Solar Resource Mapping in Pakistan MAINTENANCE VISIT REPOR.7*4% . į August 2016 This report was prepared by CSP Services, under contract to The World Bank. It is one of several outputs from the solar Resource Mapping and Geospatial Planning Pakistan [Project ID: P146140]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This document is an interim output from the above-mentioned project. Users are strongly advised to exercise caution when utilizing the information and data contained, as this has not been subject to full peer review. The final, validated, peer reviewed output from this project will be the Pakistan Solar Atlas, which will be published once the project is completed. Copyright © 2016 International Bank for Reconstruction and Development / THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org This work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work and accept no responsibility for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: +1-202-522-2625; e-mail: pubrights@worldbank.org. Furthermore, the ESMAP Program Manager would appreciate receiving a copy of the publication that uses this publication for its source sent in care of the address above, or to esmap@worldbank.org. CSP Services GmbH, Köln, Germany CSPS Technical Documentation ESMAP Tier1 Meteorological Station Maintenance Report: Quaid-e-Azam Solar Park, Punjab, Pakistan Responsible Authors Birk Kraas Roman Affolter Muhammad Umer Kamal (PITCO) Author Contact Information: CSP Services GmbH Friedrich-Ebert-Ufer 30 51143 Köln/Cologne, Germany E-Mail: b.kraas@cspservices.de 28 April 2016 CSP Services GmbH, Köln, Germany CSPS Technical Documentation CSP Services GmbH Office Cologne: Birk Kraas Friedrich-Ebert-Ufer 30, 51143 Cologne, Germany Phone: +49 2203 959003 0 b.kraas@cspservices.de Office Almería: Roman Affolter Paseo de Almería 73 – 2°, 04001 Almería, Spain Phone: +34 950 27 89 92 r.affolter@cspservices.de PITCO: Muhammad Umer Kamal 2nd Floor, Al – Maalik, 19 – Davis Road, Lahore, PAKISTAN umer.kamal@pitcopk.com CSP Services is a Spin-Off company of the German Aerospace Center (DLR), Institute of Solar Research, and makes use of licensed technology and know-how of DLR. The contents of this report are strictly confidential. They are only for the use of our client. The authors have written this report at their best knowledge and it has been rechecked within our quality control system. However, our liability, except in cases of intent, is excluded or limited to the contract conditions. CSP Services GmbH Geschäftsführer Sitz der Gesellschaft: Köln Alte Gasse 3 (Managing Directors): Amtsgericht Köln D-51143 Köln · Germany Dr.-Ing. Eckhard Lüpfert HRB 61644 T: +49 2203 296 9559 Dr. rer. nat. Klaus Pottler USt.-Id (VAT) DE814904840 F: +49 2203 296 9560 Dr.-Ing. Steffen Ulmer www.cspservices.de CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Summary Site Site: Quaid-e-Azam Solar Park, Bahawalpur Coordinates: 29.325°N, 71.819°E Station Type: ESMAP Tier 1 Station Date of installation: 2014-10-15 to 2014-10-17 Date of maintenance visit: 2016-04-28 Serial Numbers Station SN#, Control Box SN#: CSPS.MT.14.213, CSPS.CA.14.207.0001 GHI, DHI CMP SN#: 140325, 140324 DNI CHP SN#: 140125 Sun Tracker, Sun Sensor SN#: 140073, 140031 Inspection visit staff Inspection performed by (Date, Names and Signatures) Date: 28 April 2016 Muhammad Umer Kamal, PITCO The CSP Services (CSPS) ESMAP Project Tier1 meteorological station CSPS.MT.14.213, operational since Oct. 17th 2014, was visited by PITCO staff on 28 April 2016. The main goal of the visit was to repair the defect power supply of the station and install an overvoltage protection to prevent future power blackouts. After the maintenance visit, the station is fully functional except of the GHI pyranom- eter ventilation unit. It is recommended to clean the sensors on a daily basis in order to reduce the influ- ence of sensor soiling on the irradiance data. ESMAP Report 3 Pk-QASP-160428_CSPS_MaintenanceReport CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Completed Tasks  Power supply repaired (replacement of AC-DC converter, restoring power supply from the grid), overvoltage protection installed  Foundations checked for integrity  All parts and sensors of the station examined for damage, dust or condensed humidity, current status recorded and equipment cleaned where necessary  Vertical alignment of wind mast checked, wind mast anchorage and wind mast guying ropes checked for stability, secure fixation to the ground and tightness  Sun tracker alignment adjusted and fine-tuned, no perceptible influence on the irradiance data stated  Irradiance sensor alignment and leveling adjusted and fine-tuned, no perceptible influence on the irradiance data stated  GHI CVF4 ventilatior unit repair failed, the replacement ventilator did not fit in the housing  Solar irradiation sensors checked for proper operation and functionality; sensors cleaned, impact of cleaning on data recorded  Sensor cables on sun tracker checked  Batteries Box and ACDC Converter inspected and correct operation of 12 VDC and 24 VDC circuits verified  Maintenance platform checked  Datalogger program correct operation verified  Measured quantities checked for proper operation and correct values  Cleaning inspection button checked for proper functioning  Fuses, electrical components and wiring checked Pending Tasks / Recommended Tasks for next Maintenance Visit  Repair or replace GHI ventilation unit fan (cables oxidized at connection point) ESMAP Report 4 Pk-QASP-160428_CSPS_MaintenanceReport CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Maintenance Checklist Checked/ Component Work Item approved Comments yes no Foundations and anchors intact x Foundations Fence and door intact x No fence, secured roof area Lock on door intact and usable x No fence, secured roof area Firmly installed x Tracker Sup- port and Grounding cable connected x Control box All bolts tightened x Visual examination x Maint. Plat- Platform fixed to ground x form Platform leveled x All bolts tightened x Visual examination x Fuses ok x Power cable connected x Power supply restored Power supply restored, overvoltage pro- Power Supply functional x tection installed Wiring, ca- bles 230VAC – 24 VDC converter functional x AC-DC converter exchanged 24-12V DC-DC converter functional x Batteries ok and charging x All sensors connected x All cables orderly fixed x Mounted to tracker stand x Alignment (azimuth, elevation) x Alignment (horizontal) Tracker Solar sensors installed and aligned Cables attached to sensors & tracker Cables properly installed x Irradiation shield visual examination x Sensor probe and chip examination x Tamb / RH Sensor Serial No. x Model: CS215 SN#: E12539 Filter cap examination x Pressure Sensor Serial No. x Model: Setra 278 SN#: 5948996 sensor Visual examination, operability x ESMAP Report 5 Pk-QASP-160428_CSPS_MaintenanceReport CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Checked/ Component Work Item approved Comments yes no Visual examination, alignment x Extended to length of 10 m Wind tower, North Orientation of WD sensor x wind speed and direc- Wind direction sensor serial No. x Model: NRG#200 SN#: N/A tion sensors Wind speed sensor serial No. x Model: NRG#40C SN#: 1795-00229372 Operability of sensors x SIM card inserted x Provider / number: Telenor APN: internet Modem APN, username, password of provider x Username: Telenor Password: Telenor LED blinking code x Signal strength (AT+CSQ) x AT+CSQ value: 28,0 Operation system installed x Version: Std.27 Datalogger configuration saved x Filename: Pk-QASP_2014-10-16.xml IP visible in logger configuration x IP: (dynamic) Correct sensor constants in program x Correct coordinates in program x Datalogger Datalogger program installed x Prog. name: Pk-QASP_2014-10-28.CR1 Program set to “run always” x Local standard time, no daylight saving Datalogger clock correct x time: UTC+5 Measurement values plausible x Error detection codes functional x Checked with error codes list ESMAP Report 6 Pk-QASP-160428_CSPS_MaintenanceReport CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Photographic Documentation Figure 1: Control Box with datalogger and electric Figure 2: Batteries Box equipment Figure 3: GHI-CMP21 Figure 4: GHI-CMP21 level ESMAP Report 7 Pk-QASP-160428_CSPS_MaintenanceReport CSPS CSPS Tier1 Maintenance Report Concentrating Solar Power Services Figure 5: DHI-CMP21 close-up Figure 6: DHI-CMP21 level Figure 7: DNI CHP1 alignment Figure 8: Barometric pressure sensor Figure 9: Datalogger and modem Figure 10: AC-DC converter, UPS, DC-DC converter, overvoltage protection (left to right) ESMAP Report 8 Pk-QASP-160428_CSPS_MaintenanceReport