Plan vs./ Actual Days Execution Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval BEEP- Energy efficiency Proj ect Rev ie Proposal No Name of Cate Not Adv erti- Reception Short Technical No Final Ref No in Federation B&H October, w No Inv itation Submissi Obj ection Contract Comple- Assignment/Contract gory e # Selection sement of Listing Ev aluatio Obj ection Ev aluatio Start 2014 by Obj ection for RFP on Date to Signature tion Method for EOI expression and RFP n + PSC n Date Bank Date Date Date sign Date Date Date of interest ready Date Date Date Prior / contract Post A B D E F H I J Consulting firms COMPONENT 1 Combined Serv ices for Clinics and chosen Schools Detailed Energy Audit, P TME before, Design, Package 1: Audit of Design University Clinical Center A Sarajevo Ortopedic and Traumatology; BEEP- Surgery Clinic in Tuzla; Supervision, TME after, P143580-CQ- P CS CQ Prior 10/5/2015 14 24/5/2015 8 1/6/2015 7 8/6/2015 0 8/6/2015 10 18/6/2015 4 22/6/2015 0 22/6/2015 0 22/6/2015 7 29/6/2015 170 16/12/2015 0 16/12/2015 300 ######## Psychiatric Hospital Mostar Energy Labelling 02-CS-15-FBIH A 10/5/2015 14 24/5/2015 8 1/6/2015 7 8/6/2015 0 8/6/2015 10 18/6/2015 4 22/6/2015 0 22/6/2015 0 22/6/2015 7 29/6/2015 170 17/12/2015 0 1/2/2016 408 15/3/2017 Package 2 (10+3=13 obj ects) Ze-Do, Una-Sana, HNK Elementary School Ivana fra Frane Jukica Sivsa Usora; Elementary School 21. mart Doboj Jug; Gimnasium Rizah Odzeckic Zavidovici; Elementary School "Gazi Ferhad-beg" Combined Services BEEP- Tesanj; Secondary Mutual (Design, technical P143580-CQ- P CS CQ Prior 1/12/2015 14 15/12/2015 8 ######## 7 ######## 0 ######## 10 9/1/2016 4 13/1/2016 0 13/1/2016 0 13/1/2016 7 20/1/2016 2 22/1/2016 0 22/1/2016 450 16/4/2017 School Zepce; Hospital Bihać; monitoring (before and 04-CS-15-FBIH Elementary school Bosanska after), works supervision) Otoka; I Secondary school Dr. Husein Džanić & II secondary schoo l, Gymnasium; Elementary school Stijena Cazin; I & II Secondary school Cazin; Elementary School Fra Didaka Buntića Čitluk; Secondary 22.01.201 22.01.201 29.01.201 A 2/12/2015 13 15/12/2015 24 8/1/2016 10 05.02.2016. 0 05.02.2016. 0 05.02.2016. 12/2/2016 15/2/2016 15/2/2016 30/6/2018 6. 6. 6. Package 3 (12+4=16 obj ects Ze- Detailed Energy Audit, Do, Saraj ev o, HNK) TME before, Design P Secondary Mutual School completed for „Mula Stjepana Radica Usora; Mustafa Baseskija“ Elementary School Safvet-beg A Basagic Visoko; Elementary School Kulin Ban Visoko; Elementary School "Musa Cazim Catic" Zenica; Elementary School "Hamdija Kresevljakovic" Kakanj; Elementary School 15. April Kakanj; Elementary School „Mula Mustafa Baseskija“ Visoko; Combined Services BEEP- First elementary school (Design, technical P143580-CQ- CS CQ Prior 1/12/2015 14 15/12/2015 8 ######## 7 ######## 0 ######## 10 9/1/2016 4 13/1/2016 0 13/1/2016 0 13/1/2016 7 20/1/2016 2 22/1/2016 0 22/1/2016 450 16/4/2017 Zavidovici; Hospital Tesanj; monitoring (before and 05-CS-15-FBIH Elementary School „Zahid after), works supervision) Barucija; Elementary School „Hasim Spahic“; Elementary School „Srednje“ Ilijas; Secondary School Juraja Dalmatinca Mostar; Hospital Jablanica; Secondary School 22.01.201 22.01.201 29.01.201 A 2/12/2015 13 15/12/2015 08.01.2016. 05.02.2016. 0 05.02.2016. 0 05.02.2016. 12/2/2016 15/2/2016 15/2/2016 30/6/2018 6. 6. 6. BEEP- Package 2, 3 P143580-CQ- P (allocated) Audit of Design CS CQ Post 1/12/2015 14 15/12/2015 8 ######## 0 ######## 0 ######## 10 2/1/2016 0 2/1/2016 7 9/1/2016 0 9/1/2016 0 9/1/2016 2 11/1/2016 0 11/1/2016 65 16/3/2016 01-CS-15-FBIH A 2/12/2015 13 15/12/2015 14.01.2016. - 20.01.2016. 27.01.2016. 01.02.2016. 0 01.02.2016. 0 01.02.2016. 0 - 0 8/2/2016 15/2/2016 90 15/5/2016 Combined Services (Design for 18 objects, BEEP- Technical monitoring Package 4 (2017. buldings) P143580-CQ- P before and after for 19 CS CQ Post 15/1/2017 14 29/1/2017 2 31/1/2017 3 N/A 0 3/2/2017 7 10/2/2017 3 13/2/2017 0 N/A 2 15/2/2017 0 N/A 0 15/2/2017 0 15/2/2017 410 1/4/2018 (allocated) 06-CS-16-FBIH objects, Works Supervision for 13 Objects) A 17/1/2017 15 1/2/2017 15/2/2017 0 N/A 0 15/2/2017 7 22/2/2017 24/2/2017 0 N/A 0 24/2/2017 N/A 2/3/2017 0 2/3/2017 30/6/2019 Combined Services BEEP- (Works Supervision for 5 P143580-CQ- P federal level objects + 1 CS CQ Post 15/1/2017 14 29/1/2017 2 31/1/2017 3 N/A 0 3/2/2017 7 10/2/2017 3 13/2/2017 0 N/A 0 13/2/2017 2 N/A 2 15/2/2017 0 15/2/2017 410 1/4/2018 07-CS-16-FBIH Package 5 (2017. buildings) object for Piloting, Audit (allocated) of design for 19 objects) A 17/1/2017 15 1/2/2017 15/2/2017 0 N/A 0 15/2/2017 7 22/2/2017 24/2/2017 0 N/A 0 24/2/2017 N/A 6/3/2017 0 6/3/2017 30/6/2018 Combined Services BEEP- Package 6 (2018. buldings) (to (Design for 11 objects, P143580-CQ- P CS CQ Post 11/1/2018 14 25/1/2018 2 27/1/2018 3 N/A 0 30/1/2018 7 6/2/2018 3 9/2/2018 0 N/A 2 11/2/2018 0 N/A 0 11/2/2018 0 11/2/2018 450 7/5/2019 be allocated) Works Supervision for 11 08-CS-18-FBIH Objects) 03.01.2018 17.01.2018 A & 14 & 7 & 23/2/2018 0 N/A 0 27/2/2018 8 7/3/2018 8/3/2018 0 N/A 0 13/3/2018 N/A 26/3/2018 0 26/3/2018 525 31/8/2019 15.02.2018 22.02.2018 Combined Services (DEA, Design for XXX BEEP- objects, Technical P143580-CQ- P monitoring before and CS CQ Post 30/1/2019 14 13/2/2019 2 15/2/2019 3 N/A 0 18/2/2019 7 25/2/2019 3 28/2/2019 0 N/A 0 28/2/2019 2 N/A 2 2/3/2019 0 2/3/2019 304 ######## 10-CS-19-FBIH Package 7 (2019. buildings) after for XXX objects, (to be allocated) Works Supervision for XXX Objects) A Package 6 (2018. buldings - 11 BEEP- obj ects) P143580-CQ- P Audit of Design CS CQ Post 11/1/2018 14 25/1/2018 2 27/1/2018 3 N/A 0 30/1/2018 7 6/2/2018 3 9/2/2018 0 N/A 2 11/2/2018 0 N/A 0 11/2/2018 0 11/2/2018 50 2/4/2018 (to be allocated) 09-CS-18-FBIH A 3/1/2018 14 17/1/2018 23/2/2018 0 N/A 0 28/2/2018 8 8/3/2018 8/3/2018 0 N/A 0 13/3/2018 N/A 26/3/2018 0 26/3/2018 ######## BEEP- Package 7 (2019. buildings) P143580-CQ- P (to be allocated) Audit of Design CS CQ Post 30/1/2019 14 13/2/2019 2 15/2/2019 3 N/A 0 18/2/2019 7 25/2/2019 3 28/2/2019 0 N/A 2 2/3/2019 0 N/A 0 2/3/2019 0 2/3/2019 92 2/6/2019 11-CS-19-FBIH A Technical Design & BEEP- Package 7 (2019. buildings) Sepcification for AHC P143580-SSS- P (to be allocated) CS SSS Prior / 14 / 2 25/2/2019 3 28/2/2019 2 2/3/2019 7 9/3/2019 3 12/3/2019 0 N/A 2 14/3/2019 5 19/3/2019 0 19/3/2019 0 19/3/2019 30 18/4/2019 (two buildings: Mostar, 1-CS-19-FBIH Livno) A F. Preliminary/Detailed energy audits BEEP- 72 detailed energy audits - Consultant engineering P143580-CQ- P CS CQ Post 1/2/2016 14 15/2/2016 8 23/2/2016 7 N/A 0 23/2/2016 10 4/3/2016 4 8/3/2016 0 N/A 0 8/3/2016 7 N/A 2 10/3/2016 0 10/3/2016 90 8/6/2016 2017. buldings service 11-CS-16-FBIH A 19/4/2016 14 4/5/2016 6/5/2016 N/A 9/5/2016 7 16/5/2016 19/5/2016 0 N/A 0 24/5/2016 0 N/A 0 9/6/2016 0 9/6/2016 90 7/9/2016 BEEP- 30 detailed energy audits - Consultant engineering P143580-CQ- P CS CQ Post 25/5/2016 14 8/6/2016 8 16/6/2016 7 N/A 0 16/6/2016 10 26/6/2016 4 30/6/2016 0 N/A 0 30/6/2016 7 N/A 2 2/7/2016 0 2/7/2016 45 16/8/2016 2017. buldings service 18-CS-16-FBIH A 4/7/2016 14 18/7/2016 25/7/2016 N/A 3/8/2016 7 10/8/2016 1 11/8/2016 0 N/A 0 12/8/2016 0 N/A 0 25/8/2016 25/8/2016 60 ######## BEEP- 30 detailed energy audits (to be Consultant engineering P143580-CQ- P CS CQ Post 15/2/2018 14 1/3/2018 8 9/3/2018 7 N/A 0 9/3/2018 10 19/3/2018 4 23/3/2018 0 N/A 0 23/3/2018 7 N/A 2 25/3/2018 0 25/3/2018 60 24/5/2018 allocated) - 2020. buildings service 12-CS-19-FBIH A G. Social monitoring and ev aluation BEEP- Social monitoring and P143580-CQ- P Consultant services CS CQ Post 20/12/2015 14 3/1/2016 8 11/1/2016 7 N/A 0 11/1/2016 10 21/1/2016 4 25/1/2016 0 N/A 0 25/1/2016 7 N/A 2 27/1/2016 0 27/1/2016 790 27/3/2018 evaluation -(IA) (alocated) 12-CS-15-FBIH A 11.01.2016. 25.01.2016. 1/2/2016 - 9/2/2016 7 16/2/2016 1 17/2/2016 0 N/A 0 28/3/2016 - 5/4/2016 0 5/4/2016 4/10/2019 Total Estimate cost Subtotal Allocated To be allocated TOTAL COMPONENT 1 COMPONENT 2 Sub-Component A: Support for scalable financing mechanisms Consultant firms BEEP- P143580-IC- P Senior International Energy Consultant service CS IC Post 15/12/2016 14 29/12/2016 8 6/1/2017 7 13/1/2017 0 13/1/2017 10 23/1/2017 4 27/1/2017 0 27/1/2017 0 27/1/2017 7 3/2/2017 2 10/2/2017 0 10/2/2017 10/2/2017 13-CS-16-FBIH- Efficiency Consultant for the I Development of the Issue and A Options Study on Scalable 20/2/2017 14 6/3/2017 8 14/3/2017 7 21/3/2017 0 21/3/2017 10 31/3/2017 4 4/4/2017 0 4/4/2017 0 4/4/2017 7 11/4/2017 2 11/8/2017 31/8/2017 48 30/4/2018 Financing Mechanisms BEEP- IC 30/4/2019 10 10/5/2019 7 17/5/2019 6 23/5/2019 0 23/5/2019 8 1/6/2019 1/6/2019 183 1/12/2019 P143580-IC- 13-CS-19-FBIH- BEEP- P143580-IC- Consultant service CS IC Post 15/12/2016 14 29/12/2016 8 6/1/2017 7 13/1/2017 0 13/1/2017 10 23/1/2017 4 27/1/2017 0 27/1/2017 0 27/1/2017 7 3/2/2017 2 10/2/2017 0 10/2/2017 10/2/2017 13-CS-16-FBIH- Financial Expert for the II Development of the Issue and A Options Study on Scalable 20/2/2017 14 6/3/2017 8 14/3/2017 7 21/3/2017 0 21/3/2017 10 31/3/2017 4 4/4/2017 0 4/4/2017 0 4/4/2017 7 11/4/2017 2 22/8/2017 31/8/2017 50 30/4/2018 Financing Mechanisms BEEP- SS 11/2/2019 11/2/2019 180 10/8/2019 P143580-IC- 13-CS-19-FBIH- BEEP- P143580-IC- Consultant service CS IC Post 15/12/2016 14 29/12/2016 8 6/1/2017 7 13/1/2017 0 13/1/2017 10 23/1/2017 4 27/1/2017 0 27/1/2017 0 27/1/2017 7 3/2/2017 2 10/2/2017 0 10/2/2017 10/2/2017 13-CS-16-FBIH- Policy/Regulatory Expert for the III Development of the Issue and Options Study on Scalable A 20/2/2017 14 6/3/2017 8 14/3/2017 7 21/3/2017 0 21/3/2017 10 31/3/2017 4 4/4/2017 0 4/4/2017 0 4/4/2017 7 11/4/2017 2 22/8/2017 31/8/2017 65 30/4/2018 Financing Mechanisms BEEP- SS 11/2/2019 11/2/2019 180 10/8/2019 P143580-IC- 13-CS-19-FBIH- BEEP- Technical Expert for the P143580-IC- Development of the Issue and Consultant service CS IC Post 15/12/2016 14 29/12/2016 8 6/1/2017 7 13/1/2017 0 13/1/2017 10 23/1/2017 4 27/1/2017 0 27/1/2017 0 27/1/2017 7 3/2/2017 2 10/2/2017 0 10/2/2017 10/2/2017 13-CS-16-FBIH- Options Study on Scalable IV Financing Mechanisms A 20/2/2017 14 6/3/2017 8 14/3/2017 7 21/3/2017 0 21/3/2017 10 31/3/2017 4 4/4/2017 0 4/4/2017 0 4/4/2017 7 11/4/2017 2 22/8/2017 31/8/2017 40 30/4/2018 Subtotal Allocated A To be allocated A Subtotal Subcomponent A Sub-Component B: Capacity building BEEP- Training Municipality energy P143580-CQ- P Consultant service CS CQ Post 1/12/2016 14 15/12/2016 8 ######## 7 ######## 0 ######## 10 9/1/2017 4 13/1/2017 0 13/1/2017 0 13/1/2017 7 20/1/2017 2 27/1/2017 0 27/1/2017 450 22/4/2018 management-certification 14-CS-16-FBIH A 4/1/2017 14 18/1/2017 27/1/2017 0 27/1/2017 0 30/1/2017 7 6/2/2017 1 7/2/2017 0 7/2/2017 0 7/2/2017 0 7/2/2017 0 2/3/2017 2/3/2017 30/9/2019 BEEP- "Communications, awareness P143580-CQ- P Consultant service CS multi CQ Post 15/1/2016 14 29/1/2016 8 6/2/2016 7 13/2/2016 0 13/2/2016 10 23/2/2016 4 27/2/2016 0 27/2/2016 0 27/2/2016 7 5/3/2016 2 12/3/2016 0 12/3/2016 811 1/6/2018 raising and outreach". 15-CS-16-FBIH A 13.01.2016. 26.01.2016. 1/2/2016 - 9/2/2016 7 16/2/2016 17/2/2016 - 19/2/2016 - 22/2/2016 22/2/2016 30/6/2018 BEEP- P143580-CQ- P Promotion of EE results Consultant service CS multi CQ Post 20/2/2016 14 5/3/2016 8 13/3/2016 7 20/3/2016 0 20/3/2016 10 30/3/2016 4 3/4/2016 0 3/4/2016 0 3/4/2016 7 10/4/2016 2 17/4/2016 0 17/4/2016 775 1/6/2018 16-CS-16-FBIH A 22/2/2016 14 7/3/2016 20/3/2016 - 20/3/2016 24/3/2016 25/3/2016 - 29/3/2016 0 - 0 5/4/2016 5/4/2016 30/6/2018 Developing and implementing a BEEP- communication campaign and P143580-CQ- P promotion activties for the energy Consultant service CS multi SS Post 8/8/2018 7 15/8/2018 6 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 27/8/2018 0 27/8/2018 0 29/8/2018 0 29/8/2018 ######## 16-CS-18-FBIH efficiency improvements in public buildings A 8/8/2018 7 15/8/2018 6 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 21/8/2018 0 27/8/2018 0 27/8/2018 0 3/9/2018 0 3/9/2018 ######## Subtotal Allocated B To be allocated B Subtotal Subcomponent B Total A+B - allocated To be allocated TOTAL COMPONENT 2 COMPONENT 3 Proj ect management BEEP- P143580-IC- 01-CS-14- Project Coordinator Consultant service CS IC Prior 21/2/2014 7 28/2/2014 3/3/2014 12/3/2014 1 13/3/2014 1 14/3/2014 0 14/3/2014 0 12/3/2014 0 17/3/2014 ######## 16/12/2015 0 16/12/2015 167 31/5/2016 FBIH/BEEP- P143580-IC- 001-FBIH IC Post 1/6/2016 0 1/6/2016 ######## 1/6/2016 30/6/2018 2/7/2018 ######## BEEP- P143580-IC- 02-CS-14- Procurement specialist Consultant service CS IC Prior 21/2/2014 7 28/2/2014 3/3/2014 12/3/2014 1 13/3/2014 1 14/3/2014 0 14/3/2014 0 12/3/2014 0 17/3/2014 ######## 16/12/2015 0 16/12/2015 31/5/2016 FBIH/BEEP- P143580-IC- Post 1/6/2016 0 1/6/2016 ######## 1/6/2016 30/6/2018 21/7/2018 9 30/7/2018 2/8/2018 2/8/2018 6/8/2018 0 6/8/2018 ######## BEEP- P143580-IC- 06-CS-14- Financial specialist Consultant service CS IC Prior 26/8/2015 18 13/9/2015 ######## ######## 1 ######## 7 ######## 1 ######## 3 ######## 1 ######## 7/1/2016 16/12/2015 0 16/12/2015 167 31/5/2016 FBIH/BEEP- P143580-IC- Post 1/6/2016 0 1/6/2016 328 25/4/2017 Prior 21/4/2017 21/4/2017 1 22/4/2017 1 23/4/2017 0 26/4/2017 0 9/5/2017 0 9/5/2017 9/5/2017 11/5/2017 0 11/5/2017 ######## 11/5/2017 11/5/2017 ######## BEEP- P143580-IC- 04-CS-14- Technical Expert I Consultant service CS multi IC Prior 22/10/2014 14 5/11/2014 ######## 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 ######## 16/12/2015 0 16/12/2015 167 31/5/2016 FBIH/BEEP- P143580-IC- Post 1/6/2016 0 1/6/2016 ######## 1/6/2016 0 1/6/2016 ######## BEEP- P143580-IC- Technical Expert II Consultant service CS multi IC Prior 22/10/2014 14 5/11/2014 ######## 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 ######## 16/12/2015 0 16/12/2015 167 31/5/2016 05-CS-14- Post 1/6/2016 0 1/6/2016 ######## 1/6/2016 30/6/2018 2/7/2018 ######## BEEP- P143580-IC- 03-CS-14- Administrative assistant Consultant service CS IC Prior 22/10/2014 14 5/11/2014 7 ######## 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 26/1/2015 ######## 16/12/2015 0 16/12/2015 167 31/5/2016 FBIH/BEEP- P143580-IC- Post 1/6/2016 0 1/6/2016 ######## 1/6/2016 0 1/6/2016 ######## BEEP- P143580-IC- Temporary Technical Expert Consultant service CS IC Post 10/8/2016 5 15/8/2016 16/8/2016 N/A N/A N/A N/A N/A 16/8/2016 N/A 23/8/2016 23/8/2016 ######## 44-CS-16-FBIH IC Post 20/2/2018 7 27/2/2018 27/2/2018 N/A N/A N/A N/A N/A 27/2/2018 N/A 28/2/2018 1/3/2018 121 30/6/2018 IC Post 21/7/2018 9 30/7/2018 0 1/8/2018 ######## 21/7/2018 9 30/7/2018 2/8/2018 2/8/2018 9/8/2018 1/9/2018 28/2/2019 BEEP- Financial Software for World P143580-SSS- P software SSS Prior 14/9/2015 7 21/9/2015 7 28/9/2015 7 5/10/2015 7 ######## 7 ######## 3 ######## 1 ######## 1 ######## 5 ######## 48 15/12/2015 0 16/12/2015 30 15/1/2016 Bank Project 28-S-15-FBIH A 14/10/2015 0 14/10/2015 0 ######## 0 ######## 0 ######## 1 ######## 11 ######## 0 ######## 0 ######## 0 ######## 51 16/12/2015 16/12/2015 30 15/1/2016 Incremental operating costs A Annual financial audit A Total component 3 - allocated To be allocated 1/9/2014 1398 30/6/2018 TOTAL COMPONENT 3 contarct Siganture Days Execution Days Execution Plan vs./ Actual Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Days Interval Review Submis- No Invita- Bid- Evalu- No Contract Comple- date BEEP- Energy efficiency Project in Name of Cate Selection by Bank sion/ Start Ref no Note # Objection tion Opening ation & Objection Award tion Federation B&H December, 2013 Assignment/Contract gory Method Prior / Readiness Date Date Date Date Recomm. Date + PSC Date Date Post Date CLINICS BEEP-P143580- PACKAGE 1 University Clinical Center Works on reconstruction of W NCB Prior 1/5/2015 7 8/5/2015 3 11/5/2015 28 8/6/2015 14 22/6/2015 4 26/6/2015 5 1/7/2015 16 17/7/2015 0 17/7/2015 123 17/11/2015 1 NCB-29-W-15-FBIH Sarajevo Ortopedic and Traumatology Clinics A 29.04.2015. 03.05.2015. 13.05.2015. 09.06.2015. 30.06.2015. 08.07.2015. 18.12.2015. 18.12.2015. 02.03.2016. 30.06.2016. PACKAGE 2 LOT 1 - Psychiatric Hospital W 20/5/2015 7 27/5/2015 2 29/5/2015 28 26/6/2015 14 10/7/2015 7 17/7/2015 3 20/7/2015 11 31/7/2015 0 31/7/2015 114 22/11/2015 1 Mostar BEEP-P143580- Works on reconstruction of NCB Prior NCB-30-W-15-FBIH Clinics PACKAGE 2 LOT 2 - Health Centre Tuzla - W 20/5/2015 7 27/5/2015 2 29/5/2015 28 26/6/2015 14 10/7/2015 7 17/7/2015 3 20/7/2015 11 31/7/2015 0 31/7/2015 121 29/11/2015 1 Surgery Clinic A 14.05.2015. 18.05.2015. 21/5/2015 17.06.2015. 08.08.2015. 22.09.2015. 18.12.2015. 18.12.2015. 01.02.2016. 31.05.2016. CANTONS 2016. buildings BEEP-P143580- PACKAGE 3 - 2016. buildings (3 buildings) Works on reconstruction of P W NCB Post 18/4/2016 0 18/4/2016 0 18/4/2016 21 9/5/2016 5 14/5/2016 5 19/5/2016 2 21/5/2016 30 20/6/2016 0 20/6/2016 90 18/9/2016 1 NCB-31-W-16-FBIH (allocated) Sarajevo Canton A 20/4/2016 21 12/5/2016 15/7/2016 N/A 15/7/2016 22/7/2016 1/8/2016 90 30/10/2016 BEEP-P143580- PACKAGE 5 - 2016. buildings (5 buildings) Works on reconstruction of P W NCB Post 18/4/2016 0 18/4/2016 0 18/4/2016 21 9/5/2016 5 14/5/2016 5 19/5/2016 2 21/5/2016 30 20/6/2016 0 20/6/2016 90 18/9/2016 1 NCB-33-W-16-FBIH (allocated) ZE-DO Canton A 29/4/2016 21 20/5/2016 13/7/2016 N/A 13/7/2016 22/7/2016 8/8/2016 114 30/11/2016 PACKAGE 6 - LOT 1 - 2016. buildings (2 P W NCB Post 25/4/2016 0 25/4/2016 0 25/4/2016 21 16/5/2016 5 21/5/2016 5 26/5/2016 2 28/5/2016 30 27/6/2016 0 27/6/2016 90 25/9/2016 1 buildings) (allocated) BEEP-P143580- Works on reconstruction of NCB-34-W-16-FBIH HNK Canton PACKAGE 6 - LOT 2 - 2016. buildings (5 W NCB Post 25/4/2016 0 25/4/2016 0 25/4/2016 21 16/5/2016 5 21/5/2016 5 26/5/2016 2 28/5/2016 30 27/6/2016 0 27/6/2016 90 25/9/2016 1 buildings) (allocated) A LOT 1 27/5/2016 21 17/6/2016 14/7/2016 N/A 14/7/2016 25/7/2016 3/8/2016 139 20/12/2016 LOT 2 27/5/2016 21 17/6/2016 14/7/2016 N/A 14/7/2016 25/7/2016 8/8/2016 145 31/12/2016 TOTAL 2016. BUILDINGS CANTONS 2017. buildings BEEP-P143580- PACKAGE 7 2017. buildings (4 buildings) Works on reconstruction of P W NCB Post 1/7/2017 0 1/7/2017 0 1/7/2017 21 22/7/2017 5 27/7/2017 14 10/8/2017 2 12/8/2017 30 11/9/2017 0 11/9/2017 120 9/1/2018 1 NCB-35-W-16-FBIH (allocated) 4 objects in HNK Canton A 16/11/2017 7/12/2017 20/12/2017 20/12/2017 21/12/2017 9/1/2018 1/2/2018 180 31/7/2018 BEEP-P143580- PACKAGE 8 2017. buildings (5 buildings) Works on reconstruction of P W NCB Post 3/5/2017 0 3/5/2017 0 3/5/2017 21 24/5/2017 5 29/5/2017 14 12/6/2017 2 14/6/2017 30 14/7/2017 0 14/7/2017 120 11/11/2017 1 NCB-36-W-16-FBIH (allocated) 5 objects in ZE-DO Canton A 15/5/2017 21 5/6/2017 10/7/2017 10/7/2017 28/7/2017 22/8/2017 23/8/2017 240 20/4/2018 Works on reconstruction of BEEP-P143580- PACKAGE 9 2017. buildings (6 buildings) P 1 object in Canton Sarajevo W NCB Post 15/6/2017 0 15/6/2017 0 15/6/2017 21 6/7/2017 5 11/7/2017 14 25/7/2017 2 27/7/2017 30 26/8/2017 0 26/8/2017 120 24/12/2017 1 NCB-37-W-16-FBIH (allocated) & 5 federal level objects A 7/6/2017 21 28/6/2017 17/7/2017 17/7/2017 28/7/2017 22/8/2017 23/8/2017 162 1/2/2018 Works on reconstruction of BEEP-P143580- PACKAGE 10 2017. buildings (2 buildings) P 2 objects in Livanjski W NCB Post 3/5/2017 0 3/5/2017 0 3/5/2017 21 24/5/2017 5 29/5/2017 14 12/6/2017 2 14/6/2017 30 14/7/2017 0 14/7/2017 120 11/11/2017 1 NCB-38-W-16-FBIH (allocated) Canton A 22/5/2017 21 12/6/2017 10/7/2017 10/7/2017 28/7/2017 22/8/2017 23/8/2017 250 30/4/2018 BEEP-P143580- PACKAGE 11 2017. buildings (1 building) Works on reconstruction of P W NCB Post 15/7/2017 0 15/7/2017 0 15/7/2017 21 5/8/2017 5 10/8/2017 14 24/8/2017 2 26/8/2017 30 25/9/2017 0 25/9/2017 120 23/1/2018 1 NCB-44-W-16-FBIH (allocated) 1 object in Canton Sarajevo A 17/8/2017 21 7/9/2017 18/9/2017 18/9/2017 19/9/2017 4/10/2017 16/10/2017 242 15/6/2018 BEEP-P143580- PACKAGE 12 2017. buildings (1 building) Works on reconstruction of W NCB Post 27/6/2017 0 27/6/2017 0 27/6/2017 21 18/7/2017 5 23/7/2017 14 6/8/2017 2 8/8/2017 30 7/9/2017 0 7/9/2017 90 6/12/2017 NCB-45-W-16-FBIH (allocated) 1 object in ZE-DO Canton A 11/7/2017 21 1/8/2017 17/8/2017 17/8/2017 21/8/2017 12/9/2017 13/9/2017 90 12/12/2017 TOTAL 2017. BUILDINGS CANTONS 2018. buildings BEEP-P143580- PACKAGE 13 2018. buildings (3 buildings) Works on reconstruction of P W NCB Post 15/6/2018 0 15/6/2018 0 15/6/2018 21 6/7/2018 5 11/7/2018 14 25/7/2018 2 27/7/2018 30 26/8/2018 0 26/8/2018 120 24/12/2018 1 NCB-46-W-18-FBIH (allocated) 3 objects in HNK Canton A 13/8/2018 22 4/9/2018 14/9/2018 14/9/2018 20/9/2018 21/9/2018 8/10/2018 221 17/5/2019 BEEP-P143580- PACKAGE 14 2018. buildings (5 buildings) Works on reconstruction of P W NCB Post 15/6/2018 0 15/6/2018 0 15/6/2018 21 6/7/2018 5 11/7/2018 14 25/7/2018 2 27/7/2018 30 26/8/2018 0 26/8/2018 120 24/12/2018 1 NCB-47-W-18-FBIH (allocated) 5 objects in ZE-DO Canton A 14/8/2018 22 5/9/2018 13/11/2018 13/11/2018 23/11/2018 23/11/2018 12/17/2018 154 20/5/2019 BEEP-P143580- PACKAGE 15 2018. buildings (6 buildings) Works on reconstruction of P W NCB Post 15/6/2018 0 15/6/2018 0 15/6/2018 21 6/7/2018 5 11/7/2018 14 25/7/2018 2 27/7/2018 30 26/8/2018 0 26/8/2018 120 24/12/2018 1 NCB-48-W-18-FBIH (allocated) 3 object in Canton Sarajevo A 4/9/2018 20 24/9/2018 22/10/2018 22/10/2018 24/10/2018 29/10/2018 26/11/2018 182 27/5/2019 TOTAL 2018. BUILDINGS CANTONS 2019. buildings BEEP-P143580- Works on reconstruction of PACKAGE 16 2019. buildings (allocated) W NCB Post 1/6/2019 0 1/6/2019 0 1/6/2019 21 22/6/2019 5 27/6/2019 14 11/7/2019 2 13/7/2019 30 12/8/2019 0 12/8/2019 90 10/11/2019 NCB-49-W-19-FBIH xxx objects in 2019. A TOTAL 2019. BUILDINGS Total works - Component 1 / Hospitals, Schools and Administrative buildings/ allocated to be allocated GOODS Purchasing and Instalation (Performance Monitoring System for measuring the BEEP-P143580-SH- temperature and humidity) (20+7=27 G SH Post 5/2/2016 2 7/2/2016 3 10/2/2016 14 24/2/2016 1 25/2/2016 3 28/2/2016 0 28/2/2016 0 28/2/2016 0 28/2/2016 20 19/3/2016 1 39-G-16-FBIH buildings) - 2016./2017. buldings (allocated) A 25.01.2016. 01.02.2016. 3/2/2016 3/2/2016 - 5/2/2016 8/2/2016 8/2/2016 105 23/5/2016 Purchasing and Instalation (Performance Monitoring System for measuring the heat BEEP-P143580-SH- energy usage) (20+7=27 buildings) - G SH Post 5/2/2016 2 7/2/2016 3 10/2/2016 14 24/2/2016 1 25/2/2016 3 28/2/2016 0 28/2/2016 0 28/2/2016 0 28/2/2016 20 19/3/2016 1 40-G-16-FBIH 2016./2017. buldings (allocated) A 25.01.2016. 01.02.2016. 3/2/2016 3/2/2016 - 5/2/2016 8/2/2016 8/2/2016 105 23/5/2016 Purchasing and Instalation (Performance Monitoring System for measuring the BEEP-P143580-SH- temperature and humidity) (for 19 buildings) - G SH Post 15/1/2017 0 15/1/2017 0 15/1/2017 7 22/1/2017 1 23/1/2017 3 26/1/2017 0 26/1/2017 0 26/1/2017 0 26/1/2017 30 25/2/2017 1 41-G-16-FBIH 2017. buldings (allocated) A 23/1/2017 0 23/1/2017 0 23/1/2017 7 30/1/2017 2 1/2/2017 0 1/2/2017 0 1/2/2017 0 16/2/2017 0 16/2/2017 30 18/3/2017 1 Purchasing and Instalation (Performance Monitoring System for measuring the heat BEEP-P143580-SH- energy usage) (for 19 buildings) - 2017. G SH Post 15/1/2017 0 15/1/2017 0 15/1/2017 7 22/1/2017 1 23/1/2017 3 26/1/2017 0 26/1/2017 0 26/1/2017 0 26/1/2017 30 25/2/2017 1 42-G-16-FBIH buldings (allocated) A 23/1/2017 0 23/1/2017 0 23/1/2017 7 30/1/2017 2 1/2/2017 0 1/2/2017 0 1/2/2017 0 16/2/2017 0 16/2/2017 30 18/3/2017 1 BEEP-P143580-SH- Purchasing of Motor Vechicle G SH Post 10/2/2016 8 18/2/2016 3 22/2/2016 14 22/2/2016 1 22/2/2016 3 - 0 7/3/2016 0 8/3/2016 0 8/3/2016 30 7/4/2016 1 43-G-16-FBIH (allocated) A 10/2/2016 8 18/2/2016 3 22/2/2016 14 22/2/2016 1 22/2/2016 3 - 0 7/3/2016 0 8/3/2016 0 8/3/2016 30 7/4/2016 1 Procure and install additional equipment of seasonal pellet tank with pellet transporter BEEP-P143580-SH- from pellet tank to pellet boiler to make it G SH Post 11/9/2017 0 11/9/2017 0 11/9/2017 14 25/9/2017 1 26/9/2017 3 29/9/2017 0 29/9/2017 0 29/9/2017 0 29/9/2017 20 19/10/2017 1 44-G-17-FBIH easier for beneficiaries for 7 public buildings (allocated) A 11/9/2017 0 11/9/2017 0 11/9/2017 7 18/9/2017 7 25/9/2017 0 25/9/2017 0 25/9/2017 0 25/9/2017 0 25/9/2017 130 2/2/2018 Procure and install automatic regulation system for 11 objects as follows: a. Comprehensive automatic regulation system for 5 objects; BEEP-P143580-SH- b. Room temperature sensors with G SH Post 11/9/2017 0 11/9/2017 0 11/9/2017 14 25/9/2017 1 26/9/2017 3 29/9/2017 0 29/9/2017 0 29/9/2017 0 29/9/2017 20 19/10/2017 1 45-G-17-FBIH programming of existing controller with goal to make correction in line with interior temperature for 6 objects. A 11/9/2017 0 11/9/2017 0 11/9/2017 7 18/9/2017 7 25/9/2017 0 25/9/2017 0 25/9/2017 0 25/9/2017 0 25/9/2017 202 15/4/2018 BEEP-P143580-SH- Purchasing and Instalation of required goods G SH Post 30/1/2018 0 30/1/2018 0 30/1/2018 14 13/2/2018 1 14/2/2018 3 17/2/2018 0 17/2/2018 0 17/2/2018 0 17/2/2018 30 19/3/2018 1 46-G-19-FBIH (TRW & Automatisation) A Purchasing and Instalation of upgrade of the BEEP-P143580-SH- existing Web registry of Energy Building G DC Prior 9/5/2019 6 15/5/2019 1 16/5/2019 8 24/5/2019 3 29.05.20419 6 4/6/2019 1 5/6/2019 3 8/6/2019 0 8/6/2019 120 6/10/2019 1 47-G-19-FBIH Certificates software at the Ministry with New Modules A TOTAL GOODS (Performance Monitoring System) 1 allocated to be allocated TOTAL COMPONENT 1 W+G SDR Date Exchange rate TO BAM Exchange rate TO USD 12,480,000 12/13/2018 2.380715 1.38413 29,711,323.20 KM 17,273,942.40