SV Education Quality Improvement (P126364) Loan 8110-SV Procurement Plan Country: El Salvador Region: LATIN AMERICA AND CARIBBEAN Amount of TF: US$60 million New closing date of the loan: December 31, 2018 Approval Date of the procurement plan: November 27, 2017 Until today 73.13% of the Loan has been disbursed and very few processes are foreseen to start before the end of this calendar year. For next year, only a couple of new processes are foreseen (2018), most of the contracts will be in their implementation phase. All procurement processes are scheduled to be concluded on time. July 9, 2010 PROCUREMENT El Salvador : Education Quality Improvement Project PLAN General Information Country: El Salvador Banks Approval Date of the Original Procurement Plan: 2017-11-01 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-28 Project ID: P126364 GPN Date: Project Name: Education Quality Improvement Project Loan / Credit No: IBRD / 81100 Executing Agency(ies): Ministry of Education WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SV-MCE-494-O-#TIT_LPN# / REHABILITACIÓN, AMPLIACIÓN Adoption of the IFTS Model Y/O CONSTRUCCIÓN DE 2 Improvement of MINED's Pending CENTROS ESCOLARES, Post Request for Bids Open - National 1,930,000.00 0.00 2017-02-14 2017-02-20 2017-03-27 2017-04-24 2017-05-19 2017-12-22 Institutional Capacity and the Implementation UBICADOS EN LOS Schooling System's Governance DEPARTAMENTOS DE AHUACHAPAN Y SAN MIGUEL. SV-MCE-464-O-#TIT_LPN# / Rehabilitación, ampliación y/o Construcción de 13 Centros Adoption of the IFTS Model Escolares, ubicados en los Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - National 13,632,137.57 13,087,663.20 Signed 2016-05-14 2016-06-24 2016-07-01 2016-09-30 2016-12-09 2016-10-09 2016-12-23 2017-08-15 Departamentos de Ahuachapán, Institutional Capacity and the Sonsonate, La Libertad, San Schooling System's Governance Salvador, Cuscatlán, Cabañas, Morazán y La Unión. SV-MCE-378-O-#TIT_LPN# / REHABILITACION, AMPLIACION Y/O RECONSTRUCCION DE 15 CENTROS ESCOLARES EN Adoption of the IFTS Model LOS DEPARTAMENTOS DE Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - National 9,224,493.50 8,306,510.37 Signed 2015-04-28 2015-06-26 2015-07-09 2015-10-12 2016-01-14 2015-12-11 2016-01-26 2017-01-22 SANTA ANA, SONSONATE, LA Institutional Capacity and the LIBERTAD, CHALATENANGO, Schooling System's Governance CABAÑAS, USULUTAN, _x000D_ SAN MIGUEL Y LA UNION. SV-MCE-364-O-#TIT_LPN# / Adoption of the IFTS Model Rehabilitación, ampliación y/o Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - National 1,730,158.24 1,437,944.00 Signed 2015-03-19 2015-04-15 2015-05-15 2015-07-21 2015-07-21 2015-09-01 2015-08-12 2016-08-02 Reconstrucción de 2 Centros Institutional Capacity and the Escolares. Schooling System's Governance CD 35/2015 ME BIRF / CONTRATACI N DE ESPECIALISTA 5 DE INFRAESTRUCTURA PARA APOYAR LOS PROCESOS DE Adoption of the IFTS Model FORMULACI N, EJECUCI N Y Improvement of MINED's IBRD / 81100 Prior Direct Selection Direct N 15,000.00 30,000.00 Signed 2014-12-23 SUPERVISI N DE OBRAS, Institutional Capacity and the FINANCIADAS CON FONDOS Schooling System's Governance DEL BIRF, EN EL MARCO DEL PROYECTO MEJORAMIENTO DE LA CALIDAD DE LA EDUCACI N LPN 58/2015 ME BIRF. / Modificacion de recomendacion de adjudicacion de Lotes 7 y 8 de la LPN No. 58/2015 Adoption of the IFTS Model Rehabilitacion, Ampliacion y/o Improvement of MINED's Single Stage - One IBRD / 81100 Prior Request for Bids Open - National N 1,350,283.60 1,350,283.60 Signed 2016-02-24 2016-03-09 Construccion de 15 CE en los Institutional Capacity and the Envelope Departamentos de Santa Ana, Schooling System's Governance Sonsonate, La Libertad, Chalatenango, Caba as, Usulut n, San Miguel y La Union GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SV-MCE-301-B-LPI / Adoption of the IFTS Model Adquisición de Kits para Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - International 336,556.40 274,995.00 Signed 2015-02-26 2015-03-20 2015-05-09 2015-06-08 2015-07-20 2015-07-18 2015-08-18 2015-12-15 Laboratorios de Física, Química Institutional Capacity and the y Biología. Schooling System's Governance SV-MCE-300-B-LPI / Adoption of the IFTS Model Adquisición de equipo Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - International 325,344.60 240,268.07 Signed 2015-03-04 2015-03-26 2015-06-16 2015-07-15 2015-09-11 2015-08-10 2015-10-01 2015-11-06 informático y de proyección para Institutional Capacity and the centros educativos. Schooling System's Governance SV-MCE-120-B-LPI / Adoption of the IFTS Model Adquisición de Kits para Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - International 261,057.31 93,030.11 Signed 2013-11-05 2013-12-03 2014-01-20 2014-02-17 2014-07-24 2014-04-04 2014-08-21 2014-07-30 Laboratorios de Fisica, Química Institutional Capacity and the y Biología. Schooling System's Governance SV-MCE-379-B-#TIT_LPN# / Adoption of the IFTS Model Adquisición de materiales Improvement of MINED's IBRD / 81100 Prior Request for Bids Open - National 53,609.73 45,137.70 Signed 2015-07-30 2015-08-21 2015-09-14 2015-10-09 2015-10-30 2015-11-18 2015-11-11 2016-01-09 deportivos y recreativos para los Institutional Capacity and the clubes deportivos. Schooling System's Governance LPI No. 50/2014 ME BIRF / Adoption of the IFTS Model ADQUISICIÓN DE EQUIPO Improvement of MINED's Single Stage - One INFORMÁTICO Y DE IBRD / 81100 Prior Request for Bids Open - International N 330,980.00 330,980.55 Signed 2014-07-01 2014-07-31 Institutional Capacity and the Envelope PROYECCIÓN PARA CENTROS Schooling System's Governance EDUCATIVOS. Page 1 SV-MCE-496-B-#TIT_LPN# / ADQUISICIÓN DE EQUIPO Adoption of the IFTS Model INFORMÁTICO PARA SALA DE Improvement of MINED's MAESTROS Y LABORATORIOS Post Request for Bids Open - National 221,909.55 0.00 Canceled 2017-02-14 2017-02-20 2017-03-27 2017-04-24 2017-05-19 2017-12-22 Institutional Capacity and the DE INFORMÁTICA. Schooling System's Governance (COMPUTADORAS DE ESCRITORIOS Y UPS). SV-MINED-40217-GO-RFQ / "EQUIPO, MOBILIARIO Y EQUIPO INFORMATICO PARA LOS EQUIPOS DE ASISTENCIA Improvement of MINED's Request for Single Stage - One Pending TECNICA DE LAS 14 IBRD / 81100 Institutional Capacity and the Post Open - National 75,940.62 0.00 2018-01-29 2018-03-23 2018-06-23 Quotations Envelope Implementation DIRECCIONES Schooling System's Governance DEPARTAMENTALES DE EDUCACION Y NIVEL CENTRAL" SV-MINED-68174-GO-RFQ / ADQUISICIÓN DE LIBROS PARA FORTALECER LAS BIBLIOTECAS DE LOS CENTROS DE FORMACIÓN Request for Single Stage - One Pending DOCENTE DE LA DIRECCION IBRD / 81100 Adoption of the IFTS Model Post Open - National 37,263.93 0.00 2018-07-03 2018-08-10 2018-11-18 Quotations Envelope Implementation NACIONAL DE EDUCACION MEDIA DEL MINED EN EL CONTEXTO DEL PLAN NACIONAL DE FORMACIÓN DE DOCENTES EN SERVICIO NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SV-MCE-486-S-CP / SERVICIO Adoption of the IFTS Model DE IMPLEMENTACIÓN DE LA Improvement of MINED's Request for Pending ESTRATEGIA DE Post Limited - National 23,720.50 0.00 2016-09-01 2016-09-26 2016-11-17 Institutional Capacity and the Quotations Implementation COMUNICACIONES DEL SI Schooling System's Governance EITP CD 4/2015 ME BIRF / CONTRATACI N DE ESPECIALISTA EN EL AREA DE PAGADUR A AUXILIAR DE Adoption of the IFTS Model PROYECTOS, GERENCIA DE Improvement of MINED's TESORER A DE LA DIRECCI N IBRD / 81100 Prior Direct Selection Direct N 14,400.00 28,800.00 Signed 2014-12-23 Institutional Capacity and the FINANCIERA INSTITUCIONAL Schooling System's Governance PARA APOYAR EN LAS ACTIVIDADES DE PAGOS Y LIQUIDACI N FINANCIERA DEL PROYECTO. CD 11/2015 ME BIRF / Contrataci n de Especialista (2) de Adquisiciones para Apoyar Adoption of the IFTS Model Los procesos de Adquisici n y Improvement of MINED's Contrataci n de Obras, Bienes, IBRD / 81100 Prior Direct Selection Direct N 14,400.00 28,800.00 Signed 2014-12-23 Institutional Capacity and the Servicios de No Consultor a y Schooling System's Governance Consultor as, financiadas con fondos del BIRF, en el marco del Proyecto. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Adoption of the IFTS Model SV-MCE-357-CI-CD / Improvement of MINED's Contratación de consultor IBRD / 81100 Prior Direct Selection National 15,000.00 30,000.00 Signed 2014-12-23 2014-12-23 2017-12-31 Institutional Capacity and the especialista 2 en infraestructura. Schooling System's Governance Adoption of the IFTS Model SV-MCE-356-CI-CD / Improvement of MINED's Contratación de consultor IBRD / 81100 Prior Direct Selection National 15,000.00 15,000.00 Signed 2014-12-23 2014-12-23 2017-12-31 Institutional Capacity and the especialista 3 en infraestructura. Schooling System's Governance Adoption of the IFTS Model SV-MCE-355-CI-CD / Improvement of MINED's Contratación de consultor IBRD / 81100 Prior Direct Selection National 15,000.00 30,000.00 Signed 2014-12-23 2014-12-23 2017-12-31 Institutional Capacity and the especialista 1 en infraestructura. Schooling System's Governance SV-MCE-354-CI-CD / Adoption of the IFTS Model Contratación de Consultor Improvement of MINED's especialista en comunicaciones IBRD / 81100 Prior Direct Selection National 16,200.00 32,400.00 Signed 2016-12-22 2014-12-23 2017-12-31 Institutional Capacity and the para la Dirección Adjunta SI Schooling System's Governance EITP. SV-MCE-353-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Unión. SV-MCE-351-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Miguel. SV-MCE-350-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Usulután. Page 2 SV-MCE-349-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Vicente. SV-MCE-348-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 20,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Cabañas SV-MCE-347-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 12,000.00 Signed 2014-12-23 2014-12-23 2016-07-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Paz. SV-MCE-346-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 4,000.00 Signed 2014-12-23 2014-12-23 2015-04-30 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Cuscatlán. SV-MCE-345-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Salvador. SV-MCE-343-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Libertad. SV-MCE-342-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Sonsonate. SV-MCE-341-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 3,666.67 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Santa Ana. SV-MCE-340-CI-CD / Adoption of the IFTS Model Contratación del coordinador de Improvement of MINED's apoyo administrativo del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Ahuachapán. SV-MCE-339-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Unión. SV-MCE-338-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 12,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Morazán. SV-MCE-337-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 4,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Miguel. SV-MCE-336-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 2,000.00 Signed 2014-12-23 2014-12-23 2017-06-30 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Usulután. SV-MCE-335-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Vicente. SV-MCE-334-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 64.52 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Cabañas. SV-MCE-333-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Paz. SV-MCE-332-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Cuscatlán. SV-MCE-331-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de San Salvador. SV-MCE-329-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 12,000.00 Signed 2014-12-23 2014-12-23 2016-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de La Libertad. Page 3 SV-MCE-327-CI-CD / Adoption of the IFTS Model Contratación del coordinador Improvement of MINED's técnico pedagógico del SI EITP IBRD / 81100 Prior Direct Selection National 12,000.00 16,000.00 Signed 2014-12-23 2014-12-23 2015-12-31 Institutional Capacity and the para la Dirección Departamental Schooling System's Governance de Santa Ana. SV-MCE-325-CI-CD / Adoption of the IFTS Model Contratación de consultor Improvement of MINED's "Especialista en Gestión IBRD / 81100 Prior Direct Selection National 14,400.00 14,400.00 Signed 2014-12-23 2014-12-23 2017-06-30 Institutional Capacity and the Á ea Contable Financiera para el r Schooling System's Governance de Proyectos". SV-MCE-321-CI-CD / Adoption of the IFTS Model Contratación de consultor Improvement of MINED's IBRD / 81100 Prior Direct Selection National 14,400.00 28,800.00 Signed 2016-12-22 2014-12-23 2017-12-31 Especialista en Adquisiciones Institutional Capacity and the (1). Schooling System's Governance SV-MCE-319-CF-SBMC / Auditoria del Proyecto Mejoramiento de la Calidad de la Adoption of the IFTS Model Educación financiado con el Improvement of MINED's IBRD / 81100 Prior Least Cost Selection Open - National 15,000.00 12,500.00 Signed 2014-12-08 2015-04-05 2015-04-30 2015-06-26 2015-05-20 2015-06-29 2015-09-04 Convenio del BIRF 8110-SV y Institutional Capacity and the recursos del Gobierno de El Schooling System's Governance Salvador, ejecutado por el MINED, año 2014. SV-MCE-293-CF-SBCC / FORMULACIÓN DE CARPETAS Adoption of the IFTS Model TÉCNICAS PARA LA Improvement of MINED's Quality And Cost- REHABILITACIÓN DE 8 IBRD / 81100 Prior Open - National 180,000.00 245,993.58 Signed 2014-05-12 2014-09-10 2014-09-16 2015-06-16 2014-09-25 2015-06-05 2016-01-08 Institutional Capacity and the Based Selection CENTROS ESCOLARES DEL Schooling System's Governance MUNICIPIO DE SANTA ANA, DEPTO. DE SANTA ANA. SV-MCE-283-CF-SBCC / FORMULACIÓN DE CARPETAS TÉCNICAS PARA LA REHABILITACIÓN DE 8 Adoption of the IFTS Model CENTROS ESCOLARES: 7 DEL Improvement of MINED's Quality And Cost- IBRD / 81100 Prior Open - National 180,000.00 210,274.65 Signed 2014-01-28 2014-11-13 2014-11-28 2014-12-17 2014-12-05 2014-12-18 2015-09-11 MUNICIPIO DE SAN Institutional Capacity and the Based Selection FRANCISCO GOTERA Y 1 DEL Schooling System's Governance MUNICIPIO DE EL DIVISADERO, AMBOS DEL DEPTO. DE MORAZÁN. SV-MCE-282-CF-SBCC / FORMULACIÓN DE CARPETAS TÉCNICAS PARA LA REHABILITACIÓN DE 7 CTROS ESCOLARES: 3 DEL MUN. DE Adoption of the IFTS Model SAN FRANCISCO MÉNDEZ, Improvement of MINED's Quality And Cost- IBRD / 81100 Prior Open - National 157,500.00 206,005.38 Signed 2014-01-28 2014-11-13 2014-11-28 2014-12-18 2014-12-05 2014-12-18 2015-08-28 DPTO. DE AHUACHAPÁN; 3 Institutional Capacity and the Based Selection DEL MUNICIPIO DE NEJAPA, Schooling System's Governance DPTO. DE SAN SALVADOR; Y 1 DEL MUNICIPIO DE SANTA TECLA, DPTO. DE LA LIBERTAD. SV-MCE-281-CF-SBCC / FORMULACIÓN DE CARPETAS TÉCNICAS PARA LA REHABILITACIÓN DE 8 CENTROS ESCOLARES: 2 DEL Adoption of the IFTS Model MUNICIPIO DE TECOLUCA, Improvement of MINED's Quality And Cost- IBRD / 81100 Prior Open - National 180,000.00 218,383.40 Signed 2014-01-28 2014-11-13 2014-11-28 2014-12-17 2014-12-05 2014-12-18 2015-08-02 DEPTO. SAN VICENTE; 3 DEL Institutional Capacity and the Based Selection MUNICIPIO DE SAN PEDRO Schooling System's Governance MASAHUAT, DEPTO. LA PAZ Y 3 DEL MUNICIPIO DE SENSUNTEPEQUE, DEPTO. DE CABAÑAS. SV-MCE-261-CF-SBCC / Diseño Adoption of the IFTS Model y desarrollo del Sistema Improvement of MINED's Quality And Cost- IBRD / 81100 Prior Open - International 300,000.00 334,706.00 Signed 2014-05-04 2014-09-04 2014-09-24 2015-05-13 2014-10-19 2015-05-14 2016-11-06 Integrado de Administración de Institutional Capacity and the Based Selection Proyectos II - SIAP 2. Schooling System's Governance SV-MCE-243-CF-SBCC / Adoption of the IFTS Model Formulación de Carpetas Improvement of MINED's Quality And Cost- IBRD / 81100 Prior Open - International 317,288.49 120,157.01 Signed 2013-11-04 2014-02-14 2014-03-17 2014-11-12 2014-03-31 2014-11-13 2015-10-26 Técnicas para la Rehabilitación Institutional Capacity and the Based Selection de 21 Centros Escolares. Schooling System's Governance SV-MCE-362-CI-CD / Adoption of the IFTS Model Contratación de Consultor para Improvement of MINED's apoyar en procesos territoriales IBRD / 81100 Prior Direct Selection National 14,400.00 28,800.00 Signed 2016-12-22 2014-12-23 2017-12-31 Institutional Capacity and the para la Dirección Adjunta SI Schooling System's Governance EITP. SV-MCE-112-CF-SBC / Consult. para la formacion de Docentes y Tecnicos del Min. de Educacion Adoption of the IFTS Model para el desarrollo de Improvement of MINED's Quality Based competencias disciplinares y Prior Open - International 487,728.36 773,430.46 Signed 2013-06-19 2013-10-31 2013-11-20 2013-12-15 2013-12-21 2017-02-17 Institutional Capacity and the Selection didacticas de la escuela inclusiva Schooling System's Governance de tiempo pleno (EITP) en los dptos de Usulutan, San Miguel, Morazan y La Uniòn. SV-MCE-111-CF-SBC / Consult. para la form. de Docentes y Tecnicos del Min. de Educ. para Adoption of the IFTS Model desarrollo de competencias Improvement of MINED's Quality Based disciplinares y didacticas de la Prior Open - International 569,249.64 735,925.17 Signed 2013-06-19 2013-10-31 2013-11-20 2013-12-15 2013-12-21 2017-03-14 Institutional Capacity and the Selection escuela inclusiva de tiempo Schooling System's Governance pleno (EITP) en los dptos de La Libertad, Chalatenango, San Salvador y Cuscatlan. SV-MCE-110-CF-SBC / Consult. para la formacion de Docentes y Tecnicos del Min. de Educacion Adoption of the IFTS Model para el desarrollo de Improvement of MINED's Quality Based competencias disciplinares y Prior Open - International 496,987.38 614,294.21 Signed 2013-06-19 2013-10-31 2013-11-20 2013-12-15 2014-01-07 2017-02-15 Institutional Capacity and the Selection didacticas de la escuela inclusiva Schooling System's Governance de tiempo pleno (EITP) en los departamentos de Cabañas, San Vicente y La Paz. Page 4 SV-MCE-109-CF-SBC / Consult. para la formacion de Docentes y Tecnicos del Min. de Educacion Adoption of the IFTS Model para el desarrollo de Improvement of MINED's Quality Based competencias disciplinares y Prior Open - International 956,942.40 1,174,977.12 Signed 2013-06-19 2013-10-31 2013-11-20 2013-12-15 2013-12-20 2017-03-14 Institutional Capacity and the Selection didacticas de la escuela inclusiva Schooling System's Governance de tiempo pleno (EITP) en los departamentos de Ahuachapan, Santa Ana y Sonsonate. SV-MCE-102-CF-SBMC / Auditoría del Proyecto "Mejora de la Calidad de la Educ." Adoption of the IFTS Model financiado con .Convenio Banco Improvement of MINED's Mundial No. 8110 - SV y rec. del Prior Least Cost Selection Open - National 20,125.00 18,433.12 Signed 2013-06-21 2013-10-16 2013-10-21 2013-10-31 2014-04-30 2014-03-07 Institutional Capacity and the Gob. de El Salvador ejecutado Schooling System's Governance por el Min. de Educ. Por período del 15 de mayo de 2012 al 31 de diciembre de 2013. SV-MCE-499-CF-SSF / CONSULT PARA FORM. DE DOCENTES Y TÉCNICOS DEL MIN. DE Educ., PARA EL DESARROLLO DE Adoption of the IFTS Model COMPETENCIAS Improvement of MINED's Pending DISCIPLINARES Y DIDÁCTICAS Post Direct Selection National 223,170.00 0.00 2017-02-03 2017-10-23 Institutional Capacity and the Implementation DE LA ESCUELA INCLUSIVA Schooling System's Governance DE TIEMPO PLENO (EITP), EN LOS dptoS DE SAN SALVADOR, LA LIBERTAD, CHALATENANGO Y CUSCATLÁN. SV-MCE-498-CF-SSF / CONSULT. PARA LA FORMACIÓN DE DOCENTES Y TÉCNICOS DEL MIN. DE EDUCACIÓN, PARA EL Adoption of the IFTS Model DESARROLLO DE Improvement of MINED's Pending COMPETENCIAS Post Direct Selection National 194,000.00 0.00 2017-02-03 2017-10-23 Institutional Capacity and the Implementation DISCIPLINARES Y DIDÁCTICAS Schooling System's Governance DE LA ESCUELA INCLUSIVA DE TIEMPO PLENO (EITP), EN LOS DPTOS DE USULUTAN, SAN MIGUEL, MORAZAN Y LA UNION. SV-MCE-493-CF-SBMC / SUPERVISION DE OBRAS DE REHABILITACIÓN, AMPLIACIÓN Adoption of the IFTS Model Y/O CONSTRUCCIÓN DE 2 Improvement of MINED's Pending Post Least Cost Selection Open - National 116,932.66 0.00 2017-02-08 2017-05-04 2017-05-18 2017-05-29 2017-12-22 CENTROS ESCOLARES Institutional Capacity and the Implementation UBICADOS EN LOS Schooling System's Governance DEPARTAMENTOS DE AHUACHAPAN Y SAN MIGUEL. SV-MCE-472-CF-SBCC / Adoption of the IFTS Model Consultoría para desarrollar el Improvement of MINED's Quality And Cost- Pending proceso de formación presencial Prior Open - International 311,370.24 0.00 2016-10-07 2017-02-04 2017-03-01 2017-03-28 2017-10-31 Institutional Capacity and the Based Selection Implementation y virtual para especialistas en Schooling System's Governance gestión directiva. SV-MCE-492-CF-SBCC / Adoption of the IFTS Model Consultoría para desarrollar el Improvement of MINED's Quality And Cost- Pending proceso de formación presencial Post Open - International 311,370.24 0.00 2017-02-08 2017-06-05 2017-06-30 2017-07-26 2017-12-22 Institutional Capacity and the Based Selection Implementation y virtual para especialistas en Schooling System's Governance gestión directiva. Adoption of the IFTS Model SV-MCE-485-CI-CD / Improvement of MINED's Contratación del Coordinador del IBRD / 81100 Prior Direct Selection National 42,000.00 70,000.00 Signed 2016-08-31 2016-08-31 2017-12-31 Institutional Capacity and the Proyecto BIRF. Schooling System's Governance SV-MCE-501-CF-SSF / CONSULT. PARA FORM. DE DOCENTES Y TÉCNICOS DEL Min. DE Educ., PARA DESARROLLO DE Adoption of the IFTS Model COMPETENCIAS Improvement of MINED's Pending Post Direct Selection International 344,800.00 0.00 2017-02-03 2017-10-23 DISCIPLINARES Y DIDÁCTICAS Institutional Capacity and the Implementation DE LA ESC. INCLUSIVA DE Schooling System's Governance TIEMPO PLENO (EITP), dptoS DE AHUACHAPAN, SANTA ANA, SONSONATE, SAN SALVADOR Y USUSULUTAN. SV-MCE-500-CF-SSF / CONSULT. PARA LA FORMACION DE DOCENTES Y TECNICOS DEL MIN. DE EDUCACION PARA EL Adoption of the IFTS Model DESARROLLO DE Improvement of MINED's Pending COMPETENCIAS Post Direct Selection National 165,300.00 0.00 2017-02-03 2017-10-23 Institutional Capacity and the Implementation DISCIPLINARES Y DIDACTICAS Schooling System's Governance DE LA ESCUELA INCLUSIVA DE TIEMPO PLENO (EITP) EN LOS DEPARTAMENTOS DE LA PAZ, SAN VICENTE Y CABAÑAS. SV-MCE-414-CF-SBCC / Consultoria para diseñar Adoption of the IFTS Model instrumentos, evaluar la gestión Improvement of MINED's Quality And Cost- Pending Post Open - National 65,000.00 0.00 2016-06-22 2016-10-03 2016-10-18 2016-10-28 2016-10-28 institucional de los SI EITP en Institutional Capacity and the Based Selection Implementation funcionamiento que incluya la Schooling System's Governance difusión de resultados. SV-MCE-373-CF-SBMC / SUPERVISION DE OBRAS DE REHABILITACION, AMPLIACION Adoption of the IFTS Model Y/O RECONSTRUCCION DE 5 Improvement of MINED's IBRD / 81100 Prior Least Cost Selection Open - National 227,559.57 212,496.50 Signed 2015-05-21 2015-09-18 2015-10-28 2016-03-02 2015-12-15 2016-04-07 2017-04-07 CENTROS ESCOLARES EN Institutional Capacity and the LOS DEPARTAMENTOS DE Schooling System's Governance USULUTAN, SAN MIGUEL Y LA UNION. Page 5 SV-MCE-372-CF-SBMC / SUPERVISION DE OBRAS DE REHABILITACION, AMPLIACION Adoption of the IFTS Model Y/O RECONSTRUCCION DE 5 Improvement of MINED's IBRD / 81100 Prior Least Cost Selection Open - National 204,243.58 375,407.30 Signed 2015-05-21 2015-09-18 2015-10-28 2016-03-02 2015-12-15 2016-03-04 2017-04-17 CENTROS ESCOLARES EN Institutional Capacity and the LOS DEPARTAMENTOS DE Schooling System's Governance USULUTAN, LA LIBERTAD, CHALATENANGO Y CABAÑAS. SV-MCE-361-CI-CD / Adoption of the IFTS Model Contratación de Consultor para Improvement of MINED's apoyar en procesos organizativos IBRD / 81100 Prior Direct Selection National 14,400.00 960.00 Signed 2014-12-23 2014-12-23 2017-06-30 Institutional Capacity and the para la Dirección Adjunta SI Schooling System's Governance EITP. Adoption of the IFTS Model SV-MCE-360-CI-CD / Improvement of MINED's Contratación de consultor IBRD / 81100 Prior Direct Selection National 15,000.00 1,833.38 Signed 2014-12-23 2014-11-13 2017-12-31 Institutional Capacity and the especialista 5 en infraestructura. Schooling System's Governance Adoption of the IFTS Model SV-MCE-358-CI-CD / Improvement of MINED's Contratación de consultor IBRD / 81100 Prior Direct Selection National 15,000.00 30,000.00 Signed 2014-12-23 2014-12-23 2017-12-31 Institutional Capacity and the especialista 4 en infraestructura. Schooling System's Governance SV-MINED-37850-CS-QCBS / "Consultoría para recuperación del Módulo Uno y Dos de la Formación de Docentes y Técnicos del Ministerio de Quality And Cost- Pending IBRD / 81100 Adoption of the IFTS Model Post Open - National 340,000.00 0.00 2017-11-28 2017-11-28 2017-12-22 2018-01-22 2018-02-05 2018-02-26 2018-03-16 2018-08-27 Educación, para el desarrollo de Based Selection Implementation Competencias Disciplinares y Didáctica de la Escuela Inclusiva de Tiempo Pleno (EITP) en los 14 Departamentos del SV-MINED-42642-CS-LCS / AUDITORIA DEL PROYECTO"MEJORAMIENTO DE LA CALIDAD DE LA EDUCACION"FINANCIADO CON EL CONVENIO DE PRESTAMO Improvement of MINED's Pending DEL BANCO MUNDIAL No. IBRD / 81100 Institutional Capacity and the Post Least Cost Selection Open - National 35,000.00 0.00 2018-01-05 2018-01-05 2018-01-10 2018-01-31 2018-02-23 2018-03-14 2018-03-29 2018-05-28 Implementation BIRF 8110-SV Y RECURSOS Schooling System's Governance DEL GOBIERNO DE EL SALVADOR, EJECUTADO POR EL MINISTERIO DE EDUCACION, POR LOS PERÍODOS DEL 1 DE ENERO INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SV-MCE-502-CI-3CV / CONTRATACIÓN DEL Adoption of the IFTS Model COORDINADOR TÉCNICO DEL Improvement of MINED's Individual Consultant Pending Post Limited 4,500.00 0.00 2017-03-09 2017-12-31 SI EITP DE LA Institutional Capacity and the Selection Implementation DEPARTAMENTAL DE Schooling System's Governance EDUCACION DE MORAZAN SV-MINED-53294-CS-INDV / "CONSULTORIA ASISTENCIA TECNICA PARA EL Improvement of MINED's Individual Consultant Under FORTALECIMIENTO DEL IBRD / 81100 Institutional Capacity and the Post Open 9,600.00 0.00 2018-03-09 2018-03-14 2018-03-14 2018-04-27 2018-04-13 2018-04-30 2018-04-30 2018-12-31 Selection Implementation SISTEMA NACIONAL DE Schooling System's Governance EVALUACION EDUCATIVA- SNEE" SV-MINED-53296-CS-INDV / CONTRATACION DEL COORDINADOR APOYO Improvement of MINED's Individual Consultant Under ADMINISTRATIVO DEL SI EITP IBRD / 81100 Institutional Capacity and the Post Open 5,000.00 0.00 2018-03-09 2018-03-13 2018-03-14 2018-05-11 2018-04-13 2018-05-18 2018-04-30 2018-12-31 Selection Implementation PARA LA DIRECCION Schooling System's Governance DEPARTAMENTAL DE EDUCACION DE CABAÑAS Page 6