implementing a PEFA assessment. The objective is to increase users’ confidence in the findings of a given PEFA assessment and confirm that the assessment contributes to a pool of reliable information on PFM system performance. The PEFA CHECK verifies if good practices in both planning and implementing an assessment have been followed. It is a verification of compliance with practices commonly accepted and used in conducting PEFA assessments. Through PEFA CHECK, the Secretariat provides an independent evaluation of whether the 2 quality assurance arrangements included adequate peer�review processes that involved partner countries and engaged PFM institutions Box 1.1. Assessment management and quality assurance arrangements (i) Oversight Team - Chair and Members Organization name Team member details KIPPRA Executive Director (Chair) Dr. Rose Ngugi KIPPRA Dr. Augustus Muluvi KIPPRA Dr. Christopher Onyango KIPPRA Mr. Benson Kiriga KIPPRA Dr. Simon Githuku KIPPRA Dr. Douglas Kivoi World Bank Ms. Christine Anyango Owuor World Bank Mr. Tim Williamson Council of Governors Mr. Joseph Kung’u PFMR Secretariat Mr. Warui Maina/Joel Bett Office of the Controller of Budget (OCOB) Mr. Joshua Musyimi/Grace Kimitei Office of the Auditor General (OAG) Mr. George Nashon Otieno Assessment Manager: Simon Githuku-KIPPRA (ii) Assessment Team (Assessment Team A participated in the assessment of Makueni, Kajiado, and Nakuru while Team B participated in the assessment of Kakamega, West Pokot, and Baringo) Team A Organization Team B Organization Dr. Bernadette Wanjala (Team KIPPRA Dr. Simon Githuku (Team Lead) KIPPRA Lead) Jean-Marc Philip (Lead World Bank Elisaveta Teneva (Lead World Bank Consultant) Consultant) Samuel Kiautha (Consultant) World Bank Jeremiah Oliech (Consultant) World Bank Duncan Mugo Ndirangu National Christine Owuor World Bank Treasury Meimuna Mohamed Commission Joshua Musyoka National Treasury on Revenue Allocation (CRA) Warui Maina National Juliah Muguro KIPPRA Treasury Fredrick Owino KIPPRA Macklin A. Ogolla COB Grace Kimitei Controller of Nickson Omondi KRA Budget (COB) Silvanos Obondi OAG John Mose CRA Robert Ng’ang’a Kenya School Dr. Douglas Kivoi KIPPRA of Government (KSG) Kennedy Okoth KRA Paul Odhimabo KIPPRA Dr. David Waigwa World Bank Mathew Ngusya OAG Dr. Christopher Onyango KIPPRA Dr. Augustus Muluvi KIPPRA Manaseh Otieno KIPPRA (iii) Review of the concept note and/or terms of reference 3 • First round of comments was addressed in December 2017 • Second and final rounds of comments were addressed in February 2018. • Invited reviewers: the PEFA Secretariat, the World Bank, the OAG, and the National Treasury. • Reviewers who provided comments: Name Organization Jens Kristensen World Bank Timothy Williamson World Bank Dr. Jane Kiringai World Bank Agnes C. Mita OAG Representatives of the County Assembly Kakamega County Assembly Representatives of the County Executive Kakamega County Executive Warui Maina National Treasury (iv) Secretariat and date(s) of its review(s): First review comments from the PEFA Secretariat on October 14, 2017, and second review comments from the PEFA Secretariat on January 10, 2018. (v) Date(s) of final concept note and/or terms of reference: March 17, 2017 (vi) Review of the assessment report • Date(s) of reviewed draft report(s): November 2017 to October 2018 • Invited reviewers: (a) the PEFA Secretariat; (b) World Bank (Kathy Whimp, Oleksii Balabushko, and Eric Enagnon); (c) OCOB; (d) OAG; (e) IBEC; (f) the National Treasury; (g) CRA; (h) county governments of Baringo, Kakamega, Kajiado, West Pokot, Makueni, and Nakuru; and (i) development partners - the Swedish International Development Cooperation Agency (Sida) • Date of the first draft report: May 5, 2018 Invited reviewers: the county governments, the World Bank, Sida, the PEFA Secretariat • Reviewers who provided comments: the World Bank, Sida, the PEFA Secretariat. Date of the comments: June 8, 2018 • Date of the assessment team’s response: August 28, 2018 • Date of the Secretariat’s evaluation of response: September 13, 2018 • Date of the assessment team’s response: October 6, 2018 • PEFA CHECK received: November 15, 2018 1.3 Assessment methodology Coverage of the assessment This subnational PEFA assessment covers the county of Kakamega and is part of the assessment covering one-eighth of the counties in Kenya, that is, six counties. The main criterion used to select the six counties was voluntary expression of interest in being assessed. Kajiado, Baringo, Makueni, West Pokot, Nakuru and Kakamega expressed their interest in undergoing a PEFA assessment and a commitment to design and implement a reform agenda based on the assessment. An important point to note regarding these selected counties is that the assessment will cover each county and will not provide a comparison between them. Further, the counties that have been selected do not represent a group of counties from which each group will be compared against the other. This PEFA assessment has been financed by the World Bank. The assessment covers the budgetary institutions of the respective County Governments as well as the extrabudgetary entities which are funded by donors’ grants (see PI-6). These entities are mainly educational establishments. There is no lower-tier subnational government. 4 Time of the assessment The period covered in the assessment is the last three completed fiscal years after the introduction of devolved system of government, that is, FY2013/14, FY2014/15, and FY2015/16 depending on the indicators and dimensions of the assessment. The field work assessment took place in April 2017, which is the time of the assessment for those dimensions that state period as ‘at the time of the assessment’. The assessment has applied the PEFA 2016 methodology and specifically the supplementary version meant for subnational entities. The Subnational PEFA uses the same indicators as the national one but with some modifications. The main modification is the introduction of the ‘HLG-1’ indicator for assessing transfers and earmarked grants to the counties by the national government. Sources of information The key documents that have been used in the assessment are (a) the Constitution of Kenya, 2010, (b) the Strategy for Public Finance Management Reforms Strategy in Kenya 2013–2018 report (2016), and (c) the PFM Act, 2012. The exhaustive list of all documents and materials used and referred to in this PEFA assessment is provided in Annex 3. 5 2. Background Information 2.1 Economic context An overview of Kenyan economy Kenya has a unitary but devolved system of government consisting of the national and 47 county governments. All the counties do not have detailed economic data such as gross domestic product (GDP) growth, inflation rates, and so on. However, the Kenya National Bureau of Statistics (KNBS) has developed county specific statistical abstracts. The National Treasury and the World Bank are set to undertake a compilation of county-specific GDPs. The Kenyan economy has sustained its robust growth in the past decade, supported by significant structural and economic reforms. The economy grew by 5.7 percent, 5.9 percent, and 4.9 percent in 2015, 2016, and 2017, respectively. The leading sectors in growth during 2017 included tourism, building and construction, transport, and information and communication technology (ICT). On the other hand, the agriculture sector declined tremendously to 1.6 per cent from 5.1 per cent the previous year due to drought coupled with pests and diseases. Inflation rate in 2017 was 8.0 percent, a rise from 6.3 percent recorded in 2016. The inflationary pressure was mainly attributed to significant increases in oil and high food prices. Economic growth is expected to be accelerated during 2018 due to improved political stability and a favorable macroeconomic environment. In addition, the on-going investments in infrastructure, improved business confidence and strong private consumption are likely to support a strong growth. Besides, the favorable climatic conditions are likely to boost agriculture production and electricity and water sectors and hence support manufacturing growth. On the other hand, rising oil prices and depressed growth of credit to the private sector, which started in 2016, is likely to undermine the growth prospects. However, the adverse effects are likely to be offset by the strong favorable factors, resulting in better growth in 2018. Overview of Kakamega County economy Kakamega is a densely populated county that according to 2009 national census had a population of approximately 1.7 million, 12 constituencies, and 60 County Assembly wards (Table 2.1). Agriculture and fishing are the main economic activities. By 2009, the population was projected to reach over 2 million by 2017. This implies that the county will have to invest more in social and physical infrastructure to match the needs of the growing population. The increased population growth rate (estimated at 2.5 percent) has put pressure on socioeconomic facilities such as health and education. For instance, the doctor-to- population ratio is high at about 1:12,974 The poverty level in Kenya is known to be about 45 percent, of which 7.6 percent is contributed by Kakamega County. The level of population living below the poverty line is known to be 49 percent of the total population in Kakamega County. The rates of GDP, income level, economic growth, and inflation are not currently measured. Such data as well as other subnational statistical data is expected to be collected in the near future. 6 Table 2.1: Basic economic data and indicators for Kakamega County Indicator Area (km2) 3,050.3 No. of constituencies 12 County Assembly wards 60 Population 1,660, 651 Population density per km2 544.42 Main economic activities Agriculture and fishing Early Childhood Development 1,631 Education (ECDE) Centers: 876 Public 755 Private No. of primary schools: 1,136 Public 883 Private 253 No. of secondary schools: 408 Public 383 Private 25 No. of health facilities 232 Doctor-to-population ratio 12,974 Source: County Integrated Development Plan (CIDP) and Kakamega County Statistical Abstract 2015 and authors’ calculations. The main challenges for growth and development of Kakamega County are defined in the priorities and objectives of the County Vision, also known as the first CIDP issued in 2013. The focus is mainly on the ongoing projects and programs and new project proposals outlined by stakeholders during the second Medium-Term Plan (MPL) 2013–2017. This is the basic document that guides the budget preparation and planning. The major development challenges are defined as follows: (a) growing population, (b) poor road network, (c) inadequate clean and safe water, (d) food insecurity, (e) inadequate health personnel and facilities, and (f) poorly developed industry. The CIDP does not cover any activities or priorities related to reforms in the PFM. Economic performance data has been included as much as it is available for this county. There is no county-specific statistical economic data such as GDP, consumer price index (CPI), inflation, and growth, and hence, the ‘Selected Economic Indicators’ table is not presented in this section. However, the World Bank and the National Treasury of Kenya will soon be embarking on developing county GDP data. 2.2 Fiscal and budgetary trends According to Article 203 (2) of the Constitution, a minimum of 15 percent of total revenue collected by the national government should be disbursed to the counties every fiscal year. Counties are also supposed to collect their own revenues to fund their operations. Table 2.2 gives an overview of selected fiscal indicators for the county of Kakamega. The County Allocation and Revenue Act provides for the amounts that are to be disbursed to each county every year on the basis of the population rate and other parameters. Population parameter in the revenue sharing formula by the CRA has a weight of 45 percent. Table 2.2: Overview of selected fiscal indicators Budget performance Exchequer issues (K Sh, millions) 11,554.07 7 Expenditure to exchequer issued (%) Recurrent expenditure 87.8 Development expenditure 82.1 Expenditure to budget allocation (absorption rate (%) Recurrent expenditure 87.0 Development expenditure 56.8 Overall absorption rate 75.3 Revenue Annual target (K Sh, millions) 1,000.00 Actual revenue (K Sh, millions) 504.24 Revenue performance (%) 50.4 Conditional grants Annual allocation (K Sh, millions) 733.18 Actual receipts (K Sh, millions) 660.72 % of actual receipts 90.1 Expenditure by economic classification Personal emoluments (%) 38.0 Operations and maintenance (%) 19.0 Development expenditure (%) 43.0 source: The OCOB’s County Governments’ Budget Implementation Review Report (CBIRR), September 2016. Table 2.2 shows that the county is faced with the challenge of budget absorption, which is 75.3 percent. The county performs well in terms of allocations towards development which was about 43 percent. The PFM Act, 2012 stipulates that it should be at least 30 percent of the budget. The main sources of county revenue are equitable shares from the national government, local revenue collections, and donor funding (Table 2.3). The county proposes a series of measures to increase own source revenue and balance its fiscal spending such as strengthening the administrative structure and stimulating the economic growth and development. The county fiscal policies for FY2016/17 aimed at reorienting expenditure from recurrent to development. Table 2 3: Aggregate fiscal performance data for the last three fiscal years (in percentage of total revenues) Economic head 2013/14 2014/15 2015/16 Total county revenue 100.00 100.19 100.00 (i) Equitable shares 91 91 90 (ii) Conditional Grants 4 3 5 (iii) Own Source Revenue 5 6 4 Total expenditure 80 89 87 Compensation of employees 40 38 34 Use of goods and services 13 19 14 Acquisition of assets 3 22 25 Interest — — — Subsidies — — — Transfers to other Government Units — 6 3 Other grants and transfers — 3 17 Social benefits — — — Other expenses 21 5 0 Budget surplus 20 11 13 Source: County Budget and Review Outlook Paper (CBROP). 8 Table 2.3 shows that there has been an aggregate fiscal discipline in the last three years, as the budget presented a surplus in the three consecutive fiscal years. This has been confirmed by the audited annual financial statement (AFS). The county inherited some debt from the previous non-devolved government but has not generated any debt since its establishment. While the share of the national transfers and conditional grants is rather stable, the share of own source revenue is gradually decreasing. The share of salaries has also declined slightly, which is a targeted trend. Allocation of resources Table 2.4 shows the budget allocation by function for the three fiscal years and indicates higher budgetary allocations to functions considered to be of strategic importance, for example, health, agriculture, infrastructure, and education. Table 2.4: Actual budget allocations by sectors (as a percentage of total expenditure) Functional heads 2013/14 2014/15 2015/16 Office of the governor 0 2 2 Public service and administration 65 28 25 County Treasury 4 7 3 Water, environment, and natural resource 1 2 2 Social services, youth, and sports 1 1 2 Transport, infrastructure, and public works 3 12 17 Lands, housing, urban areas, and physical planning 0 1 1 Health services 11 22 28 Agriculture, livestock, fisheries, and cooperatives 1 5 5 Trade, tourism, and industrialization 1 4 2 Education, science, and technology 9 7 5 County Public Service Board 0 0 0 County Assembly 4 9 7 Total 100 100 100 Source: CBROPs. Tables 2.5 presents budgetary allocation according to economic classification and shows a declining share of wages and salaries and an increase in the share of development expenditures over the three years of the assessment. Table 2.5: Budget allocations by economic classification (as a percentage of total expenditures) 2013/2014 2014/2015 2015/2016 Current expenditures 69 56 57 Wages and salaries 75 73 66 Goods and services 25 27 34 Development Expenditure 31 44 43 Source: CBROP of Kakamega County, issue June 2016 2.3 Legal and regulatory arrangements for PFM The Constitution introduced significant changes to the political system of governance of Kenya. There are presently two levels of government: national and county governments. The legal and regulatory 9 framework providing support for PFM in Kakamega County is derived from the Constitution, various acts and regulations outlined as follows: (a) Chapter 11 and 12 of the Constitution on devolved governments and principles of public finance, respectively. Institutional arrangements for PFM include the CRA (Article 216), the National Treasury (Article 225(1)), COB (Article 228), Auditor General (Article 229), Salaries and Remuneration Commission (Article 230), Central Bank of Kenya (CBK) (Article 231), Parliament (Article 93), and County Assemblies (Article 176 (1)). Article 227 (2) provides for the creation of a framework for procurement and asset disposal by all public entities through an Act of Parliament. (b) The PFM Act, 2012. Part IV of this act details responsibilities with regard to PFM of public funds in the counties. This act covers all PFM aspects including, but not limited to, budget making process and public participation, Treasury Single Account (TSA), financial accounting and reporting, internal auditing, among others. Section 103 creates the County Treasury whose general responsibilities and powers in relation to public finance are spelled out in Sections 104 and 105. According to Section 106, upon request, the National Treasury can second public officers to the County Treasury to enhance its capacity. Section 107 places the role of enforcing fiscal responsibility principles as stated in Chapter 12 of the Constitution on the County Treasury. The County Treasury is responsible for some of the key documents related to public finance such as the budget, the County Fiscal Strategy Paper (CFSP), and the CBROP and is thereafter presented to the County Assembly. (c) The PFM Regulations (2015) for county governments. Some highlights include strengthening inter-government fiscal relations, restricting wages to 35 percent of realized revenue and providing that a the minimum, the development budget allocation should be 30 percent of total budget. (d) The Public Procurement and Asset Disposal Act (PPDA) (2015). The act provides for procedures for efficient public procurement and procedures for asset disposal by public entities. Regulations are under development. (e) The Public Audit Act (2015) requires the organization, functions, and powers of the OAG to be spelled out in accordance with the Constitution. The Auditor General is required to present audit reports to Parliament and relevant County Assemblies six months after the end of a fiscal year. Under Section 4, the OAG was established, replacing the Kenya National Audit Office (KENAO). Section 10 provides explicitly for the independence of the Auditor General. Section 11 significantly reinforces the process for selecting competent persons to the position of the Auditor General in case of any vacancy. The President may nominate a candidate and submit the nomination to Parliament for its approval. Section 24 provides for outsourcing. Section 25 provides for an Audit Advisory Board in place of the National Audit Commission (established under the 2003 Act to consider and approve the annual budget for KENAO and to determine the remuneration and other terms of appointment of staff). It affirmed that only a person registered and practicing as an accountant under the Accountants Act, 2008, should be qualified for provision of a financial audit opinion. Sections 47–48 provide for the auditing of financial statements required by the PFM Act (2012) and the time deadlines to be adhered to. Framework for the Devolved System of Government 10 The Constitution of Kenya 2010 introduced two levels of government, namely, the national and county governments. The legal and regulatory framework providing support for PFM in the county government of Kajiado, specifically Chapter(s) 11 and 12, devolved governments and principles of public finance, respectively. A fundamental change was the major devolution of central government responsibilities to 47 newly created county governments (Chapter11, Articles 174–200). Part 2 of the fourth schedule enlists 14 roles and functions of the county governments: 1. Agriculture 2. County health services 3. Control of air pollution, noise pollution, other public nuisances, and outdoor advertising 4. Cultural activities, public entertainment, and public amenities 5. County transport 6. Animal control and welfare 7. Trade development and regulation 8. County planning and development 9. Pre-primary education, village polytechnics, home craft centers, and childcare facilities 10. Implementation of specific national government policies on natural resources and environmental conservation 11. County public works and services 12. Firefighting services and disaster management 13. Control of drugs and pornography 14. Ensuring and coordinating the participation of communities and locations in governance at the local level and assisting communities and locations in developing the administrative capacity for the effective exercise of the functions and powers and participation in governance at the local level The county governments comprise the Executive, headed by elected Governors and the county assemblies comprising elected members. The counties are also represented by Senators who are elected and constitute the Senate, which is the upper house of Parliament. Institutional arrangements for PFM include the CRA (Article 216), the National Treasury (Article 225(1)), COB (Article 228), Auditor General (Article 229), Salaries and Remuneration Commission (Article 230), CBK (Article 231), Parliament (Article 93), and County Assemblies (Article 176 (1)). Article 227 (2) provides for the creation of a framework for procurement and asset disposal by all public entities through an Act of Parliament. Generally, internal and external controls are performed at the national level. Internal control is made by the COB through the integrated financial management information system (IFMIS) while external control is performed by the OAG. The legal framework under the PFM Act, 2012, and its regulations also apply to the county government. The Policy on Devolved System of Government (2015) has identified institutional, intergovernmental, and resource related challenges to be overcome to improve implementation and service delivery. 11 2.4 Institutional arrangements for PFM County governments According to the County Government Act, 2012, a county comprises the County Executive headed by a Governor and a County Assembly comprising members of the County Assembly (MCAs) representing the wards. The Governor is responsible for the general policy and strategic direction of the county. The Constitution transferred various powers and functions (including limited fiscal authority) to the counties. This is in recognition of fiscal decentralization as a mechanism for enhancing delivery of social services at the grassroots and promoting enhanced accountability. Moreover, a central objective of the Constitution was to promote good governance in PFM through the establishment of sound institutional and regulatory environment at both national and county levels. Members of the County Executive are nominated by the Governor, but their appointment has to be approved by the County Assembly. Part IV of the PFM Act, 2012 gives the county government the responsibility of managing public finances in the county. Section 103 of PFM Act, 2012, establishes the County Treasury comprising the County Executive Committee (CEC) member in charge of finance, the Chief Officer and department(s) of the County Treasury responsible for financial and fiscal matters. According to Section 103 (3), the CEC member for finance shall be the head of the County Treasury. The Chief Officers are the chief accounting officers in their respective departments. In addition to its primary function of passing legislation, the County Assembly also approves nominees to other county public service offices. Most of the MCAs are elected during a general election, but some are also nominated by political parties. The County Assembly oversees the County Executive in terms of use of public finances. Key public finance documents such as the budgets, CFSP, and CBROPs have to be presented by the County Executive for approval. All funds including the emergency funds and any other by the County Executive must be approved by the County Assembly. The Constitution of Kenya, 2010, assigns functions between the national and county governments. The task of service delivery in key sectors such as water, health and agriculture, transport, and environment among others are assigned to county governments, with the national government doing policy formulation in some of the sectors. However, the functions of defense, social security, overall coordination and oversight, and external audit are with the national government. The County Government Act, 2012, also outlines the structure and operation of county governments comprising subcounties, wards, and villages. The structure of the public sector and public finances in Kakamega County is presented in Tables 2.6 and 2.7. Table 2.6: Structure of the public sector (turnover in K Sh, millions) - FY2015/16 Year Government subsector Public corporation subsectorc Social security Nonfinancial Budgetary Extra budgetary Financial public fundsb public unit unitsa corporations corporations 1st tier 9,926 n.a. n.a. n.a. n.a. subnational - county government (13 units) 12 Source: AFS 2015/16. Note: a. The county government financial statement does not show financial information for extrabudgetary units. Extrabudgetary units do not prepare financial statements (see PI-6). b. Social security funds are governed at the national government level. c. There are two public corporation companies, which are currently under transfer process from the national government. Their financial statements are not audited yet (see PI-10.1). Table 2.7: Financial structure of county government (estimate expenditure in Ksh, millions) - FY2015/16 Year Central government Social Budgetary Extrabudgetary security Total aggregated unit units funds Revenue 1,000 n.a. n.a. 1,000 Expenditure 12,329 n.a. n.a. 12,329 Transfers to the County Assembly 271 n.a. n.a. 271 Liabilities — n.a. n.a. — Financial assets — n.a. n.a. - Source: CBROP 2015/16. Table 2.8: Financial structure of county government (actual expenditure in Ksh, millions) - FY2015/16 Year Central government Social Budgetary Extrabudgetary security Total aggregated unit units funds Revenue 504 n.a. n.a. 504 Expenditure 9,926 n.a. n.a. 9,926 Transfers to the County Assembly 374 n.a. n.a. 374 Liabilities 62 n.a. n.a. 62 Financial assets 2,160 n.a. n.a. 2,160 Source: AFS 2015/16. Key features of internal control Internal control is performed through the IFMIS and reengineering of the IFMIS was a major improvement for the reinforcing of the control. Access to the IFMIS is now complete at the county levels, but the IFMIS Office is still configuring aspects of the IFMIS to meet specific needs of ministries, departments, and agencies (MDAs) and the counties. Presently, the IFMIS is not comprehensively used at the county level. According to the OAG, manual processes are still being used for preparing and approving local purchase orders and contracts. Also, payments vouchers are being prepared manually and then uploaded into the IFMIS, instead of being prepared within the IFMIS on the basis of invoices and receipts of goods and services. The integration of systems within the IFMIS has not yet been completed for the following modules: (a) Procurement: - The module ‘Procurement to Pay’ available at the national level is not used by the county. (b) Revenue: - The county has its own IT-based tax administration system to collect some of the revenues, which is not integrated with the IFMIS. 13 (c) Payroll: - The county government uses the integrated payroll and personnel database (IPPD) management system for human resource management, which is not integrated with the IFMIS, and the payroll is prepared in the IPPD and then manually extracted. County-specific PFM documentation The CFSP. One of the key stages in the county budget cycle is the preparation of the CFSP. This is an annual paper that shows the various fiscal strategies a county government intends to employ to meet its overall objective of public service. The CFSP shows the allocation of resources in all sectors and departments. It specifies the broad strategic priority and policy goals that will guide the county government in preparing the annual budget. Section 117 of the PFM Act, 2012, outlines the procedures and responsibilities of the county government with regard to the county budget process. Section 117 (2) of the PFM Act, 2012, provides that the County Treasury shall align its CFSP with the national objectives in the budget policy statement (BPS). In addition, Section 118 (2) (b) requires that the County Treasury specifies in its CBROP the updated economic and financial forecasts that show changes from the forecasts in the most recent CFSP. The CFSP should be presented to the County Assembly by February 28 of the budget year. Section 117 (6) of the PFM Act states that the County Assembly should in 14 days consider and adopt it with or without amendments. Further, the County Treasury shall publish and publicize the CFSP after its submission in the County Assembly (Section 117 (8) of the PFM Act). The CBROP provides an analysis of the performance in a particular financial year’s budget. Counties should prepare a CBROP in accordance with Section 118 of the PFM Act, 2012. The CBROP should link policy, planning, and budgeting. The CBROP analyzes previous financial years’ fiscal performance with focus on its impact on the next financial year as detailed in the CFSP. The CIDP, 2013–2017, covers key challenges for considerations in all sectors and priorities as put forth in the respective Annual Development Plan (ADP). The purpose of the CIDP is to provide comprehensive baseline information on infrastructural and socioeconomic characteristics of the county. It would further be used in allocation of scarce resources to priority projects and programs, as determined by the county. The ADP is prepared in line with the requirements of Section 126 of PFM Act, 2012, and Article 220 (2) of the Constitution. It contains strategic priority development programs and projects to be implemented in a particular financial year. 2.5 Other important features of PFM and its operating environment According to Transparency International, bribery remains a challenge in Kenya, affecting most specifically security, administration of justice, and land services. The devolution process is expected to reduce the level of corruption in this domain. Citizen participation is key to successful devolution. The counties are to develop a system that encourages citizen participation where deliberation and proposals are made. They should take into account the special needs of the illiterate, the youth, the marginalized, and the disabled. The Constitution in Article 1 states that all sovereign power is vested in the people. The public can support mechanisms of social accountability by participating in local referendum, town hall meetings, and visiting development project sites. The PFM Act, 2012, provides for public participation in PFM and, in particular, the formulation of the BPS, CFSP, and the budget estimates and the preparation of Division of Revenue Bill and County Allocation of Revenue Bill. The County Budget and Economic Forum (CBEF) provides a platform for public participation in county planning and budgeting. 14 Public participation in Kenya is considered a crucial point in the Kenyan Constitution, and it is reflected in the legal framework at both national and subnational levels. Strengthening public participation is a key focus of Kenya’s devolution. The public is provided with the opportunity to take part in decision-making processes in the government. Public participation in Kenya is especially important in the following processes: (a) budgeting (consultation is supposed to be held with civil societies on strategic development spending in the county), (b) legislative (the public should have access to legislative scrutiny of the budget and the audit report at the County Assembly), and (c) tendering (public should have access to all information concerning public procurement process). The Kenyan Constitution is supplemented by other acts demanding inclusive and participatory engagement of citizens in planning and budgeting processes: (a) County Public Participation Bill. – in most counties the bill is still under approval. (b) PFM Act Sections 10, 35, 125, and 175 provide for public participation at budget process, in the preparation of the strategic plan and the annual budget estimates. (c) County Government Act Sections 87–90 make public participation in county planning processes compulsory, which includes timely access to information and reasonable access to planning and policy-making process and rights to petition. (d) Urban Areas and Cities Act, 2011, provides for public participation. (e) PPDA 2015 Sections 68(3), 125(5), 138, and 179 emphasize transparency of the procurement process including requirements for procuring entities to publicly avail procurement records and to publish notices of intention to enter into contract on websites and public notice boards. In the county, the civil societies are organized into the County Social Accountability Association that organize discussions and forums with the objective to participate in the formulation of the budget, to make comments on bills, and to participate in various county meetings. The PEFA assessment team held a meeting with several civil societies, where comments were made about the following issues: • Weaknesses identified in the Public Participation Act. A short time is given for preparation of public participation forums. The medium of communication (newspapers and websites) of the county is not favorable to citizens. There is a need to communicate to the citizens in the language they can understand. • Budget process. People should be made aware of budget hearing, notices of attendance should be given early in advance for proper preparations, the public should have access to budget documents, and the county should consider incorporating public views during budgeting and give feedbacks on issues raised by the civil society. • The county should organize Public Service Delivery Weeks to assess the performance of contracts related to public services (for example, water, health, schools, infrastructure). The representatives of the civil societies whom the assessment team met still consider the public participation forums only as a formality required by the Constitution. The information provided to the public is not comprehensive and easy to follow so that the civil societies can effectively participate in the discussion. Citizen budgets are not prepared and the hearings at the County Assembly were described as not easily accessible. 15 16 3. Assessment of PFM Performance 3.1 Subnational PEFA indicator HLG-1: Transfers from a higher level of government This indicator assesses the extent to which transfers to the subnational government from a higher-level government are consistent with originally approved high-level budgets and are provided according to acceptable time frames. HLG-1.1. Outturn of transfers from higher-level government The transfers constitute the majority of the revenue fund of the counties in Kenya. They are allocated by the National Treasury on the basis of the county population applying a specific formula. Each county government transfer allocation is provided to the respective County Revenue Fund (CRF), in accordance with a payment schedule approved by the Senate and published in the gazette by the Cabinet Secretary in terms of Section 17 of the PFM Act. The county governments' allocations are included in the budget estimates of the National Government and are submitted to the Parliament for approval. The County Treasury reports on the actual transfers received by the county government from the national government. According to budget documentation, the main sources of revenue for the county of Kakamega are equitable share, conditional grants, and own source revenues (see PI-3). Table 3.1 presents the budget estimates and the actual transfers from the higher-level government, which are conditional grants and equitable shares. The equitable shares appear as exchequer releases in all budget documents. Table 3.1: Estimate of actual transfers for the last 3 fiscal years (in Ksh, millions) 2013/14 2014/15 2015/16 Economic head Budget Actual % Budget Actual % Budget Actual % Grants — 3,113 — 227 227 100 733 609 83 Equitable share 7,356 6,515 89 9,426 7,749 82 10,597 10,342 98 Total revenue 7,356 9,628 131 9,653 7,976 83 11,330 10,951 97 Source: CBROP. The equitable share and grants transfers are relatively good. The outturn of transfers of Kakamega County was 131 percent in FY2013/14, 83 percent in FY2014/15, and 97 percent in FY2015/16. The reasons for the deviation are true across most counties and it is the overestimation of budget in all revenue items in the first years after the devolution. In summary, actual transfers represented at least 95 percent of the original budget estimate in two of the last three years. The score is A. HLG-1.2. Earmarked grants outturn In addition to the transfers from the national government, there are conditional allocations (appear as proceeds from domestic and foreign grants in the budget documentation) from the national government revenue to each county government to be utilized for specific purposes, including development expenditure, which are outlined in the County Allocation of Revenue Act. The County Treasury reports on the actual conditional grants received by the county government from the national government. 17 The earmarked grants are provided for specific development spending—mainly health, road maintenance, and education. In the first year FY2013/14 after the devolution, there were no grants estimate, and only actual transfer used for health establishment. In the next two financial years, grants were provided for development in the health and education. In the second year FY2014/15, the budgeted estimate was equal to the actual received grant amount. There was a difference between the original budget grant estimate and the actual earmarked grants in the third year FY2015/16, which was 83 percent. The average difference between original budget estimate and actual grants is less than 5 percent in two of the last three years. The score is B. HLG-1.3. Timeliness of transfers from higher-level government According to the PFM Law, equitable share estimates must be included in the BPS, which must be presented and adopted by Parliament in February or March. Then, transfers should be released quarterly across the year through the IFMIS. The transfers that constitute the key element of the county revenue are supposed to be disbursed from the National Treasury evenly across the year. However, the actual dates of disbursements were not provided. Mass media coverage shows that there were delays due to nonfunctioning of the IFMIS. The score for the component is D*. Summary of scores and performance table Subnational PEFA indicator HLG-1: Transfers from a higher level of D+ Brief justification for score government (M1) HLG-1.1 Outturn of transfers from A The transfers represented at least 95% of the original budget higher-level government estimate in 2 of the last 3 years. HLG-1.2 Earmarked grants outturn B In FY2013/14, there were no grants budgeted and transferred. In 2014/15, the amount budgeted was the actually provided without amendment. In 2015/16, the difference was 83 percent. The difference between original budget estimate and actual grants is less than 5% in 2 of the last 3 years. HLG-1.3 Timeliness of transfers from D* Actual dates of transfers have not been provided. higher-level government 3.2 Pillar I. Budget reliability A budget is reliable if it is implemented in accordance with the approved estimates before the beginning of the financial year. To determine the extent to which this is the case, three indicators, namely, aggregate expenditure outturn, expenditure composition outturn and revenue outturn, were examined for FY2013/14, FY2014/15, and FY2015/16. PI-1. Aggregate expenditure outturn This indicator measures the extent to which aggregate budget expenditure outturn reflects the amount originally approved, as defined in government budget documentation and fiscal reports. Table 3.2 presents aggregate expenditure outturn for FY2013/14–FY2015/16 using data from CBROPs that links policy, planning, and budgeting. The aggregate expenditure outturn was 43 percent, 73 percent, and 81 percent for FY2013/14, FY2014/15, and FY2015/16, respectively. The low absorption in FY2013/14 was 18 due to initial challenges of implementing the devolved system of government. Other reasons for expenditure deviations in the other years were (a) procurement delays related to capital projects and (b) low collection of own source revenue. In the overall, there were technical and human capacity challenges in the budgeting process. The score is D. In terms of reforms, the county is undertaking capacity building of staff on policy formulation, planning, programming, and budgeting with assistance from Ahadi Kenya, USAID, and the World Bank. The county is also recruiting more qualified technical staff to enhance efficiency in service delivery. Table 3.2: Aggregate expenditure outturn (percentage) FY Budget Actual Total expenditure deviations (%) 2013/14 13,256 5,708 43 2014/15 10,321 7,548 73 2015/16 12,330 9,926 81 Source: CBROP. Summary of scores and performance table PI-1 Aggregate expenditure outturn (M1) D Brief justification for score 1.1 Aggregate expenditure outturn D Actual expenditure outturn for FY2013/14, FY2014/15, and FY2015/16 was respectively 43%, 73%, and 81% of the budgeted expenditure. PI-2. Expenditure composition outturn This indicator measures the extent to which reallocations between the main budget categories during execution have contributed to variance in expenditure composition. PI-2.1. Expenditure composition outturn by function Budget is usually prepared according to economic, program, and administrative classifications. Table 3.3 shows that total expenditures were lower than total amounts budgeted in all the years. There was a bigger variance during FY2013/14 compared to the two subsequent years. The variance in expenditure composition was 104 percent, 21 percent, and 28 percent for FY2013/14, FY2014/15, and FY2015/16, respectively. The departments of public service and administration, water, agriculture, and trade had the largest variations between the budgeted and actual expenditures. The score is D. Table 3.3: Expenditure composition outturn by function (Ksh, millions) 2013/14 2014/15 2015/16 Administrative or functional head Budget Actual Budget Actual Budget Actual Office of the Governor — 271 271 156 627 214 Public service and administration 1,893 3,524 2,102 1,797 1,981 2,432 County Treasury 503 217 497 582 391 341 Water, environment, and natural resource 284 37 275 134 322 167 Social services, youth, and sports 377 67 276 97 417 247 Transport, infrastructure, and public works 2,417 153 1,140 958 1,742 1,715 Lands, housing, urban areas, and physical planning 363 18 365 72 296 133 Health services 3,333 594 2,378 1,744 3,174 2,737 19 Agriculture, livestock, fisheries, and cooperatives 715 57 1,040 432 940 448 Trade, tourism, and industrialization 1,022 43 410 319 452 243 Education, science, and technology 1,234 498 816 562 1,017 468 County Assembly 1,115 229 751 693 887 740 County Public Service Board — — — — 86 39 Total 13,256 5,708 10,321 7,548 12,330 9,926 Composition variance (%) 104 21 28 Source: CBROP. PI-2.2. Expenditure composition outturn by economic type The County Treasury and the Chief Officers administer expenditures according to administrative, economic, and program classifications. The extent of variance between actual and budgeted expenditures by composition of expenditures is presented in Table 3.4. Actual expenditure deviated from the original budget appropriation by 50 percent, 207 percent, and 115 percent during FY2013/14, FY2014/15, and FY2015/16, respectively. The fluctuations for FY2013/14 and FY2014/15 were heavily influenced by consumption of fixed capital and compensation of employees, while compensation of employees and consumption of goods and services caused the largest deviation in FY2015/16. The score is D. Table 3.4: Expenditure composition outturn by economic type (Ksh, millions) 2013/14 2014/15 2015/16 Economic head Budget Actual Budget Actual Budget Actual Compensation of employees 3,670 2,831 3,675 3,248 3,699 3,955 Use of goods and services 2,035 936 — 1,595 2,142 1,554 Consumption of fixed capital 382 222 4,634 3,113 5,954 2,904 Interest — — — — — — Subsidies - — — — — — Grants 50 — — — — 2,004 Social benefits — — — — — — Other expenses 7,118 1,470 2,011 — — 13 Total expenditure 13,256 5,460 10,321 7,956 11,796 10,430 Composition variance (%) 50 207 115 Source: CBROP. PI-2.3. Expenditure from contingency reserves Article 208 of the 2010 Constitution provides for the establishment of a Contingency Fund at the National level. The regulations are specified in Sections 19–24 of the PFM Act (2012). In Kenya, the budgeting and accounting treatment of contingency items relates to exceptional events that cannot be foreseen, such as earthquake, famine, civil war, and so on. This treatment holds true for both national and subnational levels. Section 110 of the PFM Act, 2012, provides for the CEC’s member for finance to establish an Emergency Fund with the approval of the County Assembly. The county has established an Emergency Fund as per the PFM Act, 2012, but has not charged any expenditure to contingency vote during the assessment period. The score is A. 20 Summary of scores and performance table PI-2. Expenditure composition outturn (M1) D+ Brief justification for score 2.1 Expenditure composition outturn by D Variance in expenditure composition by program, function administrative, or functional classification was more than 15% for the last 3 fiscal years. 2.2 Expenditure composition outturn by D Variance in expenditure composition by economic economic type classification for the last 3 years was more than 15% for the last 3 fiscal years. 2.3 Expenditure from contingency reserves A The county has not charged any expenditure to contingency vote during the assessment period. PI-3. Revenue outturn This indicator measures the change in revenue between the originally approved budget and end-of-year outturn. The main sources of revenue for county governments in Kenya are equitable share, conditional grants, and own source revenues. These revenues are described as follows: • Equitable share: This constitutes the revenue raised by the national government and equitably allocated to all county governments in accordance with Article 203 of the Constitution. The allocation should be at least 15 percent of national revenue based on the most recently audited accounts of revenue received, as approved by the National Assembly. • Conditional grants: This is provided for under Article 202 of the Constitution and constitutes additional allocations from the national government’s share of revenue, either conditionally or unconditionally. Conditional allocations are tied to the implementation of specific national policies with specific objectives by the national government. • Own source revenue: Article 209 of the Constitution of Kenya provides that a county may impose property rates and entertainment taxes, and county governments may impose charges for the services they provide. However, the taxation and other revenue-raising powers of a county shall not be exercised in a way that prejudices national economic policies, economic activities across county boundaries, or the national mobility of goods, services, capital, or labor. The main stream of revenue source of the county is the own source revenue, which is covered in the assessment of this performance indicator. PI-3.1. Aggregate revenue outturn The county has enacted the County Revenue Administration and Collection Act 2014 that provides a basis for imposition of taxes and levies. For FY2013/14, the own source revenue was estimated at Ksh 3.5 billion, but the county only raised Ksh 329 million. This was mainly due to overprojection of nonspecified revenues in the budget. During FY2014/15, the county had estimated to collect own source revenue of Ksh 874 million but realized Ksh 517 million. However, the actual own source of revenue for FY2015/16 was lower than the previous year’s 21 as per the budgeted amount. The overall revenue performance over the three years was 9 percent, 59 percent, and 50 percent, respectively (Table 3.5). The score for this dimension is D. Table 3.5: Aggregate revenue outturn (percentage) 2013/14 2014/15 2015/16 Source of revenue % % % Budget Actual Budget Actual Budget Actual share share share Total county own 3,523 329 9 874 517 59 1,000 504 50 source revenue Source: CBROPs. PI-3.2 Revenue composition outturn The overall performance of the revenue outturn is summarized in Table 3.6 indicating the revenue outturns for the last complete three fiscal years. Revenue composition variance was highest during FY2013/14 (170 percent) and relatively the same in the two following years. This huge difference is explained by overprojections of own source revenue unspecified by revenue stream. The score is D. Table 3.6: Kakamega sources of revenue for the last 3 fiscal years (Ksh, millions) Data for year 2013/14 2014/15 2015/16 Budget Deviation Budget Deviation Budget Deviation Total own source revenue 329 560 517 308 504 308 Composition variance (%) 170 60 61 Source: CBROP. In terms of reforms, the County Treasury is improving own source revenue outturn through formation of a semiautonomous revenue agency, recruitment and training of the existing staff, automation of revenue collection, and educating and sensitization of citizens on revenue collection. The county budgeted for grants from international organizations, but the money was not received as budgeted. The score is D. Summary of scores and performance table PI-3 Revenue outturn (M2) D Brief justification for score 3.1 Aggregate revenue outturn D The total revenue deviation of aggregate revenue outturn for FY2013/14, FY2014/15, and FY2015/16 was 9%, 59%, and 50%, respectively. 3.2 Revenue composition D The composition variance for FY2013/14, FY2014/15, and FY2015/16 outturn was 170%, 60%, and 61%, respectively. The variance is a lot above 15%. 3.3 Pillar II. Transparency of public finances There are six performance indicators under this pillar: budget classification, budget documentation, central government operations outside financial reports, transfers to subnational governments, performance information for service delivery, and public access to fiscal information. These indicators measure whether the budget and fiscal risk oversights are comprehensive and whether the fiscal and budget information is accessible to the public. 22 PI-4. Budget classification This indicator assesses the extent to which the government budget and accounts classification is consistent with international standards. PI-4.1. Budget classification The budget classification system provides the conditions to track county government spending. Sections 164 and 165 of the PFM Act, 2012, require reporting to be done according to the standards set by Public Sector Accounting Standards Board (PSASB) which are then aligned to the International Public Sector Accounting Standards (IPSAS) issued by International Federation of Accounts (IFAC). The PFM Act, 2012, requires the budget classification to be presented according to the administrative, economic, program- based budget (PBB) format. The classification is based on Standard Chart of accounts (SCOA) derived from GFS standards. The PBB presents the budget by programs according to administrative and economic classifications2. Budget execution and reporting are presented according to the administrative, economic, and program classifications. The county of Kakamega has set up administrative units to which programs are classified and further reported in the accounts and budgets as per the Constitution and the County Government Act, 2012. The functional classification is related to the administrative classification but differs from that of the national government because some functions are not devolved, for example, defense and foreign affairs among others. The program classification is in place but has not been consistent over the recent years, because the first budget for FY2013/14 was not program based. The number of programs is guided by the national government. The administrative classification consists of two different levels: the first level is composed only of • The County Government Executive (County Treasury) and • The County Assembly Budget and Appropriation Committee (CBAC). The second level is composed of the key management personnel (accounting officers)) who have direct fiduciary responsibility, as follows: • Office of the Governor • Public service and administration • County Treasury • Water, environment, and natural resource • Social services, youth, and sports • Transport, infrastructure, and public works 2 SCOA can be checked in the book printout on the subhead item-source-program geographical. 23 • Lands, housing, urban areas, and physical planning • Health services • Agriculture, livestock, fisheries, and cooperatives • Trade, tourism, and industrialization • Education, science, and technology • County Assembly • County Public Service Board The first level of the program classification is as follows: • P 1: General Administration Planning and Support Services. • P 2: County Executive Affairs • P 3: Public Service Board Services • P 4: Field Administration Services • P 5: Special Initiatives Consequently, budgets have consistently applied administrative, economic, functional classification criteria. The budget is initially built in Excel before being uploaded as vote heads into the budget planning system through the IFMIS. The score is C. Summary of scores and performance table PI-4 Budget classification C Brief justification for score (M1) 4.1 Budget classification C The budget estimates are presented in economic and administrative classifications. The Chart of Accounts adopted mimics the national method of classification incorporated in the IFMIS. It is a 2-level classification and revenue is not classified according to GFS. PI-5. Budget documentation This indicator assesses the comprehensiveness of the information provided in the annual budget documentation, as measured against a specified list of basic and additional elements. In assessing this indicator, consideration was made to basic and additional elements of budget documents. Although Section 130 of the PFM Act, 2012, provides for deficit financing through borrowing, the county governments were restrained due to moratorium on loans for county governments in transition over the three financial years of the assessment. This implies that the first basic criterion is not applicable. The previous year’s budget outturn is not presented in the same format as the budget proposal as required in 24 second criterion. The county satisfies the third criterion—that is, revised budget final supplementary estimates of the current year are presented in the same format as the budget proposal in the CSFP. Finally, aggregation of both revenue and expenditure is presented in the CFSP and CBROP, but not according to the main heads of the budget classification. The CSFP does not present budget execution according to the economic classification and the CBROP does not present a detailed breakdown of the economic classification. In addition, the CBROP does not provide previous budget execution of the current year. Table 3.7: Basic Elements Criteria No. Basic elements Criteria 1 Forecast of the fiscal deficit or surplus or accrual operating result No 2 Previous year’s budget outturn, presented in the same format as the budget proposal No 3 Current fiscal year’s budget presented in the same format as the budget proposal. This can be Yes either the revised budget or the estimated outturn 4 Aggregated budget data for both revenue and expenditure according to the main heads of the No classifications used, including data for the current and previous years with a detailed breakdown of revenue and expenditure estimates (Budget classification is covered in PI-4) With regard to additional elements, the county was not permitted to borrow during the analysis and therefore has no debt stock—hence, the first criterion is not applicable. Nonetheless, the county is preparing a debt management strategy. However, the county reported pending bills from the defunct local authority. The macroeconomic forecasting follows that of the national government because there is no key macroeconomic data at the county level. While the county governments were not allowed to borrow, debts acquired from the defunct local authorities have also not been authenticated and factored into the budgets as contingent liabilities. The Intergovernmental Technical Relations Committee (IGTRC) is ascertaining the correct position of assets and liabilities. Financial assets mainly include cash and bank balances prepared using the IPSAS cash standard. The county does not have the capacity to analyze fiscal risks—that is, a debt management strategy is yet to be prepared. Furthermore, analysis of budget implications from new policy initiatives and public investments is not undertaken. The medium-term fiscal forecasts are done in the CFSP, the budgets, and the CIDP. There were no indications of quantification of tax expenditures. The score is D. Table 3.8: Additonal Elements Criteria No. Additional elements Criteria 1 Deficit financing, describing its anticipated composition n.a. 2 Macroeconomic assumptions, including at least estimates of GDP growth, inflation, interest n.a. rates, and the exchange rate 3 Debt stock, including details at least for the beginning of the current fiscal year, presented in n.a. accordance with GFS or other comparable standards 4 Financial assets, including details at least for the beginning of the current fiscal year, presented Yes in accordance with GFS or other comparable standards 5 Summary information of fiscal risks, including contingent liabilities such as guarantees and No contingent obligations, embedded in structure financing instruments such as public-private partnership (PPP) contracts and so on 6 Explanation of budget implications of new policy initiatives and major new public investments, No with estimates of the budgetary impact of all major revenue policy changes and/or major changes to expenditure programs. Available in the CBROP 7 Documentation on the medium-term fiscal forecasts Yes 8 Quantification of tax expenditures No 25 Summary of scores and performance table PI-5 Budget documentation (M1) D Brief justification for score 5.1 Budget documentation D 3 elements: 1 basic and 2 additional elements PI-6. Central government operations outside financial reports This indicator measures the extent to which government revenue and expenditure are reported outside county government financial reports. Entities with individual budgets not fully covered by the main budget are considered extrabudgetary in accordance with the GFS Manual 2014 of the International Monetary Fund (IMF). PI-6.1. Expenditure outside financial reports As per the PFM Act, 2012, no expenditure is allowed outside the approved budget. All county expenditures should be recorded in the AFS for the respective fiscal year. This means that even if the county receives funds from donors such as grants that were not in the original budget, it is supposed to prepare supplementary budget to incorporate the revenue and then implement it through the county budget. The county has a number of entities that would be considered extrabudgetary items. These include the following: (a) ECDE is governed by the county through a county coordinator. The county caters for infrastructure development and operational expenditures including payment of salaries of teachers through the Department of Education. (b) Youth polytechnics are still under the control of the national government, but the county provides scholarships to students and funds for development. However, the county receives reports on the use of funds disbursed to the polytechnics. In summary, there is no evidence of record of expenditure of the education establishments, and therefore the magnitude is unknown and score is D*. PI-6.2. Revenue outside financial reports The school fees collected by the polytechnics are not incorporated in the original or the supplementary budget and their magnitude is unknown. The county owns about 20 percent shares of the Kakamega Golf Club Hotel. The revenue generated from the sales of this establishment were not included in the AFS for FY2013/14 but are recorded in the CBROPs. The magnitude of revenue is unknown, and therefore, the score is D*. PI-6.3. Financial reports of extra budgetary units There are two public corporations established under the laws, control, and ownership of the county government. They are directly owned by Kakamega County: (a) Kakamega County Water and Sanitation Company and (b) Bukura Agriculture Training and Development College. Both were undergoing transfer process from the national government at the time of the assessment and still do not have audited AFS. Therefore, no financial reports for extrabudgetary units were provided. The score is D. 26 With regard to reforms, the county is establishing a County Revenue Authority to enhance revenue collection. Summary of scores and performance table PI-6 Central government operations outside D Brief justification for score financial reports (M2) 6.1 Expenditure outside financial reports D* There is no record of expenditure outside financial reports. The polytechnic colleges have unrecorded expenditure and their magnitude is unknown. 6.2 Revenue outside financial reports D* There is no record of calculating volume of revenue generated by the polytechnics. 6.3 Financial reports of extra budgetary units D There are no financial reports for the extrabudgetary units of the county. PI-7. Transfers to subnational governments This indicator assesses the transparency and timeliness of transfers from the county government to subcounty governments with direct financial relationships to it. It considers the basis for transfers from the county government and whether subcounty governments receive information on their allocations in time to facilitate budget planning. Hence, the system for allocating transfers as well as timeliness of information on transfers are not applicable since there is no lower-tier government under the county government. Summary of scores and performance table PI-7 Transfers to sub county governments (M2) N/A Brief justification for score 7.1 System for allocating transfers N/A There is no subgovernment under the county level. 7.2 Timeliness of information on transfers N/A There is no subgovernment under the county level. PI-8. Performance information for service delivery This indicator examines the service delivery performance information in the Executive’s budget proposal or its supporting documentation in year-end reports. It determines whether performance audits or evaluations are carried out. It also assesses the extent to which information on resources received by service delivery units is collected and recorded. PI-8.1. Performance plans for service delivery Performance plans for service delivery for all functional units were prepared and reflected in the PBB. The annual PBB is presented by functions and classifies plans for the key service delivery areas, for example, agriculture, education, and health, among others. While information about the planned expenditure exists, the activities to be performed by each ministry in the PBB for FY2016/17 cannot be defined. Therefore, the materiality cannot be calculated. The specific performance information includes the program title, the delivering unit, key outputs, and performance indicators but not the total expenditure amount. Also, key outputs are not translated into quantifiable indicators—the plans and outcomes are 27 not SMART and the allocations of financial resources to the specific programs are not specified. Therefore, planned outputs and outcomes cannot be measured. The score is D. PI-8.2. Performance achieved for service delivery The outputs and outcomes of the budgets are explained in the project implementation status reports. They provide indication of the funds spent, but there is no mention of the outcomes achieved. However, the specifics on the service delivery are not stated and the outputs and outcomes are not presented in the same format as the budget. The monitoring and evaluation report provided is not comprehensive and has no time frames, outputs, and outcomes. The score is D. PI-8.3. Resources received by service delivery units The Departments of Agriculture and Health have been selected to assess this dimension. Agriculture was selected because it is the backbone of the county’s economy and employs the majority of the population. Similarly, the health sector receives the highest budgetary allocation. Therefore, there is information on resources received by service delivery units, which is collected and recorded, but there is no evidence of a report compiling the information. The above justifies score C. PI-8.4. Performance evaluation for service delivery Self-evaluation of performance has been previously undertaken at the County. Plans are underway to conduct performance evaluation at departmental level with a view to enhance effectiveness and efficiency in service delivery. Challenges and recommendations are elaborated in the project implementation reports and the PPB. However, this does not capture specific program and analysis of efficiency in the utilization of funds is not undertaken. There is no information on measurable performance indicators of outputs and outcomes for service delivery which is published. The score is D. Summary of scores and performance table PI-8 Performance information for D Brief justification for score service delivery 8.1 Performance D Information on policy or program objectives, key performance indicators, outputs plans for service produced, and the outcomes planned for departments disaggregated by function is delivery available in the PBBs that are prepared annually. However, materiality cannot be ascertained for performance delivery. 8.2 Performance D Performance results for outputs and outcomes are presented in the Medium-Term achieved for service Expenditure Framework (MTEF), but this is not done in a format and at a level delivery (program or unit) that is comparable to the plans previously adopted within the annual or medium-term budget. Materiality cannot be calculated. 8.3 Resources C This information is available on the level of monetary resources actually received received by service by service delivery units and the sources of funds, but there is no report with this delivery units information prepared annually on the 2 units mentioned earlier. 8.4 Performance D Efficiency ratios are available in the CBROPs, but independent evaluations of the evaluation for service efficiency and effectiveness of service delivery have not been carried out and delivery published for most ministries. PI-9. Public access to fiscal information 28 This indicator assesses the comprehensiveness of fiscal information available to the public based on specified elements of information, public access to which is considered critical. Article 35 of the Constitution and PFM Act, 2012, emphasize the importance of public access to information. For instance, Article 131 (6) of the PFM Act, 2012, states that “The County Executive Committee member for finance shall take all reasonably practicable steps to ensure that the approved budget estimates are prepared and published in a form that is clear and easily understood by, and readily accessible to, members of the public�. In assessing this indicator, five basics and four additional elements were considered. Of the basic elements, the enacted budget is not immediately accessible to the public. However, various documents such as the ADP, CFSP, CIDP, and CBROPs are uploaded on the county website and available at the ward offices. The in-year and annual budget execution reports (CBIRR) are normally published as guided by the PFM Act, 2012, on the COB website. Whereas the county does not publish audited financial reports, the same are available on the website of the OAG although not within 12 months after the end of the year. The compliance to the basic elements is reported as follow: Table 3.9: No. Basic elements Compliance 1 A complete set of executive budget proposal documents (as presented by the country in No PI-5) is available to the public within 1 week of the Executive’s submission of them to the legislature. 2 The annual budget law approved by the legislature is publicized within 2 weeks of passage No of the law. 3 In-year budget execution reports. The reports are routinely made available to the public Yes within 1 month of their issuance, as assessed in PI-27. 4 Annual budget execution report. The report is made available to the public within 6 Yes months of the fiscal year’s end. 5 Audited annual financial report, incorporating or accompanied by the external auditor’s No report. The reports are made available to the public within 12 months of the fiscal year’s end. With regard to additional elements, the CFSP presents the broad strategic priorities and policy goals that guide the preparation of the county budget for next fiscal year and in the medium term. The county prepares the CFSP within the stipulated time and the OAG publishes audited reports within 14 days after submission to Parliament. The other two components are not satisfied. No abridged copies of the budget are prepared or translated into the local dialect. As indicated earlier, the county depends on macroeconomic forecasts at the national level. The score is D. Table 3.10: No. Additional elements Compliance 1 Pre-budget statement. The broad parameter for the executive budget proposal regarding Yes expenditure, planned revenue, and debt is made available to the public at least 4 months before the start of the fiscal year. (CFSP is ready by February 28 of every year.) 2 Other external audit reports. All nonconfidential reports on government consolidated Yes operations are made available to the public within 6 months of submission. 29 3 Summary of the budget proposal. A clear, simple summary of the executive budget No proposal or the enacted budget accessible to the non-budget experts, often referred to as a ‘citizens’ budget’ and where appropriate translated into the most commonly spoken local language, is publicly available within 2 weeks of the executive budget proposal’s submission to the legislature and within 1 month of the budget’s approval. 4 Macroeconomic forecasts. The forecasts, as assessed in PI-14.1, are available within 1 No week of their endorsement. Summary of scores and performance table PI-9 Public access to fiscal D Brief justification for score information (M1) 9.1 Public access to fiscal D The county makes available to the public 2 basic elements and 2 information additional elements. The quality of information made available to the public is not analyzed. 3.4 Pillar III. Management of assets and liabilities Effective management of assets and liabilities is necessary to ensure that public investments provide value for money. This requires that county government assets are clearly recorded and managed, fiscal risks are identified, and debts and guarantees are prudently planned, approved, and monitored. There are four indicators under this pillar: fiscal risk reporting, public investment management, public asset management, and debt management. PI-10. Fiscal risk reporting This indicator measures the extent to which fiscal risks to the county government are reported. Fiscal risks can arise from adverse macroeconomic situations, financial positions of subcounty governments or public corporations, and contingent liabilities from the county government’s own programs and activities, including extrabudgetary units. They can also arise from other implicit and external risks such as market failure and natural disasters. Public corporations for the purpose of this indicator are defined in accordance with GFS 2014. In this regard, it is possible that certain institutional units that are legally constituted as corporations may not be classified as corporations for statistical purposes if they do not charge economically significant prices. PI-10.1. Monitoring of public corporations Public corporations are those established under the laws, control, and ownership of the county government. There are two public corporations directly owned by Kakamega County. They are (a) Kakamega County Water and Sanitation Company and (b) Bukura Agriculture Training and Development College. Both were undergoing a transfer process from the national government at the time of the assessment and still do not have audited AFS. These entities do not charge economically significant prices. Because the public corporations mentioned earlier are not fully owned by the county, it is considered that this dimension is not applicable yet. 30 PI-10.2. Monitoring of subnational governments There are supposed to be other devolved units below the county government of Kakamega as per the Urban Areas and Cities Act 2011, but the act has not been operationalized. Hence, the dimension is not applicable since there are no devolved units below the county government level. PI-10.3. Contingent liabilities and other fiscal risks At the county level, car loan and housing mortgage schemes are currently made available for the MCAs. Currently these mortgage schemes are not established in law and there is no framework to ensure compliance in terms of repayment. The county meets its statutory obligations to the National Hospital Insurance Fund (NHIF), National Social Security Fund (NSSF), and Local Authorities Provident Fund (LAPFUND). Other contingent liabilities at the county level include Mkopo Mashinani Loan Fund, which is a scheme targeting development of small and medium enterprises. This loan fund is mentioned in the Kakamega County Project Implementation Report 2013–2017. The Public Audit Act requires that the administering authority of such funds should prepare financial reports on the utilization of the funds and submit for external audit three months after the end of each financial year. Financial statements have not been submitted for external audit to the OAG within the three years of the assessment. Because the MCAs loans are still not legally regulated and the Mkopo Loan Fund does not produce financial statements, it is not possible to quantify the materiality of the contingent liabilities. The score is D. The Finance Office at the County Assembly is developing a comprehensive framework to ensure that loan payments are deducted through a checkoff system. In case of default, the ultimate responsibility rests with the county and this risk is not covered for. Summary of scores and performance table PI-10 Fiscal risk reporting D Brief justification for score (M2) 10.1 Monitoring of public N/A The public corporations are still being transferred for direct ownership corporations by the county of Kakamega. AFS are not being prepared and submitted for external audit during the assessment. 10.2 Monitoring of N/A There are no devolved units under the county government, and hence subnational governments this dimension is not applicable. 10.3 Contingent liabilities and D The MCAs have car loans and mortgage schemes. Other contingent other fiscal risks liabilities for staff include all necessarily social contribution payments. Some of these liabilities are quantified in the financial reports, but the risks are not covered. The ultimate responsibility for these liabilities, in case the county is not able to pay, stays with the county government. PI-11. Public investment management This indicator assesses the economic appraisal, selection, costing, and monitoring of public investment projects by the government with emphasis on the largest and most significant projects. PI-11.1. Economic analysis of investment proposals The county does not carry out in-depth economic analysis and feasibility studies for investment projects to inform the budgeting process. It is, therefore, difficult to establish economic costs, policy benefits, and 31 environmental impacts of the proposed investment projects. The score is D because economic analysis of investment proposals is not carried out. Тhe following is a list of some investment projects as they appear in the Project Implementation Status Report for FY2015/16. Table 3.11: No. Project name Activity Cost (Ksh) 1 Farm mechanization Purchase of tractors 74,990,000 2 Veterinary Laboratory Procurement of equipment and rehabilitate laboratory 6,665,000 building 3 Kakamega Fish Farming and New fish ponds construction/rehabilitation of fish ponds 5,985,200 Productivity Programme 4 Nakhakosia Drainage Project Excavation of cutoff drainage structures 3,200,000 Excavation of collector drainage structures Excavation of main drainage structure 5 Ivochio bridge Excavation for structures, dozing, grading, gravelling, 31,000,000 culverting, stone pitching, and gabion installation 6 Nala Hospital – Hill school – Earthworks, placing and stabilizing of the sub-base, base 52,224,551.40 C40 (Mumias Road) layers and AC layers, drainage works 7 Market lighting Installation of a 30 m monopole electric high mast 14,989,810 8 Construction of the maternity wing, fencing, and purchase of land at Lumakanda Sub 10,000,000 County Hospital 9 Kilimo Girls Construction of staffroom 10,000,000 10 15 modern kiosks Fabrication of modern kiosks 1,409,235 PI-11.2. Investment project selection The county has not established a framework to guide investment project selection. In this regard, project appraisals are not undertaken before their inclusion in the budget. The score is D. PI-11.3. Investment project costing There was no evidence of any cost-benefit analysis made on any of the investment projects. Some projects had been costed out, but in reality they were not included in the budgeting process. For example, Kakamega Dairy Development Company does not exist in the budget documentation process, yet it was revealed that it had been allocated approximately Ksh 50 million under the agriculture docket. The score is D. PI-11.4. Investment project monitoring Although the county is tasked with project monitoring, it has not established a framework for investment project monitoring. Therefore, there is no information on the implementation of major investment projects. The sponsoring entity is also tasked with project monitoring, which may compromise the objectivity of the exercise and may also fail to highlight loopholes and shortcomings of projects. This was evident since no records of monitoring reports were available to cover the period from actual project approval to the entire implementation process as of the time of this assessment. The score for this dimension is D, the same as the above ones. 32 Summary of scores and performance table PI-11 Public investment management (M2) D Brief justification for score 11.1 Economic analysis of investment proposals D Needs-based analysis is usually done by the county government. No economic analysis is undertaken. 11.2 Investment project selection D The county has an economic planning, but there are no formalized project selection criteria. There are no standard procedures to guide the investment project selection. 11.3 Investment project costing D Mostly capital costs of investment projects are indicated in the budget. Not all investment projects are included in the budget. 11.4 Investment project monitoring D There is no framework to guide objective monitoring and evaluation of investment projects. PI-12. Public asset management This indicator assesses the management and monitoring of county government assets and the transparency of asset disposal. PI-12.1. Financial asset monitoring Currently, the county has cash and its equivalents in the bank and 20 percent shares at the Kakamega Golf Hotel as financial assets. Cash and its equivalents are reported in the AFS but not the private equity. The score is C. PI-12.2. Non-financial asset monitoring It is a mandatory that a county maintains a register for fixed assets such as land, buildings, computers, motor vehicles, plant, and machinery. Currently, the county relies on the Transition Authority report for county assets and liabilities published in 2015. Table 3.12 provides categories of nonfinancial assets in the county. There is no nonfinancial assets monitoring, and the score is D. Table 3.12: Categories of nonfinancial assets Categories Sub-categories Where captured Comments Fixed assets Buildings and Transition Kakamega County has not yet established its own structures Authority report asset database. 2015 Machinery and n.a. equipment Other fixed assets n.a. Non- Land Transition The Transition Authority report is incomplete, and it produced Authority report does not include information on the county land assets 2015 properties. Mineral and n.a. Gold has been discovered in the county. However, energy resources management of such national resources fall under the national government 33 Other naturally n.a. n.a. occurring assets Intangible non- n.a. n.a. produced assets Source: Transition Authority report (2015) and interviews. PI-12.3. Transparency of asset disposal The county has not developed standard operating procedures for disposal of assets. This is because the counties were prohibited from disposing of public assets until full transition is effected by the Intergovernmental Relations Technical Committee (IGRTC). Thus, the county has not disposed of its assets since it became operational in March 2013. However, an audit report by the OAG on FY2013/14 indicated that several vehicles were earmarked for disposal. According to the PPDA 2015, a disposal committee should be appointed on an ad hoc basis when needed. Asset disposal is not included in any budget documents of the county, and therefore, it cannot be ascertained. Thus, the score is D. Summary of scores and performance table PI-12 Public asset management D+ Brief justification for score 12.1 Financial asset monitoring C The financial assets include cash in the bank and its equivalent. Shareholding in Kakamega Golf Hotel is not documented as an asset in the AFS. 12.2 Non-financial asset D The county government has not developed a nonfinancial asset monitoring register. It still relies on the asset and liabilities report published by the defunct Transition Authority (2015). 12.3 Transparency of asset D The disposal committee is to use the PPDA 2015 when disposing disposal assets. Rules for transfer or disposal of financial assets do exist. The county has not disposed of any asset, but this does not appear in any budget documents. PI-13. Debt management This indicator assesses the management of domestic and foreign debt and guarantees. It seeks to establish whether satisfactory management practices, records, and controls are in place to ensure efficient and effective arrangements. PI-13.1. Recording and reporting of debt and guarantees Counties are allowed to borrow domestically or externally by Article 212 of the Constitution and under Section 140 of the PFM Act, 2012. Borrowing framework is anchored in the county PFM Regulations of 2015 (176-196). In addition, Section 140 (d) of the PFM Act, 2012, requires county governments to develop a debt management strategy. Borrowing framework exists, but at the time of assessment, there was an administrative moratorium on county borrowing. County has not accumulated debts thus far, but it has inherited debt from the defunct local authorities and it is yet to prepare a debt management strategy. The process of identifying and costing the inherited debt is currently ongoing and it is being managed by the IGTRC. These debt records are not updated and published. The score is D. 34 PI-13.2. Approval of debt and guarantees According to Article 212 of the Constitution on PFM and devolution, county governments are allowed to borrow only if • Guaranteed by the national government and • Approved by the County Assembly. According to Article 213 of the Constitution, guarantees by the national government must adhere to the following: • Parliament should enact a law and prescribe how the national government may guarantee loans; • Within two months after the end of a fiscal year, the national government should publish a report on all guarantees issued during the past year. The county does not have legislation guiding the authorization of borrowing and neither are there policies and procedures guiding borrowing and issuing loan guarantees. The dimension is not considered applicable. PI-13.3. Debt management strategy The county is yet to develop a debt management strategy and establish a debt management unit. The score is D. Summary of scores and performance table PI-13 Debt management (M2) D Brief justification for score 13.1 Recording and reporting of D The county has not incurred any debt, but it inherited debt from debt and guarantees the previous local government entities. These debt records are not updated and published annually. 13.2 Approval of debt and N/A There is moratorium on borrowing, and the majority of the debt guarantees emanates from expenditure arrears. 13.3 Debt management strategy D The county government has neither debt management strategy nor debt management function. 3.5 Pillar IV. Policy-based fiscal strategy and budgeting Budgets and fiscal strategies should be prepared with due regard to government policies, strategic plans, and adequate macroeconomic and fiscal projections. There are five indicators under this pillar: macroeconomic and fiscal forecasting, fiscal strategy, medium-term perspective in expenditure budgeting, budget preparation process, and legislative scrutiny of budgets. PI-14. Macroeconomic and fiscal forecasting This indicator measures the ability of a county to develop robust macroeconomic and fiscal forecasts, which are crucial for developing a sustainable fiscal strategy and ensuring greater predictability of budget 35 allocations. It also assesses the government’s capacity to estimate the fiscal impact of potential changes in economic circumstances. PI-14.1. Macroeconomic forecasts Section 117 (2) of the PFM Act, 2012, provides that the County Treasury shall align its CFSP with the national objectives as provided for in the BPS. The CFSP should be presented to the County Assembly by February 28 of budget year. Section 117 (6) of the PFM Act, 2012, states that the County Assembly should in 14 days consider and may adopt it with or without amendments. Further, the County Treasury shall publish and publicize the CFSP after its submission in the County Assembly (Section 117 (8) of the PFM Act, 2012. In addition, Section 118 (2b) requires that the County Treasury specifies in its CBROP the updated economic and financial forecasts showing changes from the forecasts in the most recent CFSP. At the moment, the county adopts the macroeconomic indicators from the national government to prepare budget documents. This is allowed by the PEFA Secretariat’s subnational government guidelines. The county government uses the national government forecasts of key macro indicators in the CBROP for the budget year and the two following years. This justifies score C. PI-14.2. Fiscal forecasts The county prepares both revenue and expenditure forecasts for the budget year and the two following fiscal ones. However, the forecasts are not accompanied by the underlying assumptions and explanation of the main differences from the forecast made in the previous year’s budget. The forecasts for the transfers are provided by the national government at the stage of preparing the BPS before the county government finalizes its CFSP. The county is projecting its own sources of revenue and is informed by the availability of the new sources of revenue and the performance of the existing revenue streams. It is a requirement by the PFM Act, 2012, to prepare a balanced budget. The score is C. PI-14.3. Macro fiscal sensitivity analysis The county does not carry out macro fiscal sensitivity analysis. The score is D. However, it is setting up a sector working groups and macro working groups to develop the county-specific macro indicators. Summary of scores and performance table PI-14 Macroeconomic and fiscal D+ Brief justification for score forecasting (M2) 14.1 Macroeconomic forecasts C The county government adopts the macroeconomic indicators from the national government that guide the preparation of CBROP, CFSP, and budget estimates. 14.2 Fiscal forecasts C CBROP, CFSP, and budget estimates forecasts are not accompanied by underlying assumptions and there are no explanations of differences from the forecasts made in the previous year’s budget. 14.3 Macro fiscal sensitivity D The county does not perform sensitivity analysis in relation to own source analysis revenue. 36 PI-15. Fiscal strategy This indicator provides an analysis of the capacity to develop and implement a clear fiscal strategy. It also measures the ability to develop and assess the fiscal impact of revenue and expenditure policy proposals that support the achievement of the government’s fiscal goals. PI-15.1. Fiscal impact of policy proposals The county lacks the capacity to assess the fiscal impact of revenue and expenditure policy proposals developed during the budget preparation process. The score is D. PI-15.2. Fiscal strategy adoption The County Treasury prepares the CFSP that sets out priority programs to be implemented in the medium term in accordance with Section 117 of the PFM Act, 2012. The fiscal strategies included lack explicit time- based quantitative fiscal goals and targets together with qualitative objectives. The score is D. PI-15.3. Reporting on fiscal outcomes According to the PFM Act, 2012 (Section 118), county governments should prepare the CBROP, which presents the recent economic developments and actual fiscal performance and provides an overview of how objectives relate to the actual performance. The CBROP should also include reasons for any deviation from the financial objectives in the CFSP together with proposals to address the deviation and the time it would take to address the deviations. Because the fiscal strategy does not identify targets and quantitative and qualitative goals, there is no report to elaborate on objectives. Therefore, the score is D. The county is strengthening the planning function, especially statistics and forecasting framework. Summary of scores and performance table PI-15 Fiscal strategy (M2) D Brief justification for score 15.1 Fiscal impact of policy D The county does not assess the fiscal impact of revenue and proposals expenditure policy proposals developed during budget preparation process for the last 3 fiscal years. 15.2 Fiscal strategy adoption D The fiscal strategy of the CFSP does not include explicit time-based quantitative fiscal goals and targets together with qualitative objectives. 15.3 Reporting on fiscal D There are no objectives to report against because the fiscal strategy outcomes does not contain quantitative and qualitative goals. PI-16. Medium-term perspective in expenditure budgeting This indicator examines the extent to which expenditure budgets are developed for the medium term within explicit medium-term budget expenditure ceilings. It also examines the extent to which annual 37 budgets are derived from medium-term estimates and the degree of alignment between medium-term budget estimates and strategic plans. 16.1. Medium-term expenditure estimates The county prepares the MTEF estimates for the budget year using the GFS classification provided in the IFMIS module. The budget is prepared using the IFMIS that has an in-built SCOA with administrative, economic, and program classifications. The PBB, the budget estimates, and the MTEF is prepared with projections, allocation of resources, and ceilings for next three years. The score is A. PI-16.2. Medium-term expenditure ceilings The medium-term expenditure ceilings are issued after the budget circular. They are normally provided during the preparation of the CFSP, which is in line with the PFM Act, 2012. According to the PFM Act, 2012, the budget circular should be issued by October 30. The ceilings are included in the CFSP, which is supposed to be ready by February 28. Evidence from the county indicates that aggregate and ministry- level expenditure ceilings for the budget year and the two following fiscal years were not approved before the first budget circular was issued. The score is D. PI-16.3. Alignment of strategic plans and medium-term budgets The departments of the county have not prepared any strategic plans. The score is D. PI-16.4. Consistency of budgets with previous year’s estimates The budget estimates, CFSPs, CBROPs, and ADPs do not explain deviations of the budgetary allocations across the departments. The breakdown of allocations by department for FY2015/16 and FY2016/17 approved budget data are not comparable. The score is D. Summary of scores and performance table PI-16 Medium-term perspective in expenditure D+ Brief justification for score budgeting (M2) 16.1 Medium-term A The county provided the PBB that indicated estimate for the budget expenditure estimates year and the 2 outer years. The budget is prepared using the IFMIS that has an in-built SCOA with administrative, economic, and program classifications. The evidence is provided by PBBs and budget estimates. 16.2 Medium-term D The medium-term expenditure ceilings for the budget year and the 2 expenditure ceilings following fiscal years are not issued and approved by the government before the budget circular. The preliminary ceilings are in the CBROP. 16.3 Alignment of strategic D The county departments do not have strategic plans and are plans and medium-term therefore not aligned to the budgets. budgets 16.4 Consistency of budgets D The budget documents do not provide explanation of the changes to with previous year’s expenditure estimates between the last and the current medium- estimates term budgets at the ministry level. There is no consistency between estimates for overlapping MTEF periods. 38 PI-17. Budget preparation process This indicator measures the effectiveness of participation by relevant stakeholders in the budget preparation process, including political leadership, and whether that participation is orderly and timely. PI-17.1 Budget calendar According to Section 25 of the PFM Act, 2012, the National Treasury is required to submit the BPS to Parliament by February 15 each year. This BPS sets out the broad strategic priorities and policy goals that will guide the national government and the county governments in preparing their budgets both for the following financial year and over the medium term. Further, the PFM Act, 2012, requires that the BPS includes the amount of indicative transfers of funds from the national to the county governments. The BPS must be published not later than 15 days after its submission to Parliament. The county prepares the CFSP guided by the BPS that sets expenditure limits for counties. The CFSP is tabled in the County Assembly in February.3 It is then submitted to the County Budget and Appropriations Committee (CBAC) to deliberate upon it according to their respective mandate. The county follows the budget calendar of the national government. It is attached as annex in the CBROP. The budget ceilings are approved in the CFSP by the County Assembly in February every fiscal year as per PFM guidelines. Not all line ministries/departments have been reported to adhere to the calendar and it is not clear how much time is provided to budgetary units to complete their estimates. Information allowing calculation of materiality was not provided. The score is D. Table 3.13: Budget calendar for Kakamega County No. Activity Responsibility Deadline 1 Develop and issue MTEF guidelines Treasury August 15, 2016 2 The County Launch sector working groups Treasury August 22, 2016 3 Performance review and strategic planning MDAs August 23, 2016 Review and update of strategic plans August 23, 2016 Review of program outputs and outcome August 23, 2016 Expenditure review August 23, 2016 Progress report on MTP implementation August 23, 2016 Preparation of annual plans August 23, 2016 4 Determination of fiscal framework Macro working group September 9, 2016 Estimation of resource envelope August 26, 2016 Determination of policy priorities August 26, 2016 Preliminary resource allocation to sectors and County Assembly August 26, 2016 Draft CBROP August 26, 2016 Submission and approval of the CBROP by the County Cabinet September 2, 2016 3 The CFSP was submitted to the Assembly on February 26, 2015. 39 No. Activity Responsibility Deadline Submit the approved CBROP to the County Assembly September 9, 2016 5 Preparation of MTEF budget proposals Line ministries October 18, 2016 Draft sector report Sector working September 4–23, group 2016 Public sector hearing County Treasury October 3–7, 2016 Review of the proposal Treasury October 12, 2016 Submission of the sector report to Treasury Sector working group October 14, 2016 6 Draft CFSP County Treasury November 17, 2016 Draft CFSP County Treasury October 24, 2016 Division of Revenue Bill National Treasury October 24, 2016 County Allocation of Revenue Bill National Treasury October 24, 2016 Submission of the CFSP to the CEC County Treasury November 17, 2016 Submission of the CFSP to the County Assembly County Treasury November 28, 2016 Publishing and publicizing the CFSP Treasury December 12, 2016 7 The 2015/16 supplementary budget Treasury November 10, 2016 Develop and issue guidelines on the 2015/16 revised Treasury budget November 10, 2016 Submission of supplementary budget proposals MDAs November 20, 2016 Review of supplementary budget proposals Treasury December 3, 2016 Submission of supplementary budget proposals to the Treasury County Cabinet December 5, 2016 Submission of supplementary budget proposals to the Treasury County Assembly December 15, 2016 8 Preparation and approval of final MDAs program budgets Treasury February 28, 2016 Develop and issue final guidelines on preparation of Treasury 2015/16 MTEF budget December 2, 2016 Submission of budget proposals to Treasury Line ministries December 22, 2016 Consolidation of draft budget estimates Treasury December 26, 2016 Submission of draft budget estimates to the County Treasury Assembly January 27, 2017 Review of draft budget estimates by the County Assembly County Assembly February 22, 2017 Report on draft budget estimates from the County County Assembly Assembly February 24, 2017 Consolidation of final budget estimates and cash flows Treasury March 15, 2017 Submission of Appropriation Bill to the County Assembly Treasury March 15, 2017 9 Budget speech Treasury March 30, 2016 Source: CBROP. 40 PI-17.2 Guidance on budget preparation The budget circular gives clear guidance on the budget preparation to ministries/departments in line with the PFM Act, 2012. The ceilings are usually provided later during the sector working group meetings and firmed up at the time of finalizing the CFSP. Indicative budget ceilings in the CBROP are issued by October 22 and finalized by February 28. Ceilings for the budget year are provided by the ministry and are approved by the government before sending the budget to the County Assembly. The score is D. PI-17.3 Budget submission to the legislature According to the PFM Act, 2012, final estimates submitted to the County Assembly should have taken into account the recommendations from the CBAC. The CBAC consists of a chairperson and not more than eight other members. The specific dates of submission of the budget to the County Assembly for the three years of the assessment are as follows: April 29, 2014; April 27, 2015; April 29, 2016. Hence, the county budgets were submitted as stipulated in the PFM Act, 2012. The score is A. The county plans to train staff on policy and budget formulation process to ensure timely submission and adherence to the budget calendar. Summary of scores and performance table PI-17 Budget preparation process (M2) C Brief justification for score 17.1 Budget calendar D The budget circular is provided; however, there is no information which line ministries adhered to deadline for completing their estimates. 17.2 Guidance on budget preparation D The budget circular gives clear guidance on the budget preparation to line ministries. The budget ceilings are not provided together with the budget circular. 17.3 Budget submission to the legislature A The budget was submitted by the end of April in all last 3 fiscal years, which is 2 months before the start of the next fiscal year in July. PI-18. Legislative scrutiny of budgets This indicator assesses the nature and extent of legislative scrutiny of the annual budget. It considers the extent to which the legislature scrutinizes, debates, and approves the annual budget, including the extent to which the legislature’s procedures for scrutiny are well established and adhered to. The indicator also assesses the existence of rules for in-year amendments to the budget without ex ante approval by the legislature. PI-18.1. Scope of budget scrutiny The CBAC scrutinizes the budget documents guided by the following procedures: (a) Standing Order Paper No. 209 establishing the procedure for scrutinizing the CFSP; (b) Standing Order Paper No. 210 providing for the presentation of budget estimates to the County Assembly; (c) Standing Order Paper No. 216 providing for the pronouncement of the budget highlights and revenue raising measures before the CBAC. The scope of the budget scrutiny covers review of fiscal policies, medium-term fiscal forecasts, and medium-term priorities as well as expenditure and revenue estimates. These elements are included in the following documents: (a) the ADP, (b) the CFSP, (c) the CBROP, and (d) detailed budget estimates that are 41 debated, commented, and voted. These documents are submitted to the County Assembly for consideration and approval. The score is A. PI-18.2. Legislative procedures for budget scrutiny Standing Order Paper No. 186 establishes the CBAC. The County Assembly has standing orders that guide the operations of the CBAC. The committee applies the PFM Act, 2012, and PFM Regulations of 2015 to guide the supplementary budget review process. Article 35 of the Constitution, Section 87 of the County Government Act, 2012, and the PFM Act, 2012, Section 125 (2) provide that the public should be involved in the budget making process through public participation. Budget scrutiny is also carried out through consultation and public participation forums. Details of public consultation and specialized sectoral committees are available in the report of the CBAC, which is discussed and approved by the County Assembly. This was evidenced in the minutes of the CBAC Report of the County Assembly and the Hansard. However, it was not clear how long it took to scrutinize the budget and whether the County Executive is allowed to incorporate the review comments. The score is C. PI-18.3. Timing of budget approval It has been reported that there has been no delay in the timing of the budget approval for the last three fiscal years. The budgets for FY2014/15, FY2015/16, and FY2016/17 were approved by June 30 of the respective years. All the budgets were approved before the commencement of the new financial year. For FY2017/18, the budget was approved on April 20, 2017; however, the actual dates of submission of the budget have not been provided. The score is D. PI-18.4. Rules for budget adjustments by the executive The rules for budget adjustments are defined in the PFM Act, 2012, Sections 135 and 154. These rules are adhered to in most cases. The PFM Act, 2012, Section 135 allows the counties to spend or adjust expenditures and seek approval within two months. Currently the counties cannot spend before approval by the respective County Assemblies. Section 154 of the PFM Act, 2012, states that an accounting officer may reallocate funds, but the total reallocation shall not exceed 10 percent of the total approved expenditure vote for that particular program. Thus, the rules are allowing extensive administrative reallocations and expansion of total expenditure up to 10 percent. Materiality is provided by the supervision of the COB. Standing Order Paper No. 218 provides for the procedure of passing the supplementary budget. However, the Budget Committee follows the PFM Act, 2012, and the standing order regulations when making adjustments to the budget. The PFM Regulations No. 37(1), 2015, provides that the County Assembly can approve any changes in the budget estimates but shall not exceed 1 percent of the vote ceiling. The budget adjustments are done through preparation of supplementary budgets and reallocation across activities. This is checked by the COB on the national level and the rules are adhered to in all instances. The rules allow for administrative reallocation of total expenditure up to 10 percent, and this is controlled through the IFMIS. This is the case of all Kenya counties and it is controlled on the national level, and therefore the score is C. The County Assembly plans to strengthen the capacity of the committees that scrutinize the ministry budgets through recruitment of fiscal analysts. 42 Summary of scores and performance table PI-18 Legislative scrutiny of budgets D+ Brief justification for score (M1) 18.1 Scope of budget scrutiny A The County Assembly scrutinizes the ADP, CBROP, and CFSP, which covers review of fiscal policies, medium-term fiscal forecasts, medium-term priorities, and expenditure and revenue estimates. 18.2 Legislative procedures for budget C The legislative procedures for budget scrutiny are adhered scrutiny to, and the Budget Committee Report of the County Assembly shows that consultation and public participation forums have been organized. However, there is no evidence of technical support and negotiation procedures. 18.3 Timing of budget approval D The budgets for the 3 fiscal years under review have been approved before the start of the new fiscal year, but the actual dates of budget submission to the legislature have not been provided. 18.4 Rules for budget adjustments by the C The budget adjustments are done through preparation of executive supplementary budgets and reallocation across activities. This is checked by the COB on a national level, and the rules are adhered to in all instances. The rules allow for administrative reallocation of total expenditure up to 10% and this is controlled through the IFMIS. 3.6 Pillar V. Predictability and control in budget execution Indicators of this pillar measures whether the budget is implemented within a system of effective standards, processes, and internal controls, ensuring that resources are obtained and used as intended. There are eight indicators under this pillar: revenue administration, accounting for revenue, predictability of in-year resource allocation, expenditure arrears, payroll controls, procurement, internal control on non-salary expenditure, and internal audit. PI-19. Revenue administration This indicator relates to the entities that administer county government revenues, which may include tax administration, customs administration, and social security contribution administration. It also covers agencies administering revenues from other significant sources such as natural resources extraction. These may include public enterprises that operate as regulators and holding companies for government interests. In such cases, the assessment will require information to be collected from entities outside the government sector. The indicator assesses the procedures used to collect and monitor county government revenues. PI-19.1. Rights and obligations for revenue measures The county’s Revenue Unit is the sole entity charged with the responsibility of administering all revenues. The Finance Acts are not published and hence members of the public can only get copies from the county headquarters. Although the acts are prepared through public participatory process, there was no verifiable evidence that the contents contained therein have been disseminated or communicated to payers. 43 The county has not put in place a redress system to deal with complaints, compliments, and appeals. Complaints and other issues raised by payers are handled by ad hoc committees. There was no documentary evidence on the deliberations of these committees. The score is D. The revenue of the county is collected mostly at the cash points of the county administration. Table 3.14 shows the own source revenue streams for FY2015/16. Table 3.14: Revenue Stream Amount 1 Property rates 71,420,051 2 Single business permit 32,389,482 3 Barter market 43,186,774 4 CESS 11,958,910 5 Housing/stall 3,887,700 6 Kiosk fee 1,431,130 7 Slaughter 48,381,260 8 Bus park 8,925,394 9 Parking fee 7,832,156 10 Hire of machinery 66,821,659 11 Other revenues/devolved government functions 0 12 Contribution in lieu of rate 13,139,200 13 Liquor license 0 14 Court fines 175,786,142 15 Health facilities and others 71,420,051 Total 504,238,292 Source: CBROP. PI-19.2. Revenue risk management The Revenue Unit has not put in place a comprehensive, structured, and systematic approach for assessing and prioritizing compliance risks. Classification of taxpayers into various categories of small, medium, and large payers has not been undertaken to effectively facilitate prioritization of compliance risks and mitigation measures. Further, the county has not automated revenue collection, which is instrumental in minimizing revenue pilferage. It was also noted that there is no integrated revenue management system to detect and arrest potential revenue risks. The score is D. PI-19.3. Revenue audit and investigation The county’s Revenue Unit has not put in place audit and fraud investigation systems. It is therefore not easy to identify risks and make follow up to minimize revenue leakages. The Internal Audit function is new to the immature subnational governments. It is in process of being established and staffed. The score is D. PI-19.4. Revenue arrears monitoring Stock of revenue arrears as at end of FY2015/16 was estimated at Ksh 2.6 billion but was not disclosed in the financial statement. According to the information provided to the assessment team, the percentage of estimated revenue arrears to the total own revenue collected was about 516 percent. This is mostly due to the aged debts being inherited from the former local authorities and suggests that there is no 44 procedure for writing off bad debts. The Revenue Unit does not carry out ageing analysis of the arrears, and hence it is not possible to determine the arrears that are over 12 months. These arrears date from the time the subnational structure came to existence and include inherited arrears from the defunct local authorities. The score is D. Summary of scores and performance table PI-19 Revenue D Brief justification for score administration (M2) 19.1 Rights and obligations D All county revenue is collected and accounted for by the Revenue Unit under for revenue measures the finance and economic planning sector. The Revenue Unit has not put in place a mechanism for communicating to payers of their obligations, rights, and redress. Complaints and other issues raised by payers are handled by ad hoc committees. There was no documentary evidence on the deliberations of the committees. 19.2 Revenue risk D The county government of Kakamega has not put in place a comprehensive, management structured, and systematic approach for assessing and prioritizing compliance risks. 19.3 Revenue audit and D The Revenue Unit of the county government has not put in place audit and investigation fraud investigation systems. It is therefore not easy to identify risks and follow up to minimize revenue leakages. 19.4 Revenue arrears D Evidence provided indicated stock of revenue arrears at the end of FY2015/16, monitoring which was not in the AFS. The percentage of revenue arrears to total revenue was about 516%. PI-20. Accounting for revenue This indicator assesses procedures for recording and reporting revenue collections, consolidating revenues collected, and reconciling tax revenue accounts. It covers both tax and nontax revenues collected by the county government. PI-20.1. Information on revenue collections Revenue from various sources is paid directly to the county bank accounts, the cash office at the headquarters, or various pay points in the county. Additionally, revenue collectors visit various collection points at headquarters and the subcounties. Revenue officers submit revenue collection reports daily to the Revenue Unit at the headquarters. These reports capture all information on revenue and are consolidated reflecting revenue types and period of collection. The county of Kakamega has filed a bill (Kakamega County Revenue, Administration, and Collection Bill) with the County Assembly in 2014 for the establishment of a Tax Collection Agency. The agency is described to administer and enforce revenue law, assess, collect, and account for all rates, taxes, and fees. The bill is still with the County Assembly for approval. The taxpayers currently pay their revenue obligations directly at the county administration cash points as well as to the county bank accounts. The score is A. 45 PI-20.2. Transfer of revenue collections Revenue collected from various sources is banked daily into the county revenue collection bank accounts by the individual revenue collectors or their supervisors. There are, however, few instances where daily banking of revenue collected may not be adhered to, but the delay usually does not exceed more than one day. The score is A. PI-20.3. Revenue accounts reconciliation No evidence was provided to indicate the frequency of complete reconciliation of assessments, collections, arrears, and transfers to County Treasury revenue collection accounts. It was indicated that the reconciliations were not consistent with PFM Regulation No. 90 of 2015. The score is D. Summary of scores and performance table PI-20 Accounting for D+ Brief justification for score revenue (M1) 20.1 Information on A Revenue collection reports are prepared monthly from daily reports. This revenue collections information is broken down by revenue type and is consolidated into a report. Monthly revenue reports consolidated from the subcounties for January 2017 and February 2017 have been provided as evidence. 20.2 Transfer of revenue A All revenue collected in cash and checks is banked into the county bank accounts collections daily as evidenced by the daily banking slips. 20.3 Revenue accounts D* There was no evidence that reconciliations of assessments, collections, arrears, reconciliation and transfers to Treasury-controlled accounts are carried out. PI-21. Predictability of in-year resource allocation This indicator assesses the extent to which the Central Department of Finance is able to forecast cash commitments and requirements and to provide reliable information on the availability of funds to budgetary units for service delivery. PI-21.1. Consolidation of cash balances Section 109 (2) of the PFM Act, 2012, provides that each county government shall ensure that all monies raised or received by or on behalf of the county government shall be paid into the CRF. Not all bank accounts of the county are in the CBK. The county operates seven accounts at the CBK and their cash balances are consolidated daily. The commercial bank accounts are numerous. At the time of the assessment, it was reported that there are 48 bank accounts in commercials banks and their cash balances are consolidated on a monthly basis. A list of all bank accounts along with respective bank balances was provided. However, it was observed that the OAG reported the existence of 185 bank account in FY2015/16 operated by the county government (see PI-27.1). The score is C. PI-21.2. Cash forecasting and monitoring Section 120 of the PFM Act, 2012, provides for the management of cash at the county level. A County Treasury shall manage its cash within a framework established by the County Assembly. Every county government entity is required to prepare and submit an Annual Cash Flow Plan under the direction of the 46 County Treasury with a copy to the COB. The cash forecast is provided annually based on the approved budget and updated monthly. A copy of the cash flow forecast and requisition has been provided. The score is A. PI-21.3. Information on commitment ceilings The County Treasury prepares cash flow projections at the beginning of the fiscal year and updates it monthly based on cash requirements from all departments. The reliability of the commitment ceilings has not been ascertained. The spending units are given a month’s time to plan their commitment. There was no evidence to show that all budgetary units are given enough information on actual resources available for their budgetary commitments. The score is D. PI-21.4. Significance of in-year budget adjustments The county makes only one supplementary budget in a fiscal year as provided in Section 135 of the PFM Act, 2012, while Standing Order Paper No. 218 of the County Assembly provides for the procedure of passing the supplementary budget. In addition, adjustments to the original budget appropriations are guided by the PFM Act, 2012, and PFM Regulations of 2015. Generally, all in-year adjustments are gathered in the county supplementary budget submitted to the County Assembly for approbation. The supplementary budget is a request for approval of anticipated reallocations. Usually, the supplementary budgets are approved. Only one supplementary budget was issued in FY2015/16. The score is B. Summary of scores and performance table PI-21 Predictability of in- year resource allocation C+ Brief justification for score (M2) 21.1 Consolidation of cash C The county operates 7 accounts at the CBK and their cash balances are balances consolidated daily. The commercial bank accounts’ cash balances are consolidated monthly. A list of all bank accounts has been provided along with a copy of the bank balances. 21.2 Cash forecasting and A The cash forecast is provided annually and updated monthly on the basis monitoring of actual cash inflows and outflows. 21.3 Information on D It was not ascertained that plans and expenditure commitments were in commitment ceilings accordance with budget appropriations and that all budgetary units are given enough information on actual resources available. 21.4 Significance of in- B There was only once in-year budget adjustment in any of the 3 fiscal years year budget adjustments assessed. Supplementary budget was made once in the last fiscal year, which was done fairly transparently and has been subjected to approval by the county PI-22. Expenditure arrears This indicator measures the extent to which there is a stock of arrears and the extent to which a systemic problem in this regard is being addressed and brought under control. It contains two dimensions: stock of expenditure arrears and expenditure arrears monitoring. 47 PI-22.1. Stock of expenditure arrears Expenditure arrears in the context of the county government are referred to as pending bills. These are financial obligations due to employees, statutory organizations, service providers, suppliers, and contractors. They arise as a result of services provided, goods delivered as per orders, and contracts executed, but payments are not made by due dates. Reports on expenditure arrears are generated manually from other underlying accounting records. At the close of FY2014/15 and FY2015/16, the county had expenditure arrears amounting to Ksh 735 million and Ksh 626 million, respectively, but there were no arrears during FY2013/14. The percentage of stock of expenditure arrears to total expenditure for FY2014/15 and FY2015/16 was 9.7 percent and 6.3 percent, respectively. The percentage of stock of expenditure arrears is more than 6 percent in two years and less than 10 percent in the three years. The score is C. PI-22.2. Expenditure arrears monitoring The county prepares expenditure arrear schedules at the end of each fiscal year for incorporation in the AFS. In this regard, quarterly expenditure arrear reports are not prepared. Further, the annual expenditure arrears do not indicate their age. A report on expenditure arrears was provided indicating stock and composition. The data on the stock and composition of expenditure arrears is generated at the end of each fiscal year during the preparation of the AFS. The score is C. The county has commenced preparation of expenditure arrear reports on a quarterly basis using the template prescribed by the National Treasury. The first of such a report will cover the third quarter of FY2016/17 (January to March 2017). Summary of scores and performance table PI-22 Expenditure arrears (M1) C Brief justification for score 22.1 Stock of expenditure arrears C The stock of expenditure arrears is more than 6% in 2 years and less than 10% in the 3 years. 22.2 Expenditure arrears C Even though the county government prepares a report on monitoring expenditure arrears as at end of each financial year, the report does not include age analysis of the arrears. PI-23. Payroll controls This indicator is about the payroll for public servants: how it is managed, how changes are handled, and how consistency with personnel records management is achieved. Wages for casual labor and discretionary allowances that do not form part of the payroll system are included in the assessment of non-salary internal controls (PI-25). PI-23.1. Integration of payroll and personnel records The county government uses the IPPD management system to generate monthly payroll and staff pay slip. The system is used for human resource management including appointments/recruitment, personnel records management, career development, and pension. In addition, it administers the records of benefits enjoyed by the officers such as loans, medical benefit, claims and personal advances, and allowances. The 48 pay slip database is uploaded to the Government Human Resource Information System (GHRIS), which is an online platform that enables staff to access their pay information. The county does not have an approved staff establishment but uses existing staff and projected hires as a basis for the annual budget. In addition, staff hiring is done on a need basis. Reconciliation of the payroll with personnel records takes place on an annual basis through payroll audit. The score is D. PI-23.2. Management of payroll changes Any amendment to the personnel database on the IPPD is processed through the Authorized Data Sheet (ADS). Such changes are effected in time to allow adjustments in the following month’s pay. Only authorized officers are allowed to effect changes. There were retroactive adjustments, but the number and size varied from month to month, and in February 2017, the percentage of adjustments to total payroll expenditure was less than 3 percent. At the time of the assessment, payroll data for February 2017 indicated total payments of K Sh 256,880,011 including arrears of K Sh 1,789,016. Consequently, the percentage of arrears to total payroll expenditure was 1 percent, which is less than 3 percent. Adjustments to payroll are occasioned by promotions, deletion of staff records due to retirement or natural attribution, and reasons that are considered normal. The score is A. PI-23.3. Internal control of payroll The head of Human Resource Management allocates IPPD access rights to ensure efficiency, effectiveness, and accountability. Different access rights ensure that no one person can initiate and complete any payroll amendment without involving another party. The system requires several persons with different or same user rights to complete an action or amend a record. A formal, documented access control policy that addresses purpose, scope, roles, and responsibilities of IPPD system users is well outlined that any IPPD password is issued solely for the user in execution of the official duties assigned to him or her. Each change of records in the IPPD system must be supported by a duly filled and signed ADS. In summary, the authority to change records and payroll for employees in the IPPD is restricted, results in an audit trail, and is adequate to ensure full integrity of data. However, the procedures are not documented and the roles and responsibilities are provided in the job description. The procedures establishing roles and responsibilities for internal control were adopted from the national government. There is a County Public Service Human Resource Manual developed by Public Service Commission of Kenya that provides standard operating procedures on all human resource matters for all the counties in Kenya (www.psc.co.ke). The score is A. PI-23.4. Payroll audit During the last three years, the Internal Audit Department carried out a human resource audit and submitted the report to the audit committee. However, no documentary evidence was provided to support the information given during the meetings. The score is D*. 49 Summary of scores and performance table PI-23 Payroll controls (M1) D+ Brief justification for score 23.1 Integration of payroll and D Reconciliation of the payroll with personnel records takes place personnel records annually through payroll audit. The IPPD system is not integrated into the IFMIS that has the budget module. Staff hiring is controlled by a list of approved staff positions, but it is not sure if it is checked against the approved budget. 23.2 Management of payroll A Changes to personnel records and payroll are updated monthly and in changes time for the following month’s payments. Percentage of arrears to total payroll expenditure for the recent 2 months was less than 3%. There are no delays in recording a change in personnel status to personnel records and to payroll data. All is completed within 1 month. 23.3 Internal control of payroll A Authorization of records and payroll changes is restricted to the payroll manger based on the approved authority from the head of Human Resource. Audit trail in the form of manual documents was available and verified during the assessment. 23.4 Payroll audit D* It was indicated that payroll audits covering all county departments are carried by the Internal Audit Department. Payroll audit reports and response to the reports were not provided to support the information given during the meetings. PI-24. Procurement This indicator examines key aspects of procurement management. It focuses on transparency of arrangements, emphasis on open and competitive procedures, monitoring of procurement results, and access to appeal and redress arrangements. PI-24.1. Procurement monitoring The procurement process is regulated by the PPDA 2015PPDA. Section 68 requires that there is an accounting officer of the procuring entity to keep records for each procurement. The Procurement Directorate of the County Executive is in charge of the entire supply chain management. The county has developed a Framework Contract for low-value procurement of good and services. In addition, the annual Project Implementation Status Report provides information on value of procurement and the awarded contracts. However, the accuracy and completeness of the information could not be ascertained. The score is D. PI-24.2. Procurement methods The PPDA 2015 provides for different procurement methods. The County Executive applies two procurement methods (a) open tender and (b) request for quotation, both of which are competitive processes. This can be seen in the annual Project Implementation Status Report that provides information on data and information on contracts awarded through competitive and noncompetitive methods and value. However, no information on the percentage of the total value of contracts carried out has been provided. The score is D*. 50 PI-24.3. Public access to procurement information The public can access the legal and regulatory framework (PPDA 2015) for procurement freely from the Public Procurement and Regulatory Authority (PPRA) website. Data on resolution of procurement complaints is available online as published by the Public Procurement and Administrative Review Board (PPARB). The tendering opportunities are available on the county website. However, information on the county procurement plans, annual procurement statistics, and details of contracts awarded are not posted on the website. Any procurement complaints are addressed through the PPARB. Data on resolution of procurement complaints is available on the website of the independent board, the Public Procurement Oversight Authority (PPOA). Clear guidelines on the process followed for any conflict are published and available online at www.ppoa.go.ke. The decisions of the board are binding to all parties involved. Table 3.15 summarizes the compliance with key procurement information that should be made available to the public. There is no information on materiality. The score is D*. Table 3.15: Public access to procurement information Key procurement information to be made available to the public Compliance (Yes/No) (1) Legal and regulatory framework for procurement Yes (2) Government procurement plans No (3) Bidding opportunities Yes (4) Contract awards (purpose, contractor, and value) No (5) Data on resolution of procurement complaints Yes (6) Annual procurement statistics No PI-24.4. Procurement complaints management Procurement complaints are addressed by the PPARB under the PPRA. This is an external higher authority that is not involved in the procurement process. Section 27 of the PPDA establishes an independent PPARB to ensure the proper and effective performance of the functions of the PPRA. There are clear guidelines on the process followed in case of complaints. The decisions of the PPARB are binding to all parties involved—ref. to (6). The Procurement Regulations state that “a decision by the Review Board is binding on all parties concerned subject to judicial review where the parties so appeal.� There is a fee payable by the party filing complaints—ref to (2). The schedule of fees can be extracted from the Public Procurement and Disposal Regulations, 2013. However, it was observed that the complaints filed with the board are getting more and more each year which may imply that the fee is not so material to prohibit access. The process for submission and resolution of complaints is clearly provided for in the PPDA (Section 27), which is publicly available. The PPARB exercises the authority to suspend the procurement process—ref to (4). The PPDA provides grounds for debarment of a person from participating in procurement or asset disposal proceedings. The decisions are issued within the timeframe specified in rules—ref to (5): the PPDA requires the PPARB to make a decision within 30 days of the date of submission of an application for review. The PPARB report for FY2015/16 states that all cases filed were heard and determined within an average of 22.5 days. The score is A. Compliance of complaints reviewed by an independent body in accordance with the PEFA criteria is summarized in Table 3.16. 51 Table 3.16: Procurement complaints management Compliance Complaints are reviewed by a body which (Yes/No) (1) Is not involved in any capacity in procurement transactions or in the process leading to Yes contract award decisions (2) does not charge fees that prohibit access by concerned parties Yes (3) Follows processes for submission and resolution of complaints that are clearly defined Yes and publicly available (4) Exercises the authority to suspend the procurement process Yes (5) Issues decisions within the time frame specified in the rules/regulations Yes (6) Issues decisions that are binding on every party (without precluding subsequent access Yes to an external higher authority) Summary of scores and performance table PI-24 Procurement (M2) D+ Brief justification for score 24.1 Procurement D The County Executive has an annual Project Implementation Status Report monitoring where all major projects are recorded. The data in the report is not complete for all procurement methods for goods, services, and works. 24.2 Procurement methods D* The County Executive applies 2 procurements methods, open and request for quotation, both of which are competitive processes. There is no data on percentage of competitive versus noncompetitive tenders procured. 24.3 Public access to D* The procurement met 3 of the 6 elements for this dimension. The key procurement information procurement information elements are complete, reliable, and made available to the public. However, no information was provided on materiality. 24.4 Procurement A The procurement complaint system meets all criteria. complaints management PI-25. Internal controls on non-salary expenditure This indicator measures the effectiveness of general internal controls for non-salary expenditures. Specific expenditure controls on public service salaries are considered in PI-23. PI-25.1. Segregation of duties The legislations about segregation of duties are (a) the Constitution of Kenya of 2010, (b) the PFM Act, 2012, (c) Circulars from National Treasury, and (d) PPDA 2015. The different responsibilities about internal controls are (a) planning, (b) budgeting, (c) procurement, (d) accounting, (e) monitoring and evaluation, and (f) internal audit. The county government uses the IFMIS that has various modules and different levels of access rights to ensure adequate segregation of duties in the expenditure process. Each stage is assigned to an officer with specific log-in credentials. No one can initiate a transaction and process it to completion without the approval of the other user. Further, the county uses its own Standard Operating Procedures when making all their transactions in the IFMIS. The score is A. 52 PI-25.2. Effectiveness of expenditure commitment controls Payments are made through the IFMIS, and the system has the approved budget that serves as vote control mechanism. Any payment is supported by a payment voucher prepared by the user department. The payment voucher has various sections for authorization and approval. The authority to incur expenditure (AIE) holder signs and certifies that the expenditure was incurred for the authorized purpose, the departmental accountant signs to confirm the accuracy, and the Chief Officer in the department of finance authorizes the payment. The payment voucher has a vote book control section (Vote Book Certificate) that is used to ensure that payments are made within the approved vote. The county government makes its payment commitments based on monthly cash flows derived from Annual Budgets and Quarterly Plans. The cash flows are for both recurrent and development expenditures and are based on projected and actual expenditures of all departments. The county government has always provided for a reservation of Ksh 150 million in its Revenue Account, for payment of staff salaries in case of delay of fiscal transfers. Further, the cash flow provides an annexed list of contractors of goods and services and development projects due for payment in any particular month of the cash flow projections. This implies that there exists a comprehensive expenditure commitment control at the county. The score is A. PI-25.3. Compliance with payment rules and procedures All payments of the county were compliant with regular payment procedures as evidenced by payment vouchers from the different departments and approved at various levels. However, two accounts, Operations and Ward Projects payments, were made outside the IFMIS although the posting of vouchers is captured in the system. The calculated amounts for these payments made up only about 4.6 percent of the total. The volume of payments made outside the IFMIS, for which there was no certainty, that comply with payment rules and procedures made up less than 10 percent, and therefore the score is B. Summary of scores and performance table PI-25 Internal controls on A Brief justification for score non-salary expenditure (M2) 25.1 Segregation of duties A There is a clear segregation of duties among PFM functions. Officers have access rights to the PFM system with clear and distinct mandates. The county government also uses the standard operating procedures defining the roles and duties of each officer and their powers. 25.2 Effectiveness of A The IFMIS does not allow commitment of funds where a vote does not expenditure commitment provide funds. Internet banking gives actual balance for utilization. controls Payment cannot be made if there are no funds. 25.3 Compliance with B Most payments by the county government are made in line with payment rules and payment rules and procedures in the IFMIS. The calculated figure for procedures payments outside the IFMIS is about 4.6%. The authorization and justification are not evidenced for the payments outside the IFMIS, which constitute less than 10% of all payments executed. PI-26. Internal audit This indicator assesses the standards and procedures applied in internal audit. 53 PI-26.1. Coverage of internal audit The legal framework defining the background for internal audit consists of Section 155 of the PFM Act, 2012, and PFM Regulation No. 153, 2015, for the county governments. In addition, the PFM Regulation No. 154 specifies that internal auditors shall comply with the International Professional Practices Framework (IPPF) as issued by the Institute of Internal Auditors and shall conduct audits in accordance with policies and guidelines issued by the PSASB. The county’s Internal Audit Services Department covers all the departments in the County Executive. However, the internal audit reports showed that audit work was not executed per department/function but was done according to an audit area, for example, expenditure management audit and audit on revenue collection. The practice maintained by the Internal Audit Department is to group the entities to be audited by risk exposure as follows: (a) to audit and to have a follow-up of the high-risk entities every year, (b) to have at least one full audit in a year and a follow-up visit in two years for the medium-risk entities, and (c) to perform at least one audit every three years for the low-risk entities. The percentage of the County entities which were subject to internal audit over the last three financial years has been reported to be 75 percent. However, no evidence has been provided to justify this calculation. Therefore, the score is D*. PI-26.2. Nature of audits and standards applied The Internal Audit Services Department applies the IPPF of the Institute of Internal Audit as stipulated in the laws of Kenya. The focus of the internal audit practice is to evaluate the adequacy and effectiveness of the internal control system guided by a risk-based approach. The types of audits performed in all county departments over the last three years are internal control, regularity audit, and financial control. The Internal Audit Services Department conducted a number of internal audits in the county. However, there was no evidence of IPPF standards followed in the audit exercise, and properly documented audit working paper files were not provided. In addition, the proportion of internal control audits versus compliance audits carried out over the last three years is not clear. The score is C. PI-26.3. Implementation of internal audits and reporting The Annual Audit Plan sets out the areas of coverage. Audits carried out over the last three fiscal years have covered all the areas specified in the approved audit plan for the respective fiscal year. However, there was no evidence that more than 50 percent of the planned audits in FY2015/16 were completed. The internal audit reports were not provided. Furthermore, internal audits for FY2013/14 and FY2014/15 were conducted on an ad hoc basis mainly because of limited staff capacity. No evidence was provided on the percentage of completed planned audits, and therefore the score is D*. PI-26.4. Response to internal audits Responses to the internal audit reports are provided within one month of the report being issued. Management of the audited entity makes comments to the audit report and should respond to queries raised within two weeks. Partial evidence was provided documenting actual response to audit recommendations, but it could not be confirmed if audit recommendations were acted upon. Management letters were not obtained, and therefore the score is D*. 54 Summary of scores and performance table PI-26 Internal audit (M1) D+ Brief justification for score 26.1 Coverage of internal audit D* No evidence was provided to justify the percentage of audited county entities. 26.2 Nature of audits and C The Internal Audit Services Department applies the IPPF as standards applied stipulated in the law in Kenya. However, the review of the working papers showed that quality assurance is not diligently applied. The internal audit is focused on effectiveness of internal controls. The proportion of internal control audits versus compliance audits carried out over the last 3 years is not known. 26.3 Implementation of D* In FY2013/14 and FY2014/15, audits were only ad hoc. Planned internal audits and reporting audits have been completed only from 2016 onward, but no evidence was provided on the percentage of completed planned audits. 26.4 Response to internal D* Responses to the internal audit reports are provided within 1 month audits of the report being issued. Partial evidence has been provided on response to audit recommendations. It was not confirmed if all audit recommendations were acted upon. No management letters were viewed or obtained. 3.7 Pillar VI. Accounting and reporting Indicators under this pillar measure whether accurate and reliable records are maintained and information is produced and disseminated at appropriate times to meet decision-making, management, and reporting needs. There are three indicators under this pill: financial data integrity, in-year budget reports, and annual financial reports. PI-27. Financial data integrity This indicator assesses the extent to which treasury bank accounts, suspense accounts, and advance accounts are regularly reconciled and how the processes in place support the integrity of financial data. PI-27.1. Bank account reconciliation Section 90 (1) of the PFM Act, 2012, requires bank reconciliations to all active accounts to be prepared every month and submitted to the County Treasury with a copy to the OAG not later than 10th of the subsequent month. Any discrepancy noted during reconciliation should be investigated immediately. Reconciliations to all active bank accounts are done monthly. However, it was not confirmed whether the aggregate cash position of the county government across all its accounts is reconciled with the CBK’s corresponding records. Further, not all county government accounts are at the CBK. The bank accounts show the own source revenue of the county. An important note to make is that the county government operated 185 bank accounts in FY2015/16, and it was not possible during the external audit of the OAG to verify the reconciliation of so many accounts. The number of bank accounts with verified cash positions is 34, but in terms of weight (value), they constitute 81 percent. The bank balances of these 34 accounts is Ksh 1,722,627,416 and statement of financial assets in the AFS for FY2015/16 is Ksh 2,128,306,539. In any event, the operation of such a large number of bank accounts is inefficient and poses serious risks of loss of funds. The county keeps bank accounts in commercial banks contrary to the guidelines of the National Treasury. It was not possible for the OAG to verify the bank reconciliations in the previous two 55 financial years of the assessment. Although the assessment team was provided with copies of monthly bank reconciliations of all active bank accounts, it was not confirmed if they were submitted to the OAG within the required deadline. The score is D PI-27.2. Suspense accounts According to PFM Regulation No. 107(2b), 2015, the accounting officer must ensure that monthly reconciliations are performed to confirm the balance of each account. The county did not have any suspense account during the assessment, and therefore, this dimension is not considered applicable. PI-27.3. Advance accounts The PFM Regulation No. 93 (1 and 5), 2015, classifies imprests into two types: (a) temporary (safari) imprests that should be accounted for within seven days after returning to duty station (the county has imprest account as the only advance account) and (b) standing imprests that are given to AIE holders up to a fixed level. The imprest surrender is done within seven days after an officer returns to the duty station. Imprest reconciliations are prepared monthly and accounted for at the end of the financial year and presented as a note to the financial statements. However, they are cleared more than two months after the year-end. The score is D. PI-27.4. Financial data integrity processes The PFM Regulations No. 109 (1) and 110, 2015, require the establishment of an IFMIS, with appropriate access controls established in the system to minimize breach of information confidentiality and data integrity. The County Treasury uses the IFMIS for recording and processing budget data. This system has various modules ranging from budgeting, payments, and reporting. All users are assigned passwords and the Chief Officer of finance authorizes assignment of responsibilities in the various rights to the system. The IFMIS has an audit trail and any record change is electronically recorded in the system. The IFMIS Department in the National Treasury is responsible for introduction of new users in the system with the approval of the accounting officer. Finally, the county has an examination unit that ensures data integrity by preaudit of payments before they are passed into the system. The score is A. Summary of scores and performance table PI-27 Financial data integrity C Brief justification for score (M2) 27.1 Bank account D Reconciliation of 81% of the county bank accounts takes place monthly. reconciliation 27.2 Suspense accounts N/A 27.3 Advance accounts D Advance accounts are presented as accounts receivables (outstanding imprests) in the AFS. Advance/imprest accounts are reconciled annually as a note to the AFS, but they are cleared more than 2 months after the year-end 27.4 Financial data integrity A The IFMIS has a system administrator who ensures compliance of processes assigned responsibilities and ensures the approval are sought to make changes in the system. General Ledger reconciliations are done at the County Treasury to ensure items are correctly posted. The county has an examination unit that ensures data integrity. 56 PI-28. In-year budget reports This indicator assesses the comprehensiveness, accuracy, and timeliness of information on budget execution. In-year budget reports must be consistent with budget coverage and classifications to allow monitoring of budget performance and, if necessary, timely use of corrective measures. PI-28.1. Coverage and comparability of reports The PFM Act, 2012, requires budget execution, monthly financial statements, and nonfinancial budgetary reports to be submitted to the County Treasury. The CBROP is prepared in accordance with Section 118 of the PFM Act, 2012. According to this act, the county should prepare quarterly implementation reports to give an overview of budget execution. They give comparisons between budget estimates and actual expenditures among departments and County Assembly. Budget reports are prepared quarterly allowing for comparison with the original budgets but not for all items. The reports show budgeted expenditure against actual expenditure. Coverage and classification of data allow direct comparison to the original budget with a presentation of the main administrative headings. The score is C. PI-28.2. Timing of in-year budget reports The PFM Act (166), 2012, requires counties to prepare quarterly reports and deliver copies to the National Treasury, COB, and CRA while the County Treasury circular requires preparation of reports of performance of the entire budget during the implementation phase. Annual Expenditure Appropriation Accounts are prepared annually and submitted by September 30. Budget execution reports are prepared quarterly and submitted within one month after the end of each quarter. Copies of cover letters were obtained for (a) the CBROP of FY2015/16 (September 30, 2016), (b) the CFSP of FY2017/18 (February 27, 2015), and (c) the budget estimates of FY2015/16 (April 30, 2015, and June 22, 2015). Copies of quarterly in-year budget reports have been obtained for only two quarters as detailed in Table 3.17. The score is D. Table 3.17: Timing of in-year budget reports Type of report End of quarter Date of report Quarter Budget Expenditure Report July–September 2015 November 13, 2015 Quarter Budget Expenditure Report July–September 2016 March 7, 2017 Source: County Executive. PI-28.3. Accuracy of in-year budget reports The county uses the IFMIS to record budget reports. Changes to these reports must be sought from the National Treasury IFMIS Department to allow changes. There are guidelines on implementation of budget for FY 2015/16 that guide on how to report performance and accounting for expenditures in the County Treasury and line ministries. It has not been reported whether information on expenditure is covered at the commitment stage. The reports are prepared by the County Treasury and are reviewed and sent to various bodies including the County Executive, National Treasury, and the COB. The level of review ensures that these reports are accurate. However, no analysis of the budget execution is provided on at least a half-yearly basis. The score is C. 57 Summary of scores and performance table PI-28 In-year budget D+ Brief justification for score reports (M2) 28.1 Coverage and C Budget reports are prepared quarterly, allowing for comparison with the original comparability of reports budgets for the main administrative headings. 28.2 Timing of in-year D Quarterly reports are prepared but submitted more than 2 months after the end budget reports of each quarter. 28.3 Accuracy of in-year C It was not reported whether information on expenditure is covered at the budget reports commitment stage. AFS show that they are reflected at least at the payment stage. PI-29. Annual financial reports This indicator assesses the extent to which AFS are complete, timely, and consistent with generally accepted accounting principles and standards. This is crucial for accountability and transparency in the PFM system. PI-29.1. Completeness of annual financial reports AFS are prepared based on a template issued by the PSASB. They contain disclosure of revenue, expenditure, and cash balances. AFS are also accompanied by a balanced cash flow. Actual revenue and expenditure can be compared with the budget. The AFS compares the actuals with those of previous year but not with approved budgeted amounts. The score is C. PI-29.2. Submission of reports for external audit Section 68 of the PFM Act, 2012, requires that all entities prepare AFS for each financial year within three months after the end of the financial year and submit them to the COB and the OAG for audit. The consolidated set should be submitted within four months after the end of the fiscal year, that is, by the end of October. The AFS were submitted within three months after June 30, that is, by September 30 in line with the PFM Act, 2012. The consolidated financial statements of the last completed fiscal year were submitted to the Auditor General on October 30, 2016, which is the deadline specified in the relevant legislation, that is, within four months after the end of the fiscal year as per the PFM Act, 2012. This information was verified with the stamps of actual submission of financial reports for external audit by the OAG. The score is A. PI-29.3. Accounting standards The PSASB adopted the IPSAS and International Financial Reporting Standards (IFRS) for use by public sector entities in July 2014. Retrospective application for the year ended June 2014 was encouraged by the PSASB. The use of the IFRS and IPSAS was, therefore, formally adopted and applied for the first year ending June 30, 2014. FY2015/16 is the third year of implementation of the standards as prescribed by the PSASB in 2014. The county governments and their respective entities apply IPSAS cash based standard. The county prepares AFS as per the IPSAS cash based standards according to the requirements of the PSASB. The cash basis IPSAS enhances comprehensive and transparent financial reporting of the cash 58 receipts, cash payments, and cash balances of the county government. Application of IPSAS cash based standards implies comparability of the government's financial statements. The OAG states in the Annual Audit Report “the financial statements are prepared in accordance with and comply with IPSAS with particular emphasis on Cash Basis Financial Reporting under the Cash Basis of Accounting and applicable government legislations and regulations. The financial statements comply with and conform to the form of presentation prescribed by the PSASB of Kenya�. In summary, because the standards used in the preparation of the statements are not disclosed and do not appear as notes in the AFS and the variations between international and national standards are not disclosed, the score is D. With regard to reforms, the PSASB in Kenya is designing a framework for all county governments to move to accrual-basis IPSAS. Summary of scores and performance table PI-29 Annual financial D+ Brief justification for score reports (M1) 29.1 Completeness of C The county is applying IPSAS cash. There is only information on annual financial reports revenue, expenditure, and cash balances, but no assets and liabilities and the actuals are comparable to the approved budget. 29.2 Submission of reports A The AFS were submitted for external audit within 3 months after the for external audit end of the fiscal year, that is, by September 30 of each year. This is in line with the PFM Act, 2012. 29.3 Accounting standards D The county prepares AFS as per the IPSAS cash based standards according to the requirements of the PSASB. The standards used in the preparation of the statements are not disclosed and do not appear as notes in the AFS. Variations between international and national standards are not disclosed and gaps are not explained in the reports of the OAG. 3.8 Pillar VII. External scrutiny and audit There are two indicators under this pillar: external audit and legislative scrutiny of audit reports. These indicators assess the arrangements for scrutiny of public finances and follow-up on the implementation of recommendations by the Executive. PI-30. External audit This indicator examines the characteristics of external audit. PI-30.1. Audit coverage and standards The OAG, headed by the Auditor General, has the primary oversight role of ensuring accountability in the use of public resources. The OAG may audit the accounts of any entity that is funded from public funds (including Semi-Autonomous Government Agencies as discussed under PI-10). The Constitution and Public Audit Act, 2015, specify that the OAG must, within six months after the end of the fiscal year, audit and report on the accounts of all county government entities, covering revenue, expenditure, assets, and 59 liabilities and using International Standards on Supreme Audit Institutions (ISSAIs) or consistent national auditing standards. The audit reports highlight relevant material issues, systemic and control risks. In- depth audits should be carried out on the basis of risk analysis methods. More emphasis is given to performance audits (value for money), forensic audits, and procurement/asset disposal than under the previous law (Sections 34–38 of the Public Audit Act, 2015). For the case of Kakamega, the OAG audits receipts and payables, statement of assets, and cash flow. The OAG annually audits all county government MDAs that are linked to the IFMIS. All county budget entities have been audited in the last three completed financial years with the exception of the extrabudgetary units as discussed in PI-6.3 and PI- 12.1 that do not appear in the AFS. The financial statements of the extrabudgetary units are not audited, and it is not possible to ascertain the magnitude of expenditure. It is assumed that they do not constitute a volume of more than 50 percent of the total expenditure of the central government budget units. Therefore, the score is C. The OAG employs quality assurance system to assess whether its audits adhere to the adopted audit standards. These assessments are performed by independent peer reviewers or through the professional organization—the African Organisation of English-speaking Supreme Audit Institutions (AFROSAI-E). It assisted in the development of a Quality Assurance Manual, whereas the Quality Control Manual was developed by the OAG. The AFROSAI-E conducted its first peer review in 2003 and then in 2009, 2012, 2014, and 2016. Independent quality assurance reports are prepared by the reviewers. PI-30.2. Submission of audit reports to the legislature According to the PFM Act, 2012, the OAG directly submits audit reports to the legislature. Table 3.18 presents the dates for the submission of audit reports to the legislature (Senate and the County Assembly). The audit reports with the audited AFS of the county are submitted after 12 months. This is attributed to low staff levels at the OAG. In addition, the deadline is quite often missed because submitted financial statements are often returned to the county to correct errors. The score is D. Table 3.18: Submission of audit reports to the legislature Date AFS received by Supreme Audit FY Date audited AFS submitted to legislature Institution 2013/14 September 30, 2014 July 7, 2015 2014/15 September 30, 2015 September 26, 2016 2015/16 September 30, 2016 Not yet submitted PI-30.3. External audit follow-up The Public Audit Act, 2015, explicitly covers the audit process, including response and follow-up. The PSASB has prepared a template to this purpose. It is too early to assess its effectiveness. The audit process is prescribed in Section 31 of Part IV of the Public Audit Act, 2015, on the “Audit Process and Types of Audit.� The audit opinion and summary findings of the external audits for FY2013/14 and FY2014/15 have been received. According to the County Assembly, there is a systematic follow-up of audit findings, but no evidence of the responses was provided. The score is D*. PI-30.4. Supreme Audit Institution independence The OAG is established as an independent office under Articles 229, 248, and 253 of the Constitution. In accordance with the Constitution, the Auditor General is nominated and appointed by the President with the approval of the National Assembly. The statutory duties and responsibilities of the position are 60 provided in Article 229 of the Constitution and in the Public Audit Act, 2015. The OAG operates independently from the Executive with regard to procedures for appointment and removal of the head of the OAG, the planning of audit engagements, arrangements for publicizing reports, and the approval and execution of the OAG’s budget. This independence ensures unrestricted and timely access to records, documentation, and information. The Public Audit Act, 2015, confirms the OAG’s independence from the executive branch of the national government. Thus, OAG independence is ensured by the Constitution and law. Since the Public Audit Act, 2015, came into force in January 2016, the follow-up process has become more formalized. The PSASB (established in Sections 192–195 of the PFM Act, 2012) and elaborated on under Financial Regulation 111 of 2015. The Board of the National Treasury developed a template in FY2015/16 for preparing AFS. Section 27 of the template (available on the National Treasury’s website) provides for monitoring the actions taken by an MDA in response to the recommendations of audit reports. A matrix contains the following in column form: a list of issues raised by the OAG in its management letter to the respective MDA; management comments, the name of the MDA staff in charge of resolving the issue, status of resolving the issue, and expected date for resolving the issue. The template came into effect in FY2016/17. The audit process is still ongoing, so it is not possible to assess how well this new process has worked. The nature of the Auditor General’s functions requires guaranteed independence. This aspect has been recognized by the International Organization of Supreme Audit Institutions (INTOSAI) in the so-called Mexico Declaration on SAI4 Independence, recognizing eight core principles. The essential requirements for proper public sector auditing have been adopted in Kenya. It is worth noting that the OAG's budget is negotiated with officials of the National Treasury. This has not resulted in pressure to make changes or withhold funds. The OAG has unrestricted and timely access to records and documentation but the fact that its budget is submitted first to the Ministry of Finance (MoF) may endanger its financial autonomy. However, the score is A for its other attributes and for consistency with the national PEFA assessment. Summary of scores and performance table PI-30 External audit (M1) D+ Brief justification for score 30.1 Audit coverage and C All audits of public entities in Kenya are carried out by the OAG. The office standards applies the ISSAI and highlights material weaknesses and controls risks. County budget units have been audited over the last 3 financial years with the exception of the extrabudgetary units and the private equity (see 12.1). 30.2 Submission of audit D The audit reports were submitted to the County Assembly after 12 reports to the legislature months. 30.3 External audit follow- D* The Executive follows up on issues raised by the external auditor. The up Public Accounts Committee (PAC) at the County Assembly follows up with the Executive to ensure implementation. No evidence has been provided on follow-up activities and decisions. 30.4 Supreme Audit A All audits of public entities in Kenya are carried out by the OAG. This is an Institution independence independent office set up by the Constitution of Kenya. The financial independence has not been ensured yet. 4 SAI = Supreme Audit Institution. 61 PI-31. Legislative scrutiny of audit reports This indicator focuses on legislative scrutiny of the audited financial reports of the County government, including institutional units, to the extent that either (a) they are required by law to submit audit reports to the legislature or (b) their parent or controlling unit must answer questions and take action on their behalf. PI-31.1. Timing of audit report scrutiny The scrutiny of the audit reports is completed over six months. However, no evidence has been provided to corroborate this practice. The score is D*. PI-31.2. Hearings on audit findings Article 96 (3) of the Constitution states that “the Senate determines the allocation of national revenue among counties, as provided in Article 217, and exercises oversight over national revenue allocated to the county governments.� In addition, Article 185 (3) gives the County Assembly oversight role over the County Executive. The county confirmed that in-depth hearings on key findings of the audit reports take place regularly with the responsible officers from all audited entities that received a qualified or adverse audit opinion or a disclaimer. It was reported that once the audit report is received from the Auditor General, it is tabled in the County Assembly and submitted to the relevant committees. The committee summons relevant parties and finalizes the reports within two to four weeks for submission to the County Assembly. Staff from the OAG attend the hearings to explain the observations and findings. It was confirmed that discussions are held with the audited budget entities that are expected to provide action plans for remedy. However, records of attendance at hearings of audit reports for the last three completed fiscal years were not provided. The score is D*. PI-31.3. Recommendations on audit by the legislature The audit reports are submitted to the PAC of the County Assembly, which in turn seeks guidance from the OAG on the findings. The County Assembly then writes to the County Secretary requesting information and setting a date for interrogation. The interrogation is held and a report including observations, findings, and recommendations is prepared and tabled in the floor of the County Assembly. Once the report is adopted, it is forwarded to the Governor for implementation with a copy to the OAG. The implementation of the recommendations is monitored by the implementation committee or the PAC. However, no record of recommendations made by the legislatures for actions to be taken up by the County Executive has been provided, nor has there been any record of procedures for following up on recommendations. The score is D*. PI-31.4. Transparency of legislative scrutiny of audit reports Articles 196 and 201 of the Constitution and Section 115 of the County Government Act, 2012, state that there shall be openness and accountability, including public participation in financial matters. In addition, the County Assembly shall conduct its business in an open manner and facilitate public participation in the deliberations. The PAC proceedings are open to the public except under special circumstances that the County Assembly determines. Further, audit reports are discussed in the full chamber of the house. The committee reports are however not published on the County Assembly website. 62 In addition, no evidence was provided for civil societies’ participation in committee hearings. Further, it was not clear whether other means of public scrutiny are employed in the transmission of the proceedings. The score is D*. Summary of scores and performance table PI-31 Legislative scrutiny of D Brief justification for score audit reports (M2) 31.1 Timing of audit report D* Reportedly, the scrutiny is completed over 6 months. There is no evidence scrutiny to ascertain how much time it takes to complete scrutiny of the external audit report by the legislature after receipt of the reports from the OAG. 31.2 Hearings on audit D* Records of attendance at hearings of the audit reports for the last 3 findings completed fiscal years have not been provided. 31.3 Recommendations on D* The audit reports usually contain recommendation to the Executive for audit by the legislature implementation. The County Assembly uses these for follow-up. No record of recommendations made by the legislatures for actions to be taken up by the County Executive has been provided, nor has there been any record of procedures for following up on recommendations. 31.4 Transparency of D* No evidence has been provided on the number of hearings on the audit legislative scrutiny of audit reports or the number of hearings conducted in public or full chamber reports debates occurrences. 63 4. Conclusions of the Analysis of PFM Systems 4.1 Integrated assessment of PFM performance Pillar I: Budget reliability The aggregate budget outturn (PI-1) shows significant deviation of the actual aggregate expenditure from the originally approved budget with 43 percent, 73 percent, and 81 percent for FY2013/14, FY2014/15, and FY2015/16, respectively. There was overbudgeting, especially in the first year after the devolution, but there were improvements in budget estimation in the subsequent years. The main reasons for budget deviation include lengthy procurement procedures and low collection of own source revenue. Existing challenges undermine fiscal discipline and the ability of the county to control expenditures and manage fiscal risks. This also affects the ability to effectively plan and allocate resources to strategic policy priorities. The huge variance (PI-2) in expenditure composition by functional and economic classifications for the last three fiscal years is indicative of the early stage of county development and shows that budget forecasting is not accurate. The revenue outturn (PI-3) shows that the change in revenue between the originally approved budget and end-of-year outturn was significant due to low collection of own source revenue and overprojections. This necessitates immediate reforms geared toward improving and strengthening enforcement in the revenue collection. Accurate revenue forecasts are a prerequisite for preparation of a credible budget. The county government budget does not provide a reliable basis for policy implementation. Pillar II: Transparency of public finances The transparency of public finances is not comprehensive, consistent, and accessible to the public. The budget classification (PI-4) of government budget and accounts is consistent with international standards but is not sufficient (level 2). This does not facilitate budget tracking in formulation, execution, and reporting. The transparency of government revenue and expenditure is low because there are no financial reports for extrabudgetary operations. The budget documentation (PI-5) is fairly elaborate but not sufficient to provide a complete picture of the county government fiscal forecasts, budget proposals, and outturn of the current and previous fiscal years. There are no records of expenditures outside financial reports (PI-6) because extrabudgetary units do not prepare any kind of financial reports. This contributes to lower transparency of government operations, but there is also a gap in the analysis of the county’s policies and objectives. Performance results for outputs and outcomes are presented in the MTEF, but this is not done in a format that is comparable to the plans previously adopted within the annual or medium-term budget and does not meet the SMART criteria. Thus, information on whether the budget resources reach service delivery units as planned is not available. Operational efficiency in public service delivery is a core objective of the PFM system. The inclusion of performance information within budgetary documentation strengthens the accountability of the Executive for the planned and achieved outputs and outcomes of government programs and services. Public access to fiscal information is available (PI-9); that is, budget documents such as the CIDP, ADP, CFSP and CBROPs are available on the county website. However, audit reports are published with delays after the lapse of a fiscal year. 64 Pillar III: Management of assets and liabilities There is no effective management of assets and liabilities due to lack of a comprehensive fixed asset register and formalized investment appraisal practice. Thus, fiscal risks are not identified and monitored. The public investment (PI-11) activities are not based on in-depth cost-benefit analysis for lack of procedures to assess the economic impact and viability of projects. There are no formalized project selection criteria, and hence it cannot be ascertained if the projects undertaken by the county are of type and nature that would support social and economic development objectives. The assets of the county (PI- 12) are not properly recorded and therefore not adequately managed. Existing shareholding of assets is not included in the AFS, and there is no asset register for nonfinancial assets and no transparency of assets disposal in the AFS. The county has not yet borrowed any money but has inherited debt from the defunct local authorities (PI- 13). There is no debt management unit at the County Executive and a debt management strategy is also lacking. This puts the county’s ability to maintain fiscal discipline at risk. Pillar IV: Policy-based fiscal strategy and budgeting The county prepares fiscal strategy, budget review outlook papers, and medium-term budget estimates, which are submitted to the legislature on time. The county also prepares forecasts of main fiscal indicators (revenue and expenditure). The legislative scrutiny of budgets covers fiscal policies, medium-term fiscal forecasts, and medium-term priorities, in addition to a detailed review of expenditure and revenue. There are clear legislative procedures (standing orders) for budget scrutiny and budgets are approved by County Assembly on time. Budget adjustments by the Executive are mainly governed by the PFM Act, 2012, and are included in the supplementary budget. Besides, a comprehensive and clear budget calendar also exists and is generally adhered to. However, fiscal policies and development strategic plans are not prepared based on county-relevant macroeconomic and fiscal projections. The county relies on the economic data provided by the national government and the Kenya National Bureau of Statistics on key Macro-economic indicators such as the GDP, inflation, interest rates, and exchange rates. Sensitivity analysis, which is in essence a modelling on uncertainly and looking for options in case of unpredicted circumstance, is not prepared by the county. This has an impact on prioritizing expenditures and certainly puts limits and fiscal constraints on deployment of activities of strategic importance to the government. The ability to develop and assess the fiscal impact of revenue and expenditure policy proposals to support the achievement of the county government’s fiscal goals is nonexistent. The county had not assessed the fiscal impact of revenue and expenditure policy proposals developed during budget preparation process for the last three fiscal years (PI-15). The good practice is that the county prepares a CBROP annually providing a review of fiscal performance on a quarterly basis, as well as a CFSP elaborating on fiscal goals and targets for the medium term. Expenditure budgets are developed for the medium term within budget expenditure ceilings (PI-16), but they are not submitted together with the budget circular. The county prepares PBBs with estimate for the budget year and the two outer years. The budget is prepared using the Hyperion and uploaded into the IFMIS. Only 25 percent of the line ministries policies and programs in the ADPs are not in line with the approved budgets. There is no clear alignment of strategic plans and medium-term budgets, as well as no consistency of the budgets with the previous year’s estimates. Forward year estimates need to be linked 65 to strategic planning to provide a medium-term perspective, allowing for the effects on future years to be more apparent, predicted, and eventually provided for in the budget planning. The budget preparation process (PI-17) is good and relatively sound with participation by relevant stakeholders. It is generally orderly and timely with clear annual budget calendar and timely submission to the legislature. The key weakness is the fact that guidance on budget preparation does not include budget ceiling. This makes the information provided before budget proposals are prepared insufficient. It may lead to chances of weak and ill-considered budget proposals that may need to be revised later. V: Predictability and control in budget execution Budget execution is not very well implemented and lacks effective control and predictability. This results in revenue shortfalls and poor allocation of resources as envisaged in the county budget. Effective management of policy and program implementation requires predictability in the availability of resources when they are needed. The county does not have a well-organized system for revenue collection (PI-19). There is no integrated revenue management system in place to detect and prevent potential revenue risks. Information on the stock of revenue arrears is not disclosed in the AFS. Revenue collection monitoring is well functioning with monthly reports based on daily consolidation. However, there was no evidence provided to indicate the frequency of assessment, collections, arrears, and transfers to County Treasury revenue collection accounts. In addition, not all accounts of the county are held in the CBK, thereby making it difficult to ensure that the collection and transfer system function as well as intended. With regard to revenue accounting (PI-20), there exist clear procedures for recording and reporting revenue collections, consolidation of revenues collected, and reconciliation of revenue accounts. This indicates compliance with tax laws and strengthens the fiscal discipline and the administrative capacity to allocate budget resources to strategic priorities. However, there is no reconciliation of arrears and monitoring the difference between outstanding revenues and payments. Accumulation of arrears may disrupt the revenue administration system and affect the reliability of the revenue planning process. There is no TSA, and therefore cash balances cannot be identified and consolidated to predict the release of funds (PI-21). This creates difficulties in making management decisions about predicting the availability of cash resources. Consolidation of cash balances exists when the government has information on the total of its cash and bank balances and can switch unused balances to meet overdrawn balances and minimize its borrowing costs. For this purpose, all balances need to be held in the CBK. Planning of commitment expenditures is in accordance with budget appropriations, but it is carried out only monthly. No cash flow problems were reported while the cash forecast is provided annually and updated monthly. The expenditure arrears (PI-22) are accumulated within 10 percent of the total expenditure. The monitoring of stock is done annually but lacks age analysis, and hence it does not facilitate effective monitoring. Payroll controls (PI-23) are fairly good. There are no delays in recording a change in personnel status to personnel records and to payroll data. These are manually reconciled on a monthly basis. Adjustment to payroll is occasioned by promotions and deletion of staff records due to retirement or natural attribution. There is lack of transparency of the public procurement (PI-24) in the county; that is, information on the county procurement plans and the contracts awarded is not made public. There is no data on the percentage of competitive versus noncompetitive tenders procured. Besides, the procurement method 66 of selecting contractors cannot be ascertained. The problem is further compounded by the fact that appeals made by complainants are charged. The effectiveness of general internal controls for non-salary expenditures is good and reliable (PI-25). The segregation of duties exists to a good extent. Majority of payments are compliant with regular payment procedures. Although expenditure commitment controls are generally in place and mostly limit commitments to projected cash availability, expenditures arrears do occur. There are no sufficient and comprehensive commitment controls, and the county budget entities are not prevented from incurring unauthorized commitments through system controls, regulations, and procedures. There are regular feedbacks to management about the performance of the internal control systems (PI- 26) through an internal audit function. Although the Audit Committee is not yet established, the internal audit function applies a risk-based approach in selection of audit object and audit subject and prepares Annual Audit Work Plans. The internal audit function is primarily focused on compliance audit ensuring the adequacy and effectiveness of internal controls. Pillar VI: Accounting and reporting The financial data integrity (PI-27) is relatively sound. There is no operational TSA and key treasury accounts are reconciled at different times, thus creating backlogs and making the data unreliable for management decisions. The accounting processes in place support integrity of financial data through the IFMIS where data is processed and verified against documents. The financial data is reviewed by internal audit, but the audit process is not developed yet to ensure that areas vulnerable to risk are covered by annual scrutiny. The budget execution reports (PI-28) are generally comprehensive and accurate. Information on budget execution is prepared on a quarterly basis. Regular reporting is part of an effective monitoring and control system to ensure that budgets are executed as intended and that deviations from planned budgets are considered by decision makers. Deviations from budgets go through an adjustment process after the approval of the decision makers to adjust budget execution to better meet objectives and achieve desired outcomes. The AFS (PI-29) are generally complete, timely, and consistent with generally accepted accounting principles and standards. The AFS provide a record of how resources were obtained and used. They generally allow comparison with plans but do not contain a reconciled cash flow statement. The timeliness of submission of reconciled year-end financial reports for external audit is a key indicator of the effectiveness of the accounting function. This area needs improvement, especially concerning the quality of the financial statements submitted for external audit that are often returned because of incomplete and erroneous data. The accounting principles and national standards (consistent with international cash basis IPSAS) used are transparent and understandable. This contributes to accountability and transparency throughout the entire PFM system. Pillar VII: External scrutiny and audit The external audit and scrutiny by the legislature are not strong and effective in holding the county government accountable for its fiscal and expenditure policies and their implementation. The public finances are independently reviewed, but the external follow-up on the implementation of recommendations for improvement by the executive is poor. The audit reports are issued with delay and 67 hence scrutinized late, and no effective hearings are carried out. There is no evidence that the Executive takes actions on recommendations from the County Assembly. 4.2 Effectiveness of the internal control framework Control environment Based on the available information provided by the county, the internal control practice in place is not sufficient to contribute to the achievement of the four control objectives. (a) the execution of operations in an orderly, ethical, economical, efficient, and effective manner; (b) fulfilment of accountability obligations; (c) compliance with applicable laws and regulations; and (d) safeguarding of resources against loss, misuse, and damage. The national-level internal control framework is to a large extent indicative for the county operation because the subnational functions and operations mirror, in regulation and practice, the establishment at the national level. The following is an overview of the internal control activities collected from the preceding sections of the report. It builds on the description of the design of internal controls and the individual assessment of specific control activities as covered by the performance indicators (Chapter 3). Risk assessment The county decisions do not appear to be driven by risk assessment and management activities. This is because risks are not evaluated by their significance or the degree of likelihood of occurring almost in all budget processes. Having no risk profile of the county functions, no risk responses are to be made to reduce the likelihood or downside outcomes for key operations. Thus, potential future events that create uncertainty are not covered. Risks that are not provided for exist in all stages of PFM: • Pillar 2: Transparency of public finances. The County Executive is not able to capture expenditure and revenue outside financial reports (PI-6), which creates the risk of having incomplete budget environment, potential misuse of funds, and poor service to the public. • Pillar 3: Management of assets and liabilities. There is no economic analysis of investment proposals (PI-11), no costing of investment, and no written procedures for monitoring of the investment performance. This creates risk of abuse and loss of funds in investment projects. The county does not have a debt management strategy as well as a framework of debt reconciliation with creditors (PI-13). • Pillar 4: Policy based fiscal strategy and budgeting. The county generally lacks links between policy formulation and programmed activities in the budget estimates. This creates a risk of having a budget that is inadequate and prone to amendments. The county lacks a framework to provide for uncertain economic events and does not undertake sensitivity analysis for macroeconomic policies. • Pillar 5: Predictability and control in budget execution. Revenue administration does not have an integrated revenue management system to detect and arrest potential revenue risks and manage arrears (PI-19). The approved staff establishment is not linked to the IPPD, which is also not linked to the IFMIS (PI-23). This creates a risk of ghost workers. Nonetheless, the payment control system is well formalized and applied. Reports on procurement contracts with a selection method (competitive versus noncompetitive) are not readily available to the public. This creates 68 the risk of favoritism, reduced control on the quality of procured services or works, misuse of funds, and hence poor public service delivery (PI-24). There is a clear segregation of duties on non-salary expenditures that are electronically set up in the IFMIS. The IFMIS has different authorization levels, roles assigned to different functions and operational staff. This arrangement provides for all phases of budget implementation to be executed in the IFMIS (PI-25). Control activities The county does not have a risk profile to define risk responses, which may lead to inadequate and insufficient control activities to treat, share, avoid, or intercept the risk. There are risks related to the budget process, implementation, and execution, which is undertaken through the IFMIS. However, the use of the IFMIS is not sufficient to have a sound internal control system. There are risks that cannot be addressed by the IFMIS, for example, expenditures and revenue outside financial reports (PI-6). With regard to public investment management, the county does not have an objective criterion for selection of investment projects (PI-11). Under management of assets and liabilities, there is no ageing analysis of nonfinancial asset (PI-12). Payroll control framework is incomplete because actual staff establishment is not linked to the IPPD, which is in turn is not linked to the IFMIS. Weak internal control system leads to unreliable financial records as well as loss of organizational integrity. This can affect not only the execution of the budget but also the implementation of projects and county priorities whether they are of development or recurrent in nature. Information and communication This internal control element deals with the methods and records used to register, maintain, and report facts, events of the entity, as well as maintain accountability for the related assets, liabilities, and initiatives of the county. It is a legal requirement that all budget-related documents are made available to the public. The county is adopting legislation on public participation, which will formalize the rules for interaction with the public at all stages of budget formulation and service delivery. Monitoring Monitoring in Committee of Sponsoring Organizations (COSO) terms means the process of assessing the quality of internal control performance over time. In the context of the county, this aspect can be expanded to include the monitoring framework of the PFM process in general. Performance monitoring at the county is not sufficient because the main tools of monitoring the budget utilization are the quarterly reports and budget execution reports. The CBROP is a kind of economic assessment paper as well. There are no specific reports elaborating on consistency of planned performance, outputs, and achieved outcomes with explanations of any deviation(s). The internal control framework of the county as described is not sufficient to safeguard against irregularities and errors. It highlights areas that require improvements such as (a) performance information for service delivery; (b) public access to fiscal information, (c) monitoring of fiscal risk, (d) monitoring of public investment, and (e) public asset management. In terms of assessment of the quality of the internal control system, the county has established Internal Audit Department, and it is still forming its operational procedures. The focus of the internal audit is mainly on compliance and regulatory issues and it is still nascent to provide full oversight of all budget users. External audit is more advanced and focuses on financial audit with elements of internal control. 69 Apart from their usual financial report mandate, the external auditors check the processes related to the accounting function, salary and payroll, and procurement. There is no evidence of interaction between external and internal audit as far as the oversight of the internal control system is concerned. Apart from the OAG, the external oversight mechanism, which is supposed to contribute to monitoring and effectiveness of the internal control system, involves the review of audits by the County Assembly, the follow-up systems for the Executive’s implementation of remedial measures, and providing public access to relevant reports and debates (PI-31). The control practice in oversight of the County Executive is not quite effective. This is due to the failure to convene hearings of OAG report findings, lack of evidence of recommendations, and limited transparency of audit report scrutiny by the County Assembly. Therefore, the legislative scrutiny does not reinforce mechanisms to make the internal control system of the county government more effective. Detailed findings concerning the main elements of the five internal control components are summarized in Annex 2. As far as the national legislative framework is concerned, the internal control system of the county is largely sound. The county does not have internal control mechanism for external factors such as unexpected economic, social, and natural disasters. In addition, specific control environment does not effectively determine fiscal and budgetary outcomes despite the inherent risk assessment, control, and monitoring mechanisms. A well-established internal control system will ensure that resources are safeguarded and directed in an optimal manner to the priority activities and projects as planned 4.3. PFM strengths and weaknesses Aggregate fiscal discipline The annual budget presents estimate of expenditure for the budget year and the two following fiscal years allocated by administrative, economic, and program classifications. The budget estimates and medium- term priorities are reviewed by the County Assembly. Budget credibility is compromised by large deviations in expenditure composition outturn by functional and economic classification as well as the variance in revenue outturn composition. This is aggravated by inability of the county to capture expenditure and revenue outside financial reports. The county does not prepare macroeconomic forecast. The medium-term perspective in expenditure budgeting is undermined by the lack of fiscal impact analysis, weak policy formulation, and PBBs that are linked to the budget estimates. In addition, the county does not keep proper records of expenditure arrears with ageing analysis to facilitate effective monitoring. Data on revenue is collected and consolidated monthly. Personnel records and payroll are controlled and updated monthly. The advance accounts reconciliation is done monthly, but it is not cleared before the end of the fiscal year. The AFS are submitted within three months after the end of the year. The feedback received from the OAG is that the AFS are often returned to the counties for revision because of errors and incomplete data. The practice of accounting and reporting is well developed and functioning. The budget reporting and standards applied are in line with the PFM Act, 2012 (IPSAS cash basis), and the PSASB. The AFS are audited each year by the OAG. Weak legislative scrutiny of audited AFS undermines the effectiveness of external audit required to ensure accountability of the County Executive with regard to fiscal policies and their implementation. 70 Another weakness is the absence of a TSA and the fact that various departments maintain bank accounts in different commercial banks. There is a need for the county to operate a TSA in line with Section 119 (2) of the PFM Act, 2012. The approved staff establishment, personnel database, and payroll are directly linked. Further, the payroll is supported by full documentation for all changes made to personnel records. Staff hiring and promotion are controlled by a list of approved staff establishment and payroll audits are conducted periodically. However, the approved staff establishment, IPPD, and IFMIS are not linked. The segregation of duties deriving from national-level regulations is well formalized and executed throughout the expenditure process, and the county has developed its own standard operating procedures for finance. The County Treasury uses the IFMIS to facilitate transaction processes and reporting. There are separate levels of approval at different stages of payment in the IFMIS. The system users have passwords and the system maintains an audit trail. The OAG operates independently from the County Executive through its regional hub offices and provides external overview of the execution of the budget. The AFS of the County Executive representing most total expenditures and revenues have been audited using national auditing standards based on ISSAI during the last three completed fiscal years. The audits highlight relevant material issues and systemic and control risks. Strategic allocation of resources Revenue collection is automated, and the collections are banked daily and swept into the CRF account on timely. However, the Revenue Unit does not have an integrated revenue management system to detect and arrest potential revenue risks and to manage arrears. Revenues and expenditures are allocated within a medium-term framework and budget ceilings are established. However, the forecasts of revenue and expenditure are not based on the county but rather on national projections, and no underlying assumptions are used for the forecasts. There is no framework of managing public investments through proper selection of viable projects and performance reporting with key indicators that are recognized by development strategy and incorporated in the budget documentation. Thus, when priorities change in course of the year, the County Executive looks for available funds within other functions to keep a sustainable budget on track. This has a negative impact on strategic allocation of resources and ultimately hampers budget credibility. There is clear presentation of recurrent and development expenditure in the budget execution, which contributes to the reporting and visibility of resources allocation. Even though the county has not accumulated any new debt, it has inherited debt from the former local authorities, but this debt is not reported in the AFS. The county does not have a debt management unit and strategy. There is an Internal Audit Department that applies international internal audit standards. However, its practice is still not well developed. The weaknesses have been found in the lack of comprehensive work plans, insufficient coverage and review of internal control system, and lack of clarity in disclosing follow- up comments of previous audit findings. The practice remains closer to regularity and financial control than to a systemic approach. 71 There is weak legislative scrutiny of the OAG reports with no formalized procedures on timing, lack of procedures on documenting the hearing sessions and making recommendations to the Executive, and no transparency of the legislative scrutiny process. Efficient use of resources for service delivery The efficient and effective use of public services is not subject to systematic review by the county government. The county has not developed the necessary tools and capacity to develop PBBs focused on service delivery. The ADP and CIDP objectives and targets are not traced into specific budget priorities. There is a database of procured contracts indicating all contract details including the tender method selection, but the public has limited access. Only tender bids are announced on the website, whereas information on the county procurement plans, annual procurement statistics, and details of contracts awarded are not made public. 72 5. Government PFM Reform Process 5.1 Approach to PFM reforms In Kenya, the national government through the National Treasury takes the lead in initiating and implementing PFM reforms. The Government of Kenya has undertaken PFM reforms since 2006, which are elaborated in Vision 2030. The current PFM reform strategy is elaborated in the Strategy for Public Finance Management Reforms in Kenya 2013–2018. The overall goal of this reform strategy is to ensure “A public finance management system that promotes transparency, accountability, equity, fiscal discipline and efficiency in the management and use of public resources for improved service delivery and economic development.� The main areas of emphasis in the strategy include (a) macroeconomic management and resource mobilization; (b) strategic planning and resource allocation; (c) budget execution, accounting, and reporting and review; (d) independent audit and oversight; (e) fiscal decentralization and intergovernmental fiscal relations; (f) legal and institutional framework; and (g) IFMIS and other PFM systems. The IFMIS has been implemented at the national and the county levels to reinforce accountability, but it still has room for improvement in terms of offering solutions to procurement-related challenges. At the county level, there is a need for a better appropriation and reinforced controls. More operations by-pass the IFMIS at the county level than at the national level. The implementation of a TSA should ensure that the national and county governments better monitor the movement of funds. The PFM Act allows for the establishment of a committee to check on the use of funds and disciplinary measures that can be taken in the event of misappropriation. However, proper monitoring of public resources would be possible if the IFMIS is fully used at the county level and a business intelligence layer is implemented to facilitate data analysis and visualization. 5.2 Recent and ongoing reform actions The key reforms that are still outstanding and are relevant to this PEFA assessment are as follows: (a) Adopting the TSA at the county government level (b) Strengthening strategic planning and budget formulation by providing strong integrated results framework and costing of planning documents (MTPs, sector and county strategies) (c) Improving investment program management by strengthening the control and enhancing appraisal, selection, and monitoring procedures of projects (d) Implementing comprehensive cash management reforms by strengthening commitment control and reporting and enhancing in-year budget monitoring and reporting (e) Integrating the IPPD with the IFMIS module at the national level and then cascading to county governments (f) The Public Accounts Standards Board in Kenya is designing a framework for all county governments to move to accrual-basis IPSAS. 73 5.3 Institutional considerations The Kenyan devolution process is still young and the county of Kakamega still needs to improve the efficiency of public expenditures, while improving domestic resource mobilization. The county heavily relies on equitable transfers and grants. Focus, however, is to be on improving expenditure efficiency. The preceding analysis of Kakamega County PFM system indicates that to improve its performance, enhancement of own source revenues is necessary. Further, establishing a predictable flow of central government grants (conditional and unconditional) is also necessary to enable preparation of realistic medium-term fiscal plans. 74 Annex 1. Performance Indicator Summary COUNTY NAME: KAKAMEGA Current assessment Description of requirements Pillar Indicator/Dimension Score met Subnational PEFA indicator D+ HLG-1.1. Outturn of transfers from higher- A The transfers have been at least 95% of from a higher level level government the original budget estimate in 2 of the HLG-1: Transfers of government last 3 years. HLG-1.2. Earmarked grants outturn B The average difference between original budget and actual is less than 5% in 2 of the last 3 years. HLG-1.3. Timeliness of transfers from D* Actual dates of transfers have not been higher-level government provided. PI-1 Aggregate expenditure out- D Actual expenditure outturn for turn FY2013/14, FY2014/15, and FY2015/16 was respectively 43%, 73%, and 81% of the budgeted expenditure. PI-2 Expenditure composition D+ outturn (i) Expenditure composition D Variance in expenditure composition by outturn by function program, administrative, or functional classification was more than 15% for the last 3 fiscal years. Budget Reliability (ii) Expenditure composition D Variance in expenditure composition by outturn by economic type economic classification for the last three years was more than 15% for the last 3 fiscal years. (iii) Expenditure from A The county has not charged any contingency reserves. expenditure to contingency vote during the assessment period. PI-3 Revenue outturn D (i) Aggregate revenue outturn D The total revenue deviation of aggregate revenue outturn for FY2013/14, FY2014/15, and FY2015/16 was 65.8%, 80.7%, and 92.9%, respectively. (ii) Revenue composition D The composition variance for outturn FY2013/14, FY2014/15, and FY2015/16 was 170%, 60%, and 61%, respectively. The variance is a lot above 15% PI-4 Budget classification C The budget estimates are presented in Transparency of Public economic and administrative classifications. The Chart of Accounts adopted mimics the national method of Finances classification incorporated in the IFMIS. It is a 2-level classification and revenue is not classified according to GFS. PI-5 Budget documentation D 3 elements: 1 basic and 2 additional elements 75 PI-6 Central government D operations outside financial reports (i) Expenditure outside D* There is no record of expenditure financial reports outside financial reports. (ii) Revenue outside financial D* There is no record of calculating volume reports of such revenue. (iii) Financial reports of extra- D There are no financial reports for the budgetary units extrabudgetary units. PI-7 Transfers to subnational N/A There are no subgovernments under governments the county level. (i) System for allocating — — transfers (ii) Timeliness of information — — on transfers PI-8 Performance information for D service delivery (i) Performance plans for D There is no performance information service delivery related to outputs and outcomes. (ii) Performance achieved for D Performance results are not in format service delivery and at a level (program or unit) that is comparable to the plans previously adopted within the annual or medium- term budget. (iii) Resources received by C There is no report with this information service delivery units prepared annually. (iv)Performance evaluation for D Efficiency ratios are available in the service delivery CBROPs, but independent evaluations of the efficiency and effectiveness of service delivery have not been carried out. PI-9 Public access to information D The county makes available to the public two basic elements and two additional elements. PI-10 Fiscal risk reporting D (i) Monitoring of public N/A The public corporations are still being Management of assets and liabilities corporations transferred for direct ownership by the county of Kakamega. (ii) Monitoring of sub-national N/A There are no devolved units under the government county government. (iii) Contingent liabilities and D Contingent liabilities are not quantified other fiscal risks in the financial reports. PI-11 Public investment D management (i) Economic analysis of D Needs-based analysis is usually done by investment proposals the county government but no in-depth economic analysis is undertaken (ii) Investment project D The county has an economic planning, selection but there are no standard project selection criteria. 76 (iii) Investment project costing D Mostly capital costs of investment projects are indicated in the budget. (iv) Investment project D There is no framework to guide monitoring objective monitoring and evaluation of projects. PI-12 Public asset management D+ (i) Financial asset monitoring C The financial assets include cash in the bank and its equivalent. (ii) Non-financial asset D The county government has not monitoring developed a nonfinancial asset register. (iii) Transparency of asset D Rules for transfer or disposal of financial disposal assets do exist. The county has not disposed of any asset and this does not appear in any budget documents. PI-13 Debt management D (i) Recording and reporting of D The county does not have a debt debt and guarantees management strategy. (ii) Approval of debt and N/A The county does not have legislation or guarantees procedures for borrowing or loan guaranteeing. (iii) Debt management strategy D The county government has neither debt management strategy nor debt management function. PI-14 Macroeconomic and fiscal D+ forecasting (i) Macroeconomic forecasts C The County Treasury adopts the macroeconomic indicators from the national government for its budget estimates in the CBROP. Policy-based fiscal strategy and budgeting (ii) Fiscal forecasts C CBROP, CFSP, and budget estimates forecasts are not accompanied by the underlying assumptions. (iii) Macro-fiscal sensitivity D The county does not perform sensitivity analysis analysis in relation to own source revenue. PI-15 Fiscal strategy D (i) Fiscal impact of policy D Neither the CFSP nor CBROP provides proposals explanations required. (ii) Fiscal strategy adoption D The fiscal strategy of the CFSP does not include explicit time-based quantitative fiscal goals and targets together with qualitative objectives. (iii) Reporting on fiscal D The CBROP does not provide specific outcomes action plan to address the deviations but generic recommendations. PI-16 Medium term perspective in D+ expenditure budgeting (i) Medium-term expenditure A The county provided the PBB that estimates indicated estimate for the budget year and the two outer years. 77 (ii) Medium-term expenditure D The medium-term expenditure ceilings ceilings are not issued before the budget circular. (iii) Alignment of strategic D Only 25% of the line ministries policies plans and medium-term and programs in the ADPs are not in line budgets with the approved budgets. (iv) Consistency of budgets D The budget documents do not provide with previous year estimates explanation of the changes to expenditure estimates between the last and the current medium-term budgets at the ministry level. PI-17 Budget preparation process C (i) Budget calendar D The budget circular is provided; however, it is not adhered to by all line ministries. (ii) Guidance on budget D The budget circular gives clear guidance preparation on the budget preparation to line ministries. The budget ceilings are not provided together with the budget circular. (iii) Budget submission to the A The budget was submitted 2 months legislature before the start of the next fiscal year in July. PI-18 Legislative scrutiny of budgets D+ (i) Scope of budget scrutiny A The County Assembly scrutinizes the ADP, CBROP, and the CFSP (ii) Legislative procedures for C The legislative procedures for budget budget scrutiny scrutiny are adhered to and public participation forums have been organized. There is no evidence of technical support and negotiation procedures. (iii) Timing of budget approval D The budgets for the 3 fiscal years under review have been approved before the start of the new fiscal year, but the actual dated of budget submission to the legislature has not been provided. (iv) Rules for budget C Clear rules exist as per the PFM Act, adjustments by the executive 2012, and they allow administrative reallocation and expansion of expenditures. PI-19 Revenue administration D Predictability and control in budget (i) Rights and obligations for D All county revenue is collected and execution revenue measures accounted for by the Revenue Unit under the finance and economic planning sector. There was however no documentary evidence on the deliberations of the committees. (ii) Revenue risk management D The county government of Kakamega has not put in place a comprehensive, structured, and systematic approach for 78 assessing and prioritizing compliance risks. (iii) Revenue audit and D The Revenue Unit of the county investigation government has not put in place audit and fraud investigation systems. (iv) Revenue arrears D The percentage of revenue arrears to monitoring total revenue was about 513%. PI-20 Accounting for revenues D+ (i) Information on revenue A Revenue collection reports are collections prepared monthly from daily reports. (ii) Transfer of revenue A All revenue collected in cash and checks collections is banked into the county bank accounts daily as evidenced by the daily banking slips. (iii) Revenue accounts D There was no evidence that reconciliation reconciliations of assessments, collections, arrears, and transfers to Treasury controlled accounts are carried out. PI-21 Predictability of in-year C+ resource allocation (i) Consolidation of cash C The county operates 7 accounts at the balances CBK and their cash balances are consolidated daily. (ii) Cash forecasting and A The cash forecast is provided annually monitoring and updated monthly on the basis of actual cash inflows and outflows. (iii) Information on D It was not ascertained that plans and commitment ceilings expenditure commitments were in accordance with budget appropriations. (iv) Significance of in-year B There was only once in-year budget budget adjustments adjustment in any of the 3 fiscal years assessed. PI-22 Expenditure arrears C (i) Stock of expenditure arrears C The stock of expenditure arrears is more than 6% in 2 years and less than 10% in the 3 years. (ii) Expenditure arrears C The report does not include age analysis monitoring of the arrears. PI-23 Payroll controls D+ (i) Integration of payroll and D Reconciliation of the payroll with personnel records personnel records takes place annually through payroll audit, but it is not sure if it is checked against the approved budget. (ii) Management of payroll A Changes to personnel records and changes payroll are updated monthly and in time for the following month’s payments. 79 (iii) Internal control of payroll A Authorization of records and payroll changes is restricted to payroll manger based on approved authority. (iv) Payroll audit D* Payroll audit reports and response to the reports were not provided as evidence. PI-24 Procurement D+ (i) Procurement monitoring D The data in the report is not complete for all procurement methods for goods, services, and works. (ii) Procurement methods D* There is no data on percentage of competitive versus noncompetitive tenders procured. (iii) Public access to D* The procurement met 3 of the 6 procurement information elements for this dimension. However, no information was provided on materiality. (iv) Procurement complaints A The procurement complaint system management meets all criteria. PI-25 Internal controls on non-salary A expenditure (i) Segregation of duties A There is a clear segregation of duties among PFM functions. (ii) Effectiveness of A Payment cannot be made if there are expenditure commitment no funds. controls (iii) Compliance with payment B The calculated figure for payments rules and procedures outside the IFMIS is about 4.6%. The authorization and justification are not evidenced. PI-26 Internal audit effectiveness D+ (i) Coverage of internal audit D* No evidence was provided to justify the percentage of audited county entities. (ii) Nature of audits and C Quality assurance is not diligently standards applied applied. The proportion of internal control audits versus compliance audits carried out over the last 3 years is not known. (iii) Implementation of internal D* No evidence was provided on the audits and reporting percentage of completed planned audits. (iv) Response to internal audits D* No evidence was provided. PI-27 Financial data integrity C and Reporting Accounting (i)Bank account reconciliation D Reconciliation of 81% of the county bank accounts takes place monthly. (ii) Suspense accounts N/A (iii) Advance accounts D Advance/imprest accounts are reconciled annually as a note to the AFS, but they are cleared more than 2 months after the year-end. 80 (iv) Financial data integrity A The IFMIS has a system administrator processes who ensures compliance of assigned responsibilities and ensures approvals are sought to make changes in the system. General Ledger reconciliations are carried out. PI-28 In-year budget reports D+ (i)Coverage and comparability C Budget reports are prepared quarterly, of reports allowing for comparison with the original budgets for the main administrative headings. (ii) Timing of in-year budget D Quarterly reports are prepared but reports submitted more than 2 months after the end of each quarter. (iii)Accuracy of in-year budget C It was not reported whether reports information on expenditure is covered at the commitment stage. PI-29 Annual financial reports D+ (i)Completeness of annual C The county is applying IPSAS cash. financial reports There is only information on revenue, expenditure, and cash balances, but no assets and liabilities and the actuals are comparable to the approved budget. (ii) Submission of reports for A The AFS were submitted for external external audit audit within 3 months after the end of fiscal year, that is, by 30 September of each year. This is in line with the PFM Act, 2012. (iii) Accounting standards D Variations between international and national standards are not disclosed and gaps are not explained in the reports of the OAG. PI-30 External audit D+ (i) Audit coverage and C Not all county budget value standards expenditures have been audited over the last 3 fiscal years. (ii) Submission of audit reports D The audit reports are submitted to the External scrutiny and audit to the legislature County Assembly usually after 12 months. (iii) External audit follow-up D* No evidence has been provided on follow-up activities and decisions. (iv)Supreme Audit Institution A The OAG is an independent office set up independence by the Constitution of Kenya. PI-31 Legislative scrutiny of audit D reports (i)Timing of audit report D* There is no evidence to ascertain how scrutiny much time it takes for complete scrutiny of the external audit report by the legislature after receipt of the report from the OAG. 81 (ii) Hearings on audit findings D* Records of attendance at hearings and audit reports for the last 3 completed fiscal years have not been provided. (iii) Recommendations on audit D* No record of recommendations made by the legislature by the legislatures for actions to be taken by the County Executive has been provided, nor has there been any record of procedures for following up on recommendations. (iv)Transparency of legislative D* No evidence has been provided on the scrutiny of audit reports number of hearings on the audit reports. 82 Annex 2. Summary of Observations on the Internal Control Framework Internal control components Summary of observations and elements 1. Control environment There is a strong regulatory framework in the county that governs both the national and county governments such as the Kenya Constitution, 2010; the PFM Act, 2012; and the PFM Regulations of 2015. Government circulars are issued periodically to ensure compliance with the laws. There is an Internal Audit Department set up for all the county government functions and annual external audits are carried out by an independent OAG. The audit reports are submitted to the County Assembly when completed. There is, however, a noted delay in completion of the external audits. 1.1 The personal and Chapter 6 of the Kenya Constitution sets out the responsibilities of professional integrity and leadership of all public officers. This includes (a) oath of office of state ethical values of management officers, (b) conduct of state officers, (c) financial probity of state officers, (d) and staff, including a supportive restriction on activities of state officers, (e) citizenship and leadership, (f) attitude toward internal control legislation to establish the ethics and anti-corruption commission, and (g) constantly throughout the legislation on leadership. These appear to be understood and internalized by organization the management and staff. The mission was not aware of any reported ethical and integrity issues. 1.2. Commitment to No information is available from the PEFA assessment. However, from our competence general understanding of the county, the senior-level staff have necessary academic qualification and experience. 1.3. The “tone at the top� (i.e. Paragraph 104, the PFM Act, states that management must ensure proper management’s philosophy and management and control of, and accounting for, the finances of the county operating style) government and its entities to promote efficient and effective use of the county's budgetary resources. This responsibility rests squarely with the county leadership. The tone at the top may not be adequate judging from the work of external auditors where audit findings are not acted upon. The assembly, which is a key institution of control, has not played its oversight role effectively. 1.4. Organizational structure It has not been reported if the county has an organizational structure. 1.5. Human resource policies The county organization policies are management by the County Public and practices Service Board. The board is responsible for recruitment, staff development, and discipline. The Public Service Commission is set up by Article 234 of the Constitution, which outlines the functions and powers of the Public Service Commission. One of the key mandates of this commission is to investigate, monitor, and evaluate the organization, administration, and personnel practices of the public service including the county government. 2. Risk assessment The PFM Regulation 165 sets out role of the accounting officer in risk management. It requires the accounting officer to develop: (a) risk management strategies, which include fraud prevention mechanism, and (b) a system of risk management and internal control that builds robust business operations. However, the county does not have a risk management policy and a risk register. 83 Internal control components Summary of observations and elements 2.1 Risk identification Several performance indicators are related to the extent to which risks are identified, notably: 11.1 Economic analysis of investment proposals: Proposed capital investment projects are not submitted to the Public Investment Committee for economic appraisal before approval; 13.3 Debt management strategy: Neither debt management strategy nor debt management function exists. 21.2 Cash forecasting and monitoring: The cash forecast is provided annually and updated monthly. 19.2 Revenue risk management: Risks are not identified, and there is no comprehensive, structured, and systematic approach for assessing and prioritizing compliance risks. 2.2 Risk assessment This has not been considered. One example of a risk assessment would be (significance and likelihood) preparing a medium-term debt strategy to be updated annually and providing clear targets with associated risks. 2.3 Risk evaluation Risk-based Annual Audit Plans are prepared by the Internal Audit Department and are designed to progressively secure key risks in the control environment on time. 2.4 Risk appetite assessment No information is available from the PEFA assessment. 2.5 Responses to risk (transfer, No information is available from the PEFA assessment. tolerance, treatment or termination) 3. Control activities The various functions of departments are set out in the PFM Regulations. In PI-25, internal control was examined. All functions are properly segregated, but there are no formalized activities in place to control the risks of the county operations. 3.1 Authorization and approval The Government Accounting Manual sets out the systems of authorization, procedures policies, standards, and accounting procedures and reports used by the agencies to control operations and resources and enable the various units to meet their objectives. These procedures or activities are implemented to achieve the control objectives of safeguarding resources, ensuring the accuracy of data and enabling adherence to laws, policies, rules, and regulations. There is also an SCOA used by all county departments. 3.2 Segregation of duties Appropriate segregation of duties exists, in accordance with the IFMIS and (authorizing, processing, government circulars, which specifies clear responsibilities. recording, reviewing) 3.3 Controls over access to 25.3 Compliance with payment rules and procedures is good. Actual transfer resources and records is carried out through the IFMIS. 27.4 Financial data integrity processes is rated A. Access to records is restricted by password and changes are recorded and result in audit trail. Internet banking through the IFMIS is used to record and process budget data. 3.4 Verifications The PFM regulations and finance manual set out the usual internal control instructions for verification, review of transactions to check the propriety and reliability of documentation, costing, or mathematical computation. It includes checking the conformity of acquired goods and services with agreed quantity and quality specifications. 84 Internal control components Summary of observations and elements The verification procedures should be built into every transaction. This is an internal checking procedure to avoid errors or fraud. 3.5 Reconciliations PI-27.1 Bank account reconciliation is rated B. Monthly bank reconciliation statements are prescribed per law and they are prepared by the county. 3.6 Reviews of operating No information is available from the PEFA assessment. performance 3.7 Reviews of operations, 13.3 Debt management strategy is rated D. There is no debt management processes and activities review practice. There is a draft debt management strategy that does not include risk indicator such as foreign currency risks. 24.1 Procurement monitoring is rated ‘A’. It is comprehensive and is not published annually. 3.8 Supervision (assigning, No information is available from the PEFA assessment. reviewing and approving, guidance and training) 4. Information and All county governments are required to report quarterly and annually to the communication COB, the OAG, and the National Treasury through the production of financial reports in a template provided by the PSASB. 5. Monitoring There are no reports on performance, planned outputs, and achieved outcomes. There are no control activities to cover (a) performance information for service delivery, (b) public access to fiscal information, (c) monitoring of fiscal risk, (d) monitoring on public investment, and (e) poor public asset management information. PI-26, internal audit, found that internal audit has been formally established that audit programs are largely completed but with delays. 5.1 Ongoing monitoring Ongoing monitoring in the county government involves checking the completeness of transaction documents and reports. Transaction documentation has to be complete to substantiate the transaction. Operational and financial reports are tools for monitoring performance, subsequent planning, and decision making. 5.2 Evaluations Example of the evaluations that take place are found in the following performance indicators: 8.4 Performance evaluation for service delivery is rated ‘D’ and 11.2 Investment project selection is rated ‘D’. Major investment projects are not evaluated before they are included in the budget 5.3 Management responses PI-26.4 examined response to internal audits. Internal audit reports provide recommendations that are presented by the head of the audited unit. Documentary evidence of management response to internal audit recommendations has not been provided. Due to the lack of an audit committee and inadequate senior management support, there is no clear follow-up of the management actions. 85 Annex 3: Sources of Information by Indicator The data on aggregate budgeted expenditure was obtained from the original budget. To confirm that the budget was approved, the estimate was compared against the amounts in the respective Appropriation Act. The information on expenditure has been obtained from the economic classifications in the AFS, more specifically the statement of receipts and payments. The shortcoming of comparing budgeted expenditure to actual expenditure by economic classification is that the classification in the approved budget does not match those reported in the financial statements because the financial statements have been prepared based on IPSAS cash. Indicator/dimension Data Sources I. Budget reliability Subnational PEFA indicator HLG-1.1. Outturn of transfers from • Annual budget estimates approved by the legislature higher-level government • Annual budget execution report or AFS HLG-1.2. Earmarked grants outturn • AFS for the three fiscal years HLG-1.3. Timeliness of transfers from higher-level government PI-1. Aggregate expenditure outturn • Annual budget estimates approved by the legislature 1.1 Aggregate expenditure outturn • Annual budget execution report PI-2. Expenditure composition • Annual budget estimates approved by the legislature outturn • Annual budget execution report or AFS 2.1. Expenditure composition outturn • AFS for the three fiscal years by function 2.2. Expenditure composition outturn by economic type 2.3. Expenditure from contingency reserves PI-3. Revenue outturn • Annual budget estimates approved by the legislature 3.1 Aggregate revenue outturn • Annual budget execution report or AFS 3.2 Revenue composition outturn • AFS for the three fiscal years II. Transparency of public finances • Annual budget document for FY2015/16 PI-4. Budget classification • GFS list 4.1 Budget classification • Copy of an SCOA • Last annual budget estimates and approved budget for FY2015/16 PI-5. Budget documentation • CFSP for FY2015/16 5.1 Budget documentation • ADP 2013/14, 2015/15, 2015/2016, 2016/17 PI-6. Central government operations outside financial reports 6.1 Expenditure outside financial • Information from Treasury reports 6.2 Revenue outside financial reports 6.3 Financial reports of extrabudgetary units PI-7. Transfers to subnational governments 7.1 System for allocating transfers • N/A 7.2 Timeliness of information on transfers 86 Indicator/dimension Data Sources PI-8. Performance information for service delivery 8.1 Performance plans for service delivery • AFS 8.2 Performance achieved for service • In-year budget execution reports delivery • CFSP 8.3 Resources received by service • The National Treasury delivery units 8.4 Performance evaluation for service delivery PI- 9 Public access to fiscal • Information from the National Treasury corroborated through information availability at government websites and governance nongovernmental 9.1 Public access to fiscal information organizations • Approved budget • Budget calendar 2014/15 III. Management of assets and liabilities PI- 10 Fiscal risk reporting 10.1 Monitoring of public corporations • The National Treasury 10.2 Monitoring of sub-national • AFS government • Budget execution reports 10.3 Contingent liabilities and other fiscal risks PI- 11: Public investment management • Kakamega ADP 2014/15 and 2015/16 11.1 Economic analysis of investment • Kakamega CFSP 2014/20 and 2015/20 proposals • County Monitoring and Evaluation Project Report 2016 11.2 Investment project selection • County Projects Status 2015/16 11.3 Investment project costing 11.4 Investment project monitoring PI-12: Public asset management • Consolidated financial statements for FY2015/16, including notes 12.1 Financial asset monitoring relating to the holdings of financial assets 12.2 Nonfinancial asset monitoring • Asset register of Kakamega County 12.3 Transparency of asset disposal. PI-13: Debt management 13.1 Recording and reporting of debt • Treasury and guarantees • Debt Management Unit 13.2 Approval of debt and guarantees 13.3 Debt management strategy IV. Policy-based fiscal strategy and budgeting PI-14: Macroeconomic and fiscal forecasting • Annual budget documents 14.1 Macroeconomic forecasts • CBROP for FY2014/15 and FY2015/16 14.2 Fiscal forecasts 14.3 Macro-fiscal sensitivity analysis PI-15 Fiscal strategy 15.1 Fiscal impact of policy proposals • The National Treasury 15.2 Fiscal strategy adoption • CFSP for FY2014/15, FY2015/16, and FY2016/17 15.3 Reporting on fiscal outcomes 87 PI-16 Medium-term perspective in expenditure budgeting 16.1 Medium-term expenditure estimates • Annual budget estimates 16.2 Medium-term expenditure • Budget circular ceilings • MoF 16.3 Alignment of strategic plans and medium-term budgets 16.4 Consistency of budgets with previous year’s estimates PI-17: Budget preparation process 17.1 Budget calendar. • 2016 budget circular 17.2 Guidance on budget • 2016 CBROP preparation • Budget calendar 2016/17 17.3 Budget submission to the legislature • Budget submission 2014/15, 2015/16, 2016/17 PI-18: Legislative scrutiny of budgets 18.1 Scope of budget scrutiny. 18.2 Legislative procedures for • County Assembly budget estimates 2016 budget scrutiny. • County assembly standing orders 18.3 Timing of budget approval. 18.4 Rules for budget adjustments by the executive. V. Predictability and control in budget execution PI-19 Revenue administration 19.1 Rights and obligations for revenue measures • Revenue report for February 2017 19.2 Revenue risk management • Revenue collection authority records such as a documented report on 19.3 Revenue audit and investigation the stock of revenue arrears 19.4 Revenue arrears monitoring PI-20 Accounting for Revenues 20.1 Information on revenue collections • Treasury 20.2 Transfer of revenue collections • Central Bank of Kenya 20.3 Revenue accounts reconciliation. PI-21 Predictability of in-year resource allocation 21.1 Consolidation of cash balances. 21.2 Cash forecasting and • Treasury - List of bank accounts monitoring. • Bank balances as of March 29, 2017 21.3 Information on commitment • Cash flow requisitions 2016/17 ceilings. 21.4 Significance of in-year budget adjustments. PI-22 Expenditure arrears 22.1 Stock of expenditure arrears. • Expenditure arrears as of end-2015 and 2016 22.2 Expenditure arrears monitoring PI-23 Payroll controls 88 23.1 Integration of payroll and personnel records. • Payroll variance support documentation 23.2 Management of payroll • Salary arrears less than 3%; changes. • Payroll change authorization trail 23.3 Internal control of payroll. • Payroll restriction and audit trail 23.4 Payroll audit. PI-24 Procurement 24.1 Procurement monitoring. • Consolidated procurement plan of Kakamega; 24.2 Procurement methods. • Project Implementation Status Report 2015/16 of Kakamega 24.3 Public access to procurement • Website of the PPARB information. • PPDA 2015 24.4 Procurement complaints management. PI-25 Internal controls on non- salary expenditure • IFMIS modules and segregation of duties 25.1 Segregation of duties. • IFMIS changing rights request 25.2 Effectiveness of expenditure • Standard Financial Management Operating Procedures of Kakamega commitment controls. County, 2014 25.3 Compliance with payment rules and procedures. PI-26 Internal audit 26.1 Coverage of internal audit. 26.2 Nature of audits and standards • Internal Audit Work Plan 2016/17 applied • Internal audit questionnaire 26.3 Implementation of internal audits and reporting. 26.4 Response to internal audits. VI. Accounting and reporting PI-27 Financial data integrity • Bank reconciliations 2015/16 27.1 Bank account reconciliation. • Central Bank of Kenya 27.2 Suspense accounts. • Budget directorate 27.3 Advance accounts. • Accounting directorate 27.4 Financial data integrity • Oversight body processes • Internal audit PI-28 In-year budget reports 28.1 Coverage and comparability of • Annual expenditure reports 2015/16 reports. • Expenditure reports 28.2 Timing of in-year budget • Quarterly financial reports reports. • CBROP, CFSP transmittal letters 28.3 Accuracy of in-year budget • Kakamega County Assembly Financial Statements reports PI-29 Annual financial reports 29.1 Completeness of annual financial reports. • Annual Financial Reports 2013/14, 2014/15, 2015/16 29.2 Submission of the reports for external audit. 29.3 Accounting standards. VII. External scrutiny and audit PI-30 External audit • SAI – OAG audit reports 2013/14, 2014/15, 2015/16 30.1 Audit coverage and standards. 89 30.2 Submission of audit reports to • SAI the legislature • Legislation on SAI 30.3 External audit follow up. • External reports on SAI independence and financial governance 30.4 Supreme Audit Institution independence. PI-31 Legislative scrutiny of audit reports 31.1 Timing of audit report scrutiny 31.2 Hearings on audit findings. • SAI 31.3 Recommendations on audit by the legislature. 31.4 Transparency of legislative scrutiny of audit reports. Other documents and materials that have been used in the assessment include the following: 1. Constitution of Kenya, 2010. 2. Government of Kenya Review of the Strategy for Public Financial Management Reforms in Kenya 2013–2018 report (2016). 3. World Bank and Government of Kenya In-depth Report Recommendations and Action Plan Following the Analysis of Financial Management, Procurement and Human Resource Management in Kenya County Governments (2015). 4. National Treasury 2015 Budget Review and Outlook Paper. 5. County Budget Review and Outlook Papers. 6. County Fiscal Strategy Papers. 7. World Bank Public Expenditure Review of 2015. 8. World Bank Kenya Economic Updates of 2015 and 2016. 9. World Bank Country Economic Memorandum 2016. 10. Government of Kenya National Capacity Building Framework Progress and Implementation Reports. 11. Kenya Economic Survey 2016. 12. 2016 Budget Policy Statement. 13. Budget Summary for the FY2016/17 and Supporting Information. 14. Division of Revenue and County Allocation of Revenue Acts 2014, 2015, and 2016. 15. Revenue Books. 90 16. Quarterly Economic and Budgetary Reviews 2015/16. 17. COB quarterly, biannual, and annual reports. 18. Auditor General Reports. 19. PFM Act, 2012, and related amendments. 20. Estimates of Revenues, Grants, and Loans Book for FY2016/17. 21. The Constitution of Kenya, 2010. 22. End of assignment report to the National Treasury by PwC on the provision of technical assistance in the preparation of individual and consolidated financial statements for the county government entities for FY2014/15 (June 2016). 23. Integrated Fiduciary Assessment Report. Program for Results for the Kenya Devolution Support Operation (KDSP). December 21, 2015. 24. PEFA (2016a). Framework for assessing PFM. 25. PEFA (2016b). Supplementary guidance for subnational PEFA assessment. 26. KIPPRA Kenya Economic Report 2016. 91 Annex 3A: List of Persons Who Have Been Interviewed and Provided Information No. Name Function Telephone Email 1 Samson Otieno Head of Accounting 0726836090/0724874491 otieno_samson@yahoo.com 2 Samson Obwanga Head of the County Treasury — samsonobwanga@yahoo.com 3 Jacob Mumia Economic Planning 0713-53-36-76 4 Alex Simiyu Economic Planning 0725402681 5 WyciffWabuche — 0720079134 wycliffwabuche@yahoo.com 6 Victor Kisyamani — 0716694258 Victorkisyamani@yahoo.com 7 David Simiyu — 0713550355 Dsimiyu80@yahoo.com 8 Pascal Mwanje Principal Accountant at the County Assembly 0720389708 Pmwanje1977@gmail.com 9 Charles Tunga Head of Internal Audit 0725629755 ctunga@kakamega.go.ke 10 NabothOchieng — 0724443557 oderonaboth@yahoo.com 11 Joseph Bushuru — jbushuru@gmail.com 12 Lawrence Omuhaka: Head of Human Resources 0721-426439 omuhakalawrence@gmail.com 13 Antony Chitare — 0720568919 antonyuyendo@yahoo.com 14 Esther Akoth HR County Assembly 0722900741 esther.ariko@yahoo.com 15 Jerry Mukoko Head of Revenue 0720-867061 mukokoje@gmail.com. 16 Lucas Mwita Deputy Head of Revenue 0721778168 lucasmwita204@yahoo.com 17 Mang’eni Clerk Budget Committee 0710-460065 vmangeni@yahoo.com 92 Annex 4. Subnational Government Profile 1. Subnational government structure The subnational government structure of Kakamega is governed and guided to a large extent by the national government legislation. The national legal framework relevant for PFM was amended and enforced over the last three to four years and was meant to cover all national and subnational structures. Because the devolution in Kenya was deployed only in 2013, the subnational government structures were developed by mirroring the establishment of the higher-level national government. The administrative structures of Kakamega County consist of (a) the Office of the Governor; (b) the County Assembly and (c) the county government (Executive). The County Assembly is involved in the approval of the budget of the Executive by its budget committees, but it has no role in the monitoring process. The budget monitoring is performed by the COB at the County Executive administration. The main responsibilities of the County Assembly are to enact laws and supervise the County Executive. The County Assembly receives and approves plans and policies for management of the county’s financial resources. MCAs are elected by voters at the wards and some are nominated by political parties. The Governor as well the MCAs are independently elected in county elections. The county government has not yet developed a specific legal framework for its own structures. The economic activities are mainly farming and fishing. Kakamega serves as the headquarters of Kenya's largest sugar producing firm, Mumias Sugar, located in the town of Mumias. The county of Kakamega serves a population of 1,660,651 spread over 12 constituencies on a total area of 3,050.3 km2 with population density of 544 per km2. The nongovernmental organizations operating in the country of Kakamega are as follows: 1. Community Education Services Canada (CES Canada), established in 2004, is a Canadian nonprofit organization based in the greater Toronto area. In July 2013, CES Canada was granted Special Consultative status with the United Nations. It mainly focuses on education, water, health, and nutrition. 2. The primary mission of Kenya Education Endowment Fund (KEEF) is to provide scholarships for very bright students from Kakamega County in Western Kenya who do not have the financial means to pay the fees for secondary and post-secondary schools in Kenya. KEEF was established in 2004 under the Society Act of British Columbia and was granted charitable status by the Canada Revenue Agency in 2006. KEEF is a nonprofit organization, not affiliated with any government or religious organization. KEEF’s Board of Directors from British Columbia, Canada, is represented in Kakamega by volunteers who interview and select students meeting the academic criteria and showing a proven need for assistance. KEEF works with local Kenyan communities through personal involvement and close collaboration. 3. Kakamega Orphan Project is a Quaker-founded initiative that supports the education and well- being of orphans and other vulnerable young people. It also supports over 150 elementary school and 150 high school students as well as college students and programs for out-of-school youth. It is funded primarily by a U.S. partner organization. 93 4. African Canadian Continuing Education Society (ACCES) is a Canadian nonprofit organization that provides a suite of programs to foster social and economic improvements among the poorest of the poor, both in rural areas and the slums of Kibera in Nairobi. The flagship program of ACCES is providing post-secondary scholarships to bright and needy students from poor families. The devolution of 2010 established a lower subnational government level with all national-level legislations being mirrored in the county environment. That is, there were no laws developed or reforms undertaken in the county of Kakamega at the time of this assessment. The total expenditure at the end of 2016 was Ksh 10,799 million, the expenditure per capita was Ksh 6,503, and the own source revenue was Ksh 515,019,231 or only 5 percent of total revenue in 2016. Table A. Overview of subnational governance structure in Kakamega County Government Percentage of Own Approves Percentage % funded level or Corporate Number of Average public political own of public by administrative body jurisdictions population expenditure/total leadership budget revenues transfers tier revenue Local Yes Yes Yes 1 1,660, 651 107 15 92 2. Main functional responsibilities of the subnational government The Constitution of Kenya, 2010, in the Fourth Schedule assigns functions between the national and county governments. The Constitution assigns the task of service delivery in key sectors such as water, health, and agriculture, among others, to county governments, with the national government’s role in some of the sectors being that of policy formulation. The structure of the county government (Executive) of Kakamega is as follows: (a) Ministry of County Treasury and Economic Planning (b) Ministry of Public Service and Administration (c) Ministry of Health Services (d) Ministry of Transport, Infrastructure, and Public Works (e) Ministry of Education, Science, and Technology (f) Ministry of Agriculture, Livestock, Fisheries, and Cooperatives (g) Ministry of Environment, Water, Energy, Natural Resources, and Forestry (h) Ministry of Lands, Housing, Urban Areas, and Physical Planning (i) Ministry of Labour, Social Services, Culture, Youth, and Sports (j) Ministry of Industrialization, Trade, and Tourism These functions are entirely devolved with the subnational government, whereas the functions of defense and overall coordination and oversight as well as external audit are with the national government. 94 Schedule 4 of the Constitution clearly lists the distinct functions of the national and county governments. The national government shall pass legislations and implement policies to support the devolution process as well as provide adequate support to county governments to perform their functions while the county governments will be responsible for service delivery at the county level in addition to other functions. 3. Subnational budgetary systems The national government laws and regulations guide to a high degree the subnational budget cycle. The CBK is the banker for the national and county governments and thus monitors ensure that the institutions are not at risk of overdraft and advises the institutions on financial matters. The county of Kakamega and its entities are supposed to hold and manage their own bank accounts in the CBK, but many counties in Kenya violate this rule and deposit cash in commercial banks. The PFM Act obliges all counties to hold their account at the CBK except for imprest bank accounts for petty cash that can be in commercial banks. The subnational government has its own budget, adopted by its own approval body (by the County Assembly) and this process does not require subsequent review or modification by the national government. The county possess the authority to procure its own supplies and capital infrastructure within the context of applicable procurement legislation, which is the PPDA 2015 relevant for both national and subnational level. The Procurement Directorate of the County Executive is in charge of the entire supply chain management. It prepares a Project Implementation Status Report annually, providing information on value of procurement and the awarded contracts. However, the procurement complaints are handled at the national level by a PPARB, which is an external higher authority and is not involved in the procurement process. 4. Subnational fiscal systems The composition of financial resources collected and received by the county of Kakamega is similar to all sources of revenue for the county governments in Kenya and they are equitable share, conditional grants and own source revenues. The Constitution of Kenya (Article 209) provides that a county may impose property rates, entertainment taxes, and any other charges for the services they provide. The main tax revenue source of Kakamega County is from various charges related to business permits, parking and market fees, as well as cesses. The collection of own source revenue has been deteriorating in the three years of the assessment. The County Treasury of Kakamega is improving own source revenue outturn by forming a semiautonomous revenue agency. The transfers constitute the majority of revenue fund of the counties in Kenya. They are allocated by the National Treasury on the basis of the county population applying a specific formula. The main transfers are the earmarked grants transferred from the national government to the counties, which constitute nearly 95 percent of the county revenue of Kakamega. These transfers are distributed quarterly across the year through the IFMIS. However, there are no transfers to any lower subnational administrative structure than the county government. There are grants, constituting about 3 percent of the total county revenue, that are transferred for particular earmarked programs related to education and health. Counties are allowed to borrow domestically or externally by Article 212 of the Constitution and under Section 140 of the PFM Act, 2012. Although the legislation provides for deficit financing through 95 borrowing, the county governments were restrained from borrowing in the absence of a clear borrowing framework over the three financial years of the assessment. Thus, the county of Kakamega has not accumulated debts thus far, but it has inherited debt from the defunct local authorities and it is supposed to set up a debt management function and to prepare a debt management strategy. These, however, have not been established yet. Table B. Overview of subnational government finances for 2016 Total value Value per capita Percent of total Item Ksh Ksh % Wage and salary expenditure 4,917,531,516 2,961 0.0001 Nonwage recurrent administrative expenditure 3,285,904,098 1,979 0.0001 Capital expenditure 3,061,159,643 1,843 0.0001 Total expenditure 11,264,595,257 6,783 0.0001 Own revenue 515,019,231 310 0.0001 Intergovernmental fiscal transfers 9251132376 5,571 0.0001 Other revenue sources 317,818,852 191 0.0001 Total revenue 10,083,970,459 6,072 0.0001 Borrowing NA NA NA 5. Subnational institutional (political and administrative) structures The County Assembly is directly elected by the citizens of the county independently from any higher-level participation. The elected County Assembly is responsible for approving the budget and monitoring the finances. The county political leadership and executive are able to appoint their own officers independent from the higher level national administration and control. The only PFM function that is still exercised by a national- level institution is the external audit organized by the OAG. Nevertheless, the OAG has established a local decentralized hubs of audit teams who perform the audits of a particular country but report to the headquarter at the national level. The chief administration officer, the chief financial officer, and the internal auditors are appointed and hired by the county of Kakamega. 96 Annex 5. Calculation Sheet Templates for PI-1, PI-2, and PI-3 Calculation Sheet for PFM Performance Indicators PI-1, PI-2.1, and PI-2.3 Table 1 - Fiscal years for assessment Year 1 = 2013/14 Year 2 = 2014/15 Year 3 = 2015/16 Table 2: Data for 2013/14 (Ksh) Functional head Budget Actual Adjusted budget Deviation Absolute deviation % Office of the Governor 271,125,751 0 271,125,751 271,125,751 0.0 Public Service and Administration 1,893,099,564 3,524,418,247 815,246,162 2,709,172,085 2,709,172,085 332.3 County Treasury 502,797,412 216,834,929 216,525,146 309,783 309,783 0.1 Water, environment, and natural resource 284,463,240 36,573,646 122,501,515 −85,927,869 85,927,869 70.1 Social services, youth, and sports 376,757,786 67,143,661 162,247,324 −95,103,663 95,103,663 58.6 Transport, infrastructure, and public works 2,416,881,694 153,277,669 1,040,808,186 −887,530,517 887,530,517 85.3 Lands, housing, urban areas, and physical planning 362,804,888 17,930,637 156,238,635 −138,307,998 138,307,998 88.5 Health services 3,333,169,208 593,857,839 1,435,399,096 −841,541,257 841,541,257 58.6 Agriculture, livestock, fisheries, and cooperatives 715,065,446 57,147,543 307,936,450 −250,788,907 250,788,907 81.4 Trade, tourism, and industrialization 1,022,457,000 43,267,757 440,311,836 −397,044,079 397,044,079 90.2 Education, science, and technology 1,233,550,000 497,823,942 531,217,122 −33,393,180 33,393,180 6.3 County Assembly 1,114,504,183 228,980,973 479,951,121 −250,970,148 250,970,148 52.3 Allocated expenditure 13,255,550,421 5,708,382,594 5,708,382,594 0 5,961,215,238 Interests Contingency Total expenditure 13,255,550,421 5,708,382,594 Overall (PI-1) variance 43.1 Composition (PI-2) variance 104.4 Contingency share of budget 0.0 97 Table 3: Data for 2014/15 (Ksh) Functional head Budget Actual Adjusted budget Deviation Absolute deviation % Office of the Governor 271,125,751 155,995,573 198,273,644 −42,278,071 42,278,071 21 Public service and administration 2,101,513,781 1,797,464,465 1,536,832,239 260,632,226 260,632,226 17 County Treasury 497,260,168 582,051,507 363,645,228 218,406,279 218,406,279 60 Water, environment, and natural resource 275,468,000 134,089,399 201,449,121 −67,359,722 67,359,722 33 Social services, youth, and sports 276,029,110 97,194,000 201,859,459 −104,665,459 104,665,459 52 Transport, infrastructure, and public works 1,139,690,660 958,435,015 833,453,183 124,981,832 124,981,832 15 Lands, housing, urban areas, and physical planning 364,540,000 72,461,586 266,587,271 −194,125,685 194,125,685 73 Health services 2,378,072,277 1,744,453,345 1,739,078,837 5,374,508 5,374,508 0 Agriculture, livestock, fisheries, and cooperatives 1,040,200,000 431,610,586 760,695,890 −329,085,304 329,085,304 43 Trade, tourism, and industrialization 409,950,000 318,669,048 299,795,501 18,873,547 18,873,547 6 Education, science, and technology 816,440,000 562,296,531 597,060,712 −34,764,181 34,764,181 6 County Assembly 751,000,000 693,214,617 549,204,589 144,010,028 144,010,028 26 Allocated expenditure 10,321,289,747 7,547,935,672 7,547,935,672.0 0.0 1,544,556,842.2 Interests Contingency Total expenditure 10,321,289,747 7,547,935,672 5.1 5.2 5.1 overall (PI-1) variance 73.1 composition (PI-2) variance 20.5 contingency share of budget 0.0 Table 4: Data for 2015/16 (Ksh) Functional head Budget Actual Adjusted budget Deviation Absolute deviation % Office of the Governor 626,599,838 214,060,850 504,427,505 −290,366,655 290,366,655 58 Public service and administration 1,980,547,705 2,431,874,721 1,594,387,161 837,487,560 837,487,560 53 County Treasury 390,642,806 341,277,820 314,476,583 26,801,237 26,801,237 9 Water, environment, and natural resource 322,157,691 167,493,726 259,344,466 −91,850,740 91,850,740 35 Social services, youth, sports 417,030,280 246,525,453 335,719,116 −89,193,663 89,193,663 27 Transport, infrastructure, and public works 1,742,435,569 1,715,129,443 1,402,701,330 312,428,113 312,428,113 22 Lands, housing, urban areas, and physical planning 296,062,159 133,496,438 238,336,953 −104,840,515 104,840,515 44 Health services 3,173,551,311 2,737,056,025 2,554,782,928 182,273,097 182,273,097 7 Agriculture, livestock, fisheries, and cooperatives 939,862,773 448,361,570 756,611,484 −308,249,914 308,249,914 41 Trade, tourism, and industrialization 451,613,185 243,317,395 363,559,162 −120,241,767 120,241,767 33 98 Functional head Budget Actual Adjusted budget Deviation Absolute deviation % Education, science, and technology 1,016,586,176 467,844,702 818,375,616 −350,530,914 350,530,914 43 County Public Service Board 85,798,311 38,949,465 69,069,644 −30,120,179 30,120,179 44 County Assembly 886,853,365 740,342,013 713,937,673 26,404,340 26,404,340 4 Allocated expenditure 12,329,741,169 9,925,729,622 9,925,729,622 0 2,770,788,694 Interests Contingency Total expenditure 12,329,741,169 9,925,729,622 Overall (PI-1) variance 81 Composition (PI-2) variance 28 Contingency share of budget 0 Table 5: Results Matrix For PI-1 For PI-2.1 For PI-2.3 Year total exp. deviation composition variance contingency share 2013/14 43.1% 104.4% 2014/15 73.1% 20.5% 0.0% 2015/16 80.5% 27.9% 99 Calculation Sheet for Expenditure by Economic Classification Variance PI-2.2 Table 1: Fiscal years for assessment Year 1 = 2013/14 Year 2 = 2014/15 Year 3 = 2015/16 Table 2: Data for 2013/14 (Ksh) Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Compensation of employees 3,670,324,668 2,831,056,530 1,511,679,227 1,319,377,303 1,319,377,303 87.3 Use of goods and services 2,035,363,395 936,231,082 838,295,476 97,935,606 97,935,606 11.7 Consumption of fixed capital 381,572,358 221,857,539 157,156,399 64,701,140 64,701,140 41.2 Interest — — 0 0 0 0 Subsidies — — 0 0 0 0 Grants 50,000,000 20,593,263 −20,593,263 20,593,263 100.0 Social benefits — — 0 0 0 0 Other expenses 7,118,300,000 1,470,359,700 2,931,780,487 −1,461,420,787 1,461,420,787 49.8 Total expenditure 13,255,560,421 5,459,504,851 5,459,504,851 0 2,964,028,099 overall variance 242.8 composition variance 54.3 Table 3: Data for 2014/15(Ksh) Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Compensation of employees 3,675,397,780 3,247,713,320 1,513,768,666 1,733,944,654 1,733,944,654 115 Use of goods and services — 1,595,418,085 0 1,595,418,085 1,595,418,085 0 Consumption of fixed capital 4,634,400,000 3,112,549,590 1,908,748,365 1,203,801,225 1,203,801,225 63 Interest — — 0 0 0 0 Subsidies — — 0 0 0 0 Grants — — 0 0 0 0 Social benefits — 0 0 0 0 Other expenses −2,011,491,967 — -828,463,664 828,463,664 828,463,664 -100 Total expenditure 6,298,305,813 7,955,680,995 2,594,053,367 5,361,627,628 5,361,627,628 Overall variance 79 100 Composition variance 207 Table 4: Data for 2015/16(Ksh) Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Compensation of employees 3,699,238,010 3,955,166,241 1,523,587,628 2,431,578,613 2,431,578,613 160 Use of goods and services 2,142,286,201 1,553,979,008 882,333,265 671,645,743 671,645,743 76 Consumption of fixed capital 5,954,117,304 2,904,177,249 2,452,294,077 451,883,172 451,883,172 18 Interest — — 0 0 0 0 Subsidies — — 0 0 0 0 Grants — 2,004,212,444 0 2,004,212,444 2,004,212,444 0 Social benefits — — 0 0 0 0 Other expenses — 12,811,088 0 12,811,088 12,811,088 0 Total expenditure 11,795,641,515 10,430,346,030 4,858,214,970 5,572,131,060 5,572,131,060 Overall variance 113 Composition variance 115 Table 5: Results Matrix Year Total expenditure deviation Composition variance 2013/14 242.8% 54.3% 2014/15 79.2% 206.7% 2015/16 113.1% 114.7% 101 Calculation Sheet for PFM Performance Indicators PI-3: Revenue composition outturn Table 1: Fiscal years for assessment Year 1 = 2013/2014 Year 2 = 2014/2015 Year 3 = 2015/2016 Table 2: Data for 2013/14 (Ksh) Economic head budget actual adjusted budget deviation absolute deviation % Own source revenue Property rates 51,065,953 37,173,324 4,772,775 32,400,549 32,400,549 678.9 Single business permit 58,472,574 39,216,196 5,465,020 33,751,176 33,751,176 617.6 Barter market 36,560,824 42,905,440 3,417,083 39,488,357 39,488,357 1155.6 CESS 127,354,968 17,123,608 11,902,973 5,220,635 5,220,635 43.9 Housing/stall 10,457,528 1,856,205 977,392 878,813 878,813 89.9 Slaughter 50,701,573 — 4,738,719 (4,738,719) 4,738,719 100.0 Bus park — 48,866,080 — 48,866,080 48,866,080 #DIV/0! Parking fee 53,797,916 18,838,018 5,028,113 13,809,905 13,809,905 274.7 Hire of machinery 10,865,653 2,271,370 1,015,536 1,255,834 1,255,834 123.7 Other revenues/devolved government functions 3,004,647,096 5,494,042 280,823,226 (275,329,184) 275,329,184 98.0 Health facilities and others 119,106,093 115,528,563 11,132,008.6 104,396,554.4 104,396,554.4 937.8 Total revenue 3,523,030,178 329,272,846 329,272,846.0 0.0 560,135,807.0 Overall variance 9.3 Composition variance 170.1 Table 2: Data for 2014/15 (Ksh) Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Own source revenue Property rates 45,000,000 20,894,388 26,605,859 −5,711,471 5,711,471 21.5 Single business permit 117,295,528 91,237,493 69,349,963 21,887,530 21,887,530 31.6 Barter market 37,487,059 39,761,963 22,163,898 17,598,065 17,598,065 79.4 102 Economic head Budget Actual Adjusted budget Deviation Absolute deviation % CESS 230,000,000 42,083,894 135,985,503 −93,901,609 93,901,609 69.1 Housing/stall 3,820,640 1,777,435 2,258,920 −481,485 481,485 21.3 Kiosk fee 12,329,480 4,755,690 7,289,698 −2,534,008 2,534,008 34.8 Slaughter 6,789,080 915,314 4,013,985 −3,098,671 3,098,671 77.2 Bus park 45,986,088 45,123,400 27,188,875 17,934,525 17,934,525 66.0 Parking fee 46,350,800 11,359,310 27,404,508 −16,045,198 16,045,198 58.5 Hire of machinery 5,821,760 2,417,490 3,442,065 −1,024,575 1,024,575 29.8 Other revenues/devolved government functions 61,363,312 5,294,000 36,280,525 −30,986,525 30,986,525 85.4 Liquor license — 7,444,500 0 7,444,500 7,444,500 #DIV/0! Court fines — 344,086 0 344,086 344,086 #DIV/0! Health facilities and others 262,000,000 243,480,062 154,905,225 88,574,837 88,574,837 57.2 Total revenue 874,243,747 516,889,025 516,889,025 0 307,567,086 Overall variance 59.1 Composition variance 59.5 Table 4: Data for 2015/16 (Ksh) Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Own source revenue Property rates 47,250,000 19,078,434 23,825,259.3 −4,746,825.3 4,746,825.3 19.9 Single business permit 123,160,304 71,420,051 62,102,141.3 9,317,909.7 9,317,909.7 15.0 Barter market 39,361,412 32,389,482 19,847,531.2 12,541,950.8 12,541,950.8 63.2 CESS 241,500,000 43,186,774 121,773,547.5 −78,586,773.5 78,586,773.5 64.5 Housing/stall 4,011,672 11,958,910 2,022,838.6 9,936,071.4 9,936,071.4 491.2 Kiosk fee 12,945,954 3,887,700 6,527,845.7 −2,640,145.7 2,640,145.7 40.4 Slaughter 7,128,534 1,431,130 3,594,479.8 −2,163,349.8 2,163,349.8 60.2 Bus park 48,285,392 48,381,260 24,347,343.6 24,033,916.4 24,033,916.4 98.7 Parking fee 48,668,340 8,925,394 24,540,440.6 −15,615,046.6 15,615,046.6 63.6 Hire of machinery 6,112,848 7,832,156 3,082,332.0 4,749,824.0 4,749,824.0 154.1 Other revenues/devolved government functions 21,000,000 66,821,659 10,589,004.1 56,232,654.9 56,232,654.9 531.0 Contribution in lieu of rate 86,935,033 — 43,835,972.6 −43,835,972.6 43,835,972.6 100.0 Liquor license 38,331,879 13,139,200 19,328,401.2 −6,189,201.2 6,189,201.2 32.0 103 Economic head Budget Actual Adjusted budget Deviation Absolute deviation % Court fines 208,632 — 105,200.2 −105,200.2 105,200.2 100.0 Health facilities and others 275,100,000 175,786,142 138,715,954.1 37,070,187.9 37,070,187.9 26.7 Total revenue 1,000,000,000 504,238,292 504,238,292.0 0.0 307,765,030.0 Overall variance 50.4 Composition variance 61.0 104