PROCUREMENT PLAN (Mandatory Requirements) Project information: Country: Bangladesh Project Name: Bangladesh Sustainable Coastal and Marine Fisheries Project P-number: P161568 Project Implementation agency: Department of Fisheries (DoF) Social Development Foundation (SDF) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016, revised November 2017 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non-consulting services where international competition is required and for all consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: i. Lottery in award of contracts shall not be allowed; ii. Bidders’ qualification[s]/experience requirement[s] shall be mandatory; iii. Bids shall not be rejected based on percentage above or below the estimated cost; iv. Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; v. The eligibility of bidders shall be as defined under Section III of the World Bank Procurement Regulations for IPF Borrowers: accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. vi. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second Hand Goods: Not Applicable. Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works) as follows: Goods: Applicable; Works: Not applicable. Hands-on Expanded Implementation Support (HEIS): Not Applicable. Bank’s Procurement Prior Review Thresholds: contracts at or above the thresholds set out in table 1 below are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) Type of procurement High risk Substantial Moderate risk Low risk risk Works (including 5 10 15 20 turnkey, supply & installation of plant and equipment, and PPP) Goods, information 1.5 2 4 6 technology and non- consulting services Consulting services: 0.5 1 2 4 firms Consulting services: 0.2 0.3 0.4 0.5 Individual Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. In addition to the provisions of Table 1 above, and irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: (a) procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulations; (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations; and (e) best and final offer. 3. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract or the package -when the selection document contains more than one lot/slice-, including all taxes and duties payable under the contract. Bid/ Proposal Evaluation Committee for DoF: An international procurement and an international technical consultant will be included in the bid/ proposal evaluation committee for evaluation of the high value international contracts. In addition, the local procurement consultant will be a mandatory member of all the bid/ proposal evaluation committee(s). Fraud and Corruption (F&C) Checklist: Fraud and Corruption (F&C) checklist, as developed and provided by the Bank, shall be properly filled in during the evaluation and be attached with the evaluation report in case of contracts following national competitive procurement and request for quotations. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other 1[Draftingnote: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Bangladesh : Bangladesh Sustainable Coastal and Marine Fisheries PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-08-07 2020-03-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161568 GPN Date: 2019-01-07 Project Name: Bangladesh Sustainable Coastal and Marine Fisheries Loan / Credit No: IDA / V0770, IDA / 63260 Executing Agency(ies): Department of Fisheries WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WD3-I / Construction, Enabling Sustainable Pending Single Stage - One setting and operationalize of IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 2,600,004.73 0.00 Implementati 2020-07-08 2020-07-13 2020-08-24 2020-09-23 2020-10-28 2021-04-26 Envelope 12 MFSC Pontoon and Growth on WD6-I / Rehabilitation of Pending canals including design and Improving Infrastructure Single Stage - One IDA / 63260 Post Request for Bids Open - National 4,982,652.60 0.00 Implementati 2020-08-20 2020-08-25 2020-10-06 2020-11-05 2020-12-10 2021-06-08 supervision for scaling-up and Production Practices Envelope on cluster farming-240 ha WD6-II / Rehabilitation of Pending canals including design and Improving Infrastructure Single Stage - One IDA / 63260 Post Request for Bids Open - National 5,397,878.58 0.00 Implementati 2020-12-20 2020-12-25 2021-02-05 2021-03-07 2021-04-11 2021-10-08 supervision for scaling-up and Production Practices Envelope on cluster farming-260 ha WD10 / Sea Bass/ mullet Pending development and Improving Infrastructure Single Stage - One IDA / 63260 Post Request for Bids Open - National 413,877.92 0.00 Implementati 2020-12-10 2020-12-15 2021-01-26 2021-02-25 2021-04-01 2021-09-28 demonestration (D&D) and Production Practices Envelope on centre. WD11 / Establishment of Pending Improving Infrastructure Single Stage - One SPF BTS Brood Management IDA / 63260 Post Request for Bids Open - National 2,500,000.00 0.00 Implementati 2020-12-31 2021-01-05 2021-02-16 2021-03-18 2021-04-22 2021-10-19 and Production Practices Envelope Center (BMC) on WD12 / Repair and Project Management and Request for Single Stage - One Maintenance of DoF and IDA / 63260 Post Limited 11,826.00 11,771.11 Completed 2019-05-17 2019-05-22 2019-06-05 2019-05-28 2019-06-25 2019-06-13 Monitoring Quotations Envelope Project Command Offices WD4 / Rehabilitation & modernization of existing Pending Improving Infrastructure Open - Single Stage - One BFDC Fish harbor & FLC/ IDA / 63260 Prior Request for Bids 6,636,059.41 0.00 Implementati 2020-07-09 2020-07-14 2020-08-25 2020-10-14 2020-11-04 2022-04-28 and Production Practices International Envelope wholesale fish market at on Chittagong WD2-I / Establishment/Construction of Enabling Sustainable Pending Single Stage - One 15 Nos. new Marine IDA / 63260 Fisheries Sector Investments Prior Request for Bids Open - National 9,000,000.00 0.00 Implementati 2021-08-01 2021-08-02 2021-09-13 2021-10-13 2021-11-17 2022-11-17 Envelope Fisheries Survelliance and Growth on Checkposts (MFSC) WD7 / Construction of 3 Pending Improving Infrastructure Single Stage - One Nos Fish Health Diagnostic IDA / 63260 Post Request for Bids Open - National 937,504.43 0.00 Implementati 2021-10-28 2021-11-02 2021-12-14 2022-01-13 2022-02-17 2023-02-17 and Production Practices Envelope Labs (FHDL) on WD8 / Construction of 4 Pending Nos. Fish Quarantine Labs Improving Infrastructure Single Stage - One IDA / 63260 Post Request for Bids Open - National 977,993.52 0.00 Implementati 2021-11-10 2021-11-15 2021-12-27 2022-01-26 2022-03-02 2023-03-02 (FQL) including 1 No. and Production Practices Envelope on Reference lab. Page 1 WD9 / Renovation and Pending Improving Infrastructure Single Stage - One modernization of PCR Labs IDA / 63260 Post Request for Bids Open - National 750,005.91 0.00 Implementati 2021-11-17 2021-11-22 2022-01-03 2022-02-02 2022-03-09 2023-03-09 and Production Practices Envelope (3 nos) on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DOF/PPF/GD4 / Office Project Management and Request for Single Stage - One IDA / V0770 Post Limited 5,625.00 6,997.92 Completed 2017-08-28 2018-09-16 2017-10-07 2018-09-26 2017-12-06 2018-11-27 refurbishing Monitoring Quotations Envelope DOF/PPF/GD6 / Supply of Project Management and Request for Single Stage - One Desktop Computer, Printer IDA / V0770 Post Limited 3,750.00 4,724.46 Completed 2017-08-22 2018-05-13 2017-10-01 2018-05-22 2017-11-30 2018-05-23 Monitoring Quotations Envelope and UPS: 2 Sets DOF/PPF/GD1 / Office Project Management and Request for Single Stage - One IDA / V0770 Post Limited 4,063.00 2,914.28 Completed 2017-08-29 2018-09-30 2017-10-08 2018-10-10 2017-12-07 2018-11-27 Supplies and Consumables Monitoring Quotations Envelope DOF/PPF/GD3 / Supply of Project Management and Request for Single Stage - One IDA / V0770 Post Limited 1,250.00 5,125.86 Completed 2017-10-10 2018-08-14 2017-11-19 2018-08-26 2018-01-18 2018-08-28 computer accessories Monitoring Quotations Envelope DOF/PPF/GD5 / Project Management and Request for Single Stage - One IDA / V0770 Post Limited 1,250.00 1,179.62 Completed 2018-01-02 2018-07-22 2018-02-04 2018-06-21 2018-02-28 2018-06-24 Digital/Video Camera Monitoring Quotations Envelope DOF/PPF/GD11 / Supply and installation of Air Project Management and Request for Single Stage - One IDA / V0770 Post Limited 6,250.00 5,933.32 Completed 2018-01-02 2018-04-15 2018-02-04 2018-04-26 2018-02-28 2018-05-23 Conditioner (split type, 4 Monitoring Quotations Envelope nos) DOF/PPF/GD13 / Office Project Management and Request for Single Stage - One IDA / V0770 Post Limited 6,250.00 5,941.02 Completed 2017-12-29 2018-06-03 2018-01-27 2018-06-14 2018-02-26 2018-06-28 Furniture Monitoring Quotations Envelope GD7-I / Supply of Patrol Enabling Sustainable Pending Open - Single Stage - One Boat (surveillance)/ Vessel IDA / 63260 Fisheries Sector Investments Prior Request for Bids 2,000,000.00 0.00 Implementati 2020-09-15 2020-09-20 2020-11-01 2020-12-01 2021-01-05 2021-07-04 International Envelope for MFSC- 8 nos. and Growth on GD11 / Supply of Pending Chemicals & Reagents for Improving Infrastructure Single Stage - One IDA / 63260 Post Request for Bids Open - National 625,002.96 0.00 Implementati 2021-06-10 2021-06-15 2021-07-27 2021-08-26 2021-09-30 2022-03-29 Fish Health Diagnostic & and Production Practices Envelope on Fish Quarantine Labs GD12 / Supply of furniture Pending Improving Infrastructure Single Stage - One & fixtures: FHDLs (3 nos.) IDA / 63260 Post Request for Bids Open - National 374,855.14 0.00 Implementati 2021-06-24 2021-06-29 2021-08-10 2021-09-09 2021-10-14 2022-04-12 and Production Practices Envelope and FQLs (4 nos.) on GD13 / Supply of Pending Laboratory Equipment and Improving Infrastructure Open - Single Stage - One IDA / 63260 Post Request for Bids 1,773,762.51 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Material for FHDLs (3 nos.) and Production Practices International Envelope on and FQLs (4 nos.) GD15 / Procurement of Digital refracto meter and Under Project Management and Single Stage - One digital pH meter with IDA / 63260 Post Request for Bids Open - National 35,475.25 25,411.72 Implementati 2020-01-01 2019-11-20 2020-01-06 2020-02-17 2020-02-19 2020-03-18 2020-03-02 2020-04-22 2020-10-19 Monitoring Envelope Thermometer for Upazila on Team GD16 / Procurement of Computer / Laptop, Printer Project Management and Single Stage - One (mono laser), Printer (color), IDA / 63260 Post Request for Bids Open - National 24,998.23 24,619.75 Completed 2019-02-12 2019-04-24 2019-02-17 2019-03-03 2019-05-12 2019-03-18 2019-05-22 2019-04-22 2019-05-29 2019-05-22 2019-06-12 Monitoring Envelope Computer software, Photocopier, Scanner Page 2 GD17 / Supply of furniture Project Management and Single Stage - One & fixtures (PMU, 3 regional IDA / 63260 Post Request for Bids Open - National 132,996.71 10,499.65 Completed 2019-02-20 2019-04-11 2019-02-25 2019-03-18 2019-05-02 2019-04-07 2019-05-22 2019-05-12 2019-05-29 2019-06-11 2019-06-20 Monitoring Envelope offices) GD18 / Supply of Air-cooler Project Management and Single Stage - One (20 units) and Refrigerators IDA / 63260 Post Request for Bids Open - National 47,300.33 35,392.25 Completed 2019-02-27 2019-04-07 2019-03-04 2019-03-21 2019-05-02 2019-04-05 2019-05-22 2019-05-10 2019-05-29 2019-06-09 2019-06-20 Monitoring Envelope for PMU GD20 / Preparation, Enabling Sustainable Pending printing and supply of Single Stage - One IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 768,630.42 0.00 Implementati 2020-12-15 2020-12-20 2021-01-31 2021-03-02 2021-04-06 2021-10-03 fishers' ID card (150,000) Envelope and Growth on and smart card pilot Enabling Sustainable Pending GD9 / Supply of furniture Single Stage - One IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 125,002.96 0.00 Implementati 2021-01-14 2021-01-19 2021-03-02 2021-04-01 2021-05-06 2021-11-02 & fixtures (MFSC) Envelope and Growth on DOF/PPF/GD7-1 / Project Management and Request for Single Stage - One Procurement of photocopier IDA / V0770 Post Limited 5,054.00 2,320.51 Completed 2019-03-03 2018-08-06 2019-03-31 2018-08-16 2019-04-14 2018-08-29 Monitoring Quotations Envelope machine DOF/PPF/GD7-2 / supply Project Management and Request for Single Stage - One and installation of one IDA / V0770 Post Limited 2,527.00 4,699.92 Completed 2019-03-03 2018-05-09 2019-03-30 2018-05-23 2019-04-13 2018-06-06 Monitoring Quotations Envelope photocopier machine DOF/PPF/GD8 / supply of Project Management and Request for Single Stage - One IDA / V0770 Post Limited 1,263.00 1,154.37 Completed 2019-03-03 2018-07-10 2019-04-01 2018-07-19 2019-04-15 2018-07-31 two(2) fax machine Monitoring Quotations Envelope DOF/PPF/GD9 / Supply of Project Management and Request for Single Stage - One IDA / V0770 Post Limited 1,895.00 1,745.69 Completed 2019-03-03 2018-07-22 2019-04-14 2018-08-01 2019-04-28 2018-08-15 three(3) scanner Monitoring Quotations Envelope DOF/PPF/GD10 / supply of Project Management and Request for Single Stage - One IDA / V0770 Post Limited 3,790.00 3,510.22 Completed 2019-03-03 2018-06-07 2019-04-14 2018-06-14 2019-04-28 2018-06-30 two(2) multimedia projector Monitoring Quotations Envelope DOF/PPF/GD14 / Project Management and Request for Single Stage - One procurement of scientific IDA / V0770 Post Limited 3,032.00 2,826.55 Signed 2019-03-03 2018-12-12 2019-04-05 2018-12-20 2019-04-19 2018-12-31 Monitoring Quotations Envelope book DOF/PPF/GD7 / Procurement of Photocopier Project Management and Single Stage - One Machine, Fax Machine, IDA / V0770 Post Request for Bids Open - National 14,375.00 0.00 Canceled 2017-12-21 2017-12-26 2018-01-15 2018-01-29 2018-02-15 2018-02-28 Monitoring Envelope Scanner and Multimedia Projector with screen GD2 / Supply and Enabling Sustainable Under installation of VMS including Open - Single Stage - One IDA / 63260 Fisheries Sector Investments Post Request for Bids 1,024,004.92 0.00 Implementati 2020-01-15 2019-11-21 2020-01-20 2019-12-16 2020-03-02 2020-04-01 2020-05-06 2020-11-02 Transponders and relevent International Envelope and Growth on Hardwares and Softwares GD3 / Supply and installation of VMS station Enabling Sustainable Pending Open - Single Stage - One hardware and development IDA / 63260 Fisheries Sector Investments Post Request for Bids 1,332,497.69 0.00 Implementati 2020-07-15 2020-07-20 2020-08-31 2020-09-30 2020-11-04 2021-05-03 International Envelope of computer software at and Growth on Potenga Office GD32 / Procurement of Project Management and Request for Single Stage - One Miscellaneous office IDA / 63260 Post Limited 2,278.00 2,355.71 Completed 2019-05-17 2019-05-22 2019-06-12 2019-05-29 2019-06-27 2019-05-29 Monitoring Quotations Envelope Equipment and Materials GD26 / Development of Project Management and Single Stage - One Printed materials (Notebook, IDA / 63260 Post Request for Bids Open - National 21,996.00 17,996.18 Completed 2020-01-28 2019-06-02 2020-02-12 2020-03-04 2019-06-23 2020-04-03 2019-06-27 2020-05-01 2019-06-27 2020-08-29 2019-07-11 Monitoring Envelope Brochure) Page 3 GD1 / Supply of scientific equipment (YSI, Enabling Sustainable Pending Single Stage - One Spectophotometer,benthroprob IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 173,000.97 0.00 Implementati 2020-07-13 2020-07-18 2020-08-08 2020-09-07 2020-10-12 2021-04-10 Envelope e, HPLC, membrane filter and Growth on etc. for MFSMU) GD5 / Supply of bicycle for Pending Improving Infrastructure Single Stage - One MFA , DoF-75 & Extension IDA / 63260 Post Request for Bids Open - National 24,832.68 0.00 Implementati 2020-07-30 2020-08-04 2020-08-25 2020-09-24 2020-10-29 2021-02-26 and Production Practices Envelope Agent-Cluster Mgmt-100 on Pending GD19 / Supply of plotter/ Project Management and Single Stage - One IDA / 63260 Post Request for Bids Open - National 8,005.58 0.00 Implementati 2020-04-16 2020-04-21 2020-05-08 2020-05-18 2020-06-22 2020-10-20 Map printer Monitoring Envelope on GD8 / Supply of mobile Enabling Sustainable Pending Single Stage - One tabs including internet for IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 74,994.68 0.00 Implementati 2020-03-30 2020-04-04 2020-05-16 2020-06-15 2020-07-20 2021-01-16 Envelope fish landing data collection and Growth on GD21 / Development & supply of printed electronic communication materials for behaviour changes of Pending Project Management and Single Stage - One stakeholders / Awareness IDA / 63260 Post Request for Bids Open - National 141,901.00 0.00 Implementati 2021-03-30 2021-04-04 2021-04-25 2021-05-25 2021-06-29 2023-03-14 Monitoring Envelope raising programme including on Audio, Video, Film production (TV spot/ TV filler etc.) GD14 / Procurement of Digital photo camera, digital Project Management and Single Stage - One IDA / 63260 Post Request for Bids Open - National 88,096.87 0.00 Canceled 2019-10-30 2019-11-19 2019-11-09 2019-11-30 2019-12-30 2020-01-27 2020-03-17 video camera multimedia Monitoring Envelope projector with screen GD 14 / Procurement of Digital photo camera digital Pending video camera multimedia Project Management and Single Stage - One IDA / 63260 Post Request for Bids Open - National 88,096.87 0.00 Implementati 2020-03-31 2020-04-10 2020-05-08 2020-06-07 2020-07-12 2020-08-21 projector with screen printer Monitoring Envelope on photocopier scanner and laptop & desktop computer NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NCS1 / Conducting acoustic Enabling Sustainable Pending Open - Single Stage - One survey by an International IDA / 63260 Fisheries Sector Investments Prior Request for Bids 1,725,622.59 0.00 Implementati 2020-07-30 2020-08-04 2020-09-15 2020-10-15 2020-11-19 2021-05-18 International Envelope organization and Growth on NCS7 / Baseline Survey, Enabling Sustainable Under Single Stage - One Mid-term Evaluation and IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 161,767.14 0.00 Implementati 2019-03-10 2020-02-25 2019-03-15 2019-04-05 2019-05-05 2019-06-09 2023-06-30 Envelope Impact Assesment and Growth on NCS4 / Selection of Pending consultant for FPI Project Management and Open - Single Stage - One IDA / 63260 Post Request for Bids 119,989.12 0.00 Implementati 2020-12-10 2020-12-15 2021-01-26 2021-02-25 2021-04-01 2021-09-28 assessment (input to M&E Monitoring International Envelope on Workshops)- International DOF/PPF/GD2 / Vehicle Project Management and Single Stage - One IDA / V0770 Post Request for Bids Open - National 17,500.00 0.00 Canceled 2017-08-22 2017-08-27 2017-09-16 2017-09-30 2017-10-21 2018-02-28 Hire Monitoring Envelope Page 4 BD-DOF-101957-NC-RFB / Development of printed & electronic communication materials for behavioral Project Management and Single Stage - One changes of stakeholders & IDA / 63260 Post Request for Bids Open - National 236,501.67 0.00 Canceled 2019-10-01 2019-10-06 2019-11-17 2019-12-17 2020-01-21 2023-01-25 Monitoring Envelope awareness raising program including Audio, Video, film production(TV spot/ TV filler etc) NCS6 / Communication outreach/ Awareness/ Enabling Sustainable Pending Citizen`s Engagement Single Stage - One IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 193,079.96 0.00 Implementati 2021-07-29 2021-08-03 2021-09-14 2021-10-14 2021-11-18 2023-10-19 Platform/ Website Envelope and Growth on development and operation (Firm) NCS9 / Shrimp cluster mobilization including farmer database & ID cards & Pending Improving Infrastructure Open - Single Stage - One integrated e-traceability IDA / 63260 Prior Request for Bids 4,037,556.46 0.00 Implementati 2021-05-05 2021-05-10 2021-06-29 2021-08-08 2021-08-29 2024-10-28 and Production Practices International Envelope system design and on deployment and related business plan development Enabling Sustainable Pending NCS2 / Hiring/ leasing Single Stage - One IDA / 63260 Fisheries Sector Investments Post Request for Bids Open - National 1,768,429.39 0.00 Implementati 2019-03-03 2019-03-08 2019-04-05 2019-04-15 2019-05-20 2023-06-28 vehicles Envelope and Growth on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SD6 / Selection of Improving Infrastructure Quality And Cost- Open - Under consultancy for engineering IDA / 63260 Prior 1,821,062.84 0.00 2019-04-10 2020-01-12 2019-05-01 2020-02-09 2019-06-14 2019-07-26 2019-08-25 2019-09-29 2019-11-03 2023-05-26 and Production Practices Based Selection International Implementation design & supervision SD7 / Salinization mapping, Hydrological survey & canal Improving Infrastructure Quality And Cost- Open - Pending IDA / 63260 Post 517,879.53 0.00 2020-09-17 2020-10-08 2020-11-21 2020-12-19 2021-01-18 2021-02-22 2021-03-29 2022-03-29 rehabilitation design for and Production Practices Based Selection International Implementation phase-2. SD8 / Selection of consulting firm for Improving Infrastructure Quality And Cost- Open - Under investment promotion IDA / 63260 Post 706,193.98 0.00 2019-09-05 2019-09-22 2019-09-26 2020-02-10 2019-11-09 2019-12-21 2020-01-20 2020-02-24 2020-03-30 2021-03-30 and Production Practices Based Selection International Implementation campaign for fish and fishery products SD9 / Selection of consulting firm for marine Improving Infrastructure Quality And Cost- Open - Pending IDA / 63260 Prior 517,465.65 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-25 2020-07-25 2020-08-29 2020-10-03 2023-06-30 spatial planning and and Production Practices Based Selection International Implementation stakeholder consultation SD11 / Selection of consulting firm for Improving Infrastructure Quality And Cost- Pending development and IDA / 63260 Post Open - National 210,722.99 0.00 2020-09-20 2020-10-11 2020-11-24 2020-12-22 2021-01-21 2021-02-25 2021-04-01 2022-04-01 and Production Practices Based Selection Implementation operationalization of hatchery certification system SD12 / Selection of Project Project Management and Quality And Cost- Open - IDA / 63260 Prior 1,383,156.35 0.00 Under Review 2019-02-17 2019-05-13 2019-03-10 2019-06-26 2019-04-23 2019-06-04 2019-07-04 2019-08-08 2019-09-12 2022-09-16 Management Consultant Monitoring Based Selection International SD13 / Value Chain Improving Infrastructure Quality And Cost- Pending Mapping and business IDA / 63260 Post Open - National 312,418.70 0.00 2021-01-10 2021-01-31 2021-03-16 2021-04-13 2021-05-13 2021-06-17 2021-07-22 2022-07-22 and Production Practices Based Selection Implementation opportunity identification Page 5 SD14 / Fishing boats & Enabling Sustainable Quality And Cost- Pending gears data base update (2 IDA / 63260 Fisheries Sector Investments Post Open - National 173,060.10 0.00 2020-11-15 2020-12-06 2021-01-19 2021-02-16 2021-03-18 2021-04-22 2021-05-27 2022-05-27 Based Selection Implementation times: 3rd + 5th yr) and Growth SD10 / Selection of consulting firm for designing, Improving Infrastructure Quality And Cost- Open - Pending consultations, and testing a IDA / 63260 Prior 841,685.78 0.00 2020-12-10 2020-12-31 2021-02-13 2021-03-13 2021-04-12 2021-05-17 2021-06-21 2022-06-21 and Production Practices Based Selection International Implementation mechanism for access to finance to producers Consultant DOF/PPF/SD13 / Feasibility Project Management and IDA / V0770 Post Qualification Open - National 250,000.00 0.00 Canceled 2017-10-28 2017-11-18 2018-01-01 2018-01-31 2018-03-14 2018-09-10 study of BSCMF Monitoring Selection Consultant DOF/PPF/SD15 / Project Management and IDA / V0770 Post Qualification Open - National 75,000.00 0.00 Canceled 2017-08-13 2017-08-29 2017-09-26 2017-10-17 2017-11-14 2018-01-13 Institutional study Monitoring Selection Consultant DOF/PPF/SD12 / Study on Project Management and IDA / V0770 Post Qualification Open - National 187,500.00 0.00 Canceled 2017-08-13 2017-08-29 2017-09-26 2017-10-17 2017-11-14 2018-02-28 Fishers' Livelihood Monitoring Selection SD17 / Shrimp cluster mobilization including farmer database and ID cards, Project Management and Quality And Cost- Open - integrated e-traceability IDA / 63260 Prior 4,037,556.46 0.00 Canceled 2019-10-30 2019-12-11 2020-01-24 2020-03-06 2020-03-21 2020-04-25 2020-05-23 2023-06-30 Monitoring Based Selection International system design and deployment , and related business plan development SD15 / Baseline Survey Project Management and Quality And Cost- Open - Pending IDA / 63260 Prior 954,284.23 0.00 2020-04-09 2020-04-30 2020-06-13 2020-07-25 2020-08-24 2020-09-28 2020-11-02 2021-11-02 Boat registration campaign Monitoring Based Selection International Implementation SD18 / selection of firm for Project Management and Quality And Cost- Pending IDA / 63260 Post Open - National 141,711.80 0.00 2020-08-12 2020-09-02 2020-10-16 2020-11-13 2020-12-13 2021-01-17 2021-02-21 2024-02-26 audit Monitoring Based Selection Implementation SD1 / Design of an online Enabling Sustainable Quality And Cost- Open - Pending electronic registration and IDA / 63260 Fisheries Sector Investments Post 202,752.88 0.00 2020-10-25 2020-11-04 2020-12-18 2021-01-29 2021-02-28 2021-04-04 2021-05-09 2022-05-09 Based Selection International Implementation licensing system and Growth SD5 / EIAs/ SIA Improving Infrastructure Quality And Cost- Pending IDA / 63260 Post Open - National 193,753.99 0.00 2020-09-30 2020-10-21 2020-12-04 2021-01-01 2021-01-31 2021-03-07 2021-04-11 2023-03-12 preparation and Production Practices Based Selection Implementation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DOF/PPF/SD7 / Stock Individual Project Management and Assessment Specialist (1 IDA / V0770 Post Consultant Open 10,788.00 10,322.12 Completed 2017-08-13 2017-08-13 2017-09-22 2017-11-16 2017-10-13 2017-11-16 2017-11-10 2017-12-12 2018-02-28 2018-02-28 Monitoring person) Selection DOF/PPF/SD6 / Financial Individual Project Management and Management Specialist (1 IDA / V0770 Post Consultant Open 47,438.00 21,379.74 Completed 2017-08-13 2018-08-13 2017-09-22 2017-11-16 2017-10-13 2017-11-16 2017-11-10 2017-11-19 2018-02-28 2018-11-18 Monitoring person) Selection DOF/PPF/SD8 / Individual Project Management and Environment Specialist (1 IDA / V0770 Post Consultant Open 21,563.00 10,634.88 Completed 2017-08-06 2017-08-13 2017-09-15 2017-11-16 2017-10-06 2017-11-16 2017-11-03 2017-11-19 2018-02-27 2018-05-18 Monitoring Person) Selection DOF/PPF/SD1 / Project Individual Project Management and Management Consultant (1 IDA / V0770 Post Consultant Open 56,063.00 27,795.65 Completed 2017-08-13 2017-08-13 2017-09-22 2017-11-16 2017-10-13 2017-11-19 2017-11-10 2017-11-19 2018-02-28 2018-11-18 Monitoring person) Selection Page 6 DOF/PPF/SD2 / DPP Individual Project Management and Preparation Specialist (1 IDA / V0770 Post Consultant Open 23,725.00 7,929.70 Completed 2017-08-13 2018-04-16 2017-09-22 2018-04-30 2017-10-13 2018-05-03 2017-11-10 2018-05-03 2018-02-28 2018-07-02 Monitoring person) Selection DOF/PPF/SD4 / Monitoring Individual Project Management and & Evaluation Specialist (1 IDA / V0770 Post Consultant Open 21,563.00 10,634.88 Completed 2017-08-13 2017-08-13 2017-09-22 2017-11-16 2017-10-13 2017-11-16 2017-11-10 2017-11-19 2018-02-28 2018-05-18 Monitoring person) Selection DOF/PPF/SD10 / Individual Stakeholder outreach and Project Management and IDA / V0770 Post Consultant Open 21,563.00 10,634.88 Completed 2017-08-13 2018-08-13 2017-09-22 2017-11-16 2017-10-13 2017-11-16 2017-11-10 2017-11-19 2018-02-28 2018-05-18 Livelihoods Specialist (1 Monitoring Selection Person) DOF/PPF/SD3 / Individual Project Management and Procurement Specialist (1 IDA / V0770 Prior Consultant Open 47,438.00 0.00 Canceled 2017-08-13 2017-09-12 2017-09-29 2017-10-20 2017-11-17 2018-02-28 Monitoring person) Selection SD/DOF-02 / DPP Preparation Specialist for Project Management and IDA / V0770 Post Direct Selection Direct 23,725.00 0.00 Canceled 2018-04-30 2018-05-07 2018-05-29 2018-11-25 Sustainable Coastal and Monitoring Marine Fisheries Project Individual DOF/PPF/SD3-1 / Project Management and IDA / V0770 Post Consultant Open 47,438.00 0.00 Canceled 2017-11-06 2017-12-25 2018-01-15 2018-02-19 2018-06-19 Procurement Specialist Monitoring Selection SD26 / Project Individual Project Management and Management Specialist - IDA / 63260 Post Consultant Open 266,099.85 271,413.91 Signed 2019-02-17 2019-02-20 2019-03-29 2019-06-13 2019-04-05 2019-06-13 2019-05-03 2019-06-16 2023-06-11 Monitoring National Selection SD29 / Marine Fisheries Individual Project Management and Under Management Specialist - IDA / 63260 Prior Consultant Open 354,799.80 0.00 2019-09-17 2020-01-12 2019-11-05 2019-11-26 2019-12-31 2022-01-19 Monitoring Implementation International Selection SD31 / Marine Fisheries Individual Project Management and Under Mnagement Expert - IDA / 63260 Post Consultant Open 206,962.61 0.00 2019-07-15 2019-09-19 2019-08-19 2019-08-26 2019-09-30 2023-06-11 Monitoring Implementation National Selection Individual SD32 / Training Specialist Project Management and Under IDA / 63260 Post Consultant Open 206,962.61 0.00 2019-07-17 2019-09-19 2019-09-04 2020-03-09 2019-09-25 2019-10-30 2023-06-21 - National Monitoring Implementation Selection Individual SD33 / ICT & MIS Expert Project Management and Under IDA / 63260 Post Consultant Open 206,962.61 0.00 2019-04-04 2019-09-19 2019-05-23 2020-03-09 2019-05-30 2019-07-04 2023-03-15 - National Monitoring Implementation Selection Individual SD37 / Junior Procurement Project Management and IDA / 63260 Post Consultant Open 206,962.61 202,813.56 Signed 2019-02-17 2019-02-20 2019-03-29 2019-06-13 2019-04-05 2019-06-13 2019-05-03 2019-09-09 2023-06-11 Consultant - National Monitoring Selection SD39 / Community Individual Project Management and Development & Mobilization IDA / 63260 Post Consultant Open 206,962.61 212,496.38 Signed 2019-02-17 2019-02-20 2019-03-29 2019-06-26 2019-04-05 2019-06-26 2019-05-03 2019-07-01 2023-06-11 Monitoring Expert - National Selection SD40 / Environment & Individual Project Management and Social Safeguards Expert - IDA / 63260 Post Consultant Open 124,175.20 133,331.41 Signed 2019-02-17 2019-02-20 2019-03-29 2019-06-13 2019-04-05 2019-06-13 2019-05-03 2019-07-14 2021-10-19 Monitoring National Selection Individual SD41 / Communication Project Management and Under IDA / 63260 Post Consultant Open 124,175.20 0.00 2019-08-01 2019-09-19 2019-09-19 2020-03-09 2019-10-10 2019-11-14 2023-06-06 Specialist - National Monitoring Implementation Selection SD27 / Monitoring and Individual Project Management and Under Evaluation (M&E) Specialist IDA / 63260 Prior Consultant Open 206,962.61 0.00 2019-02-27 2019-03-05 2019-04-08 2019-04-15 2019-05-13 2023-06-21 Monitoring Implementation -National Selection Page 7 Individual SD36 / Senior Procurement Project Management and IDA / 63260 Prior Consultant Open 236,525.32 467,766.90 Signed 2019-02-20 2019-03-05 2019-04-02 2019-09-17 2019-04-09 2019-10-20 2019-05-07 2019-10-21 2023-06-15 Consultant - National Monitoring Selection DOF/PPF/SD9 / Institution Individual Project Management and and Governance Specialist (1 IDA / V0770 Post Consultant Open 21,563.00 0.00 Canceled 2017-08-13 2018-09-27 2017-09-22 2018-11-13 2017-10-13 2017-11-10 2018-03-06 Monitoring person) Selection Individual DOF/PPF/SD5 / Gender Project Management and IDA / V0770 Post Consultant Open 21,563.00 0.00 Canceled 2017-08-13 2017-09-22 2017-10-13 2017-11-10 2018-02-28 Specialist (1 person) Monitoring Selection DOF/PPF/SD11-1 / Individual Project Management and Community Development and IDA / V0770 Post Consultant Limited 6,317.00 5,519.76 Completed 2019-02-25 2018-09-28 2019-03-02 2018-11-13 2019-03-05 2018-11-13 2019-03-19 2018-11-15 2019-05-18 2018-12-31 Monitoring Mobilization Expert Selection BD-DOF-102822-CS-INDV / Individual Project Management and Establishment and IDA / V0770 Post Consultant Limited 3,790.00 3,563.23 Completed 2019-02-25 2018-11-01 2019-03-04 2018-11-27 2019-03-09 2018-11-27 2019-03-21 2018-12-02 2019-04-20 2018-12-31 Monitoring Mobilization expert Selection BD-DOF-102826-CS-INDV / Individual Project Management and Financial management IDA / V0770 Post Consultant Limited 3,790.00 3,563.23 Completed 2019-02-25 2018-10-18 2019-03-02 2018-11-28 2019-03-09 2018-12-02 2019-03-21 2018-12-02 2019-04-20 2018-12-31 Monitoring system establishment expert Selection SD38 / Financial Individual Project Management and Management Expert - IDA / 63260 Prior Consultant Open 206,962.61 390,081.32 Signed 2019-03-03 2019-04-06 2019-04-12 2019-09-17 2019-04-19 2019-10-20 2019-05-17 2019-10-21 2023-06-25 Monitoring National Selection Individual SD19 / Legal policy support Project Management and Pending IDA / 63260 Post Consultant Open 113,532.63 0.00 2020-10-15 2020-12-03 2020-12-24 2021-01-28 2023-06-30 Expert- international Monitoring Implementation Selection Individual SD21 / Food Safety and Project Management and Pending IDA / 63260 Post Consultant Open 149,007.88 0.00 2020-04-15 2020-05-11 2020-06-01 2020-07-06 2023-06-21 HACCP Expert - National Monitoring Implementation Selection SD23 / Hatchery Expert Individual Project Management and Pending (Sea Bass/ mullet)- IDA / 63260 Prior Consultant Open 454,142.33 0.00 2020-03-25 2020-04-20 2020-05-11 2020-06-15 2023-06-30 Monitoring Implementation International Selection SD24 / Hatchery Expert Individual Project Management and Pending (SPF BTS and Galda)- IDA / 63260 Prior Consultant Open 454,142.33 0.00 2020-09-24 2020-10-20 2020-11-10 2020-12-15 2023-06-30 Monitoring Implementation International Selection Individual SD25 / Coastal Aquaculture Project Management and Pending IDA / 63260 Post Consultant Open 206,962.61 0.00 2020-10-08 2020-11-03 2020-11-24 2020-12-29 2023-06-30 Expert - National Monitoring Implementation Selection Individual SD28 / Grievence Redress Project Management and Pending IDA / 63260 Post Consultant Open 206,962.61 0.00 2020-06-23 2020-07-19 2020-08-09 2020-09-13 2023-06-30 Expert - National Monitoring Implementation Selection SD30 / Stock Assessment & Individual Project Management and Pending Population Dynamics IDA / 63260 Post Consultant Open 206,962.61 0.00 2020-04-16 2020-05-26 2020-06-02 2020-07-14 2023-06-30 Monitoring Implementation Specialist - National Selection SD44 / Grant Window Individual Project Management and Manager/ Consultant - IDA / 63260 Prior Consultant Open 510,902.73 0.00 Canceled 2019-07-10 2019-04-24 2019-08-28 2019-08-18 2019-09-18 2019-10-23 2022-10-07 Monitoring International Selection Individual SD22 / Value Chain Project Management and Pending IDA / 63260 Post Consultant Open 149,007.88 0.00 2020-07-24 2020-08-19 2020-09-09 2020-10-14 2023-12-13 Expert - National Monitoring Implementation Selection Page 8 Individual SD35 / International Project Management and Pending IDA / 63260 Post Consultant Open 141,912.83 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 Consultant for SPF Monitoring Implementation Selection Individual SD34 / GIS Expert - Project Management and Pending IDA / 63260 Post Consultant Open 82,787.41 0.00 2021-07-04 2021-08-22 2021-09-12 2021-10-17 2023-06-09 National Monitoring Implementation Selection Individual SD20 / Legal and Policy Project Management and Pending IDA / 63260 Post Consultant Open 94,612.49 0.00 2021-02-23 2021-04-13 2021-05-04 2021-06-08 2023-01-29 Support Expert - National Monitoring Implementation Selection Page 9