PROCUREMENT PLAN (Textual Part) Project information: Mali – Reconstruction and Economic Recovery Projet / P-144442 Project Implementation agency: Ministry of Economy and Finance Date of the Procurement Plan: February 1, 2018 Period covered by this Procurement Plan: Up to November 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Mali : Mali Reconstruction and Economic Recovery PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2018-02-23 2019-08-07 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144442 GPN Date: Project Name: Mali Reconstruction and Economic Recovery Loan / Credit No: IDA / H9010, IDA / D3730 Executing Agency(ies):Reconstruction and Economic Recovery WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CW-REF 29 / Realisation de 10 puits modernes (à Component 1: grand diamètre) : Rehabilitation of local Amasrakad, Echel, Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 240,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 Tintibaliten, Tamaimara, prix One Envelope d'exécution (US$50 million Tin Ichmal, Doreye (2), equivalent) N’Tillit (3) dans la commune de N’Tillit CW-REF 30 / Réalisation Component 1: de 14 forages dont 11 Rehabilitation of local Positifs et l’équipement de Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 215,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 08 Forages en PMH dans prix One Envelope d'exécution (US$50 million les Communes de Fatoma, equivalent) Socoura et Kona CW-REF 31 / Soufflage, Essai de Pompage, Component 1: Réalisation de Rehabilitation of local Superstructure et Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 110,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 Fourniture et Pose de prix One Envelope d'exécution (US$50 million PMH de 17 anciens equivalent) forages dans les communes de Fatoma et Konna CW-REF 32 / Réalisation Component 1: de 03 Puits Moderne dans Rehabilitation of local les villages de Koko, Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 72,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 Grangomé et Timé dans prix One Envelope d'exécution (US$50 million la commune de Konna equivalent) cercle de Mopti CW-REF 33 / Réalisation de quatorze (14) PMH dans les commune de Diafarabé Diaka de Component 1: Diondiori de Kareri, de Rehabilitation of local Demande de Single Stage - En attente Ouro Ardo 01 à Toko et IDA / H9010 public infrastructure A posteriori Open - National 354,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 prix One Envelope d'exécution 01 de Ouro Guiré de (US$50 million deux (02) SHVA dont 01 equivalent) à Barkédaga 01 à Koubi ,réhabilitation de l'AES de Dia cercle de Ténenkou CW-REF 34 / Réalisation (10) PMH à Soni Kaguidiourou Toguéré Component 1: Coumbé Tanda Rehabilitation of local Kamaka Sebe Tomora Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 690,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 Ouroguya Gueledie prix One Envelope d'exécution (US$50 million Oualo et Sareamboubou equivalent) deux (02) SHVA Kona- Mali et Saremare de deux (02) AES Oualo et Sossobé CW-REF 35 / Réalisation de 17 PMH à Dogo à Yéré à Sarbéré à Baré Fétodjé Gandétama Component 1: Sarédin Karan à Rehabilitation of local Demande de Single Stage - En attente Diamkoko Kormou Bia IDA / H9010 public infrastructure A posteriori Open - National 309,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 prix One Envelope d'exécution Owa Diou et Doukou (US$50 million N'Garwoye Bougoudji et equivalent) réhabilitation de l'AES de Guidio saré Youwarou - Région de Mopti CW-REF 36 / Réalisation (12) PMH Kerbé kouna Herao Lanadjer Toulet tob Kouroudourou Component 1: Toromobiama Toulal Rehabilitation of local Toulal Sokodema Wario Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 222,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 Nomade Almamor prix One Envelope d'exécution (US$50 million Toupagal sonabé touki equivalent) modibo galil réhab de 03 PMH N'gniri Gnara Koubita Kora cercle de Youwarou CW-REF 37 / Realisation de trois puits pastoraux Component 1: dont 01 à Sourango Rehabilitation of local commune de Farimaké Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 60,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 01 à Kossombo et 01 à prix One Envelope d'exécution (US$50 million Tilkal dans la commune equivalent) de Dirma cercle de Youwarou région de Mopt CW-REF 38 / Réalisation de 12 forages positifs avec PMH à Sogo-Ouro, Saka Component 1: Inguéri, Ongom Sarré Rehabilitation of local Pathé, Biro, Guédia Faou Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 364,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 et Margou et à Enguem prix One Envelope d'exécution (US$50 million et Aourédans la Commune equivalent) de Youwarou et réalisation d’un AES à Sah dans la Commune de N'Dodjiga CW-REF 43 / Equipement de 03 Nouveaux forages en SHVA dans le village de Component 1: Boubakoré commune de Rehabilitation of local Demande de Single Stage - En attente Fatoma 01 dans le village IDA / H9010 public infrastructure A posteriori Open - National 108,000.00 0.00 2018-02-06 2018-04-03 2018-09-30 prix One Envelope d'exécution de Némindé et 01 dans (US$50 million le village de Sina equivalent) commune de Socoura et la réhabilitation de 01 SHVA dans le village de Koana commune de Konna CW-REF 49 / Réalisation Component 1: d'un ouvrage de Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 600,000.00 0.00 2018-02-04 2018-04-01 2018-09-28 franchissement (Pont) public infrastructure prix One Envelope d'exécution dans la commune de (US$50 million Gossi equivalent) CW-REF 50 / Component 1: Construction de la gare Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 900,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 routière à Tombouctou / C public infrastructure prix One Envelope d'exécution de Tombouctou. (US$50 million equivalent) CW-REF 51 / Component 1: Construction d'un CSCOM Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 240,000.00 0.00 2018-01-10 2018-03-07 2018-09-03 à Tondidarou dans le public infrastructure prix One Envelope d'exécution cercle de Niafunké (US$50 million equivalent) Page 1 Component 1: CW-REF 55 / Realisation Rehabilitation of local Demande de Single Stage - En attente de 7 SHVA dans le cercle IDA / H9010 A posteriori Open - National 400,000.00 0.00 2018-03-20 2018-05-15 2018-11-11 public infrastructure prix One Envelope d'exécution de Menaka (US$50 million equivalent) Component 1: CW-REF 56 / Installation Rehabilitation of local Demande de Single Stage - En attente de 300 lampadaires dans IDA / H9010 A posteriori Open - National 600,000.00 0.00 2018-03-20 2018-05-15 2018-11-11 public infrastructure prix One Envelope d'exécution le cercle de Menaka (US$50 million equivalent) CW-REF 60 / Extension du CSCOM de Daka Fifo du CSCOM de Teherdjé t Component 1: réalisation de rampes Rehabilitation of local Demande de Single Stage - En attente d’accès sur les perrons de IDA / H9010 public infrastructure A posteriori Open - National 88,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 prix One Envelope d'exécution bâtiments des CSCOM de (US$50 million Bellafarandi Sankoré et equivalent) Kabara commune de Tombouctou CW-REF 61 / Réalisation de 25 Forages productifs équipés de PMH dans 25 Component 1: écoles et réalisation de Rehabilitation of local Quatre forages productifs Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 667,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 équipés de pompe solaires prix One Envelope d'exécution (US$50 million avec fournitures et equivalent) installation de château métallique de 5 m3 dans la région de Tombouctou. CW-REF 62 / Réalisation de 07 forages productifs débit ≥ 1 m3/h pour Component 1: PMH réalisation de deux Rehabilitation of local Demande de Single Stage - En attente forages productifs débit IDA / H9010 public infrastructure A posteriori Open - National 160,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 prix One Envelope d'exécution ≥ 5 m3/h et la (US$50 million réhabilitation d'un ancien equivalent) forage ( un pour AESun pour PMH) dans le Cercle de Dirre CW-REF 63 / Rréalisation de14 nouveaux forages Component 1: productifs débit ≥ 1 Rehabilitation of local Demande de Single Stage - En attente m3/h pour PMH la IDA / H9010 public infrastructure A posteriori Open - National 302,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 prix One Envelope d'exécution Realisation d'un forage (US$50 million productif débit ≥ 5 m3/h equivalent) pour AES et la Réhabilitation de 08 anciens forages pour PMH à Région de CW-REF 64 / Réalisation Tombouctou de 10 forages PMH débit ≥à 1 m3/h d'un forage Component 1: pour SHVA avec débit Rehabilitation of local Demande de Single Stage - En attente ≥3m3/h installation d'un IDA / H9010 public infrastructure A posteriori Open - National 322,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 prix One Envelope d'exécution château d'eau de 10 m3 (US$50 million de 3 puits modernes et equivalent) d'un forage pour AES dans le cercle de Gourma Rharou. CW-REF 65 / Réalisation de 12 forages avec débit Component 1: superieur à 1 m3/h pour Rehabilitation of local PMH la réalisation d'un Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 240,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 forage avec débit prix One Envelope d'exécution (US$50 million superieur ou égal à 5 m3 equivalent) /h pour AES dans le cercle de Niafunké. CW-REF 66 / Réalisation de 5 forages débit ≥1m3 /h pour PMH d'un forage avec débit ≥ 5m3/h de Component 1: deux forages avec débit Rehabilitation of local Demande de Single Stage - En attente ≥3m3/h pour SHVA IDA / H9010 public infrastructure A posteriori Open - National 261,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 prix One Envelope d'exécution Installation de château de (US$50 million 10m3 d'un forage pour equivalent) PMH dans le cercle de Tombouctou et la commune de TONKA CW-REF 67 / Component 1: Aménagement 7 km de Rehabilitation of local Demande de Single Stage - En attente route (Bretelle RN33 - IDA / H9010 public infrastructure A posteriori Open - National 90,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 prix One Envelope d'exécution Koyan Coura) cercle de (US$50 million Niono equivalent) CW-REF 68 / Component 1: Aménagement de 3 km de Rehabilitation of local Demande de Single Stage - En attente route (Pont Abou Diarra – IDA / H9010 public infrastructure A posteriori Open - National 39,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 prix One Envelope d'exécution Nango du Sahel) (US$50 million Commune de Niono equivalent) CW-REF 69 / Component 1: Aménagement axe routier Rehabilitation of local Demande de Single Stage - En attente de 2 km (RN33 à la IDA / H9010 public infrastructure A posteriori Open - National 50,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 prix One Envelope d'exécution prison en passant par le (US$50 million lycée) Commune de Niono equivalent) Component 1: CW-REF 70 / Réalisation Rehabilitation of local Demande de Single Stage - En attente des ouvrages de jonction IDA / H9010 A posteriori Open - National 400,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 public infrastructure prix One Envelope d'exécution Gayabéré - Saraféré (US$50 million equivalent) CW-REF 71 / Component 1: Réhabilitation d'un Rehabilitation of local Demande de Single Stage - En attente ouvrage de franchissement IDA / H9010 public infrastructure A posteriori Open - National 100,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 prix One Envelope d'exécution (Pont) dans la commune (US$50 million d’Arham (Diré) equivalent) CW-REF 72 / Component 1: Réhabilitation de la piste Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 200,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 Kondi - Diré (Accès Kondi public infrastructure prix One Envelope d'exécution : 7 km) (US$50 million equivalent) CW-REF 73 / Component 1: Construction d'un pont Rehabilitation of local Demande de Single Stage - En attente sur le chenal de Kafasirta IDA / H9010 public infrastructure A posteriori Open - National 200,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 prix One Envelope d'exécution (Tessakane et Kondi) dans (US$50 million la commune de Kaneye equivalent) (Goundam) CW-REF 74 / Component 1: RRealisationde 7 AES Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 463,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 dans la région de public infrastructure prix One Envelope d'exécution Tombouctou (US$50 million equivalent) CW-REF 75 / Construction de magasins d'aliment bétail (05) de banque de céréales (02)de centre de couture (01) de Component 2: Support to Demande de Single Stage - En attente vente (01) de IDA / H9010 A posteriori Open - National 218,827.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution transformation et conservation de produits maraichers (01) de produits locaux (06) de lait (01) dans la région de Tombouctou CW-REF 76 / Atelier de Maroquinerie de réparation de moto de menuiserie plateforme) unité de fabrication de jus Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 253,792.00 0.00 2017-11-20 2018-01-15 2018-07-14 et yaourt de teinture) productive investments prix One Envelope d'exécution infrastructure pour l'aviculture (01) unité de transformation de viande unité de production de pâte arachide à Tombouctou Page 2 CW-REF 78 / Réalisation d'infrastructures et Component 2: Support to Demande de Single Stage - En attente d'équipement pour IDA / H9010 A posteriori Open - National 61,800.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution embouche ovine (5) dans le cercle de Abeibara, région de Kidal CW-REF 80 / Réalisation d'infrastructures et d'équipement pour Component 2: Support to Demande de Single Stage - En attente embouche ovine (8) et une IDA / H9010 A posteriori Open - National 11,940.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution ferme de vaches laitières dans le cercle de Kidal, région de Kidal CW-REF 81 / Construction et Component 2: Support to Demande de Single Stage - En attente équipement de huit (08) IDA / H9010 A posteriori Open - National 80,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution ateliers de tannerie dans le cercle de Kidal, région de Kidal CW-REF 82 / Travaux de construction et Component 2: Support to Demande de Single Stage - En attente équipement de (03) IDA / H9010 A posteriori Open - National 39,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution ateliers de tanerie dans le cercle de Kidal, région de Kidal CW-REF 84 / Aménagement et d'équipement d'un (01) Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 37,314.00 0.00 2017-11-20 2018-01-15 2018-07-14 Périmètre maraicher (1 productive investments prix One Envelope d'exécution ha) dans le cercle de Kidal, région de Kidal. CW-REF 85 / Rréalisation d'infrastructure et Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 37,780.00 0.00 2017-11-20 2018-01-15 2018-07-14 d'équipement pour productive investments prix One Envelope d'exécution embouche bovine (01) et ovine (02) dans le cercle de Tessalit, région de Kidal CW-REF 87 / Construction et équipement d'une (01) Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 37,660.00 0.00 2017-11-20 2018-01-15 2018-07-14 mini-laiterie et d'une (01) productive investments prix One Envelope d'exécution banque de céréales, dans le cercle de Tessalit, région de Kidal CW-REF 88 / Construction et Component 2: Support to Demande de Single Stage - En attente équipement de trois (03) IDA / H9010 A posteriori Open - National 30,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution ateliers de tannerie dans le cercle de Tin-Essako, région de Kidal CW-REF 89 / Construction et équipement d'une (01) Component 2: Support to Demande de Single Stage - En attente ferme de vaches laitières IDA / H9010 A posteriori Open - National 31,720.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution et d'une (01) boutique de vente de produits de 1ère nécessité dans le cercle de Tin-Essako, région de Kidal CW-REF 93 / Aménagement et dotation Component 2: Support to Demande de Single Stage - En attente en moto pompe de PIV IDA / H9010 A posteriori Open - National 120,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution (1) pour 20 ha dans le cercle de Douentza CW-REF 94 / Aménagement de 3 étangs Component 2: Support to Demande de Single Stage - En attente piscicoles dans la IDA / H9010 A posteriori Open - National 220,000.00 0.00 2018-01-20 2018-03-17 2018-09-13 productive investments prix One Envelope d'exécution Commune de Siribala (3) dans le cercle de Niono CW-REF 95 / Réalisation de (04) périmètres maraichers et Component 2: Support to Demande de Single Stage - En attente réhabilitation d'un autre IDA / H9010 A posteriori Open - National 250,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 productive investments prix One Envelope d'exécution dans les communes d’Anderamboukane Alata Tindermane cercle de Ménaka CW-REF 96 / Construction 17 étables pour embouche ovine et Component 2: Support to Demande de Single Stage - En attente bovine dans les communes IDA / H9010 A posteriori Open - National 386,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 productive investments prix One Envelope d'exécution de Inekar Anderamboukane Alata, Ménaka et Tidermene cercle de Ménaka CW-REF 97 / Construction de (02) Component 2: Support to Demande de Single Stage - En attente maisons d'artisans dans IDA / H9010 A posteriori Open - National 224,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 productive investments prix One Envelope d'exécution les communes de Tindermène et Alata, cercle de Ménaka Component 1: ML-PRRE-54121-CW-RFQ Rehabilitation of local Demande de Single Stage - En attente / Réhabilitation du quai IDA / H9010 A posteriori Open - National 130,000.00 0.00 2018-01-10 2018-03-07 2018-09-03 public infrastructure prix One Envelope d'exécution fluvial de Gao (US$50 million equivalent) ML-PRRE-58951-CW-RFQ / Construction d'abris de décortiqueuse (01) de moulin et décortiqueuse Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 167,141.00 0.00 2017-11-20 2018-01-15 2018-07-14 (02) d'atelier de tannerie productive investments prix One Envelope d'exécution et tissage (02) de moulin (03) dans la région de Tombouctou CW-REF 79 / Construction de trois (03) boutiques de vente de Component 2: Support to Demande de Single Stage - En attente produits de 1ère nécessité, IDA / H9010 A posteriori Open - National 65,980.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution d'un (01) atelier de tannerie dans le cercle de Abeibara, région de Kidal ML-PRRE-58940-CW-RFQ / Construction de cinq (05) boutiques de vente de produits de 1ère nécessité Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 101,300.00 0.00 2017-11-20 2018-01-15 2018-07-14 et d'une (01) boutique de productive investments prix One Envelope d'exécution vente de matériel électrique dans le cercle de Kidal, région de Kidal ML-PRRE-58945-CW-RFQ / Construction d'un (01) magasin de pièces de rechange (01) atelier de tannerie d'un (01) atelier Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 62,260.00 0.00 2017-11-20 2018-01-15 2018-07-14 de coupe d'un (01) atelier productive investments prix One Envelope d'exécution de menuiserie et d'une (01) boutique de vente de produits de 1ère nécessité dans le cercle de Tessalit CW-REF 90 / Aménagement de (69 ha) Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 260,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 dans la région de productive investments prix One Envelope d'exécution Tombouctou ML-PRRE-58931-CW-RFQ / Aménagement de PIV Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 165,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 (1) pour 15 ha dans la productive investments prix One Envelope d'exécution région de Gao Page 3 ML-PRRE-58935-CW-RFQ / Aménagement de PIV Component 2: Support to Demande de Single Stage - En attente (2) pour 100 ha dans IDA / H9010 A posteriori Open - National 463,400.00 0.00 2017-11-20 2018-01-15 2018-07-14 productive investments prix One Envelope d'exécution les cercles de Mopti et Youwarou ML-PRRE-62456-CW-RFQ / Réalisation d'une (01) AES dans le village de Koubowel 5 anciens Component 1: Forages équipés de PMH Rehabilitation of local Demande de Single Stage - En attente a Andji (02) Entaga ( IDA / H9010 public infrastructure A posteriori Open - National 223,500.00 0.00 2018-05-16 2018-06-29 2018-12-26 prix One Envelope d'exécution 01) et Tongo-tongo (02) (US$50 million 'extension d'1 AES dans equivalent) le village de Dallah réhabilitation et extension de l'AEP de Douentza ML-PRRE-62457-CW-RFQ / Réalisation de 6 forages équipés de PMH dans les Component 1: villages de Ouro Djoumal Rehabilitation of local (01), Ouro Mamou (01), Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 174,500.00 0.00 2018-05-14 2018-06-29 2018-12-26 Banaga (01)Koyo Sargnéré prix One Envelope d'exécution (US$50 million (01) Ouro Hamadi Nouh equivalent) (01) et Alabengouma (01) Pétaka et de de Réalisation d'1 SHVA à Loro Foulbé ML-PRRE-62460-CW-RFQ / Réalisation de 10 forages en PMH dans les villages de Hombori Component 1: Kouri Kantakine Gallou Rehabilitation of local Demande de Single Stage - En attente ) Boumbaki (Hordiahitt IDA / H9010 public infrastructure A posteriori Open - National 266,500.00 0.00 2018-05-15 2018-06-29 2018-12-26 prix One Envelope d'exécution Howandé Garmi (US$50 million Bounguel Diaoullé ) Narki equivalent) Doungouri et Beria et Banaye et de Réalisation d'1 SHVA à Kelmi ML-PRRE-62461-CW-RFQ / Réalisation de 2 AES dans les villages de Mougnoukana et Issez, Component 1: d'1 SHVA à Toulawendou Rehabilitation of local et d'extension de 3 AES Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 299,500.00 0.00 2018-05-14 2018-06-28 2018-12-25 àDouna (Extension réseau prix One Envelope d'exécution (US$50 million avec 4 BF) Niangassadiou equivalent) (Extension réseau avec 6 BF) et Mondoro Habé (Extension réseau avec 7 BF) CW-REF 39 / Equipement de 7 nouveaux forages positifs Component 1: Q ≥ 5 M3 pour 3shva Rehabilitation of local Demande de Single Stage - /H SHVA dans la IDA / H9010 public infrastructure A posteriori Open - National 273,000.00 0.00 Annulé 2018-01-10 2018-03-07 2018-09-03 prix One Envelope commune de BAMBA 4 (US$50 million SHVA et 3 FORAGES equivalent) POSITIFS Q ≥ 1 M3/H POUR PMH dans la commune de BOUREM ML-PRRE-62458-CW-DIR / Equipement de 7 nouveaux forages positifs Component 1: Q ≥ 5 M3 pour 3shva Rehabilitation of local Passation de En attente /H SHVA dans la IDA / H9010 public infrastructure A posteriori marché de gré Direct 248,000.00 0.00 2018-05-12 2018-05-17 2018-06-08 2018-12-05 d'exécution commune de BAMBA 4 (US$50 million à gré SHVA et 3 FORAGES equivalent) POSITIFS Q ≥ 1 M3/H POUR PMH dans la commune de BOUREM CW-REF 40 / Equipement 1 forage Component 1: positif Q ≥ 5 M3/H Rehabilitation of local pour AES dans la Demande de Single Stage - IDA / H9010 public infrastructure A posteriori Open - National 155,000.00 0.00 Annulé 2018-01-10 2018-03-07 2018-09-03 commune de GABERO et prix One Envelope (US$50 million 5 Forages positifs Q ≥ 1 equivalent) M3/H pour 5 PMH dans la commune de ANCHAWADJ ML-PRRE-62462-CW-DIR / Equipement 1 forage Component 1: positif Q ≥ 5 M3/H Rehabilitation of local Passation de pour AES dans la En attente IDA / H9010 public infrastructure A posteriori marché de gré Direct 204,000.00 0.00 2018-05-14 2018-05-19 2018-06-23 2018-12-20 commune de GABERO et d'exécution (US$50 million à gré 5 Forages positifs Q ≥ 1 equivalent) M3/H pour 5 PMH dans la commune de ANCHAWADJ CW-REF 41 / Equipement 4 forages Component 1: positifs AVEC Q ≥ 5 Rehabilitation of local M3/H POUR 02 AES Demande de Single Stage - IDA / H9010 public infrastructure A posteriori Open - National 312,000.00 0.00 Annulé 2018-01-10 2018-03-07 2018-09-03 (THIRISSORO prix One Envelope (US$50 million BAGOUDJIE) ET 02 equivalent) SHVA (KOSSEYE WABARIA DANS LA COMMUNE DE GOUNZOUREYE ML-PRRE-62463-CW-DIR / Equipement 4 forages positifs AVEC Q 5 M3/H Component 1: POUR 02 AES Rehabilitation of local Passation de En attente THIRISSORO IDA / H9010 public infrastructure A posteriori marché de gré Direct 352,000.00 0.00 2018-05-14 2018-05-19 2018-06-23 2018-12-20 d'exécution BAGOUDJIE ET 02 (US$50 million à gré SHVA KOSSEYE equivalent) WABARIA DANS LA COMMUNE DE GOUNZOUREYE CW-REF 42 / Component 1: EQUIPEMENT DE 03 Rehabilitation of local FORAGES positifs à Demande de Single Stage - IDA / H9010 public infrastructure A posteriori Open - National 24,000.00 0.00 Annulé 2018-02-06 2018-04-03 2018-09-30 Tidjerwene, Inadhan et prix One Envelope (US$50 million Inabarin dans la equivalent) Commune de Tilemsi Cercle de Gao ML-PRRE-62464-CW-DIR Component 1: / EQUIPEMENT DE 03 Rehabilitation of local Passation de FORAGES positifs à En attente IDA / H9010 public infrastructure A posteriori marché de gré Direct 96,000.00 0.00 2018-05-15 2018-05-17 2018-06-15 2018-12-12 Tidjerwene, Inadhan et d'exécution (US$50 million à gré Inabarin dans la equivalent) Commune de Tilemsi Cercle de Gao ML-PRRE-62465-CW-DIR / Amenagement DE 12 Component 1: PUITS A GRAND Rehabilitation of local Passation de En attente DIAMETRE EN PUITS IDA / H9010 public infrastructure A posteriori marché de gré Direct 144,000.00 0.00 2018-05-15 2018-05-17 2018-06-15 2018-12-12 d'exécution AVEC PMH DANS LA (US$50 million à gré COMMUNE DE SONY equivalent) ALIBER - Cercle de Gao ML-PRRE-62468-CW-RFQ / Construction de 4000 Component 1: m/l de caniveaux et de Rehabilitation of local Demande de Single Stage - En attente collecteur dans la IDA / H9010 public infrastructure A posteriori Open - National 514,000.00 0.00 2018-01-10 2018-03-07 2018-09-03 prix One Envelope d'exécution Commune urbaine de Gao (US$50 million (Quartiers Château Sud- equivalent) extension, Château, Est et Djidara) CW-REF 46 / Component 1: Construction de la gare Rehabilitation of local Demande de Single Stage - IDA / H9010 A posteriori Open - National 400,000.00 0.00 Annulé 2018-12-06 2019-01-31 2019-07-30 routière de Douentza - public infrastructure prix One Envelope (Mopti) (US$50 million equivalent) Component 1: ML-PRRE-62469-CW-RFQ Rehabilitation of local Demande de Single Stage - En attente / Construction de la gare IDA / H9010 A posteriori Open - National 980,000.00 0.00 2018-05-14 2018-06-26 2018-12-23 public infrastructure prix One Envelope d'exécution routière de Douentza (US$50 million equivalent) Page 4 CW-REF 47 / Component 1: Aménagement d'un Rehabilitation of local Demande de Single Stage - débarcadère et de 400 IDA / H9010 public infrastructure A posteriori Open - National 232,000.00 0.00 Annulé 2018-12-06 2019-01-31 2019-07-30 prix One Envelope mètres de caniveaux à (US$50 million Youwarou Ouro equivalent) ML-PRRE-62470-CW-RFQ Component 1: / Réalisation d'un Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 939,189.00 0.00 2018-05-15 2018-06-25 2018-12-22 débarcadère et de 460 public infrastructure prix One Envelope d'exécution mètres de caniveaux à (US$50 million Youwarou Ouro equivalent) Component 1: CW-REF 48 / Rehabilitation of local Single Stage - Réhabilitation de la piste IDA / H9010 A posteriori Appel d'offres Open - National 1,150,000.00 0.00 Annulé 2018-01-30 2018-02-04 2018-03-18 2018-04-17 2018-05-22 2018-11-18 public infrastructure One Envelope N'Gouma Sareféré (US$50 million equivalent) Component 1: ML-PRRE-62470-CW-RFB Rehabilitation of local Single Stage - En attente / Réhabilitation de la IDA / H9010 A posteriori Appel d'offres Open - National 1,854,500.00 0.00 2018-05-13 2018-05-14 2018-06-04 2018-06-11 2018-06-29 2018-12-26 public infrastructure One Envelope d'exécution piste N'Gouma Sareféré (US$50 million equivalent) Component 1: CW-REF 52 / Rehabilitation of local Demande de Single Stage - Electrification de la ville IDA / H9010 A posteriori Open - National 570,000.00 0.00 Annulé 2018-01-20 2018-03-17 2018-09-13 public infrastructure prix One Envelope de Rharouss (US$50 million equivalent) CW-REF 54 / Realisation Component 1: d'un forage profond avec Rehabilitation of local Demande de Single Stage - IDA / H9010 A posteriori Open - National 300,000.00 0.00 Annulé 2018-03-20 2018-05-15 2018-11-11 equipement solaire à public infrastructure prix One Envelope EGHEID BEDALAN (US$50 million equivalent) ML-PRRE-62474-CW-RFQ Component 1: / Realisation d'un forage Rehabilitation of local Demande de Single Stage - En attente profond avec equipement IDA / H9010 public infrastructure A posteriori Open - National 134,070.00 0.00 2018-05-15 2018-06-27 2018-12-24 prix One Envelope d'exécution solaire à EGHEID (US$50 million BEDALAN equivalent) CW-REF 53 / Component 1: Rehabilitation d'ouvrage Rehabilitation of local Demande de Single Stage - IDA / H9010 A posteriori Open - National 840,000.00 0.00 Annulé 2018-03-20 2018-05-15 2018-11-11 de Franchissement dans public infrastructure prix One Envelope la region de Kidal (US$50 million equivalent) ML-PRRE-62472-CW-RFQ Component 1: / CONSTRUCTION DE Rehabilitation of local LA DIGUE D'ACCES AU Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 335,960.00 0.00 2018-05-14 2018-06-27 2018-12-24 PONT DE ABANCO prix One Envelope d'exécution (US$50 million DANS LE CERCLE DE equivalent) TIN ESSAKO, REGION DE KIDAL ML-PRRE-62476-CW-RFQ Component 1: / CONSTRUCTION D'UN Rehabilitation of local RADIER SUR L'OUED Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 302,640.00 0.00 2018-05-14 2018-06-26 2018-12-23 DE AFFARA DANS LE prix One Envelope d'exécution (US$50 million CERCLE DE TIN equivalent) ESSAKO, REGION DE KIDAL ML-PRRE-62477-CW-RFQ Component 1: / CONSTRUCTION D'UN Rehabilitation of local RADIER SUR L'OUED Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 185,380.00 0.00 2018-05-15 2018-06-26 2018-12-23 DE IBADAKANE DANS prix One Envelope d'exécution (US$50 million LE CERCLE DE KIDAL, equivalent) REGION DE KIDAL Component 1: CW-REF 58 / Rehabilitation of local Demande de Single Stage - Rehabilitation du Lycée IDA / H9010 A posteriori Open - National 400,000.00 0.00 Annulé 2018-03-20 2018-05-15 2018-11-11 public infrastructure prix One Envelope d’Ansongo (US$50 million equivalent) Component 1: ML-PRRE-62480-CW-RFQ Rehabilitation of local Demande de Single Stage - En attente / Rehabilitation du csref IDA / H9010 A posteriori Open - National 194,829.00 0.00 2018-05-14 2018-06-25 2018-12-22 public infrastructure prix One Envelope d'exécution d'Ansongo (US$50 million equivalent) Component 1: CW-REF 57 / Rehabilitation of local Demande de Single Stage - Rehabilitation du Lycée IDA / H9010 A posteriori Open - National 500,000.00 0.00 Annulé 2018-03-20 2018-05-15 2018-11-11 public infrastructure prix One Envelope d’Ansongo (US$50 million equivalent) Component 1: ML-PRRE-62481-CW-RFQ Rehabilitation of local Demande de Single Stage - En attente / Rehabilitation du Lycée IDA / H9010 A posteriori Open - National 612,068.00 0.00 2018-05-17 2018-06-29 2018-12-26 public infrastructure prix One Envelope d'exécution d'Ansongo (US$50 million equivalent) Component 1: CW-REF 59 / Rehabilitation of local Demande de Single Stage - Construction de la maison IDA / H9010 A posteriori Open - National 400,000.00 0.00 Annulé 2018-03-20 2018-05-15 2018-11-11 public infrastructure prix One Envelope des Arts d'Ansongo (US$50 million equivalent) ML-PRRE-62482-CW-RFQ Component 1: / Construction de la Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 712,943.00 0.00 2018-05-17 2018-06-29 2018-12-26 maison des Arts public infrastructure prix One Envelope d'exécution d'Ansongo (US$50 million equivalent) ML-PRRE-62479-CW-RFQ Component 1: / CONSTRUCTION D'UN Rehabilitation of local RADIER SUR L'OUED Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 335,340.00 0.00 2018-05-29 2018-06-29 2018-12-26 DE TAGHILIT DANS LE prix One Envelope d'exécution (US$50 million CERCLE DE TIN equivalent) ESSAKO, REGION DE KIDAL ML-PRRE-62478-CW-RFQ Component 1: / CONSTRUCTION D'UN Rehabilitation of local RADIER SUR L'OUED Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 212,140.00 0.00 2018-05-14 2018-06-28 2018-12-25 DE EGHACHAR prix One Envelope d'exécution (US$50 million SADDIDEN DANS LE equivalent) CERCLE DE KIDAL, REGION DE KIDAL ML-PRRE-62472-CW-RFB / Electrification de la ville Component 1: de Rharouss par systèmes Rehabilitation of local hybrides (solaire PV- Single Stage - En attente IDA / H9010 public infrastructure A posteriori Appel d'offres Open - National 2,670,000.00 0.00 2018-05-13 2018-05-14 2018-06-04 2018-06-11 2018-06-28 2018-12-25 thermique diesel), réseau One Envelope d'exécution (US$50 million de distribution et equivalent) branchements de la localité de Gourma- Rharouss ML-PRRE-64156-CW-RFQ Component 1: / Construction d'un radier Rehabilitation of local Demande de Single Stage - En attente sur l'OUED de TAGHILIT IDA / H9010 public infrastructure A posteriori Open - National 335,340.00 0.00 2018-05-29 2018-06-29 2018-12-26 prix One Envelope d'exécution dans le cercle de Tin (US$50 million ESSAKO région de Kidal equivalent) ML-PRRE-67740-CW-RFQ / Réalisation de 5 clotures de périmètres maraichers Component 2: Support to Demande de Single Stage - En attente 100m x100m et 3 maisons IDA / H9010 A posteriori Open - National 188,460.00 0.00 2018-06-25 2018-07-23 2018-10-21 productive investments prix One Envelope d'exécution d'artisan àAnderaboucane Alata Tindermane à Menaka ML-PRRE-67741-CW-DIR / Construction de deux etables embouche bovine Passation de Component 2: Support to En attente dans les communes de IDA / H9010 A posteriori marché de gré Direct 28,841.00 0.00 2018-06-25 2018-07-02 2018-07-09 2018-10-07 productive investments d'exécution Telminac Fatelkairou et à gré Sinjitugu de Moribougou à Niono Page 5 ML-PRRE-67742-CW-DIR / Réalisation (07) SHVA dans les villages de Allaye Hamboye, Sikèrè Component 1: Tamba, Wailoubèrè Rehabilitation of local Passation de Zoumane, Pèhè, Boulel, En attente IDA / H9010 public infrastructure A posteriori marché de gré Direct 227,590.00 0.00 2018-06-25 2018-06-27 2018-07-13 2018-10-11 Madougou et d'exécution (US$50 million à gré Magnalé/commune de equivalent) Nampalari et de (01) mini AES dans le village Massarazana commune de Sokolo dans le cercle de Niono ML-PRRE-101788-CW- Component 1: RFQ / Electrification de la Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 900,000.00 0.00 2019-02-28 2019-03-29 2019-08-26 ville de Rharous réseaux public infrastructure prix One Envelope d'exécution H, BT et EP (US$50 million equivalent) ML-PRRE-105405-CW- Component 1: RFQ ADD / Pavage de la Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 54,545.00 0.00 2019-03-20 2019-05-01 2019-08-29 voie d'accès de la route public infrastructure prix One Envelope d'exécution nationale au Port de (US$50 million Konna equivalent) ML-PRRE-105407-CW- Component 1: RFQ / Réhabilitation de Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 43,636.00 0.00 2019-03-20 2019-05-01 2019-07-30 la maison des jeunes de public infrastructure prix One Envelope d'exécution Konna (US$50 million equivalent) ML-PRRE-105408-CW- Component 1: RFQ / Construction d'un Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 247,273.00 0.00 2019-03-25 2019-05-06 2019-10-03 complexe sportif de public infrastructure prix One Envelope d'exécution Konna (US$50 million equivalent) ML-PRRE-105410-CW- Component 1: RFQ / Collecteurs Gao Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 754,715.00 0.00 2019-04-20 2019-06-01 2019-10-29 2000 m + Réhabilitation public infrastructure prix One Envelope d'exécution Quai Fluvial de Gao (US$50 million equivalent) ML-PRRE-105412-CW- Component 1: RFQ / Réalisation d'une Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 454,545.00 0.00 2019-07-06 2019-08-18 2019-12-16 Adduction d'eau Potable à public infrastructure prix One Envelope d'exécution Tonka (US$50 million equivalent) ML-PRRE-105413-CW- Component 1: DIR / Réalisation Rehabilitation of local Passation de d'ouvrages supplémentaires En attente IDA / D3730 public infrastructure A posteriori marché de gré Direct 377,358.00 0.00 2019-05-02 2019-05-07 2019-05-28 2019-09-25 pour l'amélioration du d'exécution (US$50 million à gré niveau de service de la equivalent) piste N'Gouma - Saraféré ML-PRRE-105414-CW- Component 1: RFQ / Construction Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 76,364.00 0.00 2019-07-10 2019-08-21 2019-12-19 château d'eau au CSREF public infrastructure prix One Envelope d'exécution de Dire (US$50 million equivalent) ML-PRRE-105415-CW- RFQ / Réalisation du Component 1: réseau de distribution Rehabilitation of local Demande de Single Stage - En attente pour 02 AES à Kosseye IDA / D3730 public infrastructure A posteriori Open - National 294,545.00 0.00 2019-07-10 2019-08-21 2020-02-17 prix One Envelope d'exécution et Wabaria et Réalisation (US$50 million des infrastructures pour equivalent) l'AES de Bazi Gourma ML-PRRE-105416-CW- Component 1: RFQ / Réalisation d'une Rehabilitation of local Demande de Single Stage - En attente AES (4 BF) à Seke IDA / D3730 public infrastructure A posteriori Open - National 90,909.00 0.00 2019-07-06 2019-08-17 2019-12-15 prix One Envelope d'exécution (Commune de Fittouga, (US$50 million Cercle de Niafunké) equivalent) ML-PRRE-105417-CW- Component 1: RFQ / Renforcement du Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 454,545.00 0.00 2019-05-27 2019-07-08 2019-11-05 réseau d'adduction d'eau public infrastructure prix One Envelope d'exécution de Ménaka (US$50 million equivalent) Component 1: ML-PRRE-105419-CW- Rehabilitation of local Demande de Single Stage - En attente RFQ / Réhabilitation du IDA / D3730 A posteriori Open - National 727,273.00 0.00 2019-05-15 2019-06-26 2019-10-24 public infrastructure prix One Envelope d'exécution CSREF de Ménaka (US$50 million equivalent) ML-PRRE-105441-CW- RFQ / Aménagement de Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 384,000.00 0.00 2019-05-07 2019-06-18 2019-10-16 08 étangs piscicoles dans productive investments prix One Envelope d'exécution la commune de Konna ML-PRRE-105442-CW- RFQ / Aménagement de Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 398,000.00 0.00 2019-05-07 2019-06-18 2019-10-16 03 ha et construction de productive investments prix One Envelope d'exécution 60 magasins pour le marché de Konna ML-PRRE-105443-CW- RFQ / Aménagement d'un Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 204,000.00 0.00 2019-04-24 2019-06-05 2019-10-03 Périmètre Irrigué productive investments prix One Envelope d'exécution Villageois de 15 Ha à Tondibi ML-PRRE-105444-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Réalisation d'étang IDA / D3730 A posteriori Open - National 34,000.00 0.00 2019-04-27 2019-06-08 2019-10-06 productive investments prix One Envelope d'exécution piscicole de 15*20 à TEMERA ML-PRRE-105445-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Aménagement de IDA / D3730 A posteriori Open - National 192,000.00 0.00 2019-04-22 2019-06-03 2019-10-01 productive investments prix One Envelope d'exécution 04 étangs piscicoles à Douentza ML-PRRE-105446-CW- RFQ / Aménagement de 3 Component 2: Support to Demande de Single Stage - En attente PIV (70 ha) et d'une IDA / D3730 A posteriori Open - National 294,000.00 0.00 2019-04-23 2019-06-04 2019-10-02 productive investments prix One Envelope d'exécution bourgoutière (10 ha) dans le cercle de Douentza ML-PRRE-105447-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Aménagement de IDA / D3730 A posteriori Open - National 300,000.00 0.00 2019-05-07 2019-06-18 2019-10-16 productive investments prix One Envelope d'exécution 05 PIV (100 ha) à Tonka ML-PRRE-105448-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Aménagement de IDA / D3730 A posteriori Open - National 240,000.00 0.00 2019-05-07 2019-06-18 2019-10-16 productive investments prix One Envelope d'exécution 04 PIV (80 ha) à Douekire ML-PRRE-105449-CW- RFQ / Réhabilitation de 2 Component 2: Support to Demande de Single Stage - En attente PIV (34,90 ha) et IDA / D3730 A posteriori Open - National 170,993.00 0.00 2019-04-26 2019-06-07 2019-10-05 productive investments prix One Envelope d'exécution réalisation d'un étang piscicole de 15*20 à Banikane ML-PRRE-105451-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Réalisation d'étang IDA / D3730 A posteriori Open - National 34,800.00 0.00 2019-04-29 2019-06-10 2019-10-08 productive investments prix One Envelope d'exécution piscicole de 15x20 à Agoufou ML-PRRE-105452-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Réhabilitation de 3 IDA / D3730 A posteriori Open - National 206,816.00 0.00 2019-04-27 2019-06-08 2019-10-06 productive investments prix One Envelope d'exécution PIV (52,20 ha) à Hamzakoma ML-PRRE-105453-CW- Component 2: Support to Demande de Single Stage - En attente RFQ / Réhabilitation de 2 IDA / D3730 A posteriori Open - National 191,348.00 0.00 2019-04-23 2019-06-04 2019-10-02 productive investments prix One Envelope d'exécution PIV (26,83 ha) à Haribomo ML-PRRE-105455-CW- RFQ / Réhabilitation de 2 Component 2: Support to Demande de Single Stage - En attente PIV (27,54 ha) et IDA / D3730 A posteriori Open - National 188,109.00 0.00 2019-04-22 2019-06-03 2019-10-01 productive investments prix One Envelope d'exécution aménagement d'une bourgoutière (24 ha) à Rharous Page 6 ML-PRRE-105456-CW- RFQ / Réhabilitation de 2 Component 2: Support to Demande de Single Stage - En attente PIV (28,27 ha) et IDA / D3730 A posteriori Open - National 167,682.00 0.00 2019-04-23 2019-06-04 2019-10-02 productive investments prix One Envelope d'exécution aménagement d'une bourgoutière (10 ha) à Séréré ML-PRRE-105457-CW- RFQ / Réhabilitation de Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 58,367.00 0.00 2019-04-20 2019-06-01 2019-09-29 PIV de 17,5 ha à productive investments prix One Envelope d'exécution Tassakane dans la commune de Alafia ML-PRRE-105458-CW- RFQ / Réhabilitation de Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 57,498.00 0.00 2019-04-24 2019-06-05 2019-10-03 PIV de 13,5 ha à Saré productive investments prix One Envelope d'exécution Keyna dans la commune de Tombouctou ML-PRRE-105459-CW- RFQ / Aménagement de 6 Component 2: Support to Demande de Single Stage - En attente périmètres rizicoles de 30 IDA / D3730 A posteriori Open - National 371,700.00 0.00 2019-05-20 2019-07-01 2019-10-29 productive investments prix One Envelope d'exécution ha chacun à Andéramboukane ML-PRRE-105406-CW- Component 1: RFQ / Construction d'un Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 72,727.00 0.00 2019-05-25 2019-07-06 2019-11-03 Centre de Développement public infrastructure prix One Envelope d'exécution de la Petite Enfance à (US$50 million KONNA equivalent) ML-PRRE-101783-CW- Component 1: RFQ / Electrification de la Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 610,460.00 0.00 2019-05-13 2019-06-08 2019-10-06 ville de Rharous Centrale public infrastructure prix One Envelope d'exécution thermique et bâtiment (US$50 million exploitant equivalent) ML-PRRE-113918-CW- Component 1: RFB / Electrification de la Rehabilitation of local Single Stage - En attente IDA / H9010 A posteriori Appel d'offres Open - National 1,159,453.00 0.00 2019-05-08 2019-05-09 2019-05-30 2019-06-06 2019-06-20 2019-12-17 ville de Rharous (Réseau public infrastructure One Envelope d'exécution HT et BT) (US$50 million equivalent) ML-PRRE-101789-CW- Component 1: RFQ / Electrification de la Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 815,552.00 0.00 2019-05-19 2019-06-24 2019-11-21 ville de Rharous Centrale public infrastructure prix One Envelope d'exécution photovoltaïque (US$50 million equivalent) ML-PRRE-113934-CW- Component 1: RFQ / Electrification de la Rehabilitation of local Demande de Single Stage - En attente ville de Rharous (Travaux IDA / H9010 public infrastructure A posteriori Open - National 868,347.00 0.00 2019-05-09 2019-06-10 2019-12-07 prix One Envelope d'exécution d'installation des (US$50 million équipements d'hybridation) equivalent) Component 1: ML-PRRE-125663-CW- Passation de Rehabilitation of local En attente RFQ / Achèvement des IDA / D3730 A posteriori marché de gré Direct 52,000.00 0.00 2019-08-02 2019-08-05 2019-08-24 2019-12-22 public infrastructure d'exécution Caniveaux de Youwarou à gré (US$50 million equivalent) GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF 1 / Equipements Component 1: des écoles du cercle de Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 200,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 Douentza (15 SDC et 5 public infrastructure prix One Envelope d'exécution Bureaux -Magasins) (US$50 million equivalent) GO-REF 2 / Equipements Component 1: des écoles du cercle de Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 160,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 Youwarou (12 SDC et 05 public infrastructure prix One Envelope d'exécution Bureaux -Magasins) (US$50 million equivalent) GO-REF 3 / Equipement Component 1: pour le CSCOM de Rehabilitation of local Demande de Single Stage - En attente eguedech Commune de IDA / H9010 public infrastructure A posteriori Open - National 80,000.00 0.00 2017-11-20 2018-01-15 2018-07-14 prix One Envelope d'exécution Bamba, Cercle de Bourem, (US$50 million Région de Gao equivalent) GO-REF 4 / Equipements Component 1: pour le CSCOM de Niasso Rehabilitation of local Demande de Single Stage - En attente et de Diondiori / IDA / H9010 public infrastructure A posteriori Open - National 100,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 prix One Envelope d'exécution Commune de Diondiori/ (US$50 million Cercle de Tenenkou equivalent) GO-REF 5 / Equipements Component 1: pour le CSCOM à Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 120,000.00 0.00 2018-01-20 2018-03-17 2018-09-13 Tondidarou dans le cercle public infrastructure prix One Envelope d'exécution de Niafunké. (US$50 million equivalent) GO-REF 6 / Equipements Component 1: pour l'intitut de Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 490,000.00 0.00 2018-01-20 2018-03-17 2018-09-13 Formation Professionnel public infrastructure prix One Envelope d'exécution (IFP) de Diré (US$50 million equivalent) GO-REF 7 / Equipements Component 1: pour une école dans les Rehabilitation of local Demande de Single Stage - En attente communes de Diabaly de IDA / H9010 public infrastructure A posteriori Open - National 11,000.00 0.00 2017-10-05 2017-11-30 2018-05-29 prix One Envelope d'exécution l'académie d'enseignement (US$50 million de Ségou, CAP de Niono equivalent) GO-REF 9 / Equipements pour une école dans la Component 1: commune de Siribala, et Rehabilitation of local deux écoles dans la Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 33,000.00 0.00 2017-10-05 2017-11-30 2018-05-29 commune de Sirifila prix One Envelope d'exécution (US$50 million Boundy , de l'académie equivalent) d'enseignement de Ségou, CAP de Niono GO-REF 10 / Equipements pour un Component 1: CSCOM dans la cmmune Rehabilitation of local de Sokolo, équipement Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 110,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 une salle d’observation des prix One Envelope d'exécution (US$50 million malades et d'un magasin equivalent) pour un CSCOM dans la commune de Torridagako GO-REF 11 / Component 1: Equipements pour les Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 88,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 écoles de l'académie public infrastructure prix One Envelope d'exécution d'enseignement de (US$50 million Tombouctou, CAP de equivalent) Diré,. GO-REF 12 / Component 1: Equipements pour les Rehabilitation of local Demande de Single Stage - En attente écoles de l'académie IDA / H9010 public infrastructure A posteriori Open - National 44,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 prix One Envelope d'exécution d'enseignement de (US$50 million Tombouctou, CAP de equivalent) Goundam, GO-REF 13 / Component 1: Equipements pour les Rehabilitation of local Demande de Single Stage - En attente écoles de l'académie IDA / H9010 public infrastructure A posteriori Open - National 55,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 prix One Envelope d'exécution d'enseignement de (US$50 million Tombouctou, CAP de equivalent) Gourma Rharous, GO-REF 14 / Component 1: Equipements pour les Rehabilitation of local écoles de l'académie Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 55,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 d'enseignement de prix One Envelope d'exécution (US$50 million Tombouctou, CAP de equivalent) Niafunké et Leré, dans le cercle de Niafunké. Page 7 GO-REF 15 / Component 1: Equipements pour les Rehabilitation of local écoles de l'académie Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 71,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 d'enseignement de prix One Envelope d'exécution (US$50 million Tombouctou, CAP de equivalent) Tombouctou, dans le cercle de Tombouctou. GO-REF 16 / Equipements pour un Component 1: CSCOM dans la commune Rehabilitation of local Demande de Single Stage - En attente de Douékiré, un CSCOM IDA / H9010 public infrastructure A posteriori Open - National 240,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 prix One Envelope d'exécution dans la commune de (US$50 million Tilemsi, un CSCOM dans equivalent) la commune de Tin Aicha, dans le cercle de Goundam. GO-REF 17 / Equipementsde la maternité du CSCOM de Component 1: DAGAFIFO dans la Rehabilitation of local Demande de Single Stage - En attente commune de Haribomo IDA / H9010 public infrastructure A posteriori Open - National 100,000.00 0.00 2017-10-07 2017-12-02 2018-05-31 prix One Envelope d'exécution dans le cercle de Gourma (US$50 million Rharous, et un CSCOM equivalent) dans la commune de Soumpi dans le cercle de Niafunké. GO-REF 18 / Equipement pour cinq (05) Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 70,080.00 0.00 2017-11-20 2018-01-15 2018-07-14 unités de productive investments prix One Envelope d'exécution tannerie/maroquinerie dans le cercle de Kidal GO-REF 19 / Pose d'équipement d'agricultuere , d'embouche ovine et bovine, de magasin de stockage et de vente de Component 2: Support to Demande de Single Stage - En attente céréale, unité de IDA / H9010 A posteriori Open - National 31,760.00 0.00 2017-12-15 2018-02-09 2018-08-08 productive investments prix One Envelope d'exécution transformation des produits locaux dans les communes de: Adarmalane,Gargando,TIN AICHA et M'Bouna cercle de Goundam GO-REF 20 / Equipements pour les activités d’embouche, Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 64,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 d’artisanat et de productive investments prix One Envelope d'exécution commerce dans trois (03) communes du cercle de Goundam. GO-REF 21 / Equipements pour poulailler, atelier de menuiserie bois, magasins de stockage et de vente Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 334,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 de céréales, unités de productive investments prix One Envelope d'exécution transformation des produits locaux , les activités d’embouche et de savonnerie dans six (06) communes du cercle de Goundam. GO-REF 22 / Equipement et pose de matériels ( Component 2: Support to Demande de Single Stage - En attente Décortiqueuses, Moulins et IDA / H9010 A posteriori Open - National 72,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 productive investments prix One Envelope d'exécution Moto Pompes) dans les commune de: Ansongo , Bara, Bourra et Talataye , cercle d'Ansongo GO-REF 23 / Equipements et pose de matériels ( équipements de pêche, transformation Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 48,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 de pousson et savonnerie) productive investments prix One Envelope d'exécution dans les commune de: Tessit, Til hama, Ouatagouna,Ango et Bourra, cercle d'Ansongo GO-REF 24 / Equipements et pose de matériels pour 2 magasins de stockage et 3 Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 52,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 maisons d'artisans dans productive investments prix One Envelope d'exécution les communes de Ouatagouna, Talataye, Tessit et Tin Hama, cercle d'Ansongo GO-REF 25 / Equipements et pose de matériels pour embouche Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 26,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 ovine et bovine dans les productive investments prix One Envelope d'exécution communes de Talataye, Tessit et Tin Hama, cercle d'Ansongo GO-REF 26 / Equipements et pose de matériels pour les Component 2: Support to Demande de Single Stage - En attente activités d'aviculture et IDA / H9010 A posteriori Open - National 30,000.00 0.00 2017-12-15 2018-02-09 2018-08-08 productive investments prix One Envelope d'exécution d'embouche ovine et bovine dans les communes de Ouatagouna, Ansongo, Bara et Bourra, cercle d'Ansongo GO-REF 27 / Equipements et pose de matériels pour embouche ovine et bovine dans les Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 90,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 communes de Inekar, productive investments prix One Envelope d'exécution Anderamboukane, Alata, Ménaka et Tidermene, cercle de Ménaka GO-REF 28 / Equipements et pose de matériels pour (02) maisons d'artisan dans les Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 30,000.00 0.00 2017-12-20 2018-02-14 2018-08-13 communes de boukane, productive investments prix One Envelope d'exécution Alata, Ménaka et Tidermene, dans les communes de Tindermène et Alata, cercle de Menaka Component 1: ML-PRRE-62223-GO-RFQ Rehabilitation of local Demande de Single Stage - En attente / Equipement CSRéf IDA / H9010 A posteriori Open - National 105,840.00 0.00 2018-05-10 2018-06-28 2018-12-25 public infrastructure prix One Envelope d'exécution d'Ansongo (US$50 million equivalent) Component 1: ML-PRRE-62445-GO-RFQ Rehabilitation of local Demande de Single Stage - En attente / Equipements du Lycée IDA / H9010 A posteriori Open - National 58,830.00 0.00 2018-05-14 2018-06-27 2018-12-24 public infrastructure prix One Envelope d'exécution d'Ansongo (US$50 million equivalent) Component 1: ML-PRRE-62444-GO-RFQ Rehabilitation of local Demande de Single Stage - En attente / Equipements de la IDA / H9010 A posteriori Open - National 74,000.00 0.00 2018-05-15 2018-06-26 2018-12-23 public infrastructure prix One Envelope d'exécution maison des arts d'Ansongo (US$50 million equivalent) ML-PRRE-62475-GO-RFQ / Equipements pour deux Component 1: (02) écoles dans la Rehabilitation of local Demande de Single Stage - En attente commune de Niono et IDA / H9010 public infrastructure A posteriori Open - National 33,000.00 0.00 2018-05-15 2018-06-29 2018-12-26 prix One Envelope d'exécution une école dans le (US$50 million commune Kala Siguida, de equivalent) l'académie d'enseignement de Ségou, CAP deNiono Component 1: ML-PRRE-64155-GO-DIR Passation de Rehabilitation of local En attente / Un Bac à perche de 5 IDA / H9010 A posteriori marché de gré Direct 90,000.00 0.00 2018-05-28 2018-05-31 2018-06-14 2018-12-11 public infrastructure d'exécution tonnes pour SARAFERE à gré (US$50 million equivalent) Page 8 ML-PRRE-67738-GO-RFQ / Equipements agricoles et d'embouches (Motoculteurs, Component 2: Support to Demande de Single Stage - En attente batteuses, décortiqueuses, IDA / H9010 A posteriori Open - National 127,960.00 0.00 2018-06-25 2018-07-23 2018-09-21 productive investments prix One Envelope d'exécution mangeoires et abreuvoirs) dans les sept (07) communes du cercle d'Ansongo. ML-PRRE-67739-GO-RFQ / Equipements d'agriculture, d'embouche, de transport, de pêche et de commercialisation de Component 2: Support to Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 47,060.00 0.00 2018-06-25 2018-07-23 2018-09-21 poissons dans les productive investments prix One Envelope d'exécution communes d'Inekar, Anderamboukane, Alata, Ménaka et Tidermene, cercle de Ménaka ML-PRRE-105462-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 496,132.00 0.00 2019-04-20 2019-06-01 2019-09-29 plateau technique CSREF public infrastructure prix One Envelope d'exécution D'Ansongo (US$50 million equivalent) ML-PRRE-105464-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 199,594.00 0.00 2019-04-27 2019-06-08 2019-10-06 plateau technique CSREF public infrastructure prix One Envelope d'exécution Bourem (US$50 million equivalent) ML-PRRE-105465-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 292,776.00 0.00 2019-04-27 2019-06-08 2019-10-06 plateau technique CSREF public infrastructure prix One Envelope d'exécution Gao (US$50 million equivalent) ML-PRRE-105468-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 224,510.00 0.00 2019-04-30 2019-06-11 2019-10-09 plateau technique CSREF public infrastructure prix One Envelope d'exécution Douentza (US$50 million equivalent) ML-PRRE-105470-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 157,220.00 0.00 2019-04-24 2019-06-05 2019-10-03 plateau technique CSREF public infrastructure prix One Envelope d'exécution TENENKOU (US$50 million equivalent) ML-PRRE-105471-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 293,776.00 0.00 2019-04-27 2019-06-08 2019-10-06 plateau technique CSREF public infrastructure prix One Envelope d'exécution Youwarou (US$50 million equivalent) ML-PRRE-105472-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 247,298.00 0.00 2019-04-26 2019-06-07 2019-10-05 plateau technique CSREF public infrastructure prix One Envelope d'exécution Diré (US$50 million equivalent) ML-PRRE-105474-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 244,275.00 0.00 2019-04-28 2019-06-09 2019-10-07 plateau technique CSREF public infrastructure prix One Envelope d'exécution Goundam (US$50 million equivalent) ML-PRRE-105476-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 493,860.00 0.00 2019-05-01 2019-06-12 2019-10-10 plateau technique CSREF public infrastructure prix One Envelope d'exécution Niafunké (US$50 million equivalent) ML-PRRE-105477-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 323,925.00 0.00 2019-05-04 2019-06-15 2019-10-13 plateau technique CSREF public infrastructure prix One Envelope d'exécution Gourma Rharous (US$50 million equivalent) ML-PRRE-105479-GO- Component 1: RFQ / Renforcement Rehabilitation of local Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 353,625.00 0.00 2019-04-29 2019-06-10 2019-10-08 plateau technique CSREF public infrastructure prix One Envelope d'exécution Tombouctou (US$50 million equivalent) ML-PRRE-105599-GO- RFQ / Dotation de PPIV Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 240,000.00 0.00 2019-04-15 2019-05-27 2019-08-25 de 2 motopompes (GMP) productive investments prix One Envelope d'exécution adaptées par site sur 4 sites ML-PRRE-105604-GO- RFQ / Cages flottantes (4 Component 2: Support to Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 498,000.00 0.00 2019-05-20 2019-07-01 2019-10-29 par village) dans 16 productive investments prix One Envelope d'exécution villages de la commune de Konna ML-PRRE-105606-GO- Component 2: Support to Demande de Single Stage - En attente RFQ / Dotation des IDA / D3730 A posteriori Open - National 38,000.00 0.00 2019-04-20 2019-06-01 2019-09-29 productive investments prix One Envelope d'exécution pêcheurs en équipements de pêche Component 4: Project ML-PRRE-105608-GO- management, monitoring Demande de Single Stage - En attente RFQ / Fourniture de IDA / D3730 A posteriori Open - National 22,000.00 0.00 2019-04-15 2019-05-27 2019-06-26 and evaluation (US$5 prix One Envelope d'exécution bureau million equivalent) Component 4: Project ML-PRRE-105612-GO- management, monitoring Demande de Single Stage - En attente RFQ / Fourniture de IDA / D3730 A posteriori Open - National 8,000.00 0.00 2019-04-10 2019-05-22 2019-06-21 and evaluation (US$5 prix One Envelope d'exécution gadgets publicitaires million equivalent) Component 4: Project ML-PRRE-105615-GO- management, monitoring Demande de Single Stage - En attente RFQ / Fourniture de Tee IDA / D3730 A posteriori Open - National 8,000.00 0.00 2019-04-15 2019-05-27 2019-06-26 and evaluation (US$5 prix One Envelope d'exécution shirt million equivalent) Component 4: Project ML-PRRE-105619-GO- management, monitoring Demande de Single Stage - En attente RFQ / Fournitures IDA / D3730 A posteriori Open - National 40,000.00 0.00 2019-04-10 2019-05-22 2019-06-21 and evaluation (US$5 prix One Envelope d'exécution Equipements UCP/AR million equivalent) ML-PRRE-105460-GO- Component 1: RFB / Renforcement des Rehabilitation of local Single Stage - En attente IDA / D3730 A posteriori Appel d'offres Open - National 850,000.00 0.00 2019-05-09 2019-05-12 2019-06-02 2019-06-12 2019-06-29 2019-10-27 plateaux techniques des public infrastructure One Envelope d'exécution centres de santé de Mopti (US$50 million (KONNA) equivalent) ML-PRRE-101791-GO- Component 1: RFQ / Equipements Rehabilitation of local Demande de Single Stage - En attente IDA / H9010 A posteriori Open - National 182,497.00 0.00 2019-05-20 2019-06-20 2019-10-18 d'électrification de la ville public infrastructure prix One Envelope d'exécution de Rharous (US$50 million (Transformateurs HT BT) equivalent) ML-PRRE-114543-GO- Component 4: Project RFQ / Fourniture de management, monitoring Demande de Single Stage - En attente IDA / D3730 A posteriori Open - National 3,000.00 0.00 2019-05-14 2019-06-10 2019-12-07 Smartphones pour le suivi and evaluation (US$5 prix One Envelope d'exécution évaluation des activités million equivalent) ML-PRRE-125154-GO- RFQ / DOTATION DE 10 CSCOM NIAMBOURGOU LERNEB DAKA FIFO Component 1: KOKONTO ET Rehabilitation of local TONDIDAROU Demande de Single Stage - En attente IDA / H9010 public infrastructure A posteriori Open - National 20,000.00 0.00 2019-08-03 2019-08-31 2019-09-03 MASSARAZANA prix One Envelope d'exécution (US$50 million DOUENTZA 5E equivalent) QUARTIER ET DIAFARABE EUGUEDECH ET TONDIBI EN MEDICAMENTS ESSENTIELS ET CONSOMMABLES NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Page 9 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-101794-NC-DIR Component 1: Passation de / Manutention et Rehabilitation of local En attente IDA / H9010 A posteriori marché de gré Direct 80,000.00 0.00 2019-02-26 2019-02-27 2019-03-08 2019-03-23 transports de groupe public infrastructure d'exécution à gré électrogènes de Gourma (US$50 million Rharous equivalent) Component 4: Project ML-PRRE-105480-NC- management, monitoring Demande de Single Stage - En cours RFQ / Acquisition images IDA / D3730 A posteriori Open - National 60,000.00 0.00 2019-03-20 2019-05-01 2019-08-29 and evaluation (US$5 prix One Envelope d'exécution satellitaires million equivalent) CONSULTING FIRMS Activity Reference No. Actual Short List and Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of / Description Component Review Type Method Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CS-REF 98 / Sercice de consultances pour la Component 4: Project Sélection fondée réalisation des etudes management, monitoring sur les En attente techniques IDA / H9010 A posteriori Open - National 100,000.00 0.00 2017-09-02 2017-09-23 2017-11-06 2017-12-06 2018-01-10 2018-07-09 and evaluation (US$5 qualifications d'exécution ,environnementales et million equivalent) des consultants socio du Port de pêche de KONNA CS-REF 99 / Sercice de Component 4: Project Sélection fondée consultances pour l'Audit management, monitoring En cours IDA / H9010 A priori sur la qualité Open - National 40,000.00 0.00 2018-01-26 2018-02-16 2018-04-01 2018-04-29 2018-05-29 2018-07-03 2018-08-07 2019-08-07 externe (audit 2018 et fin and evaluation (US$5 d'exécution et le coût de projet) million equivalent) CS-REF 100 / Sercice de consultances Etudes Contrôle et surveillance de Component 1: la réhabilitation du quai Sélection fondée Rehabilitation of local fluvial la Construction de sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 46,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 4000 m/l de caniveaux et qualifications d'exécution (US$50 million de collecteur dans la des consultants equivalent) Commune urbaine de Gao (Quartiers Château Sud- extension, Château Est et Djidara) CS-REF 101 / Sercice de Component 1: Sélection fondée consultances Etudes Rehabilitation of local sur les En attente ,Contrôle et surveillance IDA / H9010 public infrastructure A posteriori Open - National 40,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 qualifications d'exécution de la Construction de la (US$50 million des consultants gare routière de Douentza equivalent) CS-REF 102 / Sercice de consultances Etudes Component 1: ,Contrôle et surveillance Sélection fondée Rehabilitation of local de l' aménagement d'un sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 32,560.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 débarcadère à youwarou qualifications d'exécution (US$50 million et construction de 400 des consultants equivalent) metres de canniveaux à Youwarou Ouro CS-REF 103 / Sercice de Component 1: Sélection fondée consultances Etudes Rehabilitation of local sur les En attente ,Contrôle et surveillance IDA / H9010 public infrastructure A posteriori Open - National 92,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 qualifications d'exécution des travaux de (US$50 million des consultants rehabilitation de la piste equivalent) N' Gouma -Saraféré CS-REF 105 / Sercice de Component 1: consultances Etudes Sélection fondée Rehabilitation of local Contrôle et surveillance sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 40,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 des travaux de qualifications d'exécution (US$50 million construction d'un CSCOM des consultants equivalent) à Tondidarou cercle de Niafunké CS-REF 106 / Sercice de Component 1: Sélection fondée consultances Contrôle et Rehabilitation of local sur les En attente surveillance des travaux IDA / H9010 public infrastructure A posteriori Open - National 60,000.00 0.00 2017-11-24 2017-12-15 2018-01-28 2018-02-27 2018-04-03 2018-09-30 qualifications d'exécution de construction de la (US$50 million des consultants Gare routiere de equivalent) Tombouctou CS-REF 107 / Services de Consultant pour les études et controle et surveillance des travaux Component 1: Sélection fondée de rehabilitation de centre Rehabilitation of local sur les En attente de santé et de points IDA / H9010 public infrastructure A posteriori Open - National 48,200.00 0.00 2018-01-05 2018-01-26 2018-03-11 2018-04-10 2018-05-15 2018-11-11 qualifications d'exécution d'eau dans les cercles de (US$50 million des consultants Bourem et de Gao et equivalent) realisation d'infrastructures dans la commune de tarkint cercle de Bourem CS-REF 108 / Services de Consultant pour les Component 1: études techniques, le Sélection fondée Rehabilitation of local contrôle et la surveillance sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 127,200.00 0.00 2018-01-16 2018-02-06 2018-03-22 2018-04-21 2018-05-26 2018-11-22 des travaux de qualifications d'exécution (US$50 million construction, de des consultants equivalent) réhabilitation et/ ou d’extension d’infrastructures dans la Région de Kidal CS-REF 109 / Services de Consultant pour les Component 1: études techniques, le Sélection fondée Rehabilitation of local contrôle et la surveillance sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 144,400.00 0.00 2018-01-16 2018-02-06 2018-03-22 2018-04-21 2018-05-26 2018-11-22 des travaux de qualifications d'exécution (US$50 million construction, de des consultants equivalent) réhabilitation et/ ou d’extension d’infrastructures dans la Région de Menaka CS-REF 110 / Services de Consultant pour les Component 1: études techniques, le Sélection fondée Rehabilitation of local contrôle et la surveillance sur les En attente IDA / H9010 public infrastructure A posteriori Open - National 23,000.00 0.00 2018-01-16 2018-02-06 2018-03-22 2018-04-21 2018-05-26 2018-11-22 des travaux de qualifications d'exécution (US$50 million construction, de des consultants equivalent) réhabilitation et/ ou d’extension d’infrastructures dans le cercle d'ANSONGO CS-REF 111 / Service de consultant pour les Sélection fondée études techniques, le Component 2: Support to sur les En attente contrôle et la surveillance IDA / H9010 A posteriori Open - National 200,876.00 0.00 2017-09-13 2017-10-04 2017-11-17 2017-12-17 2018-01-21 2018-07-20 productive investments qualifications d'exécution des travaux de réalisation des consultants de micro-projets dans lesregions de Menaka et de Gao (cercle Ansongo) ML-PRRE-55911-CS-CQS / Sercice de consultances Component 1: Sélection fondée Etudes ,Contrôle et Rehabilitation of local sur les En attente surveillance de la IDA / H9010 public infrastructure A posteriori Open - National 48,000.00 0.00 2017-07-30 2017-08-20 2017-10-03 2017-11-02 2017-12-07 2018-06-05 qualifications d'exécution réalisation d'un ouvrage (US$50 million des consultants de franchissement (Pont) equivalent) dans la commune de Gossi Component 1: Sélection fondée ML-PRRE-62447-CS-CQS Rehabilitation of local sur les En attente / Contrôle Technique Gare IDA / H9010 A posteriori Open - National 15,450.00 0.00 2018-05-12 2018-05-15 2018-06-08 2018-06-15 2018-07-20 2019-01-16 public infrastructure qualifications d'exécution routière de Tombouctou (US$50 million des consultants equivalent) ML-PRRE-62451-CS-CQS Component 1: Sélection fondée / Contrôle Technique de Rehabilitation of local sur les En attente IDA / H9010 A posteriori Open - National 240,000.00 0.00 2018-05-14 2018-05-28 2018-06-08 2018-06-13 2018-07-13 2019-01-09 l'Electrification de la ville public infrastructure qualifications d'exécution de Rharouss (US$50 million des consultants equivalent) ML-PRRE-105652-CS-CQS Component 4: Project Sélection fondée / Communication autour management, monitoring sur les En cours des activités de l'Alliance IDA / D3730 A posteriori Open - National 40,000.00 0.00 2019-04-15 2019-05-06 2019-06-19 2019-07-19 2019-08-09 2020-11-20 and evaluation (US$5 qualifications d'examen Sahel et des autres million equivalent) des consultants activités du projet Page 10 Component 4: Project Sélection fondée ML-PRRE-105672-CS-CQS management, monitoring sur les En attente / ONG locale spécialisée IDA / D3730 A posteriori Open - National 100,000.00 0.00 2019-04-10 2019-04-13 2019-05-02 2019-05-09 2019-05-26 2019-09-23 and evaluation (US$5 qualifications d'exécution aux activités de VBG/EAS million equivalent) des consultants Component 4: Project Sélection fondée ML-PRRE-105680-CS-CQS management, monitoring sur les En attente / Appui alphabétisation IDA / D3730 A posteriori Open - National 50,000.00 0.00 2019-04-10 2019-04-24 2019-05-13 2019-05-23 2019-06-13 2019-12-10 and evaluation (US$5 qualifications d'exécution numérique million equivalent) des consultants ML-PRRE-105682-CS-CQS / Etudes, contrôle et suivi Sélection fondée des travaux Component 2: Support to sur les En cours d'aménagement de 08 IDA / D3730 A posteriori Open - National 78,182.00 0.00 2019-04-12 2019-04-17 2019-05-04 2019-05-11 2019-05-25 2019-07-09 productive investments qualifications d'examen étangs piscicoles et des consultants l'aménagement de 03 ha du marché avec construction de 60 magasins à Konna. ML-PRRE-105683-CS-CQS Sélection fondée / Appui à l'étude Component 2: Support to sur les En attente IDA / D3730 A posteriori Open - National 10,000.00 0.00 2019-03-20 2019-03-23 2019-04-16 2019-04-26 2019-05-10 2019-06-09 technique et au contrôle productive investments qualifications d'exécution des cages flottantes de des consultants Konna ML-PRRE-105694-CS-CQS Sélection fondée / Formation des pêcheurs Component 2: Support to sur les En attente IDA / D3730 A posteriori Open - National 20,000.00 0.00 2019-03-29 2019-04-01 2019-04-22 2019-04-29 2019-05-13 2019-05-20 sur les techniques de la productive investments qualifications d'exécution pisciculture des consultants ML-PRRE-105710-CS-CQS Sélection fondée / Etudes et contrôle des Component 2: Support to sur les En attente travaux PIV IDA / D3730 A posteriori Open - National 35,000.00 0.00 2019-03-27 2019-03-29 2019-04-19 2019-04-26 2019-05-13 2019-06-12 productive investments qualifications d'exécution d'Anderamboucane-Ménaka des consultants à Andéramboukane Sélection fondée ML-PRRE-105713-CS-CQS Component 2: Support to sur les En attente / Etudes et contrôle de 5 IDA / D3730 A posteriori Open - National 80,000.00 0.00 2019-03-28 2019-03-30 2019-04-20 2019-04-27 2019-05-11 2019-06-10 productive investments qualifications d'exécution PIV (100 ha) à Tonka des consultants ML-PRRE-105716-CS-CQS Sélection fondée / Etudes et contrôle de 04 Component 2: Support to sur les En attente IDA / D3730 A posteriori Open - National 64,000.00 0.00 2019-03-27 2019-03-30 2019-04-18 2019-04-25 2019-05-09 2019-06-08 PIV (80 ha) à Douekire productive investments qualifications d'exécution CS-Ref 10 des consultants ML-PRRE-105721-CS-CQS / Contrôle de 4 étangs Sélection fondée piscicoles de 15x20, de 3 Component 2: Support to sur les En cours IDA / D3730 A posteriori Open - National 56,000.00 0.00 2019-03-22 2019-03-25 2019-04-15 2019-04-22 2019-05-06 2019-06-05 PIV (70 ha) et d'une productive investments qualifications d'examen bourgoutière (10 ha) dans des consultants le cercle de Douentza ML-PRRE-105724-CS-CQS Sélection fondée / Contrôle d'un Périmètre Component 2: Support to sur les En cours Irrigué Villageois de 15 IDA / D3730 A posteriori Open - National 14,000.00 0.00 2019-03-22 2019-03-25 2019-04-15 2019-04-22 2019-05-06 2019-06-05 productive investments qualifications d'examen Ha et d'un étang piscicole des consultants dans le cercle de Bourem ML-PRRE-105725-CS-CQS / Contrôle de 10 PIV Sélection fondée (177,21 ha) et Component 2: Support to sur les En cours aménagement de 2 étangs IDA / D3730 A posteriori Open - National 90,000.00 0.00 2019-03-27 2019-03-29 2019-04-17 2019-04-22 2019-05-06 2019-06-05 productive investments qualifications d'examen piscicoles de 15*20 et de des consultants 2 bourgoutières (34 ha) dans le cercle de Gourma Rharous ML-PRRE-105727-CS-CQS Component 3: Community Sélection fondée / Renforcement des engagement and local sur les En attente IDA / D3730 A posteriori Open - National 270,000.00 0.00 2019-06-16 2019-06-19 2019-07-08 2019-07-13 2019-07-27 2019-08-26 capacités des entreprises governance (US$10 qualifications d'exécution locales million equivalent). des consultants ML-PRRE-105728-CS-CQS Component 3: Community Sélection fondée / Formation des engagement and local sur les En attente IDA / D3730 A posteriori Open - National 120,000.00 0.00 2019-06-17 2019-06-20 2019-07-09 2019-07-14 2019-07-24 2019-08-23 bénéficiaires à la governance (US$10 qualifications d'exécution maitrise technique des million equivalent). des consultants équipements fournis ML-PRRE-105702-CS-CQS / Mise en œuvre des Component 3: Community activités d'engagement Sélection fondée engagement and local En attente communautaire IDA / D3730 A posteriori sur la qualité Open - National 650,000.00 0.00 2019-05-03 2019-05-17 2019-05-21 2019-06-11 2019-06-16 2019-06-26 2019-07-08 2020-07-07 governance (US$10 d'exécution gouvernance locale et et le coût million equivalent). violence basée sur le genre dans la zone économique de Konna ML-PRRE-105707-CS-CQS / Mise en œuvre des Component 3: Community activités d'engagement Sélection fondée engagement and local En attente communautaire IDA / D3730 A posteriori sur la qualité Open - National 650,000.00 0.00 2019-05-03 2019-05-17 2019-05-21 2019-06-11 2019-06-16 2019-06-26 2019-07-10 2020-07-09 governance (US$10 d'exécution gouvernance locale et et le coût million equivalent). violence basée sur le genre dans la zone économique d'Ansongo ML-PRRE-105709-CS-CQS / Mise en œuvre des Component 3: Community activités d'engagement Sélection fondée engagement and local En attente communautaire IDA / D3730 A posteriori sur la qualité Open - National 650,000.00 0.00 2019-05-03 2019-05-17 2019-05-25 2019-06-15 2019-06-20 2019-06-30 2019-07-14 2020-07-13 governance (US$10 d'exécution gouvernance locale et et le coût million equivalent). violence basée sur le genre dans la zone économique de Goundam ML-PRRE-113946-CS-CQS Component 4: Project Sélection fondée / Convention maitrise management, monitoring sur les En cours d'ouvrage délégué pour l' IDA / H9010 A posteriori Open - National 17,125.00 0.00 2019-05-08 2019-05-22 2019-05-26 2019-05-31 2019-06-14 2019-09-12 and evaluation (US$5 qualifications d'exécution achèvement de 31 MPP million equivalent) des consultants dans le cercle de Niono ML-PRRE-113947-CS-CQS / Convention pour l'achèvement de 30 MPP Component 4: Project Sélection fondée dans les cercles de management, monitoring sur les En cours Ténenkou, Niafunké, IDA / H9010 A posteriori Open - National 27,828.00 0.00 2019-05-08 2019-05-22 2019-06-01 2019-06-08 2019-06-22 2019-12-19 and evaluation (US$5 qualifications d'exécution Ansongo, Gao, Bourem et million equivalent) des consultants Douentza suite à l'expiration des conventions MOD du Financement Initial ML-PRRE-105729-CS-CQS Component 1: / Etudes techniques, Sélection fondée Rehabilitation of local contrôle et suivi des sur les En attente IDA / D3730 public infrastructure A posteriori Open - National 50,910.00 0.00 2019-05-13 2019-05-16 2019-06-04 2019-06-09 2019-06-19 2019-12-16 travaux d'aménagement et qualifications d'exécution (US$50 million de réhabilitation de la des consultants equivalent) ville de Konna ML-PRRE-105732-CS-CQS Component 1: / Etudes Techniques et Sélection fondée Rehabilitation of local contrôle de l'adduction sur les En attente IDA / D3730 public infrastructure A posteriori Open - National 54,540.00 0.00 2019-05-12 2019-05-15 2019-06-05 2019-06-12 2019-06-26 2019-07-26 d'eau potable à Tonka, qualifications d'exécution (US$50 million AES Cs réf de Diré et des consultants equivalent) AES DE SéKé ML-PRRE-105734-CS-CQS / Etudes, Contrôle et Component 1: Sélection fondée Surveillance des travaux Rehabilitation of local sur les En attente de réalisation du réseau IDA / D3730 public infrastructure A posteriori Open - National 20,000.00 0.00 2019-05-13 2019-05-16 2019-06-04 2019-06-09 2019-06-19 2019-12-16 qualifications d'exécution de distribution pour 03 (US$50 million des consultants AES à Kosseye, Wabaria equivalent) et Bazi Gourma ML-PRRE-113965-CS-CQS Component 1: Sélection fondée / Etudes et contrôle et Rehabilitation of local sur les En cours surveillance renforcement IDA / D3730 public infrastructure A posteriori Open - National 118,200.00 0.00 2019-05-08 2019-05-22 2019-06-01 2019-06-08 2019-06-22 2019-09-20 qualifications d'examen AEP et réhabilitation cref (US$50 million des consultants de Ménaka equivalent) Page 11 ML-PRRE-114541-CS-CQS / études techniques, environnementales et socio- Sélection fondée économiques centrées sur Component 2: Support to sur les En attente IDA / D3730 A posteriori Open - National 290,000.00 0.00 2019-05-11 2019-05-12 2019-06-02 2019-06-09 2019-06-21 2019-12-18 l'approche filière, le productive investments qualifications d'exécution contrôle et la surveillance des consultants des travaux de réhabilitation du périmètre de Sindiwara INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-62450-CS-CDS Component 1: / Protocole avec EDM Rehabilitation of local Sélection de En attente pour la supervision de IDA / H9010 public infrastructure A posteriori consultants par Direct 90,000.00 0.00 2018-05-15 2018-05-22 2018-06-29 2018-12-26 d'exécution l'Electrification de la ville (US$50 million entente directe de Rharouss equivalent) ML-PRRE-64108-CS-INDV / Revu du CPRP et élaboration des Component 4: Project instruments de sauvegarde management, monitoring En attente IDA / H9010 A posteriori Individuel Direct 29,000.00 0.00 2018-05-28 2018-06-06 2018-06-11 2018-06-18 2018-12-15 environnementale et and evaluation (US$5 d'exécution sociale relatifs aux million equivalent) investissements prévus au financement additionnel du PRRE ML-PRRE-69950-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community Sélection de sensibilisation des engagement and local En attente IDA / H9010 A posteriori consultants par Direct 36,804.00 0.00 2018-10-11 2018-10-12 2018-10-21 2019-04-19 communautés et la governance (US$10 d'exécution entente directe révision /élaboration des million equivalent). PDSEC de Niono à Ségou (12 communes) ML-PRRE-69947-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente communautés et la IDA / H9010 A posteriori consultants par Direct 32,700.00 0.00 2018-10-11 2018-10-12 2018-10-21 2019-04-19 governance (US$10 d'exécution révision /élaboration des entente directe million equivalent). PDSEC dans le cercle de Ténenkou, région de Mopti (10 communes) ML-PRRE-69951-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente communautés et la IDA / H9010 A posteriori consultants par Direct 27,819.00 0.00 2018-10-11 2018-10-12 2018-10-30 2019-04-28 governance (US$10 d'exécution révision /élaboration des entente directe million equivalent). PDSEC de Nianfunké dans la région de Tombouctou dans (8 communes) ML-PRRE-69952-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente communautés et la IDA / H9010 A posteriori consultants par Direct 40,342.00 0.00 2018-10-11 2018-10-12 2018-10-21 2019-04-19 governance (US$10 d'exécution révision /élaboration des entente directe million equivalent). PDSEC de Diré dans la région de Tombouctou dans (13 communes) ML-PRRE-69953-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente communautés et la IDA / H9010 A posteriori consultants par Direct 25,820.00 0.00 2018-10-11 2018-10-17 2018-10-21 2019-04-19 governance (US$10 d'exécution révision /élaboration des entente directe million equivalent). PDSEC de Goundam dans la région de Tombouctou dans (16 communes) ML-PRRE-69954-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community Sélection de sensibilisation des engagement and local En attente IDA / H9010 A posteriori consultants par Direct 25,820.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 communautés et la governance (US$10 d'exécution entente directe révision /élaboration des million equivalent). PDSEC dans sept (7) communes d'Ansongo ML-PRRE-69955-CS-CDS / La mobilisation sociale, l'information, la Component 3: Community Sélection de sensibilisation des engagement and local En attente IDA / H9010 A posteriori consultants par Direct 21,785.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 communautés et la governance (US$10 d'exécution entente directe révision /élaboration des million equivalent). PDSEC dans cinq (5) communes de Ménaka ML-PRRE-69956-CS-CDS / Etudes techniques, le contrôle et la surveillance Sélection de Component 2: Support to En attente des travaux de réalisation IDA / H9010 A posteriori consultants par Direct 50,490.00 0.00 2018-10-12 2018-10-18 2018-10-22 2019-04-20 productive investments d'exécution de micro-projets dans le entente directe cercle de Niono, région de Ségou ML-PRRE-69957-CS-CDS / Etudes techniques, le contrôle et la surveillance Sélection de Component 2: Support to En attente des travaux de réalisation IDA / H9010 A posteriori consultants par Direct 36,239.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 productive investments d'exécution de micro-projets dans le entente directe cercle de Ténenkou, région de Mopti ML-PRRE-69959-CS-CDS / Etudes techniques, le contrôle et la surveillance Sélection de des travaux de réalisation Component 2: Support to En attente IDA / H9010 A posteriori consultants par Direct 70,441.00 0.00 2018-10-12 2018-10-14 2018-10-22 2019-04-20 de micro-projets dans les productive investments d'exécution entente directe cercles de Niafunké, Diré et Goundam, région de Tombouctou ML-PRRE-69958-CS-CDS / Contrôles et Sélection de Surveillances de Component 2: Support to En attente IDA / H9010 A posteriori consultants par Direct 44,309.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 microprojets simples dans productive investments d'exécution entente directe les cercles d'Ansongo et Ménaka région de Gao et de Ménaka ML-PRRE-69941-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 8,264.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 microprojets des governance (US$10 d'exécution entente directe communes de Ber, million equivalent). Bourem Inaly et Lafia (3) du cercle de Tombouctou ML-PRRE-69942-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 9,172.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 governance (US$10 d'exécution communes de Bamba, entente directe million equivalent). Temera, Bourem, Taboye, Tarkint (5) dans le cercle de Bourem Page 12 ML-PRRE-69943-CS-CDS / Accompagnement des OCB bénéficiaires de Component 3: Community Sélection de microprojets des engagement and local En attente IDA / H9010 A posteriori consultants par Direct 12,008.00 0.00 2018-10-12 2018-10-14 2018-10-22 2019-04-20 communes de Gao, governance (US$10 d'exécution entente directe Anchawadi, Gabéro, million equivalent). Gounzoureye, N'Tillit, Sony Ali Ber et Tilemsi (7) dans le cercle de Gao ML-PRRE-69944-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-07-17 2018-10-12 2018-10-20 2019-04-18 governance (US$10 d'exécution communes de Abeibara, entente directe million equivalent). Boghassa, Tinzawatène (3) dans le cercle de Abeibara ML-PRRE-69945-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-10-12 2018-10-13 2018-10-22 2019-04-20 microprojets des governance (US$10 d'exécution entente directe communes de Kidal, million equivalent). Anefif et Essouk (3) dans le cercle de Kidal ML-PRRE-69946-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-07-17 2018-10-11 2018-10-20 2019-04-18 microprojets des governance (US$10 d'exécution entente directe communes de Tessalit, million equivalent). Adjelhoc et Tintaghène (3) dans le cercle de Tessalit ML-PRRE-69948-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 6,282.00 0.00 2018-07-17 2018-10-11 2018-10-19 2019-04-17 microprojets des governance (US$10 d'exécution entente directe communes de Tin-Essako million equivalent). et Intadjedite (2) du cercle de Tin Essako ML-PRRE-69940-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 8,264.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 governance (US$10 d'exécution communes de Salam, entente directe million equivalent). Alafia et Tombouctou (3) dans le cercle de Tombouctou ML-PRRE-69939-CS-CDS / Accompagnement des OCB bénéficiaires de Component 3: Community Sélection de microprojets des engagement and local En attente IDA / H9010 A posteriori consultants par Direct 10,080.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 communes de de governance (US$10 d'exécution entente directe Ouinerden, Gossi et million equivalent). Inadiatafane et Bambara Maoudé (4) dans le cercle de Gourma Rharous ML-PRRE-69938-CS-CDS / Services de consultants pour le contrôle et la surveillance en vue de Sélection de l'achèvement des travaux Component 2: Support to En attente IDA / H9010 A posteriori consultants par Direct 21,227.00 0.00 2018-10-11 2018-10-14 2018-10-22 2019-04-20 relatifs aux microprojets productive investments d'exécution entente directe dans les cercles de Tombouctou et Gourma Rharous, Région de Tombouctou ML-PRRE-69937-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 7,044.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 microprojets des governance (US$10 d'exécution entente directe communes de Soyé, million equivalent). Fatoma, Konna et Socoura (4) du cercle de Mopti ML-PRRE-69936-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 7,852.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 governance (US$10 d'exécution communes de Youwarou, entente directe million equivalent). Bimbere Tama et Farimaka (3) dans le cercle de Youwarou ML-PRRE-69867-CS-CDS / contrôle et surveillance en vue de l'achèvement des travaux Sélection de Component 2: Support to En attente d'aménagement d'un (01) IDA / H9010 A posteriori consultants par Direct 28,640.00 0.00 2018-10-11 2018-10-15 2018-10-21 2019-04-19 productive investments d'exécution Périmètre Irrigué entente directe Villageois (PIV) et de 63 microprojets dans les cercles de Gao et de Bourem, Région de Gao ML-PRRE-69935-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 7,100.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 microprojets des governance (US$10 d'exécution entente directe communes de Dongo, million equivalent). N'Djodjina, Dima et Deboye (4) du cercle de Youwarou ML-PRRE-69934-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 7,884.00 0.00 2018-10-11 2018-10-13 2018-10-21 2019-04-19 microprojets des governance (US$10 d'exécution entente directe communes de Douantza, million equivalent). Kerena, Dianwelly, Petaka, Koubelwel ML-PRRE-69933-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 8,684.00 0.00 2018-10-11 2018-10-13 2018-10-20 2019-04-18 governance (US$10 d'exécution communes de Dallah, entente directe million equivalent). Hombori, Haire et Mondoro (4) dans le cercle de Douentza ML-PRRE-69866-CS-CDS / Contrôle et la surveillance en vue de Sélection de Component 2: Support to En attente l'achèvement des travaux IDA / H9010 A posteriori consultants par Direct 36,904.00 0.00 2018-10-11 2018-10-18 2018-10-26 2019-04-24 productive investments d'exécution d'aménagement de entente directe microprojets dans le cercle de Douentza, Région de Mopti. ML-PRRE-69932-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 9,812.00 0.00 2018-10-11 2018-10-12 2018-10-20 2019-04-18 governance (US$10 d'exécution communes de Djaptodji, entente directe million equivalent). Korarou, Gandamia, Débéré et Dangol Boré (5) dans le cercle de Douentza ML-PRRE-69931-CS-CDS / Contrôle et la surveillance en vue de l'achèvement des travaux Sélection de Component 2: Support to En attente d'aménagement d'un IDA / H9010 A posteriori consultants par Direct 16,700.00 0.00 2018-10-11 2018-10-13 2018-10-20 2019-04-18 productive investments d'exécution Périmètre Irrigué entente directe Villageois (PIV) et 27 microprojets dans les cercles de Mopti et de Youwarou, Région de Mopti ML-PRRE-81519-CS-CDS / Accompagnement des Component 3: Community Sélection de OCB bénéficiaires de engagement and local En attente IDA / H9010 A posteriori consultants par Direct 7,044.00 0.00 2018-10-11 2018-10-14 2018-10-26 2019-04-24 microprojets des governance (US$10 d'exécution entente directe communes de Ber, million equivalent). Bourem Inaly et Lafia (3) du cercle de Tombouctou Page 13 ML-PRRE-81522-CS-CDS / Accompagnement des Component 3: Community OCB bénéficiaires de Sélection de engagement and local En attente microprojets des IDA / H9010 A posteriori consultants par Direct 7,356.00 0.00 2018-10-11 2018-10-15 2018-10-25 2019-04-23 governance (US$10 d'exécution communes de Hamzakoma, entente directe million equivalent). Séréré, Gourma Rharous, Banikane et du cercle de Gourma Rharous ML-PRRE-86885-CS-CDS / APPUI A LA FINALISATION DU Component 4: Project Sélection de CADRE STRATEGIQUE management, monitoring En attente IDA / H9010 A posteriori consultants par Direct 66,475.00 0.00 2018-11-12 2018-11-14 2018-11-20 2018-12-27 POUR LA RELANCE and evaluation (US$5 d'exécution entente directe ECONOMIQUE ET LE million equivalent) DEVELOPPEMENT DURABLE DU MALI (CREDD) ML-PRRE-105629-CS-CDS Component 4: Project Sélection de / Convention maitrise management, monitoring En attente IDA / D3730 A priori consultants par Direct 1,345,714.00 0.00 2019-03-11 2019-03-21 2019-05-11 2019-09-08 d'ouvrage délégué SOS and evaluation (US$5 d'exécution entente directe SAHEL million equivalent) ML-PRRE-105632-CS-CDS Component 4: Project / Supervision par tierce Sélection de management, monitoring En attente partie des activités IDA / D3730 A posteriori consultants par Direct 577,500.00 0.00 2019-03-11 2019-03-21 2019-05-11 2019-09-08 and evaluation (US$5 d'exécution réalisées du Projet entente directe million equivalent) TPM GISSE ML-PRRE-105726-CS- Component 2: Support to En attente INDV / Diagnostic rapide IDA / D3730 A posteriori Individuel Open 15,000.00 0.00 2019-03-20 2019-04-11 2019-04-16 2019-04-26 2019-05-26 productive investments d'exécution dans les zones de Goundam Component 4: Project Sélection de ML-PRRE-105677-CS-CDS management, monitoring En attente IDA / D3730 A posteriori consultants par Direct 40,000.00 0.00 2019-05-04 2019-05-14 2019-06-02 2019-08-31 / Protocole ODPADIN and evaluation (US$5 d'exécution entente directe million equivalent) ML-PRRE-105689-CS-CQS / Appui à l'étude Component 2: Support to En attente technique et au contrôle IDA / D3730 A posteriori Individuel Open 6,000.00 0.00 2019-05-03 2019-05-29 2019-06-05 2019-06-19 2019-07-19 productive investments d'exécution des équipements de pêches de Konna ML-PRRE-105661-CS-CQS Component 4: Project / Supervision des activités management, monitoring En attente IDA / D3730 A posteriori Individuel Open 50,000.00 0.00 2019-05-03 2019-05-26 2019-05-31 2019-06-24 2019-12-21 déjà visitées par la Tierce and evaluation (US$5 d'exécution partie. million equivalent) ML-PRRE-105736-CS-CDS Component 1: / Contrôle et surveillance Rehabilitation of local Sélection de En attente des travaux IDA / D3730 public infrastructure A posteriori consultants par Direct 22,560.00 0.00 2019-03-18 2019-03-28 2019-04-14 2019-10-11 d'exécution supplémentaires de la (US$50 million entente directe piste N'Gouma - Saraféré equivalent) ML-PRRE-114001-CS- Component 4: Project INDV / Audit management, monitoring En attente IDA / D3730 A posteriori Individuel Open 24,000.00 0.00 2019-05-07 2019-05-25 2019-05-28 2019-06-07 2019-12-04 environnemental du projet and evaluation (US$5 d'exécution (octobre 2017_ Décembre million equivalent) 2018 ML-PRRE-125124-CS- Component 4: Project INDV / Recrutement d’un management, monitoring En attente IDA / D3730 A posteriori Individuel Open 55,373.00 0.00 2019-07-29 2019-08-17 2019-08-29 2019-09-26 2020-11-30 spécialiste en and evaluation (US$5 d'exécution développement social pour million equivalent) l’AR de Mopti ML-PRRE-105642-CS-CDS Component 4: Project / Supervision par tierce Sélection de management, monitoring En attente partie des activités en IDA / D3730 A posteriori consultants par Direct 920,000.00 0.00 2019-03-11 2019-03-21 2019-05-11 2020-07-31 and evaluation (US$5 d'exécution cours et en perspectives entente directe million equivalent) du Projet ML-PRRE-125669-CS-CDS Component 1: Sélection de / Suivi des travaux Rehabilitation of local En attente IDA / D3730 A posteriori consultants par Direct 10,000.00 0.00 2019-08-02 2019-08-08 2019-08-27 2019-12-25 d’achèvement des public infrastructure d'exécution entente directe caniveaux de youwarou (US$50 million equivalent) ML-PRRE-125675-CS-CDS Component 1: Sélection de / ONG pour l’approche Rehabilitation of local En attente IDA / D3730 A posteriori consultants par Direct 20,000.00 0.00 2019-08-02 2019-08-12 2019-09-02 2019-12-01 communautaire du HIMO public infrastructure d'exécution entente directe de la piste de Konna (US$50 million equivalent) Page 14