PE Support to the Subnational Transport Program Project (P132515) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 11-Dec-2015 General Procurement Notice published on: 30-Nov-2016 July 9, 2010 PROCUREMENT Peru : Support to the Subnational Transport Program Project PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2016-12-22 2020-03-02 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132515 GPN Date: 2016-11-30 Project Name: Support to the Subnational Transport Program Project Loan / Credit No: IBRD / 85620 Executing Agency(ies): Descentralized Provias WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-9711-CW-RFB / Rehabilitacion y Mejoramiento del Camino Vecinal de Talavera- Infrastructure for Solicitud de Single Stage - One Mulacancha-Taramba-Nueva IBRD / 85620 Integration and Social Posterior Open - National 1,354,815.84 1,705,419.84 Firmado 2017-07-03 2018-02-28 2017-07-08 2017-08-19 2018-05-14 2017-09-18 2018-05-23 2017-10-23 2018-07-19 2018-03-22 ofertas Envelope Esperanza -Ap-510 , Inclusion Long. 14.28 km Prov. Andahuaylas, APURIMAC PE-PROVIAS-9712-CW-RFB / Mejoramiento de Camino Vecinal Pacobamba-Huironay- Infrastructure for Solicitud de Single Stage - One Ccerabamba-Abra Cusqueña, IBRD / 85620 Integration and Social Posterior Open - National 5,456,251.32 6,187,924.11 Firmado 2017-07-03 2018-02-28 2017-07-08 2017-08-19 2018-05-25 2017-09-18 2018-07-25 2017-10-23 2018-09-13 2018-05-21 ofertas Envelope Long. 28.83 km Inclusion Prov. Andahuaylas,APURIMAC PE-PROVIAS-4678-CW-RFB Infrastructure for Solicitud de Single Stage - One / Chuchin - Esccana - Rumi IBRD / 85620 Integration and Social Posterior Open - National 3,023,521.00 0.00 Cancelado 2017-07-03 2017-07-17 2017-08-16 2017-08-30 2017-09-13 2018-11-07 ofertas Envelope Rumi -Huinche - Moyorcco Inclusion PE-PROVIAS-4679-CW-RFB / Paquete N° 1 obras de Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 1,348,397.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-19 2017-08-02 2017-08-16 2018-05-13 mantenimiento periodico en Maintenance ofertas Envelope 40 km PE-PROVIAS-11812-CW- RFB / Servicio de gestión y conservación vial por niveles Rural Road Infrastructure Solicitud de Open - Single Stage - One IBRD / 85620 Previa 15,042,761.00 0.00 Cancelado 2018-08-13 2018-09-10 2018-10-26 2018-11-02 2018-12-11 2022-01-09 de servicio de los caminos Maintenance ofertas International Envelope vecinales de la provincia de Chanchamayo - Junín. PE-PROVIAS-77540-CW- RFB / Rehabilitación y Infrastructure for Mejoramiento del Camino Solicitud de Single Stage - One IBRD / 85620 Integration and Social Posterior Open - National 3,790,304.00 3,550,630.76 Firmado 2018-09-27 2018-09-20 2018-09-28 2018-10-29 2018-10-23 2018-11-05 2018-11-07 2018-11-19 2019-01-11 2019-07-17 Vecinal Chuchín - Esccana - ofertas Envelope Inclusion Rumirumi - Huinche - Moyorcco PE-PROVIAS-106440-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One Periódico del Camino IBRD / 85620 Posterior Open - National 1,659,562.10 0.00 En ejecución 2019-04-01 2019-04-12 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-11-12 Maintenance ofertas Envelope Vecinal Puente Mirador - Boca Satipo, Ancash PE-PROVIAS-106438-CW- RFB / Mantenimiento periódico del Camino vecinal: Circuito de Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 3,442,055.92 0.00 Cancelado 2019-04-01 2019-04-12 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-12-27 Produccion Km 15.5 Maintenance ofertas Envelope Carretera Mazamari -Puerto Ocopa - A Dos de Mayo, Junin PE-PROVIAS-106436-CW- RFB / Mantenimiento Periódico del Camino Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 2,001,461.10 0.00 Cancelado 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-09-28 Vecinal Dv. Saywite - Maintenance ofertas Envelope Cachora, ubicado en el Departamento de Apurímac. Page 1 PE-PROVIAS-106437-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One periodico del camino Palo IBRD / 85620 Posterior Open - National 2,148,246.18 0.00 Cancelado 2019-04-01 2019-04-12 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-10-28 Maintenance ofertas Envelope Seco - Parobamba Viejo, Ancash PE-PROVIAS-156785-CW- RFB / Mejoramiento de la carretera vecinal Puente Chico- Sancaragra- Cuchicancha- Mal Paso- Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 7,908,588.56 0.00 En ejecución 2020-02-03 2020-02-06 2020-02-08 2020-03-21 2020-04-20 2020-05-25 2020-11-21 Choquicocha - Santa Rosa- Maintenance ofertas Envelope Tablahuasi- Milpo - Quiulacocha, Distrito de Conchamarca - Ambo- Huánuco PE-PROVIAS-106437-CW- RFB-2 / Mantenimiento Periódico del camino vecinal Rural Road Infrastructure Solicitud de Single Stage - One Ejecución Palo Seco - Parobamba IBRD / 85620 Posterior Open - National 2,109,770.13 0.00 2020-03-23 2020-03-28 2020-04-27 2020-05-17 2020-06-21 2020-10-19 Maintenance ofertas Envelope pendiente Viejo, distritos Parobamba y Pomabamba, Provincia Pomabamba, Región Ancash PE-PROVIAS-160751-CW- RFB / Mantenimiento Periódico del camino vecinal Rural Road Infrastructure Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 800,093.62 0.00 2020-02-28 2020-03-04 2020-04-03 2020-04-23 2020-05-28 2020-09-25 Emp . AY 102- Jotopuquio- Maintenance ofertas Envelope pendiente Huallua- Tantar- Churca- Quehuayllo PE-PROVIAS-160754-CW- RFB / Mantenimiento Periódico del camino Rural Road Infrastructure Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 983,613.74 0.00 2020-02-28 2020-03-04 2020-04-03 2020-04-23 2020-05-28 2020-09-25 vecinal: Emp. AP 102- Maintenance ofertas Envelope pendiente Comun Pampa- Callapayoc- Dv Mollepata- Quispimarca PE-PROVIAS-161044-CW- RFB / Mantenimiento Periodico del camino vecinal Rural Road Infrastructure Solicitud de Single Stage - One Ejecución : Emp. AP 102- Socos - IBRD / 85620 Posterior Open - National 746,253.57 0.00 2020-03-02 2020-03-07 2020-04-06 2020-04-26 2020-05-31 2020-09-28 Maintenance ofertas Envelope pendiente Mitobamba - Dv. Ocobamba - Escorno - Emp.AP-102 (Tres Cruces) GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-80037-GO- RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One LICENCIA PARA EQUIPO IBRD / 85620 Posterior Open - National 51,618.81 49,118.99 Firmado 2018-10-01 2018-11-09 2018-10-02 2018-11-01 2018-12-11 2018-11-06 2018-12-17 2018-11-18 2018-12-21 2018-11-25 Management ofertas Envelope DE SEGURIDAD PERIMETRAL PE-PROVIAS-80038-GO- RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One RENOVACIÓN DE IBRD / 85620 Posterior Open - National 109,957.24 103,347.89 Firmado 2018-10-01 2018-12-31 2018-10-02 2018-11-01 2019-01-30 2018-11-06 2019-02-04 2018-11-18 2019-02-21 2018-12-03 Management ofertas Envelope LICENCIAS DE SOFTWARE CAD PE-PROVIAS-80039-GO- RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One LICENCIAS DE IBRD / 85620 Posterior Open - National 138,668.30 133,317.44 Firmado 2018-10-01 2018-11-09 2018-10-02 2018-11-01 2018-12-11 2018-11-06 2018-12-17 2018-11-18 2018-12-21 2018-12-03 Management ofertas Envelope SOFTWARE DE GEOREFERENCIACION PE-PROVIAS-105434-GO- RFB / Adquisición de Decentralized Road Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 801,116.74 0.00 2019-04-15 2019-04-20 2019-05-18 2019-06-02 2019-07-07 2019-09-05 Camionetas Doble Cabina Management ofertas Envelope pendiente 4x4 PE-PROVIAS-118756-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 26,865.67 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente DE BACKUP PARA SERVIDORES Page 2 PE-PROVIAS-118892-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 49,253.73 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente ANTISPAM EN EL MARCO DE PATS PE-PROVIAS-150332-GO- RFQ / Aquisición de la Decentralized Road Solicitud de Single Stage - One renovación de licencias CAD IBRD / 85620 Posterior Open - National 109,552.24 109,386.55 Firmado 2020-02-14 2019-12-26 2020-02-19 2020-04-01 2020-01-28 2020-05-01 2020-02-07 2020-06-05 2020-02-24 2020-12-02 Management ofertas Envelope para la sede central y unidad zonal PE-PROVIAS-160749-GO- RFB / Licencias de software Decentralized Road Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 49,254.00 0.00 2020-07-31 2020-08-05 2020-09-16 2020-10-16 2020-11-20 2021-05-19 antispam en el marco del Management ofertas Envelope pendiente PATS NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-9697-CS- QCBS / Estudio definitivo Infrastructure for Selección basada del camino vecinal Emp. IBRD / 85620 Integration and Social Posterior en calidad y Open - National 87,962.42 141,685.18 Firmado 2017-04-03 2017-04-28 2017-04-17 2017-05-06 2018-03-02 2017-06-03 2018-04-27 2017-06-08 2018-05-31 2017-06-29 2018-06-13 2017-07-13 2018-07-13 2018-09-06 Ruta 16 - Inkacancha Inclusion costo Long. 10.70 km Prov. Paucartambo, CUSCO PE-PROVIAS-9700-CS- QCBS / Estudio definitivo del camino vecinal Puente Checca - Puente Asunción - Infrastructure for Selección basada Chitibamba - Emp. CU-126 IBRD / 85620 Integration and Social Posterior en calidad y Open - National 240,869.05 225,734.90 Firmado 2017-04-03 2018-02-26 2017-04-17 2017-05-06 2018-03-02 2017-06-03 2018-05-02 2017-06-08 2018-08-13 2017-06-29 2018-11-05 2017-07-13 2019-01-31 2018-09-06 (Comunidad Huinchiri - Inclusion costo Quehue), Long. 29.30 km Prov. Canas, CUSCO PE-PROVIAS-9702-CS- QCBS / Estudio definitivo Infrastructure for Selección basada del camino vecinal Emp. IBRD / 85620 Integration and Social Posterior en calidad y Open - National 184,145.63 219,353.28 Firmado 2017-04-03 2017-09-18 2017-04-17 2017-05-06 2018-03-02 2017-06-03 2018-04-30 2017-06-08 2018-05-31 2017-06-29 2018-06-22 2017-07-13 2018-07-20 2018-09-06 CU-129 (Chapina) - Quille, Inclusion costo Long. 22.40 km Prov. Paruro, CUSCO PE-PROVIAS-9704-CS- QCBS / Estudio definitivo Infrastructure for Selección basada del camino vecinal Puente IBRD / 85620 Integration and Social Posterior en calidad y Open - National 246,376.98 0.00 Cancelado 2017-04-21 2017-05-05 2017-05-24 2017-06-21 2017-06-26 2017-07-17 2017-07-31 2018-09-24 Quesccañuma - Inclusion costo Huaynahuarco - Ccarapampa - Huisala PE-PROVIAS-4909-CS- QCBS / Estudio definitivo del camino vecinal Puente Infrastructure for Selección basada Angasmayo Millpo Dv IBRD / 85620 Integration and Social Posterior en calidad y Open - National 200,341.00 226,347.48 Firmado 2017-04-03 2017-10-20 2017-04-17 2017-05-06 2018-03-02 2017-06-03 2018-04-25 2017-06-08 2018-05-31 2017-06-29 2018-06-22 2017-07-13 2018-07-13 2018-09-06 Huariperja - Huariperja, Inclusion costo Long. 24.40 km Prov. Huamanga, AYACUCHO PE-PROVIAS-4914-CS- QCBS / Estudio definitivo del camino vecinal Vinchos- Infrastructure for Selección basada Paccha-Andabamba, IBRD / 85620 Integration and Social Posterior en calidad y Open - National 186,612.00 170,361.24 Firmado 2017-04-03 2017-10-20 2017-04-17 2017-05-06 2018-03-01 2017-06-03 2018-04-23 2017-06-08 2018-05-31 2017-06-29 2018-06-14 2017-07-13 2018-07-16 2018-09-06 Long. 22.70 km Inclusion costo Prov. Huamanga, AYACUCHO Page 3 PE-PROVIAS-11172-CS- QCBS / Supervision de la Infrastructure for Selección basada obra Pacobamba - Huironay IBRD / 85620 Integration and Social Posterior en calidad y Open - National 545,625.00 498,120.01 Firmado 2017-04-03 2018-03-05 2017-04-24 2018-03-06 2017-06-07 2018-04-24 2017-07-05 2018-06-04 2017-08-04 2017-09-08 2018-07-31 2017-10-13 2018-07-20 2018-06-10 - Ccerabamba - Abra Inclusion costo Cusqueña PE-PROVIAS-11174-CS- QCBS / Supervision de la Infrastructure for Selección basada obra Talavera - Mulacancha IBRD / 85620 Integration and Social Posterior en calidad y Open - National 135,482.00 245,634.66 Firmado 2017-04-03 2018-02-23 2017-04-24 2017-06-07 2018-03-13 2017-07-05 2018-05-10 2017-08-04 2017-09-08 2018-07-17 2017-10-13 2018-09-17 2018-04-11 - Taramba - Nueva Inclusion costo Esperanza - AP-510 PE-PROVIAS-4917-CS- Selección basada QCBS / Elaboracion de Plan Decentralized Road IBRD / 85620 Posterior en calidad y Open - National 322,959.48 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2017-12-10 Vial Provincial Participativo Management costo de 10 GLP PE-PROVIAS-4690-CS- Selección basada IBRD / 85620 Project Management Posterior Open - National 694,245.00 0.00 Cancelado 2017-09-04 2017-09-18 2017-10-07 2017-10-28 2017-11-02 2017-11-23 2017-12-07 2021-11-16 QCBS / Auditoria financiera en calidad y costo PE-PROVIAS-4915-CS- QCBS / Implementación del Selección basada Decentralized Road plan de acción de VDL en IBRD / 85620 Posterior en calidad y Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management 4 provincias . Region de costo Cusco y Puno PE-PROVIAS-4691-CS-FBS Infrastructure for Selección basada / Paquete N° 2 de 10 IBRD / 85620 Integration and Social Posterior en calificaciones Open - National 1,644,157.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-08 2017-07-22 2017-08-05 2018-09-29 Estudios definitivos de Inclusion de consultores camino vecinales en 200 km PE-PROVIAS-4916-CS- QCBS / Implementación del Selección basada Decentralized Road plan de acción de VDL en IBRD / 85620 Posterior en calidad y Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management 4 provincias . Region de costo Cajamarca y Amazonas PE-PROVIAS-4918-CS- Infrastructure for Selección basada QCBS / Paquete N° 2 de IBRD / 85620 Integration and Social Posterior en calidad y Open - National 2,466,236.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 Estudio definitivo en 5 Inclusion costo corredores logisticos PE-PROVIAS-4689-CS- QCBS / Sistema de Selección basada Decentralized Road Open - Informacion , monitoreo y IBRD / 85620 Posterior en calidad y 293,599.53 0.00 Cancelado 2017-05-24 2017-06-07 2017-06-26 2017-07-24 2017-07-29 2017-08-19 2017-09-02 2017-12-31 Management International evaluación diseñado e costo implementado, mantenido y de acceso libre PE-PROVIAS-63578-CS- QCBS / PAQ.ANCASH: Perfil y est def rehab y mejoramiento CV Tr1:Emp.PE-1N-Dv.Fundo Pto Viejo-Pto. Santa, Infrastructure for Selección basada Open - Tr2:Emp.PE-1N-Emp.PE-1N IBRD / 85620 Integration and Social Posterior en calidad y 444,794.14 407,580.09 Firmado 2018-06-14 2018-02-14 2018-06-28 2018-06-28 2018-07-17 2018-08-14 2018-09-03 2018-08-19 2018-09-04 2018-09-09 2019-01-07 2018-09-23 2019-04-23 2019-03-22 International Q,Emp.PE-1NQ-Emp.AN- Inclusion costo 924,Emp.AN-921 (Nepeña)- Dv.AN-925,Dv.San José(Nepeña)-San José- Emp.AN-104(Morteros),Tr3: Emp. An101(Alto Pusha PE-PROVIAS-63580-CS- QCBS / PAQ.APURIMAC:Perfil y est def rehab y mejoramiento CV Tr1:AP-855-Emp.PE-109 (Ccoriray)- Infrastructure for Selección basada Open - Vito,Tr2:Emp.PE3SF-Pta. IBRD / 85620 Integration and Social Posterior en calidad y 432,486.73 392,071.76 Firmado 2018-06-14 2018-02-14 2018-06-28 2018-06-28 2018-07-17 2018-07-21 2018-08-14 2018-09-04 2018-08-19 2018-09-21 2018-09-09 2019-01-07 2018-09-23 2019-05-09 2019-03-22 International Carretera(Casanacocha),Tr3: Inclusion costo Dv Puca Puca-Molinopata- Trujipata-Emp.AP 103,Tr4:Emp. PE03A(Puente Huayquipa)-Huayquipa,Tr5: Emp.AP-768(Dv.Chalhuan Page 4 PE-PROVIAS-63587-CS- QCBS / PAQ.LA LIBERTAD:Perfil y est def rehab y mejoramiento CV Tr1:Emp.LI-111- Lucma-La Represita-Penintay- Infrastructure for Selección basada Open - Huachacual- IBRD / 85620 Integration and Social Posterior en calidad y 433,134.49 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 International Samamuy,Emp.LI-713- Inclusion costo Recuaycito,Tr2: Quiruvilca- Emp.LI-931,Emp.LI-931- Huacampalda- Dv.Bado,Tr3:Emp.LI- 528(Pacanga)- Martín Sanches-Emp.LI-512 PE-PROVIAS-63588-CS- QCBS / PAQ.LAMBAYEQUE: Perfil y est. def. rehab. y mejoramiento CV Infrastructure for Selección basada Tr1:Emp.PE-1N- Manco Open - IBRD / 85620 Integration and Social Posterior en calidad y 344,391.58 0.00 Cancelado 2018-06-14 2018-02-14 2018-06-28 2018-06-28 2018-07-17 2018-07-23 2018-08-14 2018-09-18 2018-08-19 2018-09-09 2018-09-23 2019-03-22 Capac 1-Emp.PE-1N,Emp.PE- International Inclusion costo 1N-Manco Capac 2-Emp.PE- 1N,Tr2:Emp.PE-06-El Higo- Emp.LA-109,Tr3:Emp.LA-112- Emp.LA-111,Emp.LA-112- Pta.Carretera,Tr4:Emp.PE- 1NJ(El Puente)-Inverna PE-PROVIAS-63581-CS- QCBS / PAQ. AYACUCHO:Perfil y estudio definitivo rehabilitación y Infrastructure for Selección basada mejoramiento de los CV Tr Open - IBRD / 85620 Integration and Social Posterior en calidad y 428,816.10 0.00 En ejecución 2018-06-14 2018-02-14 2018-06-28 2018-06-28 2018-07-17 2018-07-23 2018-08-14 2018-09-10 2018-08-19 2018-09-09 2018-09-09 2018-09-23 2019-03-22 1: Emp. AY - 103 - International Inclusion costo Allpaspina - Putacca - Raymina - Pitec, Tr 2: Huambo - Alcamenca - Emp. PE - 32A PE-PROVIAS-63591-CS- QCBS / PAQ.PUNO: Perfil y est. def.rehab. y mejoramiento CV Tr1:Emp. PE-3SG(Llalli)-Emp.PU- Infrastructure for Selección basada 125,Tr2:Emp.PU-123-Dv.PU- Open - IBRD / 85620 Integration and Social Posterior en calidad y 621,157.18 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1005-Dv.PU-1006-Dv. Huayta International Inclusion costo Pata, Emp.PU-1004-Huayta Pata-Coa Chico,Tr3:Emp.PE- 3S-Marcuyo-Emp.PU- 1198(Río Zapatilla),Emp:PU- 1198(Río Zapatilla PE-PROVIAS-63592-CS- QCBS / PAQ.TUMBES: Perfil y estudio definitivo rehabilitación y mejoramiento de los CV Tr Infrastructure for Selección basada 1: Emp. TU-101 (La Coja) - Open - IBRD / 85620 Integration and Social Posterior en calidad y 392,325.71 744,355.60 Firmado 2018-06-14 2018-02-14 2018-06-28 2018-06-28 2018-07-17 2018-07-23 2018-08-14 2018-09-06 2018-08-19 2018-09-24 2018-09-09 2019-01-21 2018-09-23 2019-04-24 2019-03-22 Emp. TU-516, Dv La Coja International Inclusion costo - Emp. TU-524 (Dv el Tutumo), Tr 2: Dv. Salado Grando - Plateritos - Emp.TU-516, Dv. Plateritos -Emp.TU-105 PE-PROVIAS-63590-CS- QCBS / PAQ.LORETO: Perfil y estudio definitivo rehabilitación y mejoramiento C.V. Emp. LO- Infrastructure for Selección basada 103 (Nuevo San Juan) - Dv. IBRD / 85620 Integration and Social Posterior en calidad y Open - National 176,751.69 257,454.74 Firmado 2018-06-14 2018-02-14 2018-06-28 2018-07-17 2018-08-03 2018-08-14 2018-09-12 2018-08-19 2018-09-24 2018-09-09 2019-01-21 2018-09-23 2019-03-19 2019-03-22 San Juan de Puritana - Inclusion costo Villa Puerto Cruz, Emp. Via No Clasificada - Nuevo Mundo - San Juan - San Juan de Puritana PE-PROVIAS-63589-CS- QCBS / PAQ.LIMA: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr I: Infrastructure for Selección basada Emp. PE-1S-Emp. LM-835 IBRD / 85620 Integration and Social Posterior en calidad y Open - National 235,481.79 217,118.63 Firmado 2018-06-14 2018-02-14 2018-06-28 2018-07-17 2018-08-14 2018-08-16 2018-08-19 2018-08-16 2018-09-09 2019-01-07 2018-09-23 2019-03-20 2019-03-22 (DV. La Huaca) - San Inclusion costo Antonio, Tr II: Emp. PE-1S - San Antonio, Tr 2: Emp. PE-1S - Huayhuanco - Emp. LM-878 (Roldan) Page 5 PE-PROVIAS-63593-CS- QCBS / PAQ.UCAYALI: Perfil y estudio definitivo rehabilitación y Infrastructure for Selección basada mejoramiento del camino IBRD / 85620 Integration and Social Posterior en calidad y Open - National 233,754.44 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 vecinal Emp UC 105 Inclusion costo (Bolognesi) - Pta Carretera (A chambiral)-CC NN Sta Clara PE-PROVIAS-66683-CS- QCBS / Elaboración de Planes Viales Provinciales Selección basada Participativos de: Huaraz, Decentralized Road IBRD / 85620 Posterior en calidad y Open - National 244,397.43 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Antonio Raymondi, Huari, Management costo Huarmey, Huaylas, Ocros, Pomabamba, Santa, Sihuas y Yungay PE-PROVIAS-66684-CS- QCBS / Elaboración de Planes Viales Provinciales Selección basada Decentralized Road Participativos de: IBRD / 85620 Posterior en calidad y Open - National 195,235.76 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management Huamanga, Cangallo, costo Huanta, La Mar, Lucanas, Paucar del Sara Sara y Víctor Fajardo PE-PROVIAS-66685-CS- QCBS / Elaboración de Planes Viales Provinciales Selección basada Participativos de: Abancay, Decentralized Road IBRD / 85620 Posterior en calidad y Open - National 290,334.35 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Andahuaylas, Cotabambas, Management costo Grau, Caraveli, Castilla, Nazca, Pisco, Barranca, Huaral y Yauyos PE-PROVIAS-66703-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Selección basada Decentralized Road Open - Cajamarca, Cajabamba, IBRD / 85620 Posterior en calidad y 313,447.03 0.00 Cancelado 2018-06-14 2018-06-28 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management International Chota, Contumazá, Cutervo, costo Hualgayoc, San Ignacio, San Marcos, San Pablo, Bellavista, Huallaga y Picota PE-PROVIAS-66709-CS- QCBS / Elaboración de Selección basada Planes Viales Provinciales Decentralized Road IBRD / 85620 Posterior en calidad y Open - National 108,683.10 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Participativos Management costo de:Chanchamayo, Jauja, Oxapampa, Atalaya PE-PROVIAS-66712-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Chiclayo, Ferreñafe, Lambayeque, Selección basada Decentralized Road Open - Ascope, Bolivar, Chepén, IBRD / 85620 Posterior en calidad y 361,532.15 0.00 Cancelado 2018-06-14 2018-06-28 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management International Julcán, Otuzco, Pacasmayo, costo Pataz, Sánchez Carrión, Santiago de Chuco, Gran Chimu, Virú y Contralmirante Villar PE-PROVIAS-66714-CS- QCBS / Elaboración de Planes Viales Provinciales Selección basada Participativos de: Carabaya, Decentralized Road IBRD / 85620 Posterior en calidad y Open - National 221,424.37 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Chucuito, El Collao, Lampa, Management costo Moho, San Antonio de Putina, Tambopata, Manu y Tacna PE-PROVIAS-66717-CS- QCBS / Elaboración de Selección basada Decentralized Road Planes Viales Provinciales IBRD / 85620 Posterior en calidad y Open - National 47,132.58 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management Participativos de: Maynas y costo Ucayali. Page 6 PE-PROVIAS-73704-CS- QCBS / PQT APURIMAC:Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp Infrastructure for Selección basada PE-3S(Pte San Martin)- Open - IBRD / 85620 Integration and Social Posterior en calidad y 424,462.65 0.00 Cancelado 2018-08-13 2018-08-27 2018-08-15 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Huancamarca-Chaccobamba- International Inclusion costo Casabamba-Cayara- Morochuco-Orccorbamba-Emp AP-549 (Lte Dist),Tr2 Emp AP-108-Pachaconas, Tr3 Emp AP-108-Huancaray, Tr4 Emp PE-PROVIAS-73705-CS- QCBS / PQT LA LIBERTAD I:Perfil y estudio definitivo rehabilitación y Infrastructure for Selección basada mejoramiento CV Tr1 Emp Open - IBRD / 85620 Integration and Social Posterior en calidad y 459,693.98 0.00 Cancelado 2018-08-13 2018-08-27 2018-08-15 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 PE-1N(Manuel Guarniz)- International Inclusion costo Faclo Chico -Nueva Esperanza-Faclo Grande -El Ingenio-La Compuerta- Algodonal-Hda Flaco Grande Vieja-Cruz de Guayabo-La Barranca, Tr 2 Emp PE PE-PROVIAS-73706-CS- QCBS / PQT LA LIBERTAD II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp Infrastructure for Selección basada Open - PE-1N-Calunga, Emp PE-1N- IBRD / 85620 Integration and Social Posterior en calidad y 464,018.96 0.00 Cancelado 2018-08-13 2018-08-27 2018-08-15 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 International Chanquin Bajo-Emp LI-119, Inclusion costo Emp S/C-Puente La Alameda, Tr2 Dv. Susanga(Huacapongo)- Condornada-Caray, Tr3 Emp PE-10A-Ayangay- Chugurpampa- C PE-PROVIAS-73707-CS- QCBS / PQT LA LIBERTAD III: Perfil y estudio definitivo rehabilitación y Infrastructure for Selección basada mejoramiento CV Tr1 Santa Open - IBRD / 85620 Integration and Social Posterior en calidad y 385,356.14 0.00 Cancelado 2018-08-13 2018-08-27 2018-08-15 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Rosa-El Alto San Idelfonso- International Inclusion costo Nvo. Horizonte-Lomas de Prieto, Tr2 Emp PE-1NH- Nvo Paraiso-Pta Carretera, Tr3 Quiruvilca-Emp LI- 931,Emp LI-931- Huacampalda-Dv. Bado PE-PROVIAS-73708-CS- QCBS / PQT MADRE DE DIOS: Perfil y estudio definitivo rehabilitación y Infrastructure for Selección basada mejoramiento CV Tr1 Emp Open - IBRD / 85620 Integration and Social Posterior en calidad y 432,662.82 0.00 Cancelado 2018-08-13 2018-08-27 2018-08-15 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 PE-30C (Dv. Piñal) - Piñal International Inclusion costo - Nuevo San Juan, Tr2 Emp MD-101 (Boca Colorado) - Emp MD-518 (Nuevo San Juan Grande) PE-PROVIAS-73709-CS- QCBS / PQT PASCO: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr I: Emp Infrastructure for Selección basada PE-5N (Dv. Villa Rica) - IBRD / 85620 Integration and Social Posterior en calidad y Open - National 254,655.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-08-15 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Cedro Pampa - Purus - Pte. Inclusion costo Paucartambo - Emp PE-5N, Emp PA-691 - El Oconal - Puente Oconal - Emp. PA- 691 PE-PROVIAS-73710-CS- QCBS / PQT PUNO I: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3S-Culuyo-Chancachi- Infrastructure for Selección basada Open - Aripa Ccoca Ruma- IBRD / 85620 Integration and Social Posterior en calidad y 457,315.24 0.00 Cancelado 2018-08-13 2018-09-03 2018-08-15 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 International Thunuhuaya-Emp PU-1130, Inclusion costo Tr2 Emp PE-3S(Pueblo Libre)-Emp PU-130, Emp PE-3S(Crucero)-Ticaraya-Emp PU-130, Emp PE- 3S(Crucero)-Tuquin Page 7 PE-PROVIAS-73711-CS- QCBS / PQT SAN MARTIN II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp Infrastructure for Selección basada SM-113 (Yantalo) - Pto Los Open - IBRD / 85620 Integration and Social Posterior en calidad y 395,736.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-08-15 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Angeles (Rio Mayo), Tr2 International Inclusion costo Emp PE-5N - Purus - Rioja, Emp PE-5N - Sector Winba, Tr3 Emp SM-116 - Dv. CCNN El Naranjal - Dv. Lamas - Chirap PE-PROVIAS-74170-CS- QCBS / PQT ANCASH: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3N(Caraz)-Tarna-Dv. Infrastructure for Selección basada Open - Miramar-Dv. Lluco-Dv. IBRD / 85620 Integration and Social Posterior en calidad y 381,896.15 0.00 Cancelado 2018-08-16 2018-08-30 2018-08-29 2018-09-18 2018-10-16 2018-10-21 2018-11-11 2018-11-25 2019-11-25 International Culluna-Parón-Pta Inclusion costo Carretera(Pto Control ANP P.N. Huascarán), Emp AN- 836-Culluna-Emp AN-834 (Pte.Llacsho)-Llacsho,Tr2 Emp PE PE-PROVIAS-11816-CS- QCBS / Supervisión Selección basada Rural Road Infrastructure Open - Mantenimiento por niveles IBRD / 85620 Previa en calidad y 1,504,276.00 0.00 Cancelado 2018-09-03 2018-09-24 2018-11-07 2018-12-05 2019-01-04 2019-02-08 2019-03-15 2020-03-14 Maintenance International de servicio de la provincia costo de Chanchamayo - Junín. PE-PROVIAS-77544-CS- QCBS / Supervisión de Rehabilitación y Infrastructure for Selección basada Mejoramiento del Camino IBRD / 85620 Integration and Social Posterior en calidad y Open - National 283,971.00 276,039.66 Firmado 2018-09-14 2018-09-28 2018-10-02 2018-10-25 2018-10-30 2018-11-27 2018-11-02 2018-11-06 2019-01-15 2018-11-18 2019-03-12 2019-08-15 Vecinal Chuchín - Esccana - Inclusion costo Rumirumi - Huinche - Moyorcco PE-PROVIAS-100356-CS- QCBS / REHABILITACION Y MEJORAMIENTO DEL CAMINO VECINAL Infrastructure for Selección basada Open - Ejecución SHOCOSH - IBRD / 85620 Integration and Social Posterior en calidad y 372,390.88 0.00 2019-03-15 2019-04-05 2019-05-19 2019-06-16 2019-07-16 2019-08-20 2019-09-24 2020-09-23 International pendiente MANTACOCHA - Inclusion costo QUEPATUPE - ACOBAMBILLA, DISTRITO DE HUACAR - AMBO - HUANUCO PE-PROVIAS-100357-CS- QCBS / MEJORAMIENTO DE LA CARRETERA VECINAL PUENTE CHICO - SANCARAGRA - Infrastructure for Selección basada CUCHICANCHA - MAL Open - IBRD / 85620 Integration and Social Posterior en calidad y 388,058.82 0.00 Cancelado 2019-05-15 2019-06-05 2019-07-19 2019-08-16 2019-09-15 2019-10-20 2019-11-24 2020-11-23 PASO - CHOQUICOCHA - International Inclusion costo SANTA ROSA - TABLAHUASI - MILPO - QUIULACOCHA, DISTRITO DE CONCHAMARCA - AMBO - HUANUCO PE-PROVIAS-106710-CS- QCBS / Supervision de la obra: Mejoramiento periódico Selección basada del camino vecinal Circuito Rural Road Infrastructure Ejecución IBRD / 85620 Posterior en calidad y Open - National 296,581.77 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-11 de Produccion Km 15.5 - Maintenance pendiente costo carretera Mazamani - Puerto Ocopa - A dos de Mayo, Junin PE-PROVIAS-106715-CS- QCBS / Supervisor de la Selección basada obra: Mantenimiento Rural Road Infrastructure Ejecución IBRD / 85620 Posterior en calidad y Open - National 147,391.40 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-13 periódico del Camino vecinal Maintenance pendiente costo Dv Saywite - Cachora, Apurimac PE-PROVIAS-106717-CS- QCBS / Supervision de la Selección basada Rural Road Infrastructure Ejecución obra: Mantenimiento IBRD / 85620 Posterior en calidad y Open - National 184,726.51 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-15 Maintenance pendiente periódico del camino vecinal costo Palo Seco - Parobamba viejo Page 8 PE-PROVIAS-106718-CS- QCBS / Supervision de la Selección basada Obra: Mantenimiento Rural Road Infrastructure Ejecución IBRD / 85620 Posterior en calidad y Open - National 206,710.73 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-09 periódico del camino vecinal Maintenance pendiente costo Puente Mirador - Boca Satipo, Junin PE-PROVIAS-160502-CS- QCBS / Supervisión de obra: Mejoramiento de la carretera vecinal Puente Chico- Sancaragra- Selección basada Cuchicancha- Mal Paso - Rural Road Infrastructure Open - IBRD / 85620 Posterior en calidad y 744,778.43 0.00 En ejecución 2020-02-19 2020-02-20 2020-03-11 2020-04-24 2020-05-22 2020-06-21 2020-07-26 2020-08-30 2021-08-30 Choquicocha -Santa Rosa - Maintenance International costo Tablahuasi- Milpo - Quiulacocha, distrito de Conchamarca- Provincia de Ambo - departamento de huánuco INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-4694-CS- INDV / Paquete N° 3 de 25 expedientes de Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 694,245.00 0.00 Cancelado 2017-06-05 2017-07-03 2017-07-17 2017-07-31 2017-11-28 mantenimiento periodico de Maintenance caminos vecinales por 500 km PE-PROVIAS-4693-CS- INDV / Elaboracion de Plan Decentralized Road IBRD / 85620 Posterior Individual Open 17,616.00 0.00 Cancelado 2017-01-16 2017-02-13 2017-02-27 2017-03-13 2017-10-09 Vial Departamental Management Participativo paquete 2 PE-PROVIAS-12057-CS- INDV / Consultoría para los procedimiento de Decentralized Road IBRD / 85620 Posterior Individual Open 8,807.99 0.00 Cancelado 2017-05-02 2017-05-07 2017-05-07 2017-05-19 2017-08-17 certificación ocupacional Management para el mantenimiento de caminos PE-PROVIAS-12307-CS- INDV / Consultoría para el Decentralized Road IBRD / 85620 Posterior Individual Open 16,441.57 0.00 Cancelado 2017-05-02 2017-05-16 2017-05-16 2017-05-28 2017-12-24 seguimiento y evaluación del Management Plan de Acción de la VDL PE-PROVIAS-28360-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,161.48 Firmado 2017-09-29 2017-11-30 2017-10-06 2018-06-05 2017-10-06 2017-10-27 2018-07-25 2018-02-24 Plan Vial Provincial Management Participativo de ICA PE-PROVIAS-28370-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,137.90 Firmado 2017-09-29 2017-11-30 2017-10-06 2018-06-11 2017-10-06 2017-10-27 2018-07-20 2018-02-24 Plan Vial Provincial Management Participativo de General Sánchez Cerro PE-PROVIAS-28372-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-11-30 2017-10-06 2018-06-05 2017-10-06 2017-10-27 2018-07-25 2018-02-24 Plan Vial Provincial Management Participativo de Daniel Alcides Carrión PE-PROVIAS-28374-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-11-30 2017-10-06 2018-06-08 2017-10-06 2017-10-27 2018-07-26 2018-02-24 Plan Vial Provincial Management Participativo de Candarave PE-PROVIAS-39281-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 25,901.94 25,265.44 Firmado 2017-12-04 2018-03-14 2017-12-11 2018-12-18 2017-12-11 2017-12-26 2019-01-23 2018-12-21 Management la gestión vial de gobiernos regionales PE-PROVIAS-39284-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 22,201.67 0.00 Cancelado 2017-12-04 2017-12-11 2017-12-11 2017-12-26 2018-12-21 Management la gestión vial de gobiernos locales Page 9 PE-PROVIAS-39747-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,958.65 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-07-20 2018-04-06 Plan Vial Provincial Management Participativo - Chupaca PE-PROVIAS-39752-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 20,448.05 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-07-30 2018-03-22 Plan Vial Provincial Management Participativo - Cajatambo PE-PROVIAS-39753-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-04 2017-12-15 2017-12-22 2018-07-20 2018-03-22 Plan Vial Provincial Management Participativo - Tahuamanu PE-PROVIAS-39754-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 0.00 Cancelado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Plan Vial Provincial Management Participativo -Ilo PE-PROVIAS-39756-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-07-25 2018-04-06 Plan Vial Provincial Management Participativo - Huancané PE-PROVIAS-39757-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 28,060.44 27,339.64 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-08-06 2018-04-06 Plan Vial Provincial Management Participativo - Melgar PE-PROVIAS-39759-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-07-25 2018-04-06 Plan Vial Provincial Management Participativo - Sandia PE-PROVIAS-39771-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,936.16 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-12 2017-12-15 2017-12-22 2018-07-20 2018-04-06 Plan Vial Provincial Management Participativo - Rioja PE-PROVIAS-39772-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 24,360.16 23,734.41 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-08 2017-12-15 2017-12-22 2018-07-30 2018-04-06 Plan Vial Provincial Management Participativo - San Martín PE-PROVIAS-39773-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-06-05 2017-12-15 2017-12-22 2018-07-20 2018-03-22 Plan Vial Provincial Management Participativo - Tocache PE-PROVIAS-39774-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-11-30 2017-12-15 2018-07-05 2017-12-15 2017-12-22 2018-07-20 2018-04-06 Plan Vial Provincial Management Participativo - Tarata PE-PROVIAS-62410-CS- INDV / Expediente tecnico para el mantenimiento periodico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 58,967.72 57,699.86 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-25 2018-05-18 2018-06-01 2018-07-19 2018-07-31 vecinales de los tramos: 1) Maintenance San Luis - Cardon - Canchabamba y 2) Tarica - Parihuanca - Aco PE-PROVIAS-62413-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure vecinales de los tramos 1) IBRD / 85620 Posterior Individual Open 64,410.80 63,025.92 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-25 2018-05-18 2018-06-01 2018-07-16 2018-07-31 Maintenance Palo Seco - Parobamba Viejo, 2) Puente Tambillo - Runtujirca y 3) Emp. R548 (Huayllan) - Huanchacbamba PE-PROVIAS-62414-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 32,562.05 31,861.94 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-25 2018-05-18 2018-06-01 2018-07-12 2018-07-31 vecinales de los tramos 1) Maintenance Dv. Saywite - Cachora y 2) Cementerio - San isidro de Chicón Page 10 PE-PROVIAS-62415-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 49,428.95 48,366.18 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-24 2018-05-18 2018-06-01 2018-07-16 2018-07-31 periodico del camino vecinal Maintenance Puente Mirador - Boca Satipo PE-PROVIAS-62416-CS- INDV / Expediente Técnico para el mantenimiento periodico de los caminos vecinales de los tramos 1) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 70,928.31 0.00 Cancelado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Emp R510 (Cerro Rico) - Maintenance Mina San Juan de Chorunga y 2) Huanca - Pte. Pichiricma - Sector Suchocc PE-PROVIAS-62417-CS- INDV / Expediente tecnico para el mantenimiento periodico del camino vecinal Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 70,841.00 69,317.87 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-24 2018-05-18 2018-06-01 2018-07-16 2018-07-31 Circuito de Produccion Km Maintenance 15.5 Carretera Mazamari - Puerto Ocopa - A Dos de Mayo PE-PROVIAS-62418-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 48,166.65 47,131.02 Firmado 2018-05-11 2018-03-05 2018-05-18 2018-04-24 2018-05-18 2018-06-01 2018-07-19 2018-07-31 vecinales de los tramos 1) Maintenance DV. Chapapampa - Jonsani y 2) DV. Pampa Blanca - Huanuara- Cairani PE-PROVIAS-62419-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 18,276.43 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Paijan - El Milagro PE-PROVIAS-62420-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 28,713.88 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Locuto - Callejones PE-PROVIAS-62421-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 8,361.57 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 periodico del camino vecinal Maintenance Santa Rosa de Masisea - Laguna Santa María PE-PROVIAS-63005-CS- INDV / Elaboración de Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.00 20,292.15 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-05-17 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Vial Provincial Participativo Management de Asunción PE-PROVIAS-63490-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 23,177.80 22,679.46 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-05-17 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Casma PE-PROVIAS-63496-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,768.36 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-06 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Antabamba PE-PROVIAS-63497-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,438.22 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-06 2018-05-28 2018-06-15 2018-07-25 2018-09-13 Plan Vial Provincial Management Participativo - Aymaraes PE-PROVIAS-63502-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,381.04 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-06 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Camaná Page 11 PE-PROVIAS-63503-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,872.64 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-07 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Condesuyos PE-PROVIAS-63507-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,672.08 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-08 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Arequipa PE-PROVIAS-63508-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 32,021.96 31,465.39 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-07 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo -Caylloma PE-PROVIAS-63510-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,475.28 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-07-10 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo -Parinacochas PE-PROVIAS-63512-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-07 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Sucre PE-PROVIAS-63513-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 24,092.71 23,755.83 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-08 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo -Santa Cruz PE-PROVIAS-63515-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-08 2018-05-28 2018-06-15 2018-07-30 2018-09-13 Plan Vial Provincial Management Participativo -San Miguel PE-PROVIAS-63517-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 28,972.25 28,468.68 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-08 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Celendin PE-PROVIAS-63519-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 29,887.16 29,469.25 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-05-31 2018-05-28 2018-06-15 2018-07-20 2018-09-13 Plan Vial Provincial Management Participativo - Jaén PE-PROVIAS-63521-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.03 20,448.05 Firmado 2018-05-21 2017-11-30 2018-05-28 2018-06-04 2018-05-28 2018-06-15 2018-07-25 2018-09-13 Plan Vial Provincial Management Participativo - Palpa PE-PROVIAS-75994-CS- INDV / Elaboración del Decentralized Road IBRD / 85620 Posterior Individual Open 26,573.00 26,167.77 Firmado 2018-08-28 2017-11-30 2018-09-04 2018-10-05 2018-09-04 2018-09-22 2018-12-05 2019-01-05 Plan Vial Provincial Management Participativo - La Unión PE-PROVIAS-80036-CS- INDV / Actualización de la Metodología para la Decentralized Road IBRD / 85620 Posterior Individual Open 27,489.31 27,070.11 Firmado 2018-09-28 2018-10-15 2018-10-05 2018-12-11 2018-10-05 2018-10-23 2018-12-31 2019-01-21 Elaboración de Planes Management Viales Departamentales Participativos - PVDP PE-PROVIAS-89108-CS- INDV / PAQUETE Nro.1 Expediente Técnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AN-104 - Tambillo - IBRD / 85620 Posterior Individual Open 59,179.77 60,149.93 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-18 2018-12-14 2018-12-20 2019-02-07 2019-02-18 Maintenance Dv. Parcap - Huata, Tramo 2: Tramo 1: Emp. PE.-14C (Pomabamba) - Dv. Chuyas - Dv. Huayllan - Pte. Lucma (Límite Provincial). Page 12 PE-PROVIAS-89109-CS- INDV / PAQUETE Nro. 2 Expediente Tecnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AP-113 - Hurihuiri - IBRD / 85620 Posterior Individual Open 75,182.42 76,414.92 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-18 2018-12-14 2018-12-20 2019-01-31 2019-02-18 Maintenance Taribamba - Pichibamba - Sorconta - Dv. Sapsi - Paccaypata, Tramo 2: Emp. PE-30 A (Yaca) - Occobamba - Soccos - Lucmayoc - Circa. PE-PROVIAS-89114-CS- INDV / PAQUETE Nro. 3 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-108 Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 111,343.90 113,169.21 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-18 2018-12-14 2018-12-20 2019-02-13 2019-02-18 (Huancapampa) - Dv. Maintenance Chajama - Ayahuay - Chilcahuay - Pachaconas, Tramo 2: Dv. Yauricocha (Tunapita) - Yanaca, Tramo 3: Emp. AY-105 - Dv. Yanasanja - Ccoña PE-PROVIAS-89115-CS- INDV / PAQUETE Nro. 4 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-102 - Socos - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 93,242.01 94,770.57 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-18 2018-12-14 2018-12-20 2019-02-20 2019-02-18 Mitobamba - Dv. Ocobamba Maintenance - Escorno - Emp. AP-102 (Tres Cruces), Tramo 2: Emp. AP-102 (Comun Pampa) - Callapayoc - Dv. Mollepata - Quispimarca, T PE-PROVIAS-89116-CS- INDV / PAQUETE Nro. 5 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. CA-109 - Pizon - Dv. Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 103,080.74 104,780.04 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-20 2018-12-14 2018-12-20 2019-02-06 2019-02-18 El Mirador - Chalan, Emp. Maintenance CA-992 - El Mirador, Tramo 2: Emp. CA-100 (San Gregorio) - Dv. Varapaccha - Agua Blanca - El Prado - Emp. CA-100. PE-PROVIAS-89117-CS- INDV / PAQUETE Nro. 6 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. CU-105 - Ipal - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 83,747.27 85,120.18 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-20 2018-12-14 2018-12-20 2019-02-20 2019-02-18 Yanacacca - Arenalniyoc - Maintenance Santa Cruz - Dv. Combapata - Abra Bellavista, Tramo 2: Quebrada Honda - Selva Alegre - Sigasiato - Yuveni - Chuanq PE-PROVIAS-89118-CS- INDV / PAQUETE Nro. 7 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. PE-12G (Haquira) - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 115,386.53 117,278.11 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-20 2018-12-14 2018-12-20 2019-02-06 2019-02-18 Orcopampa - Dv. Maintenance Patabamba - Chacamachay - Dv. Yuricancha - Emp. PE- 3SY, Tramo 2: Emp. CU- 118 (Ccapi) - Cajapacara - Cascas - Emp. CU-119 PE-PROVIAS-89119-CS- INDV / PAQUETE Nro. 8 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. CU-113 - Manzanares Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 83,817.76 85,191.82 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-20 2018-12-14 2018-12-20 2019-02-20 2019-02-18 - Sunchubamba - Jajahuana Maintenance - Challabamba - Dv. Mojopata - Dv. Chusa - Ichipia, Tramo 2: Emp. CU- 118 (Icura) - Dv. Chillahuane - Dv. Huach Page 13 PE-PROVIAS-89120-CS- INDV / PAQUETE Nro. 9 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. PE-3N - Estaca Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 118,133.66 120,070.28 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-20 2018-12-14 2018-12-20 2019-02-06 2019-02-18 Machay - Chuquis - Ninash Maintenance - Huancapampa - Dv. Tingo Chico - Huancan, Emp. HU- 717 (Chuquis) - Ucrumarca, Tramo 2: Emp. PE-18A - Pachachupan - PE-PROVIAS-89121-CS- INDV / PAQUETE Nro.10 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. JU-106 (Hornomachay) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 87,353.49 88,785.52 Firmado 2018-12-04 2018-03-05 2018-12-10 2018-12-18 2018-12-14 2018-12-20 2019-02-07 2019-02-18 - Huancash - Yanañahui, Maintenance Tramo 2: Huasahuasi - Dv. Tambra - Dv. Pongo - San Juan de La Libertad - Cayan, Emp. JU-548 (San Juan de La Li PE-PROVIAS-162175-CS- INDV / Supervisión del Mantenimiento Periodico del Rural Road Infrastructure Ejecución IBRD / 85620 Posterior Individual Open 60,900.96 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 camino vecinal Emp. AY Maintenance pendiente 102- Jotopuquio -Huallua - Tantar -Churca - Quehuayllo PE-PROVIAS-162177-CS- INDV / Supervision del Mantenimiento Periodico del Rural Road Infrastructure Ejecución camino vecinal : Emp. AP IBRD / 85620 Posterior Individual Open 67,561.09 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Maintenance pendiente 102- Socos - Mitobamba - Dv. Ocobamba - Escorno - Emp.AP-102 (Tres Cruces) PE-PROVIAS-162176-CS- INDV / Supervision del Mantenimiento Periódico del Rural Road Infrastructure Ejecución IBRD / 85620 Posterior Individual Open 97,719.07 0.00 2020-03-02 2020-04-20 2020-05-11 2020-06-15 2020-12-12 camino vecinal: Emp AP Maintenance pendiente 102- Comun Pampa- Callapayoc- DV. Mollepata- Quispimarca Page 14