103651 Detailed Procurement Plan Scaling-Up Participatory Sustainable Forest Management Project (P130222) (IDA Project No: H 852-LA/TF015286) (Revised as of January 14, 2016) I. General 1. Project information:  Country/Borrower: Lao PDR  Project Implementing Agency: National Project Management Office (NPMO), Department of Forestry (DoF), Ministry of Agriculture and Forestry (MAF) Provincial Agricultural & Forestry Office (PAFO) in 13 provinces (Khammouane, Savannakhet, Salavanh, Champasak, Attapeu, Sekong, Bolikhamxay, Vientiane, Sayabouly, Saysomboun, Bokeo, Luang Namtha and Oudomxay) 2. Bank’s approval date of the procurement Plan:  Original Plan: April 9, 2013.  First Revision: April 29, 2014.  Second Revision: January 2, 2015.  Third Revision: July 10, 2015.  Forth Revision: January 14, 2016. 3. Date of General Procurement Notice: Dec 27, 2013 4. Period covered by this procurement plan: March 1, 2014 till December 2018 1 II. Works and Goods and Non-consultant Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Contract Value Prior Review Threshold Comments Method Method (US$’000) (US$’000) 1. NCB (Works) 200 - < 2,000 First NCB contract for Works 2. First shopping contract for Shopping (Works) < 200 Works. 3. ICB (Goods) ≥ 600 All ICB contractsfor goods 4. NCB (Goods) 100 - < 600 First NCB contract for goods 5 First shopping contract for Shopping (Goods) < 100 goods 6 Direct Contracting All contracts 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: None 4. Procurement packages for Goods (prior and post reviews) with method and Time Schedule 2 1 2 3 4 5 6 7 8 9 Ref. No. Contract Estimated Procurement Prequal Domestic Review Expected Comments (Description) Cost Method ification Preferenc by Bank Bid- US$ (yes/no) e (yes/no) (Prior / Opening Post) Date Works Construction of NPMO First contract for NCB. W01 250,000 NCB No No Prior May 2016 building. Implemented by NPMO W02 Construction of new 24 district offices in 9 provinces February Phouvong DAFO, Attapeu 20,000 Implemented by Provincial W02-1 Shopping No No Post 2016 Province. Forestry Section (PFS) September Completed Houayxai DAFO, Bokeo 20,000 W02-2 Shopping No No Post 2015 PHATTHANA Province. Construction. September Completed Meung DAFO, Bokeo 20,000 W02-3 Shopping No No Post 2015 PHATTHANA Province. Construction. September Completed PhaOudom DAFO, Bokeo 20,000 W02-4 Shopping No No Post 2015 PHATTHANA Province Construction. September Completed Tonpheung DAFO, Bokeo 20,000 W02-5 Shopping No No Post 2015 PHATTHANA Province Construction. September Completed Mounlapamok DAFO, 20,000 W02-6 Shopping No No Post 2015 Inphoumy Construction. Champasak Province September Completed Soukhouma DAFO, 20,000 W02-7 Shopping No No Post 2015 Inphoumy Construction. Champasak Province 3 December Viengphoukha DAFO, 20,000 Implemented by PFS. W02-8 Shopping No No Post 2015 Luang Namtha Province First Shopping for Works. September Nalea DAFO, Luang 20,000 Completed W02-9 Shopping No No Post 2015 Namtha Province. Keovilay Construction. September Long DAFO, Luang 20,000 Completed W02-10 Shopping No No Post 2015 Namtha Province. Keovilay Construction. September Completed Beng DAFO, Oudomxay 20,000 W02-11 Shopping No No Post 2015 KKFC Construction Province. Co; Ltd. September Houn DAFO, Oudomxay 20,000 Completed KKFC W02-12 Shopping No No Post 2015 Province. Construction Co; Ltd. Implemented by PFS. September La DAFO, Oudomxay 20,000 Completed W02-13 Shopping No No Post 2015 Province. KKFC Construction Co; Ltd. September Completed Namor DAFO, Oudomxay 20,000 W02-14 Shopping No No Post 2015 KKFC Construction Province. Co; Ltd. September Completed Nga DAFO, Oudomxay 20,000 W02-15 Shopping No No Post 2015 KKFC Construction Province. Co; Ltd. Completed September KKFC Construction Pakbeng DAFO, Oudomxay 20,000 W02-16 Shopping No No Post 2015 Co; Ltd. Province. 4 September Completed Xay DAFO, Oudomxay 20,000 W02-17 Shopping No No Post 2015 KKFC Construction Province. Co; Ltd. February Boten DAFO, Sayabouly 20,000 W02-18 Shopping No No Post 2016 Implemented by PFS Province. February Hongsa DAFO, Sayabouly 20,000 W02-19 Shopping No No Post 2016 Implemented by PFS Province. February Xienghon DAFO, 20,000 W02-20 Shopping No No Post 2016 Implemented by PFS Sayaboury Province. February Khop DAFO, Sayabouly 20,000 W02-21 Shopping No No Post 2016 Implemented by PFS Province. February Hom DAFO, Xaysomboun 20,000 W02-22 Shopping No No Post 2016 Implemented by PFS Province. February Xaysomboun DAFO, 20,000 W02-23 Shopping No No Post 2016 Implemented by PFS Xaysomboun Province. September W02-24 Dakcheung DAFO, Sekong 20,000 Completed: Shopping No No Post 2015 Province. Khamvilay Construction. Sub-Total for W02: 480,000 W03 Office Renovation (4 district offices in 4 provinces) September Completed Bokeo PAFO Office 20,000 W03-1 Shopping No No Post 2015 PHATTHANA renovation Construction. 5 September Louang Namtha PAFO 20,000 Completed W03-2 Shopping No No Post 2015 Office renovation Saysomboun Construction September Completed. Oudomxay PAFO Office 20,000 W03-3 Shopping No No Post 2015 KKFC Construction renovation Co; Ltd. Xaysomboun PAFO Office 20,000 March 2016 W03-4 Shopping No No Post Implemented by PFS renovation Sub-Total for W03: 80,000 Grand Total for Works 810,000 (W01+W02+W03) Goods Computers, printers and IT Completed G01 1,121,915 ICB No No Prior May 2015 Accessories. ACE CS Intellect JV. Notebook Computers and IT Completed G01-1 Accessories for Project’s 30,000 Shopping No No Post October 2014 SP Computer. Financial Management. Power Back - UPS for September Completed G01-2 65,000 Shopping No No Post Desktop Computers. 2015 Champa IT Application server +storage, 70,000 Prior/ Completed G02 GIS computers, IT Shopping No No January 2015 Post Micro Info Computer. accessories. GIS computers and IT Implemented by NPMO. G02.1 10,000 Shopping No No Post April 2016 accessories. G03 Furniture Furniture for New Office December G03-1 25,000 Shopping No No Post Building of NPMO. 2016. Implemented by NPMO. Completed Furniture for DOF, DOFI, G03-1.1 68,000 Shopping No No Post October 2015 Mahasok Trading Sole Co. DAEC, DLM, DIMEX Ltd. 6 Furniture for Attapeu G03-2 6,000 Shopping No No Post June 2016 Implemented by PFS province and 1 District. Furniture for Bokeo June 2016 G03-3 15,000 Shopping No No Post Implemented by PFS province and 4 Districts. Furniture for PFS June 2016 G03-4 3,000 Shopping No No Post Implemented by PFS Bolikhamxay province. Furniture for PFS G03-5 Champasak province and 2 9,000 Shopping No No Post June 2016 Implemented by PFS Districts. Furniture for PFS Luang G03-6 Namtha province and 3 15,000 Shopping No No Post June 2016 Implemented by PFS Districts. Furniture for PFS G03-7 Oudomxay province and 27,000 Shopping No No Post June 2016 Implemented by PFS 7 Districts. Furniture for PFS Vientiane June 2016 G03-8 6,000 Shopping No No Post Implemented by PFS province. Furniture for PFS G03-9 Xaysomboun province and 12,000 Shopping No No Post June 2016 Implemented by PFS 2 Districts Furniture for PFS G03-10 Sayabouly province and 4 15,000 Shopping No No Post June 2016 Implemented by PFS Districts Furniture for PFS Sekong June 2016 G03-11 9,000 Shopping No No Post Implemented by PFS province and 1 District Sub-Total for G03 210,000 Implemented by NPMO. G04 Portable generator, 12,800 Shopping No No Post June 2016 Large display screens and Completed G04.1 8,800 Shopping No No Post October 2015 wireless audio microphone Champa IT 7 Completed; Software “includes G05 20,000 Shopping No No Post April 2014 Motives Solution (Laos) ACCPACC” Ltd. Other Electronic and Field Equipment:(Silva, Suunto, Completed February G06 Measuring Tape, Diameter 60,000 Shopping No No Post SM SURVEY 2015 Tape, Spencer Logger’s EQUIPMENT SUPPLY. Tape) Other Electronic and Field Completed G06-1 Equipment: ( Handheld 37,000 Shopping No No Post January 2015 SM SURVEY GPS) EQUIPMENT SUPPLY. Other Electronic and Field December Completed G06 - 2 Equipment: ( Sleeping bag 85,000 Shopping No No Post 2015 UniqTek Co; Ltd. and Tent) Radio equipment set, telephones and tablet G07 166,100 Shopping No No Post June 2016 Multiple contracts. computers (first lot only for testing) Satellite Images (RapidEye) Direct Completed. G08 110,000 No No Prior April 2014 1stBatch * Contracting Aruna Technology Other remote sensing Direct Late 2014- G09 300,000 No No Prior Completed. images Contracting 2018 Aruna Technology G10 Late 2014 – Multiple contracts Topographic and other maps 20,000 Shopping No No Post 2018 Completed Lot 1: LAO TOYATA SUV (3 Units)*, Double November SERVICE CO; LTD. G11 1,755,000 ICB No No Prior Cab Pick Up (72 units)* 2014 lot 2: ISUZU LAO SERVICE SOLE Co; LTD, 8 Completed G12 Motorbikes (755 units)* 906,000 ICB No No Prior March 2015 THAI YAMAHA MOTOR Co; Ltd. G13 Office Equipment: ( Scanner, Copier, Fax, Implementing by NPMO. 230,000 NCB No No Prior April 2016 LCD Projector, Wifi First NCB for Goods. Router) G14 Meeting Room Sound December 17,000 Shopping No No Post System for NPMO. 2016 G15 IT equipment for DOFI 50,000 Shopping No No Post April 2016 G16 Field equipment for DOFI 50,000 Shopping No No Post April 2016 Grand Total for Goods 5,334,615 Non – Consulting Services. Transportation of 755 units N01 of motorbikes to 13 project 50,000 Shopping No No Post June 2016. provinces. N02 Project Promotion Video Shopping December Completed 20,000 No No Post Production. 2015 DANHO Media. Grand Total for Non – Consulting 70,000 Services. Grand Total: W,G&N 6,214,615 * priority 9 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Thresholds Prior Review Threshold Comments (US$,000) (US$’000) 1. Competitive Methods (Firms) - ≥300 All Contracts Quality & Cost Based Selection (QCBS) and Quality Based Selection (QBS) Least-Cost Selection (LCS) and < 300 ≥ 100 and/ or first Contract for Selection Based on Consultant hiring consulting firm regardless of Qualifications (CQS) value 2. Single Source (Firms) - All contracts 3. Individual Consultant NA >=10 for single source selection & all fiduciary consultants 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 5. For all contract amendments/extensions/ follow-on contracts, etc., the following guidelines shall apply: i) gross salary increases shall be limited to CPI plus a performance-based increase not to exceed 2%; ii) there shall be no increase in living allowances or similar expenses unless explicitly authorized by MOF Decree. 10 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review Expected Comments No. Cost Method by Bank Proposals US$ (Prior / Submission Post) Date The first contract for CQS. Completed. C01 Project Financial Audit 160,000 CQS Prior March 2014 PriceWaterhouseCooper (Lao) Co; Ltd. Design of project field offices/NPMO Completed February C02 building, supervision of construction of 50,000 CQS Post Souksavanh Consultants Sole Co, 2015 NPMO building. Ltd. Sub-contracts with universities, private April 2014 - C03 960,000 SSS/CQS Prior/Post companies etc. 2018 Completed. Sub-contracts with universities, private April 2014 - C03. 1 SSS Prior Souphanouvong University (C03- companies etc. 2018 LPB1.2) Completed Dongkhamxang Agriculture Sub-contracts with universities, private April 2014 - C03.2 SSS Post Technical School (C03.1-DKX) companies etc. 2018 Completed. Mouang Mai Agriculture and Sub-contracts with universities, private April 2014 - Forestry School (Bolikhamxay C03.3 SSS Post companies etc. 2018 Province C03.1- BLK) 11 Completed. Savannakhet University, Sub-contracts with universities, private April 2014 - C03.4 SSS Post Faculty of Agriculture and companies etc. 2018 Environment (C03 –ATP). Completed Sub-contracts with universities, private April 2014 - C03.5 SSS Post National University of Laos, Faculty companies etc. 2018 of Forestry Science (C03.1 –SKG). Completed Procurement Consultant (Short-Term April 2014 - C04 128,000 SSS Prior Ms. OithipMongkolsawath. International) 2018 February Completed. C05 Procurement Consultant (National) 150,000 IC Prior 2014 - 2018 Mr. Bounsooli CHITTANON. September Completed C06 Senior Finance Management Consultant 150,000 IC Prior 2013 - 2018 Mr. SaNguane CHINDARATH. September Financial Management Consultant C07 IC Prior 2013 -2018 (4 positions) September Completed. Financial Management Consultant based in C07.1 120,000 IC Prior 2013 - 2018 Mr. Samlong KICHANDA. Southern Provinces. September Financial Management Consultant based in Completed. C07.2 120,000 IC Prior 2013 Northern Provinces. Ms. Nanthida SOUVANNA ASA. Completed. Financial Management Consultant based in August 2015 C07.3 120,000 IC Prior Mr. Viengxay VONGPHACHANH Northern Provinces. Financial Management Consultant based in August 2015 C07.4 120,000 IC Prior Middle Provinces. 12 September C08 Project Assistants (79 positions) 1,516,800 IC Post 2014 - 2018 Completed. See Annex 1. C09 Other short term consultant (national) 75,000 IC Prior/Post - C10 Other short term consultant (international) 60,000 IC Prior/Post - Feb 2014- Completed. C11 Forest Stewardship Council(FSC) auditors 150,000 SSS Prior December Rainforest Alliance Inc. 2018 Completed. C12 National Procurement Assistant 80,000 IC Prior August 2015 Ms. Chintana XABANDITH. Completed. February C13 National Consultant for Village Forestry 150,000 IC Prior Mr. Phonsavanh KEOASA. 2015 Provincial Finance Assistant Completed. See Annex 2: C14 9,600 IC Post April 2015 (Internship staff) Completed: National Finance Assistant to November C15 30,000 IC Post Mr. Chittaphone DOF Finance Unit. 2015 CHANHTHAVILAY Village Forestry Advisor October C16 187,000 IC Prior (international) 2016 October C17 Forest Management Advisor (international) 224,000 IC Prior 2016 Village Livelihood Development Advisor October C18 160,000 IC Prior (international) 2016 October C19 M&E Advisor (international) 340,000 IC Prior 2016 13 National Forestry Consultant October C20 136,000 IC Prior (Northern Provinces) 2016 National Forestry Consultant October C21 136,000 IC Prior (Middle Provinces) 2016 National Forestry Consultant October C22 136,000 IC Prior (Southern Provinces) 2016 National Livelihoods Development October C23 136,000 IC Prior Consultant (Northern Provinces) 2016 National Livelihoods Development October C24 136,000 IC Prior Consultant (Middle Provinces) 2016 National Livelihoods Development October C25 136,000 IC Prior Consultant (Southern Provinces) 2016 October C26 GIS Consultant (national) 40,000 IC Prior 2016 October C27 Translator / Interpreter (national) 64,000 IC Prior 2016 October C28 Assistant to National Project Coordinator 80,000 IC Prior 2016 Grand Total for Consultants 6,060,400 14 Annex 1: C08 Project Assistant. 1 2 3 4 5 6 7 Expected Estimated Review Ref. Selection Proposal Description of Assignment. Cost by Bank Comments. No. Method Submission US$. (Prior/Post) Date C08 Project Assistant VLD Project Assistant based in Pha - Oudom September- Completed. C08.1 4,800 IC Post DAFO, Bokeo Province. 2014 Mr. Xayadaeth SOUKHAPHONE. September- VLD Project Assistant based in Houayxay Completed. C08.2 4,800 IC Post 2014 DAFO, Bokeo Province. Mr. Thongxay KEOCHANSY September- VLD Project Assistant based in Meung Complete. C08.3 4,800 IC Post 2014 DAFO, Bokeo Province. Mr. Ekanan SINOORLAY September- VLD Project Assistant based in Completed. C08.4 4,800 IC Post 2014 Tonpheung DAFO, Bokeo Province. Ms. Sonelideth SOUTHAMMAVONG. September- PSFM Project Assistant based in Pha - Oudom Completed. C08.5 4,800 IC Post 2014 DAFO, Bokeo Province. Mrs. Enkeo XAYVONG. September- PSFM Project Assistant based in Houayxay Completed. C08.6 4,800 IC Post 2014 DAFO, Bokeo Province. Mr. Somkit SAYBOUATHONG. September- PSFM Project Assistant based in Meung Completed. C08.7 4,800 IC Post 2014 DAFO, Bokeo Province. Mr. Phounpasith SYPASERTH. September- PSFM Project Assistant based in Completed. C08.8 4,800 IC Post 2014 Tonpheung DAFO, Bokeo Province. Mr. Khamnoy CHANHMANY. 15 September- VLD Project Assistant based in Sayabouly Completed. C08.9 4,800 IC Post 2014 DAFO, Sayabouly Province. Mr. Sy SYSAMOUT. September- VLD Project Assistant based in Completed. C08.10 4,800 IC Post 2014 Boten DAFO, Sayabouly Province. Mrs. Vimone SOMPHARN. September- Completed. VLD Project Assistant based in C08.11 4,800 IC Post 2014 Mr. Thongkhoune Hongsa DAFO, Sayabouly Province. SOUVATMOUNGKH. September- VLD Project Assistant based in Completed. C08.12 4,800 IC Post 2014 Khob DAFO, Sayabouly Province. Mr. Phonesack ONMANY. September- VLD Project Assistant based in Completed. C08.13 4,800 IC Post 2014 Phieng DAFO, Sayabouly Province. Ms. Phimphone SUKAPHONE. September- VLD Project Assistant based in Completed. C08.14 4,800 IC Post 2014 Xienghone DAFO, Sayabouly Province. Mr. Sengvat XONG. September- PSFM Project Assistant based in Completed. C08.15 4,800 IC Post 2014 Sayabouly DAFO, Sayabouly Province. Mr. Bounthasinh TINGBOUA September- PSFM Project Assistant based in Completed. C08.16 4,800 IC Post 2014 Boten DAFO, Sayabouly Province. Mr. Niphonh CHANHTHAVONG. September- PSFM Project Assistant based in Completed. C08.17 4,800 IC Post 2014 Hongsa DAFO, Sayabouly Province. Mr. Adisone INTHAPHORN. September- PSFM Project Assistant based in Completed. C08.18 4,800 IC Post 2014 Khob DAFO, Sayabouly Province. Mr. Bounmark MAKEETHONG September- PSFM Project Assistant based in Completed. C08.19 4,800 IC Post 2014 Phieng DAFO, Sayabouly Province. Mr. Linethong KOUBASITH. 16 September- PSFM Project Assistant based in Completed. C08.20 4,800 IC Post 2014 Xienghone DAFO, Sayabouly Province. Mr. Khonepaseuth ANOUSONE. September- VLD Project Assistant based in Kaleum Completed. C08.21 4,800 IC Post 2014 DAFO, Xekong Province. Mr. Bountavisuk XAIYASON. September- VLD Project Assistant based in Completed. C08.22 4,800 IC Post 2014 Dakcheung DAFO, Xekong Province. Mr. Sikham KHAMPHOUMY. September- PSFM Project Assistant based in Kaleum Completed. C08.23 4,800 IC Post 2014 DAFO, Xekong Province. Mr. Saysamone CHOUMSYSAVNH. September- PSFM Project Assistant based in Dakcheung Completed. C08.24 4,800 IC Post 2014 DAFO, Xekong Province. Mr. Chanpheng NARVILAISAN. September- VLD Project Assistant based in Nalae DAFO, Completed. C08.25 4,800 IC Post 2014 LouangNamtha Province. Mr. Set SOULIXAY. September- VLD Project Assistant based in Viengphoukha Completed. C08.26 4,800 IC Post 2014 DAFO, LouangNamtha Province. Mr. khammixay MANISONE. September- VLD Project Assistant based in Long DAFO, Completed. C08.27 4,800 IC Post 2014 LouangNamtha Province. Mr. Thony XAYACHACK. September- PSFM Project Assistant in based Viengphoukha Completed. C08.28 4,800 IC Post 2014 DAFO, LouangNamtha Province. Mr. Anong XAYACHACK. Completed. September- Mr. Sainuan SY ONCHANH. PSFM Project Assistant in Long DAFO, C08.29 4,800 IC Post 2014 LouangNamtha Province. 17 September- PSFM Project Assistant based in Nalae DAFO, Completed. C08.30 4,800 IC Post 2014 LouangNamtha Province. Ms. Kheuam MORVANHXAY. September- VLD Project Assistant based in Houn DAFO, Completed. C08.31 4,800 IC Post 2014 Oudomxay Province. Mr. Singthong SOUDTHIVONG September- VLD Project Assistant based in Beng DAFO, Completed. C08.32 4,800 IC Post 2014 Oudomxay Province. Mr. Thongphoun LOUANGSIDA. September- VLD Project Assistant based in Xay DAFO, Completed. C08.33 4,800 IC Post 2014 Oudomxay Province. Mr. Sisavath TOULAKOUN. September- VLD Project Assistant based in Namor DAFO, Completed. C08.34 4,800 IC Post 2014 Oudomxay Province. Mr. Somsak DUENSAVANH. September- VLD Project Assistant based in Nga DAFO, Completed. C08.35 4,800 IC Post 2014 Oudomxay Province. Mr. Viengxay KEOVILAY. September- VLD Project Assistant based in La DAFO Completed. C08.36 4,800 IC Post 2014 Oudomxay Province. Ms. Dy SYAMPHAY. VLD Project Assistant based in Parkbeng September- Completed. C08.37 DAFO, 4,800 IC Post 2014 Ms. Tamon SAIYASAN Oudomxay Province. September- PSFM Project Assistant based in Parkbeng Completed. C08.38 4,800 IC Post 2014 DAFO, Oudomxay Province. Mr. Thony XAYASITH. September- PSFM Project Assistant based in Namor DAFO, Completed. C08.39 4,800 IC Post 2014 Oudomxay Province. Mr. Sombuth SOUDAPHONE. September- PSFM Project Assistant based in Beng DAFO, Completed. C08.40 4,800 IC Post 2014 Oudomxay Province. Mr. Ounheuan XAYAPHONE. 18 September- PSFM Project Assistant based in La DAFO, Completed. C08.41 4,800 IC Post 2014 Oudomxay Province. Mr. Phonethavy CHINDALA. September- PSFM Project Assistant based in Nga DAFO, Completed. C08.42 4,800 IC Post 2014 Oudomxay Province. Mr. Thongsouk KEOPHILA. September- PSFM Project Assistant based in Houn DAFO, Completed. C08.43 4,800 IC Post 2014 Oudomxay Province. Mr. Invanh PHIATHEP. September- PSFM Project Assistant based in Xay DAFO, Completed. C08.44 4,800 IC Post 2014 Oudomxay Province. Mr.Bounthavy KEOPANHYA. VLD Project Assistant based in Sanamxay September- Completed. C08.45 DAFO, 4,800 IC Post 2014 Mr Thepthida OUDOMPHANH Attapeu Province. VLD Project Assistant based in Phouvong September- Completed. C08.46 DAFO, 4,800 IC Post 2014 Mr. Phonexay SENGPHACHAN Attapeu Province. VLD Project Assistant based in Xaysetha September- Completed. C08.47 DAFO, 4,800 IC Post 2014 Mr Kedsana VONGNALAD Attapeu Province. September- PSFM Project Assistant based in Xaysetha Completed. C08.48 4,800 IC Post 2014 DAFO, Attapeu Province. Mr. Thanongsack VONGNANEE. September- PSFM Project Assistant based in Sanamxay Completed. C08.49 4,800 IC Post 2014 DAFO, Attapeu Province. Mr Phonevina XAYABOUD September- PSFM Project Assistant based in Phouvong Completed. C08.50 4,800 IC Post 2014 DAFO, Attapeu Province. Mr Phonepasith SESANGCHAN September- VLD Project Assistant based in Bolikhan Completed. C08.51 4,800 IC Post 2014 DAFO, Bolikhamxay Province. Mr. Sonthany INTHANOUSONE 19 September- VLD Project Assistant based in Parksan Completed. C08.52 4,800 IC Post 2014 DAFO, Bolikhamxay Province. Mr. Soisavath SISOMBATH September- VLD Project Assistant based in Parkading Completed. C08.53 4,800 IC Post 2014 DAFO, Bolikhamxay Province. Mr. Soubanh KEOMUNG September- VLD Project Assistant based in Viengthong Completed. C08.54 4,800 IC Post 2014 DAFO, Bolikhamxay Province. Mr. Viengxay MOUA September- PSFM Project Assistant based in Bolikhan Completed. C08.55 4,800 IC Post 2014 DAFO, Bolikhamxay Province. Mr. Soulin XAYYALATH September- PSFM Project Assistant based in Moulapamok Completed. C08.56 4,800 IC Post 2014 DAFO, Champasack Province. Mr. Nutthasin CHANHTHAPHIM September- PSFM Project Assistant based in Soukhoumma Completed. C08.57 4,800 IC Post 2014 DAFO, Champasack Province. Mr. Xam SAYYASING September- PSFM Project Assistant based in Bajieng Completed. C08.58 4,800 IC Post 2014 DAFO, Champasack Province. Mr. Phoukhao PHOUTTHAVONG September- VLD Project Assistant based in Soukhomma Completed. C08.59 4,800 IC Post 2014 DAFO, Champasack Province. Mr. Khaokeo PHOUMSAVATH September- VLD Project Assistant based in Moulapamok Completed. C08.60 4,800 IC Post 2014 DAFO, Champasack Province. Mr. Phaiphanom XAYYALATH. VLD Project Assistant based in Anouvong September- Completed. C08.61 DAFO, 4,800 IC Post 2014 Mr Xongchang Ngiakaoleng Saysomboun Province. 20 September- PSFM Project Assistant in based Anouvong Completed. C08.62 4,800 IC Post 2014 DAFO, Saysomboun Province. Mr Khamsao Khamsavanh September- PSFM Project Assistant based in Kasi DAFO, Completed. C08.63 4,800 IC Post 2014 Vientiane Province. Mr Soumounsay XAYAVONG. September- PSFM Project Assistant based in Maet DAFO, Completed. C08.64 4,800 IC Post 2014 Vientiane Province. Mr khamsy DAOPASERTH September- VLD Project Assistant based in Vangveing Completed. C08.65 4,800 IC Post 2014 DAFO, Vientiane Province. Ms khonsavanh KEOPHOMMA. September- VLD Project Assistant based in Kasi Completed. C08.66 4,800 IC Post 2014 DAFO, Vientiane Province. Mr Viley PHOMMACHIT. September- VLD Project Assistant based in Maet Completed. C08.67 4,800 IC Post 2014 DAFO, Vientiane Province. Mr Vilasak PHITAENG. September- VLD Project Assistant based in Vangvieng Completed. C08.68 4,800 IC Post 2014 DAFO, Vientiane Province. Mr Toukta PHILAVONG September- VLD-PSFM Project Assistant based in Parklai Completed. C08.69 4,800 IC Post 2014 DAFO, Sayabouly Province. Mr. Inta VINANMA. September- VLD-PSFM Project Assistant based in Lamman Completed. C08.70 4,800 IC Post 2014 DAFO, Xekong Province. Mr. Soutchai PHOMMACHANH. September- VLD-PSFM Project Assistant based in Sanxay Completed. C08.71 4,800 IC Post 2014 DAFO, Xekong Province. Mr Siha BOUDSADY September- VLD-PSFM Project Assistant based in Completed. C08.72 4,800 IC Post 2014 Salavanh PAFO. Mr. Vathana XAYAPHET. 21 September- VLD-PSFM Project Assistant based in Completed. C08.73 4,800 IC Post 2014 Savannakhet PAFO. Ms. Siphandone PHIEWONE PSFM-VLD Project Assistant based in September- Completed. C08.74 Sanakham 4,800 IC Post 2014 Mr They VANSY DAFO, Vientiane Province. September- PSFM-VLD Project Assistant based in Meun Completed. C08.75 4,800 IC Post 2014 DAFO, Vientiane Province. Mr Inpone VORLAVONG. September- PSFM-VLD Project Assistant based in Feuang Completed. C08.76 4,800 IC Post 2014 DAFO, Vientiane Province. Mr. Boukhao SAYACHACK. September- PSFM-VLD Project Assistant based in Completed. C08.77 4,800 IC Post 2014 Khammouane PAFO. Mr. Phousaming KHOUANPASA. 22 Annex 2: Provincial Finance Assistant (Internship Staff). 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review Expected Comments No. Cost Method by Bank Proposals US$ (Prior/Post) Submission Date C14 Provincial Finance Assistant. (Internship Staff) IC Post April 2015 C14.1 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Sayabouly Province. Ms. Phompha SILISOMBATH. C14.2 Provincial Finance Assistant. Completed. Based in Vientiane Province. 1,200 IC Post April 2015 Ms. Amphaivanh ALOUNSAVATH. C14.3 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Khammouane Province. Ms. Pananh SILUBSY. C14.4 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Salavanh Province. Mr. Sengchanh VORASANE C14.5 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Savannakhet Province. Ms.Souban SENGNAVONG. C14.6 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Champasack Province. Mr. Khamphay PHOMMALOUN C14.7 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Sekong Province. Ms. Niphaphone KHAMPHASOUK C14.8 Provincial Finance Assistant. Completed. 1,200 IC Post April 2015 Based in Attapeu Province. Ms. Phonethip SENGKEO. Grand Total for Consultants 9,600 23