REPUBLIC OF BOTSWANA MINISTRY OF TRANSPORT AND COMMUNICATIONS ROADS DEPARTMENT Botswana Integrated Transport Project OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) (ASSET MANAGEMENT CONTRACT) FOR DESIGN, REHABILITATION/IMPROVEMENT, NETWORK PERFORMANCE WORKS (ROUTINE MAINTENANCE) AND PERIODIC MAINTENANCE/ RESEALING WORKS OF PACKAGE 2: ROAD SECTIONS ROAD SECTIONS B101-1 RAKHUNA/A1 JUNCTION-TIHARESELEELE (12.3 KM); B101-2 TIHARESELEELE — B101/A1 PITSANE JUNCTION (5.25KM); B101-3 B101/A1 PITSANE B101/A1 JUNCTION PHITSHANE MOLOPO CHANGE PAVED/NEW DESIGN ROAD (66.8 KM); B101-4 -PHITSHANE MOLOPO CHANGE PAVED/NEW DESIGN ROAD -MABULE (60.2 KM) ADDENDA TO RESETTLEMENT ACTION PLAN REPORT FINAL REVISION (October 17) PACKAGE -2 2017 1 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 This report is property of the Joint Venture ELSAMEX – ITNL JVCA It is completely forbidden to copy the present documentation without previous authorization. Addenda to Resettlement Action Plan Package 2 FINAL REVISION 2 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 INDEX PAGE Nº 0. REVISED SUMMARY DATA OF RAP ............................................................................................................................................. 5 1. INTRODUCTION ......................................................................................................................................................................... 7 2. DESCRIPTION OF PAP COMPENSATION ...................................................................................................................................... 8 3. UNIDENTIFIED PROPERTIES ........................................................................................................................................................ 8 4. AVOIDED PAP’S ......................................................................................................................................................................... 9 5. PAP COMPENSATION COST AND BUDGET .................................................................................................................................. 9 6. CONCLUSIONS ......................................................................................................................................................................... 15 APPENDIX 1.SUMMARY TABLE OF ADDITIONAL & OLD PAP´S ........................................................................................................... .16 APPENDIX 2. AFFECTED ASSETS DRAWINGS ...................................................................................................................................... .20 ..79 APPENDIX 3. AFFECTED ASSETS MAPPING.......................................................................................................................................... APPENDIX 4.BUDGET CONFIRMATION LETTER BY ROAD DEPARMENT. .............................................................................................193 ..........................................................195 APPENDIX 5.APPROVAL LETTER BY BOTSWANA NATIONAL MUSEUM (ARCHEOLOGICAL SITES). Addenda to Resettlement Action Plan Package 2 3 FINAL REVISION Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 LIST OF ABBREVIATIONS ARAP Abbreviated Resettlement Action Plan BWP Botswana Pula OPRC Output and Performance Based Road Contracts PAP Project Affected Persons RAP Resettlement Action Plan RD Road Department WB World Bank Addenda to Resettlement Action Plan Package 2 FINAL REVISION 4 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 0. REVISED SUMMARY DATA OF RAP No. Subject Detail (Data) OLD RAP ADDENDA TOTAL 1 Location of Road Project Project road is situated in the southern part of the Southern district, Package-2 Road Sections B101-1 Rakhuna /A1 junction- Tlhareseleele (12.03 Km) ,B101-2 Tlhareseleele –B 101/A1 Pitsane junction (5.25 Km), B101-3 B101/A1 Pitsane B101/A1 junction – Phitshane Molopo (66.8 Km) , B101-4 Pitshane Molopo Change paved /new design Road –Mabule (60.2 Km) 2 Road Length Main Road -144.28 Km Access Road- 15.96 Km 3 Type of Contract Output and performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance Works (Routine Maintenance) and Periodic Maintenance/Resealing Works 4.1 Quantity of Agricultural land to 106,597.00 Sqm be affected 4.2 Quantity of Developed 1,411.40 Sqm Resident plots to be affected 4.3 Quantity of Undeveloped 1,850.60 Sqm Resident plots to be affected 4.4 Quantity of Church land to be 11.00 Sqm 165,190,33 Sqm 275,724.53 Sqm affected (16.51 Hectares) (27.57 Hectares) 4.5 Quantity of Water Well land to 193.00 Sqm be affected 4.6 Quantity of Grave yard land to 11.20 Sqm be affected (No graves are impacted) 4.7 Quantity of Fenced Kraal l land 460.00 Sqm to be affected 5 Number of trees to be affected 23 Trees 0 Trees 23 Trees Addenda to Resettlement Action Plan Package 2 FINAL REVISION 5 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 6 Number of project affected 126 owners affected 65 owners 191 owners persons (PAPs) affected affected 7 No of electrical poles to be 77 No 0 No 77 No affected 8 No of telephone poles to be 22 No 0 No 22 No affected 9 Affected Fencing Length 15,291.00 Mtr 635.80 Mtr 15,926.8 Mtr 10 No of Street Light poles to be 92 No 0 No 92 No affected B101-1. KM: 9+260 RHS No. of Archaeological Sites B101-2. (None of these Sites impact the Project. See Appendix 5 - KM: 4+890 LHS 11 Approval letter by Botswana 4 No 0 No 4 No B101-3.AR1. National museum) 1+300 LHS B101-4. 27+925 LHS Table 1 Summary data Addenda to Resettlement Action Plan Package 2 FINAL REVISION 6 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 1. INTRODUCTION This document (Addenda to RAP Report) updates the information provided in main Resetlement Action Plan (RAP) on the status and processes followed for resettlement processes for Botswana Integrated transport project in the Output and Performance Based Road Contracts (OPRC) PACKAGE 2 [“PERFORMANCE BASED ROAD CONTRACT (OPRC) (ASSET MANAGEMENT CONTRACT) FOR DESIGN, REHABILITATION/IMPROVEMENT/, NETWORK PERFORMANCE (ROUTINE MAINTENANCE) AND PERIODIC MAINTENANCE WORKS PACKAGE 2: ROAD SECTIONS B101-1 RAKHUNA/A1 JUNCTION TLHARESELEELE (12.03 KM); B101-2 TLHARESELEELE — B101/A1 PITSANE JUNCTION(5.25KM);B101-3— B101/A1 PITSANE B101/A1 JUNCTION PHITSHANE MOLOPO CHANGE PAVED/NEW DESIGN ROAD (66.8 KM); B101-4 — PHITSHANE MOLOPO CHANGE PAVED/NEW DESIGN ROAD MABULE (60.2 KM)” ] at the stage of Draft Detailed Design. The update presents properties and project affected persons that are additional to those presented in already submitted RAP. 1.1 Reasons for preparing Addenda to RAP During the works done on site for the initial project phase when the original RAP report was prepared, some of the affected properties were undetected due to the absense of any indication of plot ownership/occupance, drawing or benchmarks on site. In some cases owners of such properties did not present themeselves at Kgotla meetings for RAP or at PAPs consultation meetings. After finalization and submission of the main RAP Report, some additional affected properties were identified. During the compensation exercise of properties affected by the project team, PAPs not identified in the RAP ( additional project affect persons) came to present themselves for properties that were not recorded in the original RAP report. Such claims were verified with local authorities, for example the Kgotla and the landboards. Once claims to property were verified the process of project affected persons consultation was triggered where individuals were consulted on the basis of prior informed consent. The consultation method followed was that as discussed in detail in the main RAP report. PAPs were also informed of the respective grievance commitiees and the details of the chairpersons per village committee were also shared. In the drawings attached to this addendum, location and property affections for additional PAPs is shown. These drawings also show location information of Old PAP´s, avoided PAPs, wrongly Captured PAP´s, Archeological Sites, and Old Road (which were the alignment By-passes for the villages of Mmakgori and Tshidilamolomo as shown in Appendix 2 Sheet 25 and 28 respectively). Addenda to Resettlement Action Plan Package 2 FINAL REVISION 7 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 2. DESCRIPTION OF PAP COMPENSATION The method followed for compensation of PAPs is the method discused in detail in the main RAP report. The Addenda presents 65 additional project affected persons and their properties. The table below presents a abstract of the affected properties (2 PAP´s have been avoided). Description of Development No. Affected properties Developed Resident Plots 21 Farms 31 Church 1 Graveyard 1 Undeveloped Residential Plots 7 Water well 1 Fenced Kraal 1 Total 63 Table 2 Affected Properties Data PAPs individual preferences for future compensation (Money, Land, extension, want to keep their property, etc) are included in Appendix-1. 3. UNIDENTIFIED PROPERTIES In this Addendum there are two properties whose owners could not be identified dispite public consultations and confirming from the available records. In mitigation, such properties whose owners could not be located/identified were still submitted to the Sub Land Board for valuation of such properties so that compensation amounts could be determined. Land Board has assesed these properties. The amount determined based on the landboard assessment will be deposited in the account of the Office of the District Commisioner or any other designated government account, such that if the claimants come at a future date they will then receive compensation from the Office of District Commisioner or any other office where compensation amount is deposited. Addenda to Resettlement Action Plan Package 2 FINAL REVISION 8 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 No Description of Code Identification Additional Area Road Chainage Development number as per RAP RAP or Old (m2) RAP. 1 Developed Additional 18.7 B101-1 0+840 RHS 1-58 Resident Plot 2 Developed Additional 14 B101-1 1+140 LHS 1-59 Resident Plot 3 Developed Old 224 B101-1 2+520 RHS 1-10 Resident Plot 4. AVOIDED PAP’S Seven of the PAP’s which were identified were avoided by realignment of road. No Description of Code Identification Additional Area Road Chainage Development number as per RAP RAP or Old (m2) RAP. 1 Developed Resident Plot 1-54 Additional 7.2 B101-1 0+720 LHS 2 Cemetery 1-12 Old 0.87 B101-1 2+680 LHS 3 Cemetery 2-03 Old 197.45 B101-2 0+100 RHS 4 Developed Resident Plot 4-01 Old 126.50 B101-4 0+360 LHS 5 Farm 4-85 Additional 23.6 B101-4 11+010 RHS 6 Developed Resident Plot 4-18 Old 4.48 B101-4 16+880 RHS 7 Developed Resident Plot 4-40 Old 30.39 B101-4 45+240RHS 5. PAP COMPENSATION COST AND BUDGET The cost estimation follows the procedure detailed in main RAP report. The valuation of the economic compensations is done as per process presented in the 2006 compensation guidelines prepared by the Department of Lands, Government of Botswana. 1. Compensation Cost Estimate for Additional PAPs: Addenda to Resettlement Action Plan Package 2 FINAL REVISION 9 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Code Cost Total Cost after Serial Identification Description of after 10% 10% Amount No. number as Developments distribution distribution per RAP allowance allowance B101-1 Developed Area 85.00 93.50 2 1-55 727.76 Residential Plot Fence 576.6 634.26 Developed Area 151.25 166.38 3 1-56 793.82 Residential Plot Fence 570.4 627.44 Area 431.25 474.38 Developed 4 1-57 No 474.38 Residential Plot 0 0.00 Fence Area 233.75 257.13 Developed 5 1-58 No 257.13 Residential Plot 0 0.00 Fence Area 175.00 192.50 Developed 6 1-59 No 192.50 Residential Plot 0 0.00 Fence Developed Area 62.50 68.75 7 1-60 518.87 Residential Plot Fence 409.2 450.12 Developed Area 175.00 192.50 8 1-61 806.30 Residential Plot Fence 558 613.80 Developed Area 42.50 46.75 9 1-71 114.95 Residential Plot Fence 62 68.20 Developed Area 900.00 990.00 10 1-72 2,913.24 Residential Plot Fence 1748.4 1,923.24 Developed Area 60.00 66.00 11 1-62 720.72 Residential Plot fenced 595.2 654.72 Area 774.30 851.73 18 1-69 Farm No 851.73 0 0.00 Fence Area 397.50 437.25 19 1-70 Farm No 437.25 0 0.00 Fence Area 817.50 899.25 20 1-73 Farm No 899.25 0 0.00 Fence 21 1-74 Farm Area 743.70 818.07 818.07 Addenda to Resettlement Action Plan Package 2 FINAL REVISION 10 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Code Cost Total Cost after Serial Identification Description of after 10% 10% Amount No. number as Developments distribution distribution per RAP allowance allowance No 0 0.00 Fence Area 247.20 271.92 22 1-75 Farm No 271.92 0 0.00 Fence Area 821.25 903.38 12 1-63 Residential Plot No 903.38 0 0.00 fence Area 581.40 639.54 13 1-64 farm No 639.54 0 0.00 fence Area 100.20 110.22 14 1-65 farm 11,090.42 Fence 9982 10,980.20 Area 140.00 154.00 15 1-66 Grave yard 822.36 Fence 607.6 668.36 Area 137.50 151.25 16 1-67 Church 1,651.65 Fence 1364 1,500.40 Area 200.00 220.00 17 1-68 Residential Plot No 220.00 0 0.00 Fence B101-2 Area 377.70 415.47 23 2-31 Farm No 415.47 0 0.00 Fence Area 328.80 361.68 24 2-30 Farm No 361.68 0 0.00 Fence Area 135.60 149.16 25 2-29 Farm No 149.16 0 0.00 Fence Area 43.20 47.52 26 2-28 Farm No 47.52 0.00 0.00 Fence Area 229.50 252.45 27 2-18 Farms NO 252.45 0.00 0.00 Fence Addenda to Resettlement Action Plan Package 2 FINAL REVISION 11 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Code Cost Total Cost after Serial Identification Description of after 10% 10% Amount No. number as Developments distribution distribution per RAP allowance allowance Area 574.50 631.95 28 2-19 Farms NO 631.95 0.00 0.00 Fence Area 1,255.50 1,381.05 29 2-20 Farms No 1,381.05 0.00 0.00 Fence Area 866.40 953.04 30 2-21 Farms No 953.04 0.00 0.00 Fence Undeveloped Area 211.25 232.38 31 2-22 1,078.06 Residential Plot Fence 768.8 845.68 Undeveloped Area 83.75 92.13 32 2-32 92.13 Residential Plot Fence 0.00 0.00 Area 2,125.00 2,337.50 Developed 33 2-23 No 2,337.50 Residential Plot 0.00 0.00 Fence Developed Area 672.50 739.75 34 2-24 2,171.95 Residential Plot Fence 1302 1,432.20 Developed Area 212.50 233.75 35 2-25 1,052.15 Residential Plot Fence 744 818.40 Developed Area 240.00 264.00 36 2-26 2,378.20 Residential Plot Fence 1,922 2,114.20 Developed Area 1,900.00 2,090.00 37 2-27 5,650.04 Residential Plot Fence 3,236.4 3,560.04 B101-4 Area 732.30 805.53 38 4-59 Farms No 805.53 0.00 0.00 Fence Area 2,583.00 2,841.30 39 4-81 Farms No 2,841.30 0.00 0.00 Fence Area 1,910.70 2,101.77 40 4-60 Farms No 2,101.77 0.00 0.00 Fence Addenda to Resettlement Action Plan Package 2 FINAL REVISION 12 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Code Cost Total Cost after Serial Identification Description of after 10% 10% Amount No. number as Developments distribution distribution per RAP allowance allowance Area 893.10 982.41 41 4-61 Farms No 4460.61 3,,162.00 3,478.20 Fence Area 1822.80 2,005.08 42 4-86 Farms No 2005.08 0.00 0.00 Fence Area 696.00 765.60 43 4-62 Farms No 765.60 0.00 0.00 Fence Area 2,375.00 2,612.50 44 4-63 Residential No 2,612.50 0.00 0.00 Fence Area 1,812.50 1,993.75 Undeveloped 45 4-64 No 1,993.75 Residential Plot 0 0.00 Fence Area 3,212.50 3,533.75 Undeveloped 46 4-84 No 3,533.75 Residential Plot 0.00 0.00 Fence Area 2,412.50 2,653.75 47 4-65 Water well No 2,653.75 0.00 0.00 Fence Area 4,887.50 5,376.25 Developed 48 4-66 No 5,376.25 Residential Plot 0.00 0.00 Fence Area 111.60 122.76 49 4-67 Farm 941.16 Fence 744.00 818.40 Area 800.00 880.00 Undeveloped 50 4-68 No 880.00 Residential Plot 0.00 0.00 Fence Area 1,300.00 1,430.00 Undeveloped 51 4-82 No 1,430.00 Residential Plot 0.00 0.00 Fence Area 3,287.50 3,616.25 Undeveloped 52 4-83 No 3,616.25 Residential Plot 0.00 0.00 Fence Area 9,512.00 10,463.75 53 4-87 Farms No 10,463.75 0.00 0.00 Fence Addenda to Resettlement Action Plan Package 2 FINAL REVISION 13 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Code Cost Total Cost after Serial Identification Description of after 10% 10% Amount No. number as Developments distribution distribution per RAP allowance allowance Area 12,425.00 13,667.50 53 4-69 Residential 19,730.48 Fence 5,511.8 6,062.98 Area 138.00 151.80 54 4-71 Fenced kraal 7,653.80 Fence 6,820.00 7,502.00 Area 427.50 470.25 55 4-72 Farms No 470.25 0.00 0.00 Fence Area 1,201.80 1,321.98 56 4-73 Farms No 1,321.98 0.00 0.00 Fence Area 278.70 306.57 57 4-74 Farms No 306.57 0.00 0.00 Fence Area 1,353.90 1,489.29 58 4-75 Farms No 1,489.29 0.00 0.00 Fence Area 2,010.30 2,211.33 59 4-76 Farms No 2,211.33 0.00 0.00 Fence Area 1,137.90 1,251.69 60 4-77 Farms No 1,251.69 0.00 0.00 Fence Area 1,657.20 1,822.92 61 4-78 Farms No 1,822.92 0.00 0.00 Fence Area 7,398.00 8,137.80 62 4-79 Farms No 8,137.80 0.00 0.00 Fence Area 1,800.00 1,980.00 63 4-80 Residential 3,446.30 Fence 1333 1,466.30 TOTAL 139,401.02 Table 3 Cost for Additional PAPs data Location of each of the additional PAP, along with the location of PAPs listed in main RAP report is presented on Line drawings of the respective Road. These line drawings also include location of some PAPs which were avoided (by realigning road) and the location of Archeological sites (refered in main RAP). 2. Total Compensation Cost (RAP report + Addenda) Addenda to Resettlement Action Plan Package 2 FINAL REVISION 14 Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Design, Rehabilitation/Improvement, Network Performance works (Routine Maintenance) and Periodic Maintenance Resealing Works of Package 2 Description Cost after 10% Distribution Allowance ORIGINAL PAPS BWP 1,164,800.81 ADDENDUM BWP 139,401.02 Total BWP 1,304,201.83 Table 4 Total Compensation Cost data The Total Estimated cost of compensation of PAPs on Package-2 , including both Original and additional PAPs is 1,304,201.83 Botswana Pula (One Million Three Hundred and Four Thousand, Two Hundred One Pula and Eigthy Three Thebe) including both Original and additional PAPs. The source of of funding for this compensation is Botswana Government. (See Appendix 5 - letter issued by Road Deparment). 6. CONCLUSIONS This addendum provides a complete updated list and description of the additional affected properties by the project. All the details about affected PAPs from this addendum and from Original PAPs appear in the Appendix 1 of this document. In Appendices 2, 3 and 4 details about asset drawings, assets mapping and line diagrams respectively are provided. Consistent with the World Bank’s disclosure policy, this amendment of Resettlement Action Plan (RAP) will be publicly disclosed in Botswana at Kgotla’s of the Project Affected villages and the Office of the District Commissioner. This amendment of RAP will also be publicly disclosed in the World Bank Info-shop. Addenda to Resettlement Action Plan Package 2 FINAL REVISION 15 APPENDIX 1 .SUMMARY TABLE OF ADDITIONAL & OLD PAP´S 16 TABULATED DETAILS OF THE ADDITIONAL AFFECTED PROPERTIES : PACKAGE 2 AFFECTED ASSETS LOCATION Code Description of Developments Area Affected m2 Fence m Trees u Compensation Owner (As per assessment record) Consultation Identificatio Money / Area Serial No. n number as Quantity Quantity Quantity Place Road Name Central Chainage Side per ARAP B101-1 1 1-54 Developed Residential Plot Fence 7.4 9.10 Koloti Edwin Mabapa Rakhuna Section B-101-1 0+720 LHS Money 2 1-55 Developed Residential Plot Fence 6.8 9.30 Boipelo Linah Mosidila Rakhuna Section B-101-1 0+720 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 3 1-56 Developed Residential Plot Fence 12.1 9.20 Mpotsang Daniel Sebopelo Rakhuna Section B-101-1 0+760 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 4 1-57 Developed Residential Plot No Fence 34.5 0.00 Goitsemodimo Madikela Rakhuna Section B-101-1 0+780 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 5 1-58 Developed Residential Plot No Fence 18.7 0.00 unknown Rakhuna Section B-101-1 0+840 RHS 6 1-59 Developed Residential Plot No Fence 14.0 0.00 unknown Rakhuna Section B-101-1 1+140 LHS 7 1-60 Developed Residential Plot Fence 5.0 6.60 Mosimanegape T. Mokgadinyane Rakhuna Section B-101-1 1+220 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 8 1-61 Developed Residential Plot Fence 14.0 9.00 Molatlhegi Kwenantsi Rakhuna Section B-101-1 2+280 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 9 1-71 Developed Residential Plot Fence 3.4 1.00 Motawana Douglas Mpholo (Deceased) REP Lorato Mpholo Rakhuna Section B-101-1 2+920 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 10 1-72 Developed Residential Plot Fence 72.0 28.20 Aron Masedi (Deceased) REP Poloko M. Masedi Rakhuna Section B-101-1 3+060 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 11 1-62 Developed Residential Plot fenced 4.8 9.60 Bereng Daniel Mokhefane Rakhuna Section B-101-1 3+060 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 18 1-69 Farm No Fence 2581.0 0.00 Basiamise Ngakane (Deceased) REP Molehe Makgatlho Rakhuna Section B-101-1 5+120-5+400 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 19 1-70 Farm No Fence 1325.0 0.00 Dimakatso Mpholo (Deceased) REP Mmakgotso Kelly Letshelea Rakhuna Section B-101-1 5+260-5+480 RHS Farm disputed 20 1-73 Farm No Fence 2725.0 0.00 Tuelo Mojakisane Rakhuna Section B-101-1 5+490-5+810 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 21 1-74 Farm No Fence 2479.0 0.00 Goitseone N. Mosalakatane Rakhuna Section B-101-1 6+430-6+790 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 22 1-75 Farm No Fence 824.0 0.00 William Phushudi REP Joseph M. Phusudi Rakhuna Section B-101-1 6+790-6+910 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 12 1-63 Residential Plot No fence 65.7 0.00 Lucy Goratwa Lekaba Tlhareseleele Section B-101-AR 2 0+100 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 13 1-64 farm No fence 1938.0 0.00 Mokgeseng Walter Sello REP Matshidiso Sello Tlhareseleele Section B-101-1 10+640-10+860 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 14 1-65 farm Fence 334.0 161.00 Lephalo Mohlomi REP Alice M Motlhomi Tlhareseleele Section B-101-1 10+980-11+140 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 15 1-66 Grave yard Fence 11.2 9.80 Tlhareseleele V.D.C Tlhareseleele Section B-101-1 11+120 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 16 1-67 Church Fence 11.0 22.00 Methodist Church of South Africa Tlhareseleele Section B-101-1 11+220 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 17 1-68 Residential Plot No Fence 16.0 0.00 Gilbert Mmasa Tlhareseleele Section B-101-1 11+700 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation B101-2 23 2-31 Farm No Fence 1259.0 0.00 Palesa Mohlomi Poane Tlhareseleele Section B-101-2 1+380-1+580 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 24 2-30 Farm No Fence 1096.0 0.00 Mosenantsa Lekgori Tlhareseleele Section B-101-2 1+580-1+740 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 25 2-29 Farm No Fence 452.0 0.00 Ditshenyegelo Mooketsane Tlhareseleele Section B-101-2 1+760-1+960 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 26 2-28 Farm No Fence 144.0 0.00 Puleng Emily Methole Tlhareseleele Section B-101-2 1+960-2+310 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 27 2-18 Farms NO FENCE 765.0 0.00 Akanyang Joel Matlhola PITSANE Section B-101-2 2+320-2+450 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 28 2-19 Farms NO Fence 1915.0 0.00 Tatlhego Abel Mohlomi PITSANE Section B-101-2 2+460-2+740 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 29 2-20 Farms No Fence 4185.0 0.00 John Boy Arabang PITSANE Section B-101-2 2+740-3+080 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 30 2-21 Farms No Fence 2888.0 0.00 Moses Gaolatlhe Kepadisa PITSANE Section B-101-2 3+080-3+380 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 31 2-22 Undeveloped Residential Plot Fence 16.9 12.40 Keitumetse Motsatsing PITSANE Section B-101-2 3+650 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 32 2-32 Undeveloped Residential Plot Fence 6.7 0.00 Elliot K. Kenosi PITSANE Section B-101-3 3+700 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 33 2-23 Developed Residential Plot No Fence 170.0 0.00 ASELE KELAPILE BOLEN PITSANE Section B-101-2 4+000 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 34 2-24 Developed Residential Plot Fence 53.8 21.00 Kedibonye Moswela REP Joseph Matong Moswelo PITSANE Section B-101-2 4+180 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 35 2-25 Developed Residential Plot Fence 17.0 12.00 Malebogo Moswela PITSANE Section B-101-2 4+250 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 36 2-26 Developed Residential Plot Fence 19.2 31.00 Bontle Denise Gaboutloeloe REP Boikhutso Gaboutloeloe Pitsane Section B-101-2 4+360 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 37 2-27 Developed Residential Plot Fence 152.0 52.20 Lenah Mavis Ncenga Pitsane Section B-101-2 4+460 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation B101-4 38 4-59 Farms No Fence 2441.0 0.00 Gaoabelwe Mmelesi PHITSHANE MOLOPO#LEPORONG Section B-101-04 6+090-6+400 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 39 4-81 Farms No Fence 8610.0 0.00 Baboloki . J. Boluwade PHITSHANE MOLOPO-LEPORONG Section B-101-4 8+240-8+660 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 40 4-60 Farms No Fence 6369.0 0.00 Rebaone Mmusi PHITSHANE MOLOPO#LEPORONG Section B-101-04 8+260-8+770 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 41 4-61 Farms Fence 2977.0 51.00 Obakeng Monamodi PHITSHANE MOLOPO#LEPORONG Section B-101-04 10+190-10+240 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 42 4-86 Farms No Fence 6076.0 0.00 Sarah Sechele PHITSHANE MOLOPO#LEPORONG Section B-101-04 10+790-11+150 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 43 4-85 Farms No Fence 210.0 0.00 Kutlwano Lentsokwane LEPORONG Section B-101-4 11+010-11+020 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 44 4-62 Farms No Fence 2320.0 0.00 Keimetse Lentsokwane LEPORONG Section B-101-04 11+820 -11+960 C Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 45 4-63 Residential No Fence 190.000 0.00 Dineo A. Sekwenyane LEPORONG Section B-101-04 12+070-12+105 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 46 4-64 Undeveloped Residential Plot No Fence 145.0 0.00 Tsepang Lentsokwane LEPORONG Section B-101-4 12+340-12+380 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 47 4-84 Undeveloped Residential Plot No Fence 257.0 0.00 Thato Lentsokwane LEPORONG Section B-101-4 12+340-12+380 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 48 4-65 Water well No Fence 193.0 0.00 Matsidiso J. Sechele LEPORONG Section B-101-004 13+200-13+220 RHS 49 4-66 Developed Residential Plot No Fence 391.0 0.00 Khunoto Setumo LEPORONG Section B-101-004 16+910-16+960 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 50 4-67 Farm Fence 372.0 12.00 Nametso Sebolai Dikhukhung-Makgori Section B-101-4 20+920-20+960 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 51 4-68 Undeveloped Residential Plot No Fence 64.0 Christina Mapale MANKGORI Section B-101-4 33+880-33+900 RHS Money Land board to allocate new land 52 4-82 Undeveloped Residential Plot No Fence 104.0 Willy Monyatsi MANKGORI Section B-101-4 33+900-33+920 RHS Money Land board to allocate new land 53 4-83 Undeveloped Residential Plot No Fence 263.0 Motlalepula Singini MANKGORI Section B-101-4 33+920-33+944 RHS Money Land board to allocate new land 54 4-87 Farm No Fence 761.0 0.00 Edwin Mothibamele MANKGORI Section B-101-4 36+440 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 55 4-69 Undeveloped Residential Plot Fence 994.0 88.90 Phontsho Mokobelo TSHIDILAMOLOMO Section B-101-4 45+660-45+720 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 56 4-71 Fenced kraal Fence 460.0 110.00 VDC TSHIDILAMOLOMO Section B-101-4 47+440-47+480 C 57 4-72 Farms No Fence 1425.0 0.00 Nkagisang Magope TSHDILAMOLOMO-MABULE Section B-101-4 51+130-51+380 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 58 4-73 Farms No Fence 4006.0 0.00 Bothibang Kelapile TSHIDILAMOLOMO-MABULE Section B-101-4 51+380-51+840 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 59 4-74 Farms No Fence 929.0 0.00 Mosweu Tsatsi TSHDILAMOLOMO-MABULE Section B-101-4 52+370-52+520 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 60 4-75 Farms No Fence 4513.0 0.00 Mooketsi Khumoile TSHIDILAMOLOMO-MABULE Section B-101-4 52+910-53+500 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 61 4-76 Farms No Fence 6701.0 0.00 Susan Tsiang TSHDILAMOLOMO-MABULE Section B-101-4 53+700-54+080 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 62 4-77 Farms No Fence 3793.0 0.00 Motsamai Bogale TSHIDILAMOLOMO-MABULE Section B-101-4 54+100-54+540 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 63 4-78 Farms No Fence 5524.0 0.00 Miriam Bogale TSHDILAMOLOMO-MABULE Section B-101-4 54+560-55+060 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 64 4-79 Farms No Fence 24660.0 0.00 Oarabile Maiketso TSHIDILAMOLOMO-MABULE Section B-101-4 57+000-57+680 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 65 4-80 Residential Fence 144.0 21.50 Solomon. P.Motladiile TSHIDILAMOLOMO-MABULE Section B-101-4 61+340 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 17 TABULATED DETAILS OF THE OLD AFFECTED PROPERTIES : PACKAGE 2 AFFECTED ASSETS LOCATION Compensation Code Area Affected m2 Fence m Trees u Owner (As in original RAP) Owner (As per assessment record) Money / Area Serial No. Identificatio Description of Developments Plot nº Quantity Quantity Quantity Place Road Name Central Chainage Side Consultation n number as B101-1 1 1-01 Developed Residential Plot Fence 2481 173.74 78.00 Jonatharn Molapo Tebogo Bodutu Molapo Rakhuna Section B-101-1 0+160 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 2 1-02 Developed Residential Plot Fence 2481 8.32 10.00 2 Nathaniel Maetso Nathaniel Maetso REP Betty Nyilongo Rakhuna Section B-101-1 0+260 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 3 1-03 Developed Residential Plot Fence 2822 72.23 37.00 Church UCCSA UCCSA REP Florence K. Mosimakoko Rakhuna Section B-101-1 0+300 LHS 4 1-04 Developed Residential Plot Fence 2840 10.13 11.00 Onalenna Maetso Onalenna M. Maeco REP Dineo G. Maeco Rakhuna Section B-101-1 0+380 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 5 1-05 Developed Residential Plot Fence 2881 7.26 10.00 Belita Banda Olebeng Belita Babili Rakhuna Section B-101-1 0+600 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 6 1-06 Developed Residential Plot Fence 2538 20.93 14.00 Mpotsang D Sebopelo Juliah Dilaolo Thibelang Rakhuna Section B-101-1 0+940 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 7 1-07 Developed Residential Plot Fence 2594 31.64 17.00 Thapelo J Moroka Thapelo Joseph Moroka Rakhuna Section B-101-1 1+320 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 8 1-08 Developed Residential Plot Fence 290.29 119.00 1 Mmakunu Sekonko Makhunu Sekonko REP Kamogelo Sekonko Rakhuna Section B-101-1 2+060 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 9 1-09 Developed Residential Plot No fence 0.00 0.00 Unknown Rakhuna Section B-101-1 2+480 RHS Money Wronly captured by CE 10 1-10 Developed Residential Plot No fence 224.00 0.00 Unknown Unknown Rakhuna Section B-101-1 2+520 RHS 11 1-11 Developed Residential Plot Fence 2959 75.11 11.00 Shenkele L Mambo Kenalemang Tudumo Rakhuna Section B-101-1 2+540 RHS 12 1-12 Cemetery Fence 2944 0.87 4.00 Rakhuna VDC Cemetry (VDC) Rakhuna Section B-101-1 2+680 LHS 13 1-13 Developed Residential Plot Fence 2948 64.57 27.00 Sesupo Mojakisane Sesupo Mojakisane Rakhuna Section B-101-1 2+760 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Dimakatso Mpholo (Deceased) REP Mmakgotso 14 1-14 Developed Residential Plot Fence 2950 200.47 68.00 Moleleki Letshelea Rakhuna Section B-101-1 2+880 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Kelly Letshelea 15 1-15 Developed Residential Plot Fence 181.92 9.00 1 Moleleki Letshelea Mmakgotso Kelly Letshelea Rakhuna Section B-101-1 2+900 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation James Motsumi Sekonko (Deceased) REP 16 1-16 Developed Residential Plot Fence 2924 39.65 19.00 3 Kedidimetse Moitato Rakhuna Section B-101-1 2+980 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Kebareng Sekonko 17 1-17 Developed Residential Plot Fence 3036 30.59 27.00 Bontshang Ngakane Bontshang Ngakane Rakhuna Section B-101-1 3+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Motawana Douglas Mpholo (Deceased) REP 18 1-18 Cropland No fence 3412 3,512.77 0.00 Mpholo D Motawana Rakhuna - Tlhareseleele Section B-101-1 3+900 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Lorato Mpholo 19 1-19 Cropland Fence 3411 4,671.41 463.00 Maisie Johnson Piet Johnson (Deceased) REP Kone Johnson Rakhuna - Tlhareseleele Section B-101-1 3+900 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 20 1-20 Cropland No fence 347.29 0.00 Batoloki Moyoya Batoloki Moyoya Rakhuna - Tlhareseleele Section B-101-1 4+140 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 21 1-21 Cropland Fence 841.55 181.00 Otshabeng R Mambo Otshabeng R Mambo Rakhuna - Tlhareseleele Section B-101-1 4+540 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 22 1-22 Cropland Fence 3477 863.77 164.00 Bruce Nkgakile Bruce Nkgakile Rakhuna - Tlhareseleele Section B-101-1 4+540 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 23 1-23 Cropland No fence 1,950.75 0.00 Mbangi Phanaesa Leshomo Rakhuna - Tlhareseleele Section B-101-1 4+760 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 24 1-24 Cropland Fence 1,094.80 266.00 Stien Maetso Mosiamemang G Maetso REP Lorato Maetso Rakhuna - Tlhareseleele Section B-101-1 4+920 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 25 1-25 Cropland Fence 255.73 93.00 Empi Mojakisane Empi Mojakisane Rakhuna - Tlhareseleele Section B-101-1 5+220 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 26 1-26 Cropland No fence 1,747.76 0.00 Motshehei Motaung Motshehei Motaung Rakhuna - Tlhareseleele Section B-101-1 5+000 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 27 1-27 Cropland No fence 1,583.53 0.00 Tatolo Mohlomi Tatolo Collen Mohlomi Rakhuna - Tlhareseleele Section B-101-1 5+960 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 28 1-28 Cropland No fence 405.08 0.00 See Rolong Land board Thabo B. Mabilo Rakhuna - Tlhareseleele Section B-101-1 6+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 29 1-29 Cropland No fence 106.01 0.00 Bertha Motseko Bertha Motseko REP Rorisang Letshikhoane Rakhuna - Tlhareseleele Section B-101-1 6+260 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 30 1-30 Cropland No fence 3,945.62 0.00 Motseng Motseko Motseng Mary Motseko Rakhuna - Tlhareseleele Section B-101-1 6+800 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Jethro Molefhi Mohlomi REP Leruo Mohlomi & 31 1-31 Cropland No fence 4,015.96 0.00 Leruo Mohlomi Rakhuna - Tlhareseleele Section B-101-1 6+800 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Patrick Motseko 32 1-32 Cropland Fence 5,228.03 582.00 Mr Motshabi (Deceased) (c/o Dipuo) Dipuo Grace Motshabi Rakhuna - Tlhareseleele Section B-101-1 7+300 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 33 1-33 Cropland No fence 753 2,200.21 0.00 Motseko Motseko Sesilane Motseko Rakhuna - Tlhareseleele Section B-101-1 7+400 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 34 1-34 Cropland No fence 752 823.04 0.00 Molatudi Pheko Molatudi A. Pheko Rakhuna - Tlhareseleele Section B-101-1 7+600 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 35 1-35 Cropland No fence 1,549.51 0.00 Nkolang Letshelea Senyane Letshelea REP Moilwa Aron Letshelea Rakhuna - Tlhareseleele Section B-101-1 7+760 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 36 1-36 Cropland No fence 751 1,564.93 0.00 Mary Makgetha Mofolonyane Makgetha Rakhuna - Tlhareseleele Section B-101-1 7+780 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 37 1-37 Cropland No fence 750 1,180.97 0.00 Motshegwa Matsheka Baitlotli Selelo Rakhuna - Tlhareseleele Section B-101-1 8+800 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 38 1-38 Cropland No fence 735.86 0.00 Molefhi Pheko Molefhi Gilbert Pheko Rakhuna - Tlhareseleele Section B-101-1 7+960 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 39 1-39 Cropland No fence 1,426.67 0.00 Matshidiso Selelo Matshidiso Sello REP Edison Tshireletso Sello Rakhuna - Tlhareseleele Section B-101-1 8+160 LHS Khauhelo P.Madiehe REP Gaotlhobogwe 40 1-40 Cropland No fence 749 1,293.07 0.00 Kgauhelo Madiehe Rakhuna - Tlhareseleele Section B-101-1 8+160 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation S.Madiehe 41 1-41 Cropland No fence 747 1,614.60 0.00 Tshephang Madiehe Mookgo Madiehe REP Tshephang Madiehe Rakhuna - Tlhareseleele Section B-101-1 8+300 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 42 1-42 Cropland No fence 1,836.01 0.00 Mary Moilwa Mary Moilwa Rakhuna - Tlhareseleele Section B-101-1 8+400 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 43 1-43 Cropland No fence 745 1,842.61 0.00 Mamelelo Selelo Ditaba Sello REP Baitlotli Selelo Rakhuna - Tlhareseleele Section B-101-1 8+500 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 44 1-44 Cropland No fence 2,887.13 0.00 Moilwa Letshelea Moilwa Aron Letshelea Rakhuna - Tlhareseleele Section B-101-1 8+700 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 45 1-45 Cropland No fence 741 1,721.65 0.00 Tshepho Letshelea Tshepho Letshelea Rakhuna - Tlhareseleele Section B-101-1 8+940 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 46 1-46 Cropland No fence 3,249.45 0.00 Letshelea Letshelea Letshelea Letshelea Rakhuna - Tlhareseleele Section B-101-1 9+060 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 47 1-47 Cropland No fence 740 1,974.60 0.00 Ntutu Letshelea Sekonyela Derick Letshelea Rakhuna - Tlhareseleele Section B-101-1 9+200 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 48 1-48 School Fence 672 306.51 51.00 Government (Goodhope Sub-District) Tlhareseleele Primary School REP Bagogi Nkwane Tlhareseleele Section B-101-1 10+200 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 49 1-49 Developed Residential Plot Fence 306 12.94 12.00 A.M.E. Church A.M.E. Church REP Kganari Madiehe Tlhareseleele Section B-101-1 10+400 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 50 1-50 Developed Residential Plot Fence 373 55.51 42.00 Mpuane Selelo Mpuane Zacharia Sello Tlhareseleele Section B-101-1 10+420 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 51 1-51 Developed Residential Plot Fence 302 152.71 58.00 1 Mapompo Selelo Mapompo Sello Tlhareseleele Section B-101-1 10+440 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 52 1-52 Developed Residential Plot Fence 372 34.05 24.00 1 Molefhi Pheko Molefhi Pheko Tlhareseleele Section B-101-1 10+500 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 53 1-53 Developed Residential Plot Fence 461 0.75 4.00 1 Phakiso Mmasa Phakiso Daniel Mmasa Tlhareseleele Section B-101-1 11+840 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation B101-2 54 2-01 Developed Residential Plot Fence 272.84 57.00 4 Dimakatso Mmasa Dimakatso Maasa Tlhareseleele Section B-101-2 0+080 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 55 2-02 Developed Residential Plot Fence 46.55 39.00 1 Elliot Mmasa Elliot Putsweng Mmasa Tlhareseleele Section B-101-2 0+080 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 56 2-03 Cemetery Fence 197.45 46.00 1 Tlhareseleele VDC Tlhareseleele VDC(cemetry) Tlhareseleele Section B-101-2 0+100 RHS Football Pitch Tlhareseleele VDC REP Phakiso 57 2-04 Football Ground Fence 9.97 13.00 Football Pitch Tlhareseleele VDC Tlhareseleele Section B-101-2 0+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Mmasa 58 2-05 Developed Residential Plot Fence 64.33 55.00 1 Mosenantsa Lekgori Mosenantsa Lekgori Tlhareseleele Section B-101-2 0+300 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 59 2-06 Cropland Fence 78.27 35.00 Selelo Maoba Sello Ephraim Maoba Tlhareseleele Section B-101-2 0+600 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 60 2-07 Cemetery Fence 33.45 20.00 Pitsane VDC Pitsane V.D.C Pitsane Section B-101-2 3+800 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 61 2-08 Developed Residential Plot Fence 80.65 46.00 Mmatumo Methole Letsema James Methole rep Lorato B Methole Pitsane Section B-101-2 4+040 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 62 2-09 Developed Residential Plot Fence 186.79 44.00 Ranko Motshweneng Ranko Motshweneng Pitsane Section B-101-2 4+040 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 63 2-10 Developed Residential Plot Fence 16.44 52.00 Kebaabetswe A Leshomo Kebaabetswe Leshomo Pitsane Section B-101-2 4+100 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 18 AFFECTED ASSETS LOCATION Compensation Code Area Affected m2 Fence m Trees u Owner (As in original RAP) Owner (As per assessment record) Money / Area Serial No. Identificatio Description of Developments Plot nº Quantity Quantity Quantity Place Road Name Central Chainage Side Consultation n number as 64 2-11 Developed Residential Plot Fence 32.60 34.00 Selekanyo .E. Zulu Selekanyo .E. Zulu Pitsane Section B-101-2 4+500 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 65 2-12 Developed Residential Plot Fence 43.68 44.00 Henry Nchupetsang Henry Nchupetsang Pitsane Section B-101-2 4+600 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 66 2-13 Developed Residential Plot Fence 31.12 17.00 Violet .T. Kolwane Violet .T. Kolwane REP Joshua Kolwane Pitsane Section B-101-2 4+700 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 67 2-14 Developed Residential Plot No fence 166.61 0.00 Doreen Kolwane Pitsane Section B-101-2 4+760 RHS Money Wronly captured by CE 68 2-15 Developed Residential Plot Fence 21.98 21.00 Botswana Railways Pitsane Section B-101-2 5+060 RHS 69 2-16 Developed Residential Plot Fence 123.10 63.00 See Rolong Land board Tomas Madikela (deceased) REP Pitsane Section B-101-2 4+000 LHS Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation B101-04 70 4-01 Developed Residential Plot Fence 126.50 42.50 Batsile Edith Molale Batsile Edith Molale Pitsane Molopo - Leporung Section B-101-4 0+360 LHS 71 4-02 Cropland Fence 565.00 87.00 Aobakwe Mmelesi Aobakwe Mmelesi Pitsane Molopo - Leporung Section B-101-4 6+680 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 72 4-03 Cropland Fence 1,770.46 304.00 Lapologang Sebina Lapologang .C. Sebina Pitsane Molopo - Leporung Section B-101-4 6+880 - 7+160 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 73 4-04 Cropland Fence 2,176.86 365.00 Thusoyaone Mogorosi Thusoyaone Mogorosi Pitsane Molopo - Leporung Section B-101-4 7+900 - 8+260 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 74 4-05 Cropland Fence 5,447.25 470.00 Matsatsakwe Sechele Matsetsako Sechele Pitsane Molopo - Leporung Section B-101-4 8+680 - 9+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 75 4-06 Cropland Fence 3,771.19 257.00 Monnaakoma Otukile Monnaakoma Otukile Pitsane Molopo - Leporung Section B-101-4 8+780 - 9+100 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 76 4-07 Cropland Fence 3,750.56 339.00 William. G. Mokgosi William. G. Mokgosi Pitsane Molopo - Leporung Section B-101-4 9+100 - 9+420 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 77 4-08 Cropland Fence 2,710.34 532.00 Mothathobi Matshane Simon M. Matshane Pitsane Molopo - Leporung Section B-101-4 9+420 - 9+940 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 78 4-09 Cropland Fence 1,862.31 316.00 Tebog Ramahosi Tebogo Ramahosi Pitsane Molopo - Leporung Section B-101-4 10+700 - 11+000 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 79 4-10 Developed Residential Plot Fence 27.44 23.00 Keeditse Sekwenyane Keeditse Sekwenyane Leporung Section B-101-4 12+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 80 4-11 Undeveloped Residential Plot No fence 257.21 0.00 Tshepang Lentsokwane Bonolo Sekwenyane Leporung Section B-101-4 12+300 - 12+420 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 81 4-12 Cropland Fence 298.65 127.00 Jackson Sechele Matsidiso J. Sechele Leporung Section B-101-4 13+080 - 13+200 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Kgaotsang Motsamai (Deceased) 82 4-13 Developed Residential Plot Fence 26.85 21.00 Goitsemang Makgokolo Leporung Section B-101-4 13+520 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Goitsemang Makgokolo Mothaakgotla Serathi (Deceased) 83 4-14 Developed Residential Plot Fence 17.00 18.00 Gontlemang Khupelo Leporung Section B-101-4 13+620 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Gontlemang Khupelo 84 4-15 Developed Residential Plot Fence 108.18 43.00 Kanti Phadima Olivina Phadima Leporung Section B-101-4 13+699 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 85 4-16 Developed Residential Plot Fence 66.79 27.00 Kanti Phadima Kagiso Sekwenyane Leporung Section B-101-4 13+700 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 86 4-17 Cropland Fence 1,066.28 279.00 Kenalegetsho Loabile Kenalegetsho Loabilwe Leporung Section B-101-4 14+520 - 14+800 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Phitshane 87 4-18 Developed Residential Plot Fence 4.48 7.00 Unknown Leporung Section B-101-4 16+880 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Molopo Land Board Jambo Kokomane (Deceased) 88 4-19 Developed Residential Plot Fence 50.36 28.00 Mmatshipa Kokomane Leporung Section B-101-4 16+980 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Mmatshipa Kokomane Property of Botswana Telecoms 89 4-20 Telcoms Antenna/ Tower Fence 18.96 23.00 BTC Leporung Section B-101-4 17+380 RHS Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Corporation Philmon T. Dikhutso (deceased) REP Boingotlo 90 4-21 Developed Residential Plot Fence 207.20 62.00 2 Philmon Tlhatlosi Dikhutso Leporung Section B-101-4 18+080 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Angos Philmon T. Dikhutso (deceased) REP Boingotlo 91 4-22 Developed Residential Plot Fence 336.56 61.00 Philmon Tlhatlosi Dikhutso Leporung l 18+120 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Angos 92 4-23 Developed Residential Plot Fence 27.64 19.00 Rraditla Jackson Tsamaesi Rraditla Jackson Tsamaesi Leporung - Dikhukhung Section B-101-4 19+800 LHS Money Wronly captured by CE 93 4-24 Cropland Fence 802.61 166.00 Brad Sesike Norman Sesike Leporung - Dikhukhung Section B-101-4 20+540-20+700 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Nametso Sebolai 94 4-25 Cropland Fence 1,240.18 278.00 Nametso Sebolai Leporung - Dikhukhung Section B-101-4 20+860 - 21+140 LHS Money Wronly captured by CE c/o Mosidi Lenah Sebolai Gopolang Belemo (Deceased) 95 4-26 Developed Residential Plot Fence 133.82 45.00 Dibaga Belemo Leporung - Dikhukhung Section B-101-4 21+960 - 22+000 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Dibaga Belemo 96 4-27 Developed Residential Plot Fence 6.43 26.00 Tsholofelo Belemo Tsholofelo Belemo Leporung - Dikhukhung Section B-101-4 22+010 - 22+040 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 97 4-28 Developed Residential Plot Fence 147.57 53.00 Ntshesane Tshukudu Ntshesane Tshukudu Leporung - Dikhukhung Section B-101-4 22+120 - 22+160 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 98 4-29 Developed Residential Plot Fence 97.96 53.00 1 Mothobodi Sebetlela Julia Sebetlela Leporung - Dikhukhung Section B-101-4 22+380 - 22+420 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 99 4-30 Cropland Fence 1,532.12 231.00 Loeto Edward Kepadisa Loeto E. Kepadisa Dikhukhung - Mmakgori Section B-101-4 27+040 - 27+240 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Marks Seleka (Deceased) 100 4-31 Cropland Fence 1,860.26 178.00 Marks Seleka Dikhukhung - Mmakgori Section B-101-4 28+640 - 28+800 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Kealeboga Seleka Marks Seleka (Deceased) 101 4-32 Cropland Fence 2,566.87 231.00 Marks Seleka Dikhukhung - Mmakgori Section B-101-4 29+020 - 29+220 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Kealeboga Seleka 102 4-33 Cropland Fence 312.12 265.00 Oaitse Kebakuile Oaitse Kebakuile Dikhukhung - Mmakgori Section B-101-4 29+320 - 29+580 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 103 4-34 Undeveloped Residential Plot Fence 24.80 33.00 2 Thabo Kgololo Thabo Kgololo Mmakgori Section B-101-4 33+860 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 104 4-35 Developed Residential Plot Fence 3.38 6.00 Motlhatlhobi Mothibamele Motlhatlhobi Mothibamele Mmakgori Section B-101-4 34+100 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 105 4-36 Cattle Kraal Fence 38.36 19.00 Unknown (krall) unknown (kraal) Mmakgori Section B-101-4 34+300 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 106 4-37 Cattle Kraal Fence 116.63 44.00 Mogomotsi Lekgowe Mogomotsi Lekgowe (kraal) Mmakgori Section B-101-4 34+640 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 107 4-38 Church/ Prayer Area Fence 685.28 103.00 ZCC Church ZCC Church Mmakgori Section B-101-4 35+520 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 108 4-39 Cropland Fence 2,005.93 290.00 Ophaketse Tsamaesi c/o Ntshegetsang Tsamaesi Ophaketse Tsamaesi Mmakgori - Tshidilamolomo Section B-101-4 42+320 - 42+600 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 109 4-40 Developed Residential Plot Fence 30.39 21.00 Mokgatla Kedisitse Mokgatla Kedisitse Tshidilamolomo Section B-101-4 45+240 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 110 4-41 Developed Residential Plot Fence 18.14 14.00 1 Kealeboga Morupisi (nee) Motseokae Kealeboga Morupisi Tshidilamolomo Section B-101-4 45+620 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 111 4-42 Cropland Fence 3,934.58 461.00 Magopelo Thomas Mokatosakgotla Thomas Tshidilamolomo - Mabule Section B-101-4 50+060 - 50+500 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Kepaletswe Seikalaheng (deceased) rep Baetla 112 4-43 Cropland Fence 4,308.95 621.00 Mmabeetla Moopedi Tshidilamolomo - Mabule Section B-101-4 50+520 - 51+120 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Diphoko 113 4-44 Cropland Fence 7,511.38 731.00 Mmaseroba Motladiile Kgomonyana Motladiile Tshidilamolomo - Mabule Section B-101-4 50+800 - 51+500 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Jan Vanveisterhuizen (Deceased) 114 4-45 Cropland Fence 3,548.37 337.00 Jan Vanderwesterhuizen Tshidilamolomo - Mabule Section B-101-4 51+500 - 51+820 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Dikeledi Vanveisterhuizen 115 4-46 Cropland Fence 7,921.71 564.00 Zakaria Tsatsi Zakaria Tsatsi Tshidilamolomo - Mabule Section B-101-4 51+820 - 52+360 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation States Motladiile 116 4-47 Cropland Fence 3,902.87 318.00 Ruth L. Motladiile Tshidilamolomo - Mabule Section B-101-4 51+840 - 52+140 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Lesegonyane Ruth Motladiile 117 4-48 Cropland Fence 1,752.15 374.00 Kelibileone Maiketso Kelibileone Maiketso Tshidilamolomo - Mabule Section B-101-4 52+520 - 52+900 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Lekgari (Surname unknown) 118 4-49 Cropland Fence 2,110.16 430.00 Lucky Laki Lesaumakwe Tshidilamolomo - Mabule Section B-101-4 55+080 - 55+480 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation whereabouts unknown 119 4-50 Cropland Fence 7,107.37 404.00 Freeman Mogaga Freeman Mogaga Tshidilamolomo - Mabule Section B-101-4 55+500 - 55+860 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Martha Rampagane (Deceased) 120 4-51 Cropland Fence 8,422.09 595.00 Martha Rampagane Tshidilamolomo - Mabule Section B-101-4 55+880 - 56+460 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Andrew Rampagane 121 4-52 Cropland Fence 4,527.11 420.00 Motshidisi Melangwane Motshidisi E Kopolo Tshidilamolomo - Mabule Section B-101-4 56+600 - 57+000 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Onchebile Moreeng (Deceased) 122 4-53 Cropland Fence 12,959.14 1,201.00 Onchebile Moreeng Tshidilamolomo - Mabule Section B-101-4 56+640 - 57+820 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Mmapolo Moreeng 123 4-54 Developed Residential Plot Fence 1.73 5.00 Selatlho Moreeng Selatlho E.Moreeng Mabule Section B-101-4 60+080 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Government (Goodhope Sub-District 124 4-55 School Fence 414.15 110.00 Goodhope Sub-District Mabule Section B-101-4 60+600 - 60+700 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation Education Department) Motlhabane Oatsi (Deceased) 125 4-56 Cropland Fence 684.45 176.00 Nurse Oatsi Mabule Section B-101-4 60+880 - 61+040 LHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation c/o Nurse Oatsi 126 4-57 Developed Residential Plot Fence 18.43 41.00 Anna Moreeng Anna Moreeng Mabule Section B-101-4 61+060 - 61+100 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 127 4-58 Developed Residential Plot Fence 112.96 52.00 Bernard Pule Bernard Pule Mabule Section B-101-4 61+280 - 61+320 RHS Money Face to face consultation with affected person. The PAP appreciated the project and opted for monetary compensation 19 APPENDIX 2. AFFECTED ASSETS DRAWINGS (ALL PAP´s - OLD, ADDITIONAL & AVOIDED) 20 X= X= X= X= X= X= 35 35 35 35 35 35 67 68 70 6 6 7 60 90 10 00 00 00 0 0 0 0 10 0+ X= 35 650 0 00 26 7 17 Y= B101-1-3 0+300 0+200 0+400 0 00 STOP B10 0+100 0+ 1 0+300 B101-1-2 B101-1-4 R=377 0+308,149 RECTA 0+400 0+200 B101-1-1 0+100 RECTA 0+134,415 R=430 0 0+5 0+00 00 STOP R=3 A REC 77 0 + R=430 0+ REC T B101-1 TA 0+5 0+00 458 0+600 -5 00 ,234 0 040, 314 0+600 R=-4 REC 80 0+5 TA SHEET 2 9,68 3 1350 2 0 50 0 0 0 0 72 40 30 20 10 71 72 72 72 72 Y= 71 71 71 71 Y= Y= Y= Y= 0 10 0+ X= X= X= X= X= SHEET 1 35 35 35 35 35 7 7 7 7 7 10 30 40 50 20 0 0 0 0 0 X= 35 7 00 0 0+900 B101 B101_1_59 B101 0+694,527 B101_1_56 1+000 0+900 1+100 B101_1_54 RECTA R=-480 0+500 1+200 B101-1-5 1-6 1+000 0+600 0+800 B101- 0+900 1+100 R=770 1+045,285 RECTA R=770 0+894,964 RECTA 0+700 0+500 1+200 0+600 0+800 B101_1_58 B101 B101_1_57 _1_60 R=-48 0 RECT 20 0+700 2 17 0 B101_1_55 A 7 Y= 0+539,6 1350 82 ET 3 SHE X= 0 0 0 0 0 10 00 90 80 70 35 2 2 1 1 1 6 17 17 17 17 17 90 7 7 7 7 7 0 Y= Y= Y= Y= Y= Rakhuna 0+ 00 0 0+000 RECTA R=430 0+040,3 SH 14 0+100 R=430 RECTA 0+134,415 EE Start Axis 0+200 OLD PAP T1 CH 0+000 0+300 RECTA R=377 0+308,149 0+0 B101-1-AR1 00 0+400 0+458,234 R=377 RECTA ADDITIONAL PAP 1 A 0+500 RECTA R=-480 0+539,682 Ramatlabama 0+600 AVOIDED PAP 0+694,527 R=-480 RECTA 0+700 SH 0+800 EE T2 RECTA 0+900 R=770 0+894,964 1+0 WRONGLY CAPTURED PAP 1+000 00 R=770 RECTA 1+045,285 1+100 T5 SHEE 1+200 1+300 SH T4 2+768,505 R=300 R=-460 RECTA R=-600 EE 1+352,112 2+700 EE SH T 3 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 1 OF 9 21 B101 RECTA _1_5 1+937,093 9 R=-125 X =3 X=3 X=3 X=3 X =3 X =3 X=3 T4 ET 2 5 5 5 5 57 57 58 76 77 78 81 500 900 000 SHEE 00 00 00 00 B10 SHE 1 B101 0 1+2 1+90 0 1+90 00 1+2 00 B1 01 _1 _6 0 1+3 00 1+3 B1 00 01- 1-7 0 0 0 1+4 80 1+ 700 171 1+662,753 P STO Y=7 1+4 00 0 80 RE 0 R= 1+ CT -60 STOP RECTA A R=-600 1+500 1+3 52,1 1+600 12 1+500 1+700 X=3 57 1+600 400 R=-125 RECTA 1+700 1+750,607 600 500 400 171 171 171 Y=7 Y=7 Y=7 Y= Y= Y= Y= Y= Y= SHEE 71 71 71 71 71 71 71 71 71 71 72 72 60 70 80 90 00 10 0 0 0 0 0 0 T3 2+300 2+40 0 2+300 0 0 00 2+20 8 1_61 35 B101_ 2+40 X= 0 R=310 2+ REC TA -1-08 2+20 B101 0 239, 903 0 2+ 2+10 500 B1 R= TA RE 310 C 01 3 -1- 7,09 2+ 463 09 2+10 1+93 2+ ,71 500 4 0 TA 5 REC R=-12 B101 0 2+00 B101 B1 01 -1-10B1 1+900 01 -1- 2+00 11 2+ 0 1+900 600 2+ 600 ET 5 SHE 10 0 00 30 0 4 00 00 8 82 58 58 85 35 35 3 3 35 X= X= X= X= X= Ramatlabama 0+600 0+694,527 R=-480 RECTA 0+700 SH 0+800 6 EE T EE T2 SH RECTA 0+900 R=770 0+894,964 OLD PAP 1+0 1+000 00 R=770 RECTA 1+045,285 1+100 RECTA 3+500 R=1220 3+505,5 19 ADDITIONAL PAP R=1220 RECTA 5 3+425,5 00 T 3+400 SHEE 1+200 59 3+315,1 RECTA R=-400 3+300 01 B1 3+200 1+300 SH T4 3+068,455 2+768,505 3+000 R=-400 RECTA RECTA R=-225 R=300 R=-460 3+166,518 RECTA R=-600 EE 1+352,112 2+700 3+000 3+100 2+800 EE 2+900 R=-225 R=300 1+400 2+600 SH R=-460 2+500 RECTA 2+917,230 RECTA R=310 2+400 2+678,538 2+463,714 AVOIDED PAP T 2+300 3 R=310 1+500 RECTA 2+239,9 03 2+200 1+600 0 2+100 00 53 1+662,7 R=-600 RECTA 2+ 2+000 93 1+700 1+937,0 RECTA R=-125 1+900 1+800 RECTA R=-125 1+750,6 07 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 22 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 2 OF 9 Y= Y= Y= Y= T6 7 7 7 7 17 17 17 17 2 2 2 2 10 20 30 40 EE 0 0 0 0 ET 4 59 SH 5,1 31 3+ SHE -4 0 T A C 0 RE B101 R= 01 B1 2+768,505 0 30 3+ B101-1-12 R=300 2+600 0 R=-460 30 B101-1-13 2+700 3+ B101-1-1 Y=7 17 1 2 2+600 00 2+700 0 2+800 B10 1-1 0 3+20 -15 R=-460 RECTA 2+678,5 2+800 455 0 3+20 -17 3+068, 2+9 B101-1 00 B10 A 38 1-1- RECT R=-225 _72 14 1_1 B10 B101- 2+9 3+000 1- 0 16 0 3+100 B1 R=-400 R= R= 5 RECT 01 -22 300 _1 3+000 _7 A 1 2+ 3+166, 3+100 917 ,23 518 0 1_62 0 50 B101_ 3 58 X= 0 0 0 0 0 0 60 90 00 70 80 10 58 58 59 8 8 9 35 35 35 3 3 3 X= X= X= X= X= X= Y= Y= Y= Y= Y= Y= Y= 7 7 7 7 7 7 7 T7 172 172 172 172 172 173 173 SHEET 6 EE 500 600 700 800 900 000 100 SH SHEET 6 8,455 A3+06 5 RECT R=-22 B10 1-1- 17 B101-1-18 3+10 3+315,159 0 3+800 RECTA 3+200 B101 B101 R=-400 3+700 3+10 3+600 3+900 3+500 3+300 0 3+200 3+400 3+800 000 3+700 359 3+600 R=1000 RECTA X= 4+000 3+900 3+500 3+300 R=-40 RECT R=1220 RECTA B101-1-19 3+400 3+765,795 R=1220 3+425,500 0 A RECTA 3+16 3+505,519 4+000 6,518 4+1 Y= 00 7172 400 4+10 0 B10 T5 4+2 1-1- 00 20 EE SH 100 200 300 4+20 359 359 35 9 X= X= X= 0 0 00 5+ 5+000 T 7 SHEE 4+900 4+745,322 RECTA R=-630 R=-475 4+700 RECTA 4+800 4+839,820 4+443,189 R=-630 RECTA RECTA R=-1180 4+600 4+665,106 RECTA 4+581,124 R=640 4+400 4+500 R=640 RECTA 4+500,877 R=-1180 4+362,565 RECTA 4+300 R=1000 RECTA 4+284,577 4+200 000 4+100 4+ 6 4+000 T B101-1 E 3+900 HE OLD PAP 3+800 S R=1000 RECTA 3+765,7 95 3+700 3+600 RECTA 3+500 R=1220 3+505,5 ADDITIONAL PAP 19 R=1220 RECTA T5 3+425,5 00 3+400 SHEE 59 3+315,1 RECTA R=-400 3+300 01 B1 3+200 SH T4 3+068,455 2+768,505 3+000 R=-400 RECTA RECTA R=-225 R=300 R=-460 3+166,518 EE 2+700 3+000 3+100 2+800 AVOIDED PAP EE 2+900 R=-225 R=300 2+600 SH R=-460 2+500 RECTA 2+917,230 RECTA R=310 2+400 2+678,538 2+463,714 T 2+300 3 R=310 RECTA 2+239,9 03 2+200 0 2+100 00 2+ 2+000 93 1+937,0 RECTA R=-125 WRONGLY CAPTURED PAP 1+900 1+800 RECTA R=-125 1+750,6 07 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 23 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 3 OF 9 Y= Y= Y= Y= Y= T6 7 7 7 7 7 17 17 17 17 17 3 3 3 3 3 20 30 40 50 60 EE 0 0 0 0 0 SH Y= 7 17 3 10 0 4+443,189 RECTA R=-1180 B101-1-22 4+400 1355 4+200 4+300 B101 B101 4+100 4+400 4+500 4+700 4+600 4+200 4+300 R=1000 4+284,577 RECTA 4+100 4+500 0 55 B101-1-20 R=-1180 4+00 4+700 55 13 RECTA 4+362,565 RECTA R=640 13 4+600 B101-1-21 R=640 4+581,124 RECTA 4+500,877 4+00 R=-630 RECTA 4+665,106 0 30 0 9 35 X= T8 SHEE 0 0 0 0 0 0 40 50 60 70 80 90 9 9 9 9 9 9 35 35 35 35 35 35 X= X= X= X= X= X= Y= Y= Y= Y= Y= Y= 7 71 71 71 71 71 71 T 73 73 73 73 74 74 9 SHEE 60 70 80 90 00 10 SHEET 0 0 0 0 0 0 B101_1_69 00 98 35 X= B10 B101 2 1 5,32 4+74 0 4+70 Y= B101 A 30 RECT 71 R=-6 -1-23 73 4+7 5+400 00 5+300 50 0 86 R=-6 5+045,8 REC 5+200 TA 30 5+400 A 5+300 RECT R=-475 B101-1-26 RECTA R=900 4+80 5+200 0 5+100 B101-1-25 5+000 4+900 5+300,219 4+80 B101_1_70 R=900 5+13 RECT 5+100 4+900 5+000 0 A R=-4 RECT 1,294 75 9,820 4+83 A B101-1-24 00 99 35 X= 00 10 0 20 0 00 00 60 0 03 36 3 36 36 X= X= X= X= 10 EET SH ET 9 6+400 6+242,630 RECTA R=-500 SHE 6+300 6+200 6+000 R=-500 6+100 RECTA 6+134,906 6+000 5+900 RECTA 5+926,842 R=1100 5+800 5+700 5+600 8 ET R=1100 RECTA 5+541,488 OLD PAP 5+500 E SH 5+400 5+300 RECTA R=900 5+300,219 5+200 R=900 RECTA 5+131,2 00 86 94 5+045,8 5+100 RECTA R=-475 0 5+ ADDITIONAL PAP 5+000 T7 SHEE 4+900 4+745,322 RECTA R=-630 R=-475 4+700 RECTA 4+800 4+839,820 4+443,189 R=-630 RECTA RECTA R=-1180 4+600 4+665,106 RECTA 4+581,124 R=640 4+400 4+500 R=640 RECTA 4+500,877 R=-1180 4+362,565 RECTA 4+300 R=1000 RECTA 4+284,577 4+200 000 AVOIDED PAP 4+100 4+ 6 4+000 B101-1 ET 3+900 E SH 3+800 R=1000 RECTA 3+765,7 95 3+700 WRONGLY CAPTURED PAP 3+600 RECTA 3+500 R=1220 3+505,5 19 R=1220 RECTA 3+425,5 00 3+400 59 3+315,1 RECTA R=-400 3+300 01 B1 3+200 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 24 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 4 OF 9 Y= Y= Y= Y= Y= 7 7 7 7 7 17 17 17 17 17 4 4 4 4 4 20 30 40 50 60 0 0 0 0 0 Y= 13 7 60 17 4 10 0 5+700 5+800 136 0 20 5+600 5 5+900 0 36 X= 5+700 5+800 B101 B101 5+600 5+500 5+900 6+000 B101-1-2 8 R=1100 5+926,8 RECTA R=1100 5+541,4 RECTA 5+500 B101-1 6+000 5+400 6+100 -27 _73 101_1 42 88 B 6+100 5+400 R=-500 RECTA 6+134,9 SHEET 10 0 _1_7 06 B101 8 SHEET 0 0 0 0 0 0 30 40 50 60 70 80 0 0 0 0 0 0 36 36 36 36 36 36 X= X= X= X= X= X= Y= Y= Y= Y= Y= Y= SHEET 9 7 7 7 7 7 7 17 17 17 17 17 17 4 5 4 4 4 5 1 80 10 60 70 90 00 0 0 0 0 0 0 1 SHEET 1365 0 13 70 7 60 0 3 X= B101 B101 -31 20 B101- -1 6+717,7 1-28 B101 6+242,630 RECTA R=-500 6+100 RECTA 6+800 R=-500 B101-1-29 6+700 6+200 6+100 6+800 6+200 6+700 6+300 6+400 6+500 6+600 R=-500 RECT _ B101_1 A 6+300 6+134, 6+400 6+500 6+600 R=-500 906 RECTA 6+624,160 _74 B101_1 Y= 7 17 4 50 0 0 0 0 0 0 0 80 90 00 10 20 30 3 60 36 0 361 36 1 361 36 1 X= X= X= X= X= X= 00 7+0 7+103,107 7+000 R=-1000 R=440 6+953,853 6+900 R=440 RECTA 6+873,515 10 6+800 6+717,720 EET RECTA R=-500 6+700 SH R=-500 RECTA 6+600 6+624,160 6+500 ET 9 6+400 6+242,630 RECTA R=-500 SHE 6+300 6+200 6+000 R=-500 6+134,906 RECTA 6+100 6+000 5+900 RECTA 5+926,842 R=1100 5+800 OLD PAP 5+700 5+600 T8 R=1100 RECTA 5+541,488 EE 5+500 SH 5+400 5+300 RECTA R=900 5+300,219 ADDITIONAL PAP 5+200 R=900 RECTA 5+131,2 0 86 94 5+045,8 5+100 00 RECTA R=-475 5+ 5+000 4+900 4+745,322 RECTA R=-630 R=-475 4+700 RECTA 4+800 4+839,820 R=-630 RECTA AVOIDED PAP 4+600 4+665,106 RECTA 4+581,124 R=640 4+500 R=640 RECTA 4+500,877 B101-1 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, AFFECTED ASSETS B-101-1 PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 SHEET: GABORONE AP MAIN ROADS. B101-1 PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: 25 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 5 OF 9 Y= Y= Y= Y= Y= Y= Y= 7 71 71 71 71 71 71 T 12 17 75 75 75 75 75 75 10 51 2 3 4 5 6 7 00 00 00 00 00 00 00 SH EET S HE E R=-1800 7+458,394 B101 B101-1-31 B101 RECTA 7+047,377 RECTA R=-1000 7+000 B101-1-32 7+400 6+900 6+800 7+500 00 7+300 2 7+200 3 61 7+000 13 X= 1375 7+400 7 6+900 5 6+800 7+500 7+100 RECTA R=440 7+200 7+300 R=-1000 R=440 6+873,515 6+953,8 7+100 B101-1-33 R=-1800 B101_1_75 RECTA 7+103,107 53 B101-1-30 30 0 00 00 00 1 14 15 16 36 36 36 36 X= X= X= X= Y=7 Y=7 Y=7 Y=7 Y=7 Y=7 Y=7 SHEET 13 176 175 175 175 176 176 176 000 700 800 900 100 200 300 T 11 SHEE 7+726,528 B101 B101 B101-1-38 B101-1-39 B101-1-35 R=5000 R=-1170 7+600 7+700 7+500 8+000 8+100 8+200 7+900 7+800 7+600 7+700 00 7+500 8+200 6 8+100 8+000 61 7+900 X=3 7+800 R=5000 RECTA R=-1170 B101-1-37 B101-1-40 RECTA 7+569,067 B101-1-34 B101-1-36 7+957,803 0 00 00 6 1 70 61 8 61 9 X=3 X=3 X=3 6+0 00 SHEE T 10 SHEET 1 3 9+00 0 OLD PAP 8+945,144 RECTA R=-2500 B101 8+900 8+800 SHEET 12 6+100 8+700 6+242,630 6+200 SHEET 11 R=-500 RECTA RECTA R=-500 ADDITIONAL PAP 6+134,906 R=-2500 8+600 RECTA 8+632,983 8+500 6+300 8+000 8+400 6+400 8+300 6+717,720 8+200 6+500 7+000 RECTA R=-500 6+700 8+100 6+600 7+726,528 8+000 RECTA 7+047,377 RECTA R=-500 R=5000 R=5000 RECTA 7+957,803 R=-1170 7+000 7+900 6+624,160 R=-1000 6+800 7+700 7+458,394 6+900 RECTA R=440 7+800 7+600 RECTA 6+873,515 R=-1000 R=-1800 R=440 7+200 7+300 7+400 6+953,853 7+100 R=-1800 RECTA 7+103,107 B101-1 R=-1170 7+500 RECTA 7+569,067 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 26 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 6 OF 9 Y= 7 Y= 7 Y= 7 Y= 7 Y= 7 Y= 7 Y= 7 SHEET 14 SHEET 12 176 176 176 176 176 176 177 400 500 600 700 800 900 000 00 61 8 X=3 Y= 7 176 300 B101-1-39 B101 B101 B101-1-42 8+900 B101-1-44 8+800 8+700 8+200 8+900 8+300 8+400 8+500 8+800 8+600 8+700 8+200 8+300 8+400 B101-1 8+500 B101-1-40 8+600 B101-1-41 R=-2500 RECTA B101-1-43 8+632,983 00 61 9 X=3 00 00 62 0 62 1 X=3 X=3 Y=7 Y=7 Y=7 Y=7 Y=7 Y=7 Y=7 T 15 1 1 1 1 1 1 1 000 77 0 77 1 77 2 77 3 77 4 77 5 77 6 SHEET 13 2 X=36 SHEE 00 00 00 00 00 00 00 8+945,144 13 9+354,300 80 B101-1-46 RECTA B101 B101 R=-2500 0 138 RECTA R=-800 8+900 9+300 9+500 9+000 9+100 9+600 8+900 9+400 9+200 9+300 9+500 9+100 9+000 RECTA R=400 9+496,956 9+600 9+400 R=1500 RECTA 9+200 R=1500 RECTA R=400 9+597,9 CTA RE R=-800 100 B101-1-45 B101-1-47 RECTA 2 9+014,339 X=36 AL SITE 9+123,199 OLOGIC ARCHE 9+258,559 56 0 2 20 2 300 X=36 X=36 Tlhareseleele B101-1-AR2 OLD PAP 255153.121,7147663.966 SHEET 15 ADDITIONAL PAP 0+000 SHEET 16 10+073,944 10+000 R=150 T 14 R=-400 SHEE 10+100 R=-1000 9+853,099 RECTA 10+200 AVOIDED PAP 10+000 9+800 R=-400 RECTA RECTA 10+349,299 R=150 R=-240 10+300 10+004,938 10+225,0 9+900 R=-240 02 R=-1000 9+752,123 9+700 RECTA 10+600 10+500 9+600 RECTA R=400 10+400 9+597,956 9+354,300 9+500R=400 RECTA RECTA R=-800 9+496,956 R=-310 RECTA 10+499,592 9+400 9+300 1 3 SHEET 9+00 0 R=-800 RECTA 9+200 9+258,559 8+945,144 R=1500 RECTA 9+123,199 9+100 RECTA R=-2500 B101 8+900 9+000 R=1500 RECTA 9+014,339 8+800 SHEET 12 8+700 R=-2500 8+600 RECTA WRONGLY CAPTURED PAP 8+632,983 8+500 8+000 8+400 8+300 8+200 8+100 7+726,528 8+000 R=5000 R=5000 RECTA 7+957,803 R=-1170 7+900 7+700 7+800 B101-1 ARCHEOLOGICAL SITE CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 27 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 7 OF 9 e e KGOT KGOTLA FO LA GATE GATE R FOR VE HICL VEHICLES ES 0 0+10 0+10 B1 0 01 _1 _6 3 Y= Y= Y= Y= Y= Y= Y= 7 7 7 7 7 7 7 17 17 17 17 17 17 17 77 78 79 80 81 82 83 00 00 00 00 00 00 00 0+000 4 73,94 10+0 R=-40 0 SHEET 15 R=15 0 STOP 0+000 SHEET 15 10+100 R=-1000 9+853,099 00 22 36 10+100 X= B101 -1-48 RECTA 10+000 10 9+800 +20 B101 9+900 0 B1 10+000 01 R=-400 RECTA R= 40 9+800 R= 10+004,93 15 -2 9+900 ,299 0 9+700 10 10+349 10 00 +3 +2 9+600 00 10+3 25 8 Y= ,0 02 71 RECTA R=-240 77 9+700 R=-1000 9+752,123 60 RECTA 0 9+600 9+50 0 T 14 SHEET 16 B101-1-50 RECTA R=400 138 80 00 0 13 SHEE 4,3 9+597,956 10+400 B101-1-52 9+50 E 9+35 L SIT 0 ICA LOG H EO ARC Y= Y= Y= Y= Y= Y= SHEET 15 SHEET 17 7 71 71 71 71 71 17 78 78 78 78 78 83 00 40 50 60 70 80 25 00 36 0 0 0 0 0 X= B1 B101 0 1 Y= 71 10+900 78 9 10+349,29 0 _64 10+80 2 1_1 00 10 B10 ,112 300 +3 11+000 00 10+ 658 10+800 RECTA + R=-240 10 10 10+900 RECTA R=-3 TA R=310 10+865,380 REC B101-1-50 11+000 R=2005 RECTA 10+977,177 700 10+400 B101-1-52 10+ R=3 REC 10+600 10+ 10+500 10 10+ TA 700 7 18,1 10+500 B101-1-49 86 B101-1-5 10+400 10+600 1 0 2 60 36 X= R=-310 RECTA 10+499,59 2 0 0 00 00 2 70 80 29 30 36 362 36 36 X= X= X= X= Tlhareseleele B101-1-AR2 OLD PAP SHEET 15 ADDITIONAL PAP 0+000 SHEET 16 SHEET 17 AVOIDED PAP 10+073,944 T 14 10+000 R=150 R=-400 11+000 SHEE 10+100 R=-1000 9+853,099 RECTA 10+200 10+000 9+800 R=-400 RECTA RECTA 10+349,299 R=150 R=-240 10+300 10+658,112 10+004,938 10+225, 9+900 10+800 002 R=-240 10+900 RECTA RECTA R=310 10+865,380 R=-310 11+366,569 11+000 R=2005 RECTA R=-1000 9+752,123 9+700 RECTA R=310 RECTA RECTA 10+600 10+700 R=-800 10+500 10+977,177 R=2005 11+057,257 11+300 RECTA 9+600 11+100 10+718,186 RECTA R=400 10+400 9+597,956 11+200 9+354,300 9+500R=400 RECTA R=-800 RECTA RECTA R=-800 11+400 9+496,956 RECTA 10+499,592 R=-310 11+500 11+249,067 RECTA R=850 11+480,280 9+300 9+400 13 SHEET 9+00 0 WRONGLY CAPTURED PAP R=-800 RECTA 9+200 9+258,559 8+945,144 RECTA 9+123,199 9+100 R=1500 RECTA R=-2500 B101 8+900 R=1500 9+000 RECTA 9+014,339 8+800 8+700 R=-2500 8+600 RECTA 8+632,983 B101-1 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 28 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 8 OF 9 Y= Y= Y= Y= Y= Y= 8 71 71 71 71 71 71 1 79 79 78 79 79 79 SHEET 00 30 90 10 20 40 0 0 0 0 0 0 SHEET 16 B101 11+366,569 B101 B101_1_68 B101_1_65 RECTA R=-800 B101_1_67 11+600 Y= 11+300 11+500 71 11+7 78 11+000 00 11+100 80 0 11+400 11+600 11+200 11+500 11+300 R=850 R=310 R=850 11+480,280 00 RECTA 11+000 29 11+400 11+100 R=2005 36 RECTA 11+607,758 R=2005 X= RECTA 11+200 11+ R=-40 700 0 R=3 B101_1_66 10+977,177 R=-800 RECTA 11+057,257 11+ 10 11+249,067 00,57 24 80 13 00 10 0 00 00 30 3 32 33 36 36 36 36 X= X= X= X= Y= Y= Y= Y= Y= 17 7 7 7 7 7 17 17 17 17 17 9 9 9 9 9 SHEET 30 40 60 70 50 0 0 0 0 0 5 138 0 10 3 36 ,156 X= 1385 11+894 11+777,477 _1_ 68 B101 A RECT R=-310 B101 RECTA STO R=-400 13 85 P 18 1385 35 0+000 STOP 11+700 STOP 11+600 Y= 11+900 STOP 7 11+800 17 9 20 RECT 11+900 11+600 0 11+700-400 R=850 R=310 A R= R=310 B101-1-53 11+922 11+800 00 11+5 R=-310 11+607,758 RECTA ,806 11+700 85 11+5 5 138 13 11+828,533 ,524 00 R=850 11 REC TA +480 ,280 11+4 1385 00 0 0 0 0 0 0 20 30 40 50 60 70 363 36 3 36 3 3 63 36 3 36 3 X= X= X= X= X= X= 1+000 Tlhareseleele B1 B101-1-AR2 01 B101-2 OLD PAP ADDITIONAL PAP SHEET 15 0+000 SHEET 16 SHEET 17 AVOIDED PAP 10+073,944 10+000 R=150 R=-400 11+000 10+100 R=-1000 9+853,099 RECTA 10+200 10+000 9+800 R=-400 RECTA RECTA 10+349,299 R=150 R=-240 10+658,112 10+300 10+004,938 10+225, SHE 9+900 10+800 002 R=-240 10+900 RECTA RECTA R=310 10+865,380 R=-310 11+366,569 11+000 R=2005 RECTA R=-1000 9+752,123 9+700 RECTA R=310 RECTA ET 1 RECTA 10+600 10+700 R=-800 10+500 10+977,177 R=2005 11+057,257 11+300 RECTA 11+100 10+718,186 10+400 11+200 8 R=-800 RECTA WRONGLY CAPTURED PAP 11+400 RECTA 10+499,592 R=-310 11+500 11+249,067 RECTA R=850 11+600 0+000 11+480,280 R=850 11+607,758 R=310 11+777,477 RECTA R=-400 11+700 11+894,156 R=310 R=-400 11+700,524 RECTA R=-310 11+800 RECTA R=-310 11+900 11+828,533 RECTA 11+922,806 Final Axis CH 11+937.194 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 29 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 9 OF 9 e e KGOT KGOTLA FO LA GATE GATE R FOR VE HICL VEHICLES ES 0 0+10 0+10 B1 0 01 _1 _6 3 Y= Y= Y= Y= Y= Y= Y= 7 7 7 7 7 7 7 17 17 17 17 17 17 17 77 78 79 80 81 82 83 00 00 00 00 00 00 00 0+000 4 73,94 10+0 R=-40 0 SHEET 15 R=15 0 STOP 0+000 SHEET 15 10+100 R=-1000 9+853,099 00 22 36 10+100 X= B101 -1-48 RECTA 10+000 10 9+800 +20 B101 9+900 0 B1 10+000 01 R=-400 RECTA R= 40 9+800 R= 10+004,93 15 -2 9+900 ,299 0 9+700 10 10+349 10 00 +3 +2 9+600 00 10+3 25 8 Y= ,0 02 71 RECTA R=-240 77 9+700 R=-1000 9+752,123 60 RECTA 0 9+600 9+50 0 T 14 SHEET 16 B101-1-50 RECTA R=400 138 80 00 0 13 SHEE 4,3 9+597,956 10+400 B101-1-52 9+50 E 9+35 L SIT 0 ICA LOG H EO ARC Y= Y= Y= Y= Y= Y= SHEET 15 SHEET 17 7 71 71 71 71 71 17 78 78 78 78 78 83 00 40 50 60 70 80 25 00 36 0 0 0 0 0 X= B1 B101 0 1 Y= 71 10+900 78 9 10+349,29 0 _64 10+80 2 1_1 00 10 B10 ,112 300 +3 11+000 00 10+ 658 10+800 RECTA + R=-240 10 10 10+900 RECTA R=-3 TA R=310 10+865,380 REC B101-1-50 11+000 R=2005 RECTA 10+977,177 700 10+400 B101-1-52 10+ R=3 REC 10+600 10+ 10+500 10 10+ TA 700 7 18,1 10+500 B101-1-49 86 B101-1-5 10+400 10+600 1 0 2 60 36 X= R=-310 RECTA 10+499,59 2 0 0 00 00 2 70 80 29 30 36 362 36 36 X= X= X= X= Tlhareseleele B101-1-AR2 OLD PAP SHEET 15 ADDITIONAL PAP 0+000 SHEET 16 SHEET 17 10+073,944 T 14 10+000 R=150 R=-400 11+000 SHEE 10+100 R=-1000 9+853,099 RECTA 10+200 10+000 9+800 R=-400 RECTA RECTA 10+349,299 R=150 R=-240 10+300 10+658,112 10+004,938 10+225, 9+900 10+800 002 R=-240 10+900 RECTA RECTA R=310 10+865,380 R=-310 AVOIDED PAP 11+366,569 11+000 R=2005 RECTA R=-1000 9+752,123 9+700 RECTA R=310 RECTA RECTA 10+600 10+700 R=-800 10+500 10+977,177 R=2005 11+057,257 11+300 RECTA 9+600 11+100 10+718,186 RECTA R=400 10+400 9+597,956 11+200 9+354,300 9+500R=400 RECTA R=-800 RECTA RECTA R=-800 11+400 9+496,956 RECTA 10+499,592 R=-310 11+500 11+249,067 RECTA R=850 11+480,280 9+300 9+400 13 SHEET 9+00 0 R=-800 RECTA 9+200 9+258,559 8+945,144 RECTA 9+123,199 9+100 R=1500 RECTA R=-2500 B101 8+900 R=1500 9+000 RECTA 9+014,339 8+800 8+700 WRONGLY CAPTURED PAP R=-2500 8+600 RECTA 8+632,983 B101-1 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, AFFECTED ASSETS B-101-1 PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER ACCESS ROADS B101-1 AR2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 30 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-1-20june 2017.dwg 9 OF 9 1385 1385 85 13 u 72 5.1 +92 138 11 00 11 +9 0 u . 5 0 -31 line 94 0 R= ight 7.1 0 +93 u a Str li ne 11 ht Str aig B101 u 00 9 11+ B101-2-0 u u 0+ 00 R= -3 RE 10 1 u u 06 ,8 0 CT A 11 u 922 11+ CT A STOP u +89 4 ,15 u 0+700 6 STOP RE u u u u B101-2-0 u u .163 u 4 13 STOP u 0 +3 6 STOP u u 8 u 13 274 u 5 u 80 0 u 0+60 9.418 R=-1 u u .000 0+ 0+100 u u u u 0 u u R=- 20.00 line B101-2-0 Straig 0.000 u u u u 0.0 e 2 160 u -10 t lin u ht 00 u 1 aig u R=1 6 B101-2-0 ht lin u -06 R= igh u B101-2 u Str 3 u 0 u tra u 0+50 e 0+20 0 71 S u u 00 u 0 Straig R=45 t line 000 u R=1120. 0 0+ 0.00 13 u u u u 1.4 0.000 0+6 u 85 h 0+048.56 R=-10 u 01 u u B101-2-0 0+ u u u u 5 u 0+40 0 u 8 u u u u u 33.3 u 0+300 u 24 u u u u u u 11 u u u u u u u u u u 1+000 u u u u 1+100 u u 0+900 u u u u u u u u u u u u u B101 u u u u u u 10 u u u 1+200 0+800 u u u u u u u 1 u u B101 B10 u u u u u u u 1+300 u u u u u u u line u 4 R=700.000 1375 Straight u R=700.0 u u u 00 u Straight u 1+400 0+7 u u u line u Straight u 00 0+894.869 u R=450.0 u u 1+097.52 u line 0+804.404 00 u u R= 45 0.0 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 CHECKED BY: MN August REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 rev1.dwg 1 OF 4 31 _30 B101_02 _31 B101_02 B101_02_ 29 u u 1+600 u u 1+700 2 _28 B101_0 u u u u u u u u u u u 0 u u u 1+50 u u u u B101 u u 1+800 u u u u u 1 u u u B101 B10 u u u u u u u 1+900 u u u u u u u t line u Straigh 0 u u u u u 07 R=500.00 u 00 u 1+4 u u 2+000 2+100 u u u u u u u u R=5 ht lin u Stra .3 1+724 e 00. e ig 5.000 u 54 Straight lin u 000 1+ R=-92 441 .98 .9 8 1+875 13 70 B101 B101 u u u B101_02_28 u u _ 19 u B101_02_18 B101_02 u 137 137 0 2+100 u 0 137 0 u 2+80 u u 0 u u u u u u u 1370 u u u u u 2+200 u u u u u u u u u 2+500 2+700 u u u u u 2+300 u u u u u u u u u u u u u u u u u u u u 1370 u 2+400 2+600 u u u u 1370 u 2+500 u u u 2+170.241 R=-925.000 u e u Straight lin u u u u u u u u R=-1500.00 e R=-740.000 R=-740.000 2+422.064 Straight lin 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 CHECKED BY: MN August REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 32 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-2 rev1.dwg 2 OF 4 20 B101_02_ B101_ 02_21 13 70 13 3+000 70 3+100 1370 3+200 u u u u B101 2+900 u u 3+300 B101 u 13 u u 3+400 70 u u u u u 2+800 u 3+500 u u u u 1370 13 70 1370 8 B101-2-0 1 1370 137 0 6 B101-2-1 137 u 37 u u u u 1370 0 BTC u B101 0 B101 13 70 u u BTC u 70 BTC u 13 u 4+100 u BTC 4+000 1370 BTC u u u u u u u TC B u u 1370 u u u u 3+50 u 4+200 B101-2-09 u 13 0 B101-2-10 u 3+900 u 7 u 70 B101-2-0 13 u 13 u u u u 70 u 70 u u u u u u BTC u u u B101_02_23 u 3+600 8.3477 u u 3+700 u u 3+800 u u B101_2_24 u u u u u u STOP B101_2 u u 1370 B101_02_22 B101_02_32 70 13 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 CHECKED BY: MN August REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: 2017 MAIN ROADS. B101-2 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 33 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-2 rev1.dwg 3 OF 4 B101 u u B1 BT C u 01 u u u u 4+200 13 u u u 70 u 4+ STOP u 90 STOP u u u u 0 u 4+300 u u u u u u STOP u u u u u u u u u u u u u u B101_2_24 4+400 u u u u u 4+800 u u uB u u u TC BT u 0+000 C B101_2_25 u u u u u 4+500 4+600 4+700 u STOP STOP u u u u u u u u u u u u B101_2_26 u 137 u u u 0 B101_2_27 B101-2-11 2-12 2-13 2-14 B101- B101- B101- u u u u u KGOTLA GATE FOR VEHICLES 0+ 10 0 u u B101 u u 175 u 0 0 13 375 +0 P STO 0 4+900 STO u P STOP u u STO 0 P 20 u 5+ u u u u u u u u u u u 5+ 00 STO 0 P u 00 P STO u 4 +8 TE u 0+ SI 00 0 L CA u P STO GI 0 10 B1 LO 5+ u 01 EO u u -2 CH u -1 u AR 5 14 2- u u - 01 0 70 u 4+ B1 u u BT C u 3 KGOTLA GATE u -1 FOR VEHICLES 1-2 0 B1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP ARCHEOLOGICAL SITE CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-2 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 rev1.dwg 4 OF 4 34 B101-4-01 B101 u u u u STOP u u u u u u u u u u u u u u u u u u u u u u 0+300 0+400 0+500 0+600 u 0+000 0+100 0+200 60 66+700 STOP STOP u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u 119 11 11900 90 119 0 B101 B101 u u u u u u u u u u u u u u STOP u u u u u u u u u u u u u u u u u u u u u u u u 0+600 0+700 0+800 0+900 1+000 1+100 1190 1+200 1+300 STOP STOP 11 u u u u u u u u u u u u u u u u u u u u u u u u u u119 u u u u u u u u 90 0 0 0 119 119 Molopo B101-4-AR1 OLD PAP SHEET 1 0+000 SHEET 2 SHEET 3 ADDITIONAL PAP 1+000 0+000 2+000 AVOIDED PAP Start Axis CH 0+000 WRONGLY CAPTURED PAP B101-3 METLOJANE-MOLOPO 66+000 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 1 OF 44 35 u 0 119 u u u u u 1190 11 90 1191 0190 11 u 90 u 1190 B101 B101 119 1190 0 u u u u u u u u u u u STOP u u u u u u u u STOP 0+000 11 11 1+300 1190 90 2+000 90 1+400 1+500 1+600 1+700 1+800 1+900 11 90 u u u u u u u u u u u u u u 1190 11 1190 90 11 11 90 90 B101 B101 2+200 2+300 2+400 2+500 2+600 2+700 60 2+000 2+100 STOP B101-4-AR1 OLD PAP SHEET 1 SHEET 2 SHEET 3 ADDITIONAL PAP SHEET 4 SHEET 5 1+000 0+000 2+000 3+000 B101 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 36 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 2 OF 44 1185 B101 B101 4+10 0 4+800 4+700 118 5.00 4+20 0 4+600 4+30 0 4+500 4+400 1185 85 11 B101 B101 STOP 5+200 5+300 5+400 5+500 4+800 4+900 5+000 5+100 5+195 5 80 11 117 E T9 OLD PAP SHE 0 6+00 ET 8 ADDITIONAL PAP SHE B101 SHEET 6 SHEET 7 5+00 0 AVOIDED PAP 4+000 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 37 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 4 OF 44 B101 B101 2+700 2+800 2+900 3+000 3+100 3+200 3+300 3+400 B101 B101 3+800 3+900 3+700 4+000 3+500 3+600 3+400 4+100 3+909 OLD PAP SHEET 3 2+000 SHEET 4 SHEET 5 B101 SHEET 6 SHEET 7 ADDITIONAL PAP 3+000 4+000 AVOIDED PAP B101-4 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-4 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 38 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 3 OF 44 1165 11 70 B101 B101 u u u u u u u 5+500 5+600 5+700 5+800 5+900 6+000 6+100 6+200 u u u u u u 70 11 5 117 B101-4_59 B101-4-02 B101 117 B101 5 1175 u u u u u u u u u u u u 6+200 6+300 6+400 6+500 6+600 6+700 6+800 6+900 u u u u u u u u u u u u u u u 1175 B101-4_59 5 117 SH 5+ 00 EE 0 T8 SH EE T9 6+ OLD PAP 00 0 SH EE ADDITIONAL PAP T1 0 AVOIDED PAP 7+ SH 00 0 E ET 11 WRONGLY CAPTURED PAP SHEET 12 EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: CONSULTANT: SCALE: NTS DRAWN BY: VT DATE: TITLE: AFFECTED ASSETS B-101-4 DRAWING Nº: OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 39 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 5 OF 44 B101 1175 1 6+900 B10 u u 7+000 u u u u 7+100 75 00 7+6 u u 11 7+200 u 7+300 7+400 7+500 B101-4-03 1180 B101 u B101 u u u u u u 8+200 8+300 u u u u u 8+100 8+000 7+900 7+800 u u u u u 7+600 7+700 80 11 B101-4-04 SH EE T9 6+ 00 0 SH EE T1 0 OLD PAP 7+ SH ADDITIONAL PAP 00 EE 0 T 11 SHEET 12 SHEET 13 AVOIDED PAP B101 8+000 9+000 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 40 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 6 OF 44 B101_4_81 B101-4-05 8+849 B101 B101 u u 8+300 8+400 8+500 8+600 8+700 8+800 8+900 9+000 u 8+489 8+831 B101-4_60 B101-4-06 B101 B101 0 u u u u 118 9+000 9+100 9+200 9+300 9+400 9+500 9+600 9+700 11 80 B101-4-06 B101-4-07 B101-4-08 OLD PAP SHEET 15 SHEET 14 10+000 ADDITIONAL PAP SHEET 13 B101 SHEET 12 9+000 8+000 AVOIDED PAP B101-4 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 41 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 7 OF 44 B101 B101 STOP 9+700 9+800 9+900 10+000 10+100 10+200 10+300 10+400 STOP u u B101-4-08 4_08 B101-4_61 B101-4_86 1175 B101 B101 u u u u u u u u u u u u 10+400 10+500 10+600 10+700 10+800 10+900 11+000 11+100 u u u u u u u u u u u u u u 1175 10+685 B101-4-09 B101-4_85 OLD PAP SHEET 17 SHEET 16 ADDITIONAL PAP SHEET 15 11+000 SHEET 14 9+000 B101 10+000 AVOIDED PAP WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 42 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 8 OF 44 01 _4 B1 B101 B101 11+100 u 0 11 11+200 +8 0 80 0 11+ 70 11+300 11+400 11+500 11 11+600 60 11+700 u u u B1 01 B101 11 11 + 8 +8 00 00 B1 01 -4_84 B101 0 0 12+5 _4 _ 62 6 4 -4_ B101 - 4-11 B101 00 1170 12+4 11+ 900 00 STOP 12+3 0 B101-4-1 B101-4_63 00 12+2 12+00 65 0 11 12+100 SHEET 20 19 E T S HE 00 0 + 13 SHE OLD PAP ET 1 6 T 18 ADDITIONAL PAP 11+ 000 SHE ET 1 EE SH 7 AVOIDED PAP 00 1 2+0 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE:AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 43 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 9 OF 44 12+700 12+800 B101-4-12 B101 B101 u 12+600 12+900 13+000 u 13+100 13+200 12+500 1160 u u 1160 u u u 1160 u 60 u 11 B101_4_65 1165 u u 13+500 B101 13+400 -4-15 B101 u u 13+6 13+ 600 00 u -4-16 u u u u B101-4- u u 13+ 300 13 u u 13+700 u u u u u 117 B101-4- B101 14 0 0 117 u 1170 13+800 0 1 B1 u u u u u u 13+900 u u 00 u +2 u 13 u u u 5 _6 u _4 01 u 1 5 116 B SHEET 20 SHEET 21 19 14+000 SHEET 22 OLD PAP T EE 0 15+000 SH 3+00 1 ADDITIONAL PAP AVOIDED PAP 18 T EE SH WRONGLY CAPTURED PAP 00 0 12+ CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER GABORONE 44 AP 2017 MAIN ROADS. B101-4 SHEET: PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 10 OF 44 1160 11 65 B101 B101 14+400 14+300 14+200 14+100 14+500 14+000 u u u u 14+600 13+900 u u u u u u u u u u u 65 11 B101 B101 5 116 B101-4-1 14+6 00 7 u u 15+300 u 15+200 u u u 14+700 u 15+100 15+000 14+900 1165 14+800 OLD PAP SHEET 20 SHEET 21 SHEET 23 14+000 SHEET 22 B101 16+000 ADDITIONAL PAP 15+000 00 13 +0 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 45 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 11 OF 44 1165 1165 B101 1165 B101 15+300 15+500 15+600 15+700 15+800 15+900 16+000 15+400 u u u u u u u u u 1165 1165 15+794 65 11 11 5 5 B101 B101 u u u 16+600 16+500 16+700 16+000 16+100 16+400 16+200 16+300 11 u 60 u u u u u u u u 60 11 SHEET 23 SHEET 24 SHE ET 25 OLD PAP 17+ SHEET 22 16+000 000 B101 15+000 ADDITIONAL PAP 0+ 00 B101-4 0 Leporung AVOIDED PAP B101-4-AR2 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 46 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 12 OF 44 1160 u u u u u u u u u u 17+000 17+100 u 17+200 16+900 u u u 17+30 u u 0 u u 0+000 B101-4-19 u 00 16+8 66 B1 B101-4_ u STOP 01 4-18 u B101- 1 u B10 u u u u 17+ 888 400 u 16+ u u 0 16+ 70 B10 11 u u 60 1-4 u -20 u 17+ u 382 u u u u 0+10 0 B101 B101 17+40 u 0 u 00 u 18+1 u u u u u B101-4- 22 1-4- u 20 17+50 0 B10 u 1 18+0 00 1 -4-2 17+382 B10 17+60 0 u u 0 u 17+90 17+700 u 17+800 u u u u u u u 0 116 17+842 17+846 SHEET 24 SHE ET 17+ 25 16+000 000 OLD PAP 0+ ADDITIONAL PAP 00 0 B101-4 SH Leporung EE T AVOIDED PAP 26 B101-4-AR2 WRONGLY CAPTURED PAP 18+ 000 28 SHE ET 2 SH EET 7 000 19+ CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER GABORONE 47 AP 2017 MAIN ROADS. B101-4 SHEET: PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 13 OF 44 B101 01 B1 18+100 u u 18+200 800 u u 18+ B101-4-21 u B101-4-22 18+3 00 00 18+7 18+400 18+500 18+600 55 11 55 11 11 55 B101 B101 11 55 STOP 19+300 19+400 18+80 19+200 19+2 00 19+500 0 1155 19+100 STOP 19+000 1155 u 18+900 19+238 SHE ET 25 0+ 00 0 SH EE T OLD PAP 26 18+ 000 20+000 ADDITIONAL PAP SHE E T 28 ET 2 SHE 7 19+ 000 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 48 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 14 OF 44 -23 B101-4 11 55 19+900 19+800 20+000 u u u u u u u 19+700 u u 20+10 0 B10 1 B101 19+60 0 1160 STOP 20+ 200 0 19+50 STOP 20+15 0 116 0 u u B101 B101 u 20+400 20+300 20+500 11 60 u u u u 20+600 20+900 u u 1160 20+200 u u u 20+700 u 20+800 B101-4-24 1160B101-4_6 7 93 20+2 20+823 OLD PAP 20+000 SHE ET 30 SHE ET 2 8 ADDITIONAL PAP SHEET 31 000 19+ 21+00 0 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 49 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 15 OF 44 11 55 B101 B101-4-2 B101 5 20+900 u u u 21+600 21+000 21+100 21+200 21+300 21+500 21+400 u u u B101-4_67 1160 21+343 203 m 11 60 B101-4-26 B101-4-27 B101-4-28 u u B101 B101 u u 22+000 21+900 22+100 21+800 21+700 22+200 u 1160 22+300 21+600 65 11 22+294 SHE ET 30 OLD PAP SHEET 31 ADDITIONAL PAP 21+00 0 SHEE T 32 AVOIDED PAP 22+00 0 SHEET 34 SHEET 33 B101 23+0 00 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 16 OF 44 50 B101 1 B10 22+3 00 u u 000 23+ u u 22+4 u 00 22+2 94 u u u u u 900 B101 22+ -4-29 22+5 00 u u u 5 u 1165 116 u 22+6 u 00 u u 00 u u u u 22+8 u 22+700 898 22+ 60 60 11 23+300 23+400 23+200 u u u u u u u u 23+500 u u u u u u 00 u u 23+1 u u B101 23+600 1 B10 50 11 75 23+3 23+700 00 23+0 55 11 70 23+0 45 23+6 1145 OLD PAP ADDITIONAL PAP SHEET 34 SHEET 35 SHEET 32 SHEET 33 24+000 AVOIDED PAP 22+000 000 1 23+ B10 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 51 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 17 OF 44 11 1150 45 B101 B101 23+900 24+000 23+800 24+100 u u u u 23+700 24+200 24+400 24+300 1145 55 11 24+238 24+800 1155 STOP 0+000 B101 24+700 24+900 B101 24+600 25+000 u u u u u u u 24+400 24+500 25+100 24+7 50 5 115 B101-4-AR3 Dikhukhung OLD PAP SHEET 34 SHEET 35 SHEET 37 ADDITIONAL PAP SHEET 36 24+000 0+000 25+000 23+ 000 AVOIDED PAP B101-4 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 52 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 18 OF 44 25+500 B101 B101 25+600 25+400 25+700 25+300 25+800 25+100 25+200 25+51 9 B101 B101 25+800 25+900 26+000 26+100 26+200 26+300 26+400 26+500 26+314 26+368 B101-4-AR3 OLD PAP Dikhukhung ADDITIONAL PAP SHEET 37 AVOIDED PAP SHEET 36 SHEET 38 0+000 25+000 26+000 SHEE T 39 WRONGLY CAPTURED PAP 27+0 00 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 53 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 19 OF 44 26+800 26+900 B101 26+700 27+000 B101 26+600 27+100 26+500 u 27+200 u u 26+829 u u 0 115 201 m B101-4-3 0 B101 B101 AL SITE ARCHEOLOGIC u u u 27+200 27+300 u 27+900 27+400 27+500 27+600 27+800 u u 27+700 u u u u u u 1150 27+298 1155 27+887 1155 27+579 27+749 OLD PAP SHEET 39 SHEET 38 SHEE ADDITIONAL PAP 27+000 T 40 26+000 SHEET 41 AVOIDED PAP 28+000 WRONGLY CAPTURED PAP ARCHEOLOGICAL SITE CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 54 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 20 OF 44 B101 B101 27+900 u u u u u u 28+600 28+500 28+400 28+000 28+300 28+100 28+200 u u u u u 11 2575 + 887 28+380 1160 28+900 29+000 28+800 29+100 u B101 B101 0 u 28+70 u u u u 29+200 u u u u u u u u u u 29+300 0 28+986 28+60 u u u u u u u u B101-4-3 1 2 -4-3 B101 SHEET 43 SHEET 42 29+000 30+000 OLD PAP ET 41 SHE SHEET 40 00 ADDITIONAL PAP 28+0 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 55 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 21 OF 44 B101 B101 u u u u u u u u u u u u u u 29+300 29+400 29+500 29+600 29+700 29+800 29+900 30+000 u u u u u u u u u u u u u u u u u u u u u u u u u B101-4-33 29+887 B101 B101 u u u u u u u u u u u u u 30+000 30+100 30+200 30+300 30+400 30+500 30+600 30+700 u u u u u u u u u u u u u u 30+566 SHEET 42 SHEET 43 SHEET 44 OLD PAP 29+000 30+000 B101 SHEET 45 31+000 ADDITIONAL PAP AVOIDED PAP B101-4 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 56 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 22 OF 44 B101 B101 30+700 30+800 30+900 31+000 31+100 31+200 31+300 31+400 u u u u u u u u u u u 31+293 B101 B101 u u u u u u u u u u 31+400 31+500 31+600 31+700 31+800 31+900 32+000 32+100 u u u u u u u u 1160 31+775 OLD PAP SHEET 44 30+000 B101 SHEET 45 SHEET 46 ADDITIONAL PAP 31+000 SHEET 47 32+000 33+000 AVOIDED PAP B101-4 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 57 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 23 OF 44 11 B101 55 B101 u u 32+200 32+300 32+400 32+500 32+600 32+700 32+100 32+800 60 u u u u u u 32+768 32+517 32+229 B101 B101 1160 u u u u u u u u u u 32+800 32+900 33+000 33+100 33+200 33+300 33+400 33+500 u u u u u u u u u u 1160 33+394 OLD PAP SHEET 46 SHEET 47 SHEET 48 SHEET 49 32+000 33+000 34 +0 00 ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 58 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 24 OF 44 1160 D 000 11 60 A O 38+ 11 D R to 60 O 3+9 L 00 60 1160 3 11 O M 11 FR 60 33+900 u 33+800 B101 u STOP u 33+700 B101 u 35 u 33+600 34+ B101-4- 1160 000 u u u B101_4_68 B101_4_82 B101-4-34 u u B101_4_83 0 0 34+2 u u 33+500 u 34+100 u u 1160 34+072 B1 01 B101 34 +2 00 34+900 60 11 B101-4-36 34+800 34+700 34+600 60 34+3 00 34+500 34+400 B101-4-37 B101-4-AR4 SHEET 52 1 T5 0+000 EE SH OLD PAP 0 +00 35 0 ADDITIONAL PAP T5 EE SHEET 48 SH SHEET 4 9 AVOIDED PAP 33+000 34 +0 00 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER GABORONE 59 AP 2017 MAIN ROADS. B101-4 SHEET: PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 25 OF 44 STOP 0+000 35+200 35+300 35+400 35+100 STOP 35+500 B101 B101 35+000 1160 35+6 00 0 00 34+9 6 11 B101- 4- 38 B101 u u 35+800 B101 35+900 35+700 36+000 u u u u u 36+100 u u u u 36+200 35+600 u u 36+300 Mmakgorig B101-4-AR4 SHEET 52 SHEET OLD PAP 53 36+000 B101 T 51 ADDITIONAL PAP 0+000 EE SH 35 +00 0 B101-4 AVOIDED PAP 50 T SHEET SH EE WRONGLY CAPTURED PAP 49 34 +0 00 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 60 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 26 OF 44 B101 36+600 36+500 36+700 36+800 B101 36+900 36+400 37+000 36+300 87 B101-4- B101 B101 37+000 u u u u u 37+100 37+200 37+300 37+400 37+500 37+600 u u u u 37+080 37+225 Mmakgorig SHEET 52 SHEET 53 OLD PAP 36+000 B101 SHEET 37+00 0 54 ADDITIONAL PAP SHE ET 5 5 B101-4 38+ 000 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 61 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 27 OF 44 OLD R FROM OAD 3 3+900 to 38+0 00 STOP 38+000 37+900 u 38+100 u u u 37+800 u B101 u B101 38+200 u u u u u 37+700 u u u u u u u 38+300 u 37+600 u u u u 37+908 u STOP u 55 11 1150 B101 B101 u u u 38+300 39+000 u 38+400 u STOP 38+500 38+900 38+600 38+800 38+700 37+0 SHEE T 54 OLD PAP 00 SHE E T 55 ADDITIONAL PAP 38+ 000 AVOIDED PAP SH EE T 56 WRONGLY CAPTURED PAP SHEET 57 39+0 00 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 62 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 28 OF 44 11 50 B101 B101 39+000 u 39+700 u 39+100 39+600 39+200 39+500 39+300 39+400 39+090 B101 B101 50 11 40+200 40+100 40+000 1150 40+300 39+900 u u u 39+700 39+800 u u 1150 40+400 SHE OLD PAP ET 55 38+ 000 ADDITIONAL PAP SH EE T5 AVOIDED PAP 6 SHE SHEET 58 ET 5 SHEET 57 9 WRONGLY CAPTURED PAP 39+0 00 40+000 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 63 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 29 OF 44 1150 40+800 40+700 40+900 40+600 41+000 B10 1 0 B101 40+50 41+ 100 00 40+786 40+4 B101 B101 41+10 0 u 41+800 u 41+700 u 41+2 u 00 41+600 u u 41+500 u u u u u 41+300 41+400 41+543 50 11 SHEET 59 OLD PAP 8 ET 5 41+0 SHE 000 00 SHEE T 60 ADDITIONAL PAP 40+ SHE 42+0 ET 6 1 00 SHEET 62 AVOIDED PAP B101 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 64 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 30 OF 44 1145 42+000 42+100 B101 41+900 11 B101 42+200 45 u 42+300 0 41+80 42+500 42+400 1145 B101-4-39 11 45 B101 B101 42+500 0 43+20 42+600 0 42+700 11 43+10 45 u u 42+800 B101-4-3 42+900 43+000 9 1145 1145 42+715 43+030 41+ 000 SHE ET 6 0 OLD PAP SHE 42+ ET 000 61 ADDITIONAL PAP SHEET B101 62 SHEET 63 AVOIDED PAP 44+000 43+000 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 65 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 31 OF 44 B101 B101 u u u u u u u u u 43+200 u 43+600 43+700 43+800 43+900 43+300 43+500 1145 1145 43+400 u u u u u u u u u B101 B101 1145 44+000 0 1145 44+60 43+900 44+100 u u u u 44+200 u u u u u u u u u u 44+500 11 45 1145 44+300 44+400 u u u u u u u 44+151 5 114 OLD PAP SHE ET 61 T6 5 ADDITIONAL PAP EE SH B101 SHEET 62 SHEET 63 SHEET 64 45 +0 00 AVOIDED PAP 44+000 43+000 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 66 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 32 OF 44 B1 01 1 B10 44+ 600 300 45+ 44+ 700 200 45+ -4 -40 01 44+8 00 B1 00 45+1 u u u 44+900 45+000 44+8 09 44+9 32 6 0 11 AD B10 +7 45 1 -4_6 B101-4-41 9 48 RO 0 to LD 45+600 40 45+50 0 O + STOP 45 45+7 0 45+70 00 O M u FR 45+8 00 400 45+ 45+9 00 45+755 B101 01 B1 46+0 00 0 +30 45 B101-4-AR5 68 SHEET ET 66 SHE 46+000 SHEET 67 47+00 0 OLD PAP 0 00 0+ EE T 65 ADDITIONAL PAP SH 00 SHEET 64 +0 44+000 45 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 67 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 33 OF 44 u 10 u 0 u 0+ u u u B101 B101 46+000 u 46+700 46+100 u 46+200 u u 46+600 STOP u 0 u 00 u u u 0+ 46+300 STOP 46+400 46+500 11 50 1150 B101 B101 47+200 47+300 47+000 47+100 46+800 46+900 47+400 46+700 u u u u u u 47+157 Tsh idila mol omo Tshidilamolomo B101-4-AR5 SHEET 68 SHEET 69 OLD PAP ET 66 SHEET 67 48+000 SHE 46+000 47+00 0 ADDITIONAL PAP 0 00 0+ AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 68 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 34 OF 44 4_71 B101 B101 u 47+500 47+600 47+700 47+800 47+900 47+900 48+000 48+100 47+400 u u u u u u u u u u u 47+917 FRO OLD M4 RO 5+4 AD 00 48+400 48+500 to 4 48+600 STOP 8+7 48+300 u u u u u 6 0 u u u 48+7 00 00 u 48+2 B101 1150 u 1 u B10 48+8 00 100 48+ 48+668 Tshidilamolomo SHEET 70 T 69 SHEE 48+0 00 OLD PAP SH 49+ EE 000 T7 T6 8 1 ADDITIONAL PAP EE SH 47 +0 00 AVOIDED PAP SH EE T7 2 WRONGLY CAPTURED PAP 50 +0 00 B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 69 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 35 OF 44 49+200 49+100 u u u 49+300 u 49+000 u u u u B101 49+400 B101 u 48+900 u 49+500 48+800 49+410 42 1 -4- B 10 B101 B101 49+50 0 00 50+2 STOP 49+600 50+000 50+100 49+800 49+900 49+700 50+137 SHEET 70 48+0 00 49+ SH EE OLD PAP 000 T7 1 ADDITIONAL PAP SH EE T7 50 2 SHEET 73 AVOIDED PAP +0 51+000 00 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 70 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 36 OF 44 3 B101-4-4 B10 B101-4-4 1 2 B101 1150 1150 1150 50+ 200 1150 50+900 50+800 50+700 50+600 1150 STOP 50+500 50+300 50+400 1150 11 50 1150 4_72 4_73 B101 B101 u u u 50+900 51+000 51+100 51+200 51+300 51+400 51+500 51+600 u u u u u u u D E N PLAN GARTOGRAPHY C L EMBANKMENT NEW SIDEWALK BERM CUTTING 1155 BUILDING CARRIAGEWAY AND EXISTING WAY WALL FENCE FACILITIES DITCH SHOULDER AXIS NOTE: 0+200 -35 ROAD CONTOUR LEVEL AND FENCE SouthernVIEW CULVERT PROGRESSIVE MASTER Universal RESERVEHemisphere Transverse and Datum WGS84 Mercator (UTM) NEW COUNTERSLOPES EXISTING UNLINED CULVERT CULVERT DITCH DITCH STOP STOP 16+300 B101 STOP 17+600 17+500 17+400 17+300 17+200 1285 17+100 17+000 16+900 16+800 16+700 16+600 16+500 16+400 16+200 14+600 1290 15+900 16+000 16+100 STOP B101 15+800 15+700 15+600 15+500 15+400 15+300 15+200 15+100 15+000 14+900 14+800 14+700 14+500 14+400 14+300 14+200 14+100 14+000 13+900 13+80012+900 12+800 1295 B101 13+700 13+600 13+500 13+400 13+300 13+200 13+100 13+000 11+700 11+600 12+700 12+600 12+500 12+400 12+300 12+200 12+100 12+000 11+900 11+800 STOP 1310 1305 1300 B101 11+500 11+400 11+300 11+200 11+100 11+000 10+900 10+800 10+700 10+600 10+500 10+400 10+300 10+200 10+100 7+100 7+200 7+300 7+400 7+500 7+600 7+700 7+800 7+900 8+000 8+100 8+200 8+300 8+400 8+600 8+700 8+800 8+900 9+000 9+100 9+200 B101 STOP 1320 1325 7+000 8+500 6+900STOP B101 6+800 6+700 6+500 6+400 6+300 6+200 6+100 6+000 5+900 1325 5+700 5+500 5+400 5+300 5+200 5+100 5+000 4+900 4+800 4+700 5+600 5+800 1330 6+600 1335 1345 STOP B101 4+600 4+500 4+400 4+300 4+200 4+100 4+000 3+900 3+800 3+500 3+400 3+300 3+200 3+100 3+000 2+900 2+800 2+700 2+600 2+500 3+600 3+700 1340 1350 1+600 1370 1365 1360 1355 STOP B101 2+400 2+300 2+200 2+100 1+900 1+800 1+700 1+500 1+400 1+300 1+200 1+100 1+000 0+900 0+800 0+700 0+600 0+400 0+300 0+200 0+500 2+000 1375 STOP 0+000 5+100 5+200 4+800 5+000 0+100 B101 1375 1370 PEOPLE 4+700 4+600 4+500 4+400 4+300 4+200 4+100 4+000 3+900 3+800 3+700 3+600 OFFICES KGOTLA FOR 4+900 3+500 GATE GATE VEHICLES R=850 11+500 11+600 11+607,758 R=310 11+700 11+700,524 R=-400 11+777,477 11+800 11+480,280 11+400 RECTA R=-800 11+366,569 11+300 STOP 11+900 11+894,156 R=-310 RECTA 11+828,533 11+922,806 21+100 20+500 19+000 19+100 20+900 21+000 STOP B101 1280 20+800 18+900 20+700 20+600 20+400 20+300 20+200 20+100 20+000 19+900 19+800 19+200 19+300 19+400 19+500 19+600 1275 19+700 18+800 1285 B101 17+700 17+800 17+900 18+000 18+100 18+200 18+300 18+400 18+500 18+600 18+700 STOP 9+400 9+700 9+300 9+800 9+500 1310 1315 STOP B101 10+000 9+900 9+600 1375 1370 1365 2+800 3+000 3+100 3+200 3+300 3+400 B101 1370 2+900 0+900 0+800 0+700 0+600 1+000 0+400 0+300 0+200 1+900 0+100 1+100 1+200 1+300 1+400 1+500 1+600 1+700 0+500 1+800 1370 1385 1380 1375 B101 2+700 2+600 2+500 2+400 2+300 2+200 2+000 2+100 21+900 22+100 22+200 22+300 22+400 22+500 22+600 22+700 22+800 22+900 23+000 23+100 21+800 23+300 23+400 23+500 23+600 23+700 23+800 23+900 24+000 24+100 24+200 STOP B101 1265 1270 23+200 22+000 10+200 10+225,002 R=-240 10+300 10+349,299 10+400 10+499,592 R=-310 10+500 10+600 10+658,112 10+700 10+718,186 10+100 10+800 10+865,380 10+900 10+977,177 R=2005 11+000 11+057,257 11+100 11+200 11+249,067 R=-800 9+000 9+014,339 R=-2500 R=150 10+073,944 R=-400 RECTA 10+004,938 10+000 9+900 9+100 8+945,144 8+900 8+800 9+853,099 9+800 R=-1000 9+752,123 9+700 9+600 9+597,956 9+500 R=400 9+496,956 9+400 9+354,300 9+300 9+258,559 9+200 9+123,199 R=310 R=1500 1275 B101 21+700 21+600 21+500 21+400 21+200 21+300 1275 1355 1350 1360 B101 OFFICES KGOTLA FOR STOP GATE GATE 1380 VEHICLES 1255.978 1255.962 1255.947 1255.931 1255.916 1255.900 1255.885 1255.869 1255.854 1255.838 1255.823 1255.807 1255.792 1255.776 1255.761 1255.745 1255.730 1255.714 1255.699 1255.683 1255.668 1255.652 1255.637 1255.590 1255.606 1255.621 1256.753 1256.738 1256.722 1256.707 1256.691 1256.676 1256.660 1256.645 1256.629 1256.614 1256.598 1256.583 1256.567 1256.552 1256.536 1256.520 1256.505 1256.489 1256.474 1256.458 1256.443 1256.427 1256.412 1256.396 1256.381 1256.365 1256.350 1256.334 1256.319 1256.303 1256.288 1256.272 1256.257 1256.241 1256.226 1256.210 1256.195 1256.179 1256.164 1256.148 1256.133 1256.117 1256.102 1256.086 1256.071 1256.055 1256.040 1256.024 1256.769 1255.993 1258.413 1258.367 1258.320 1258.273 1258.227 1258.180 1258.134 1258.087 1258.040 1257.994 1257.947 1257.901 1257.854 1257.809 1257.767 1257.728 1257.693 1257.660 1257.631 1257.604 1257.581 1257.561 1257.544 1257.529 1257.513 1257.498 1257.482 1257.466 1257.451 1257.435 1257.420 1257.404 1257.389 1257.373 1257.358 1256.009 1257.342 1257.327 1257.311 1257.296 1257.280 1257.265 1257.249 1257.234 1257.218 1257.203 1257.187 1256.784 1256.800 1256.815 1256.831 1256.846 1256.862 1256.877 1256.893 1256.908 1256.924 1256.939 1256.955 1256.970 1256.986 1257.001 1257.017 1257.032 1257.048 1257.063 1257.079 1257.094 1257.110 1257.125 1257.141 1257.156 1257.172 3+300 1250 B101 27+900 27+800 27+700 1255 25+700 25+800 25+900 26+000 26+100 26+200 26+300 26+400 26+500 26+600 26+700 25+100 26+900 27+000 27+100 27+200 27+300 27+400 27+500 27+600 STOP B101 1255 25+600 25+500 25+400 25+300 25+200 26+800 1260 24+400 24+300 24+700 24+800 24+900 25+000 B101 1260 24+600 24+500 8+400 8+500 8+600 8+632,983 R=-2500 8+700 7+500 6+717,720 7+569,067 R=-1170 7+600 7+700 7+726,528 7+100 R=-1000 7+103,107 R=-1800 7+047,377 7+300 7+400 7+458,394 6+873,515 R=440 6+900 6+953,853 7+000 6+800 6+242,630 R=-500 RECTA 6+300 6+400 6+500 6+600 6+624,160 6+700 7+800 7+900 7+957,803 R=5000 RECTA 8+000 8+100 8+200 7+200 8+300 1345 1370 B101 1375 8+100 B101 8+300 7+400 7+500 7+600 7+700 7+800 7+900 8+000 8+200 STOP 1246.057 1246.035 1246.014 1245.993 1245.972 1246.078 1246.099 1246.120 1246.142 1246.163 1246.184 1246.205 1246.226 1246.248 1246.269 1246.290 1246.311 1246.333 1246.354 1246.375 1246.396 1246.417 1246.439 1246.460 1246.481 1246.502 1246.524 1246.545 1246.566 1246.587 1246.608 1246.630 1246.651 1246.672 1246.693 1246.715 1246.736 1246.757 1246.778 1246.799 1246.821 1246.842 1246.863 1246.884 1246.906 1246.927 1246.948 1246.969 1246.990 1247.012 1247.033 1247.054 1247.075 1247.097 1247.118 1247.139 1247.160 1247.181 1247.224 1247.245 1247.266 1247.288 1247.309 1247.330 1247.203 1250.923 1250.898 1250.872 1250.846 1250.821 1250.795 1250.770 1250.745 1250.720 1250.695 1250.671 1250.646 1250.622 1250.598 1250.574 1250.550 1250.526 1250.502 1250.479 1250.455 1250.432 1250.409 1250.386 1250.363 1250.341 1250.318 1250.296 1250.274 1250.252 1250.230 1250.208 1250.187 1250.165 1250.144 1250.122 1250.101 1250.081 1250.060 1250.039 1250.019 1249.998 1249.978 1249.958 1249.938 1249.918 1249.899 1249.879 1249.860 1249.841 1249.822 1249.803 1249.784 1249.766 1249.747 1249.729 1249.711 1249.693 1249.675 1249.657 1249.639 1249.622 1249.605 1249.587 1249.570 1249.553 1249.537 1249.520 1249.504 1249.487 1249.471 1249.455 1249.439 1249.423 1249.408 1249.392 1249.377 1249.362 1249.347 1249.332 1249.317 1249.302 1249.287 1249.272 1249.257 1249.242 1249.227 1249.212 1249.197 1249.182 1249.167 1249.152 1249.136 1249.121 1249.105 1249.089 1249.073 1249.057 1249.040 1249.024 1249.007 1248.990 1248.973 1248.956 1248.939 1248.921 1248.904 1248.886 1248.868 1248.850 1248.831 1248.813 1248.794 1248.776 1248.757 1248.738 1248.719 1248.699 1248.680 1248.660 1248.640 1248.620 1248.600 1248.580 1248.559 1248.539 1248.518 1248.497 1248.476 1248.455 1248.433 1248.412 1248.391 1248.370 1248.349 1248.327 1248.306 1248.285 1248.264 1248.242 1248.221 1248.200 1248.179 1248.158 1248.136 1248.115 1248.094 1248.073 1248.051 1248.030 1248.009 1247.988 1247.967 1247.945 1247.924 1247.903 1247.882 1247.860 1247.839 1247.818 1247.797 1247.776 1247.754 1247.733 1247.712 1247.691 1247.669 1247.648 1247.627 1247.606 1247.585 1247.563 1247.542 1247.521 1247.500 1247.479 1247.457 1247.436 1247.415 1247.394 1247.372 1247.351 STOP 1252.846 1252.811 1252.776 1252.741 1252.707 1253.900 1252.672 1252.638 1252.604 1252.570 1252.536 1252.502 1252.469 1252.436 1252.402 1252.369 1252.336 1252.303 1252.271 1252.238 1252.206 1252.174 1252.142 1252.110 1252.078 1252.046 1252.015 1251.983 1251.952 1251.921 1251.890 1251.859 1251.829 1251.798 1251.768 1251.738 1251.707 1251.678 1251.648 1251.618 1251.589 1251.559 1251.530 1251.501 1251.472 1251.443 1251.415 1251.386 1251.358 1251.329 1251.301 1251.273 1251.246 1251.218 1251.191 1251.163 1251.136 1251.109 1251.082 1251.055 1251.029 1251.002 1250.976 1250.949 1252.881 1255.574 1255.559 1255.543 1255.528 1255.512 1255.497 1255.481 1255.466 1255.450 1255.435 1255.419 1255.404 1255.388 1255.373 1255.357 1255.342 1255.326 1255.311 1255.295 1255.280 1255.264 1255.249 1255.233 1255.218 1255.202 1255.187 1255.171 1255.156 1255.140 1255.125 1255.109 1255.094 1255.078 1255.063 1255.047 1255.032 1255.016 1255.001 1254.985 1254.970 1254.954 1254.939 1254.923 1254.908 1254.892 1254.877 1254.861 1254.846 1254.830 1254.815 1254.799 1254.784 1254.768 1254.753 1254.737 1254.722 1254.706 1254.691 1254.675 1254.660 1254.644 1254.628 1254.613 1254.597 1254.582 1254.566 1254.551 1254.535 1254.520 1254.504 1254.489 1254.473 1254.458 1254.442 1254.427 1254.411 1254.396 1254.380 1254.365 1254.349 1254.334 1254.318 1254.303 1254.287 1254.272 1254.256 1254.241 1254.225 1254.210 1254.194 1254.179 1254.163 1254.148 1254.132 1254.117 1254.101 1254.086 1254.070 1254.055 1254.039 1254.024 1254.008 1253.993 1253.977 1253.962 1253.946 1253.931 1253.915 1252.916 1253.884 1253.869 1253.853 1253.835 1253.817 1253.798 1253.778 1253.757 1253.734 1253.711 1253.687 1253.661 1253.635 1253.607 1253.578 1253.549 1253.518 1253.486 1253.454 1253.420 1253.385 1253.349 1253.312 1253.276 1253.239 1253.203 1253.167 1253.130 1253.094 1253.058 1253.022 1252.987 1252.951 1+600 FOR 1+700 VEHICLES PEOPLE OFFICES GATE 32+300 32+100 STOP 1250 VEHICLES 32+200 32+000 31+900 31+800 31+700 32+400 B101 FOR OFFICES KGOTLA 0+000 0+100 0+200 0+300PEOPLE 31+500 31+400 31+300 31+200 31+100 31+000 30+900 30+800 30+700 30+600 30+500 30+400 30+300 30+200 30+100 30+000 1+400 1+300 1+200 1+100 1+000 0+900 0+800 0+700 0+600 0+500 0+400 31+600 GATE GATE 28+400 28+500 28+600 28+700 28+800 28+900 29+000 29+100 28+200 29+300 28+300 29+500 29+600 29+200 29+700 29+800 29+900 B101 1255 1250 28+000 28+100 29+400 0+0004+500,877 RECTA R=640 4+581,124 4+600 4+665,106 R=-630 4+700 4+745,322 4+800 4+839,820 R=-475 4+900 5+000 5+045,886 5+100 5+131,294 R=900 5+200 5+300 5+300,219 5+400 5+500 5+541,488 R=1100 5+600 5+700 5+800 5+900 5+926,842 6+000 6+100 6+134,906 R=-500 6+200 3+400 3+425,500 R=1220 3+500 3+505,519 3+600 3+700 3+765,795 R=1000 3+800 3+900 4+000 4+100 4+200 4+284,577 4+300 4+362,565 R=-1180 4+400 4+443,189 RECTA 3+315,159 R=-400 4+500 RECTA STOP 1345 1360 B101 1365 1355 1223.496 1223.470 1223.663 1223.415 1223.387 1223.685 1223.705 1223.725 1223.744 1223.763 1223.781 1223.799 1223.816 1223.832 1223.847 1223.522 1223.876 1223.890 1223.904 1224.099 1223.918 1223.932 1223.946 1223.960 1223.974 1223.988 1224.002 1224.016 1224.030 1224.044 1224.058 1224.072 1223.547 1223.572 1223.596 1223.619 1223.862 1223.641 1223.443 STOP 1224.445 1224.454 1224.463 1224.471 1224.477 1224.483 1224.488 1224.492 1224.495 1224.499 1224.498 1224.497 1224.494 1224.491 1224.487 1224.481 1224.475 1224.468 1224.460 1224.451 1224.441 1224.430 1224.419 1224.406 1224.392 1224.378 1224.364 1224.350 1224.337 1224.323 1224.309 1224.295 1224.281 1224.267 1224.253 1224.239 1224.225 1224.211 1224.197 1224.183 1224.169 1224.155 1224.141 1224.127 1224.113 1224.085 1225.225 1225.206 1225.187 1225.169 1225.150 1225.131 1225.112 1225.093 1225.074 1225.055 1225.036 1225.018 1224.999 1224.981 1224.964 1224.946 1224.929 1224.913 1224.897 1224.881 1224.865 1224.850 1224.835 1224 1224.821 1224.807 1224.793 1224.780 1224.767 1224.754 1224.742 1224.730 1224.718 1224.707 1224.696 1224.685 1224.675 1224.665 1224.655 1224.646 1224.637 1224.629 1224.620 1224.612 1224.604 1224.595 1224.587 1225.244 1224.570 1224.562 1224.553 1224.545 1224.537 1224.528 1224.520 1224.511 1224.503 1224.495 1224.486 1224.478 1224.470 1224.461 1224.453 1224.444 1224.436 1224.428 1224.419 1224.403 1224.394 1224.386 1224.377 1224.369 1224.361 1224.352 1224.344 1224.336 1224.327 1224.319 1224.310 1224.302 1224.294 1224.285 1224.277 1224.268 1224.260 1224.252 1224.243 1224.235 1224.227 1224.210 1224.201 1224.193 1224.185 1224.176 1224.168 1224.160 1224.151 1224.143 1224.134 1224.126 1224.119 1224.113 1224.101 1224.098 1224.099 1224.100 1224.103 1224.107 1224.111 1224.117 1224.125 1224.133 1224.142 1224.152 1224.164 1224.177 1224.190 1224.204 1224.218 1224.232 1224.246 1224.259 1224.273 1224.287 1224.301 1224.315 1224.328 1224.342 1224.356 1224.370 1224.384 1224.397 1224.411 1224.423 1224.434 1225.263 1225.282 1225.301 1225.320 1225.339 1225.358 1225.377 1225.395 1225.414 1225.433 1225.452 1225.471 1225.490 1225.509 1225.528 1225.547 1225.566 1225.585 1225.603 1225.622 1225.641 1225.660 1225.679 1225.698 1225.717 1225.736 1225.755 1225.774 1225.793 1225.811 1225.830 1225.849 1225.868 1225.887 1225.906 1225.925 1225.944 1225.963 1225.982 1226.001 1226.019 1226.038 1226.057 1226.076 1226.095 1226.114 1226.133 1226.152 1226.171 1226.190 1226.209 1226.227 1226.246 1226.265 1226.284 1226.303 1226.322 1226.341 1226.360 1226.379 1226.398 1226.416 1226.435 1226.454 1226.473 1226.511 1226.530 1226.549 1226.568 1226.587 1226.606 1226.624 1226.643 1226.662 1226.681 1226.700 1226.719 1226.738 1226.757 1224.579 1226.492 1228.977 1228.989 1228.998 1228.996 1228.994 1228.990 1228.984 1228.978 1228.969 1228.960 1228.949 1228.937 1228.923 1228.908 1228.892 1228.874 1228.856 1228.837 1228.818 1228.799 1228.780 1228.761 1228.742 1228.723 1228.704 1228.685 1228.666 1228.648 1228.629 1228.610 1228.591 1228.572 1228.553 1228.534 1228.515 1228.496 1228.477 1228.459 1228.440 1228.421 1228.402 1228.383 1228.364 1228.345 1228.326 1228.307 1228.288 1228.269 1228.251 1228.232 1228.213 1228.194 1228.175 1228.156 1228.137 1228.118 1228.099 1228.080 1228.061 1228.043 1228.024 1228.005 1227.986 1227.967 1227.948 1227.929 1227.910 1227.891 1227.872 1227.853 1227.835 1227.816 1227.797 1227.778 1227.759 1227.740 1227.721 1227.702 1227.683 1227.664 1227.645 1227.627 1227.608 1227.589 1227.570 1227.551 1227.532 1227.513 1227.494 1227.475 1227.456 1227.437 1227.419 1227.400 1227.381 1227.362 1228.961 1227.324 1227.305 1227.286 1227.267 1227.248 1227.230 1227.211 1227.192 1227.173 1227.154 1227.135 1227.116 1227.097 1227.078 1227.059 1227.040 1227.022 1227.003 1226.984 1226.965 1226.946 1226.927 1226.908 1226.889 1226.870 1226.851 1226.832 1226.814 1226.795 1226.776 1229.735 1229.719 1229.700 1229.679 1229.656 1229.631 1229.604 1229.575 1229.545 1229.514 1229.483 1229.453 1229.422 1229.391 1229.361 1229.330 1229.300 1229.269 1229.238 1229.208 1229.177 1229.147 1229.116 1229.085 1229.055 1229.024 1228.963 1228.932 1228.903 1228.876 1228.850 1228.825 1228.781 1228.726 1228.710 1228.697 1228.674 1228.665 1228.658 1228.652 1228.645 1228.644 1228.646 1228.650 1228.655 1228.661 1228.669 1228.678 1228.686 1228.694 1228.703 1228.711 1228.719 1228.728 1228.736 1228.744 1228.753 1228.769 1228.778 1228.786 1228.794 1228.802 1228.811 1228.819 1228.827 1228.836 1228.844 1228.852 1228.861 1228.869 1228.877 1228.886 1228.894 1228.902 1228.911 1228.919 1228.927 1228.936 1228.944 1228.952 1227.343 1229.775 1229.765 1229.756 1229.748 1229.741 1229.735 1229.731 1229.728 1229.726 1229.725 1229.724 1229.723 1229.721 1229.720 1229.719 1229.718 1229.717 1229.716 1229.715 1229.713 1229.712 1229.711 1229.709 1229.708 1229.707 1229.706 1229.704 1229.703 1229.702 1229.701 1229.700 1229.699 1229.696 1229.695 1229.694 1229.693 1229.692 1229.691 1229.690 1229.689 1229.686 1229.685 1229.684 1229.683 1229.682 1229.681 1229.679 1229.678 1229.677 1229.676 1229.674 1229.672 1229.670 1229.668 1229.665 1229.662 1229.659 1229.655 1229.651 1229.646 1229.642 1229.636 1229.631 1229.625 1229.619 1229.612 1229.606 1229.598 1229.591 1229.583 1229.575 1229.566 1229.550 1229.542 1229.534 1229.526 1229.518 1229.510 1229.501 1229.493 1229.485 1229.477 1229.469 1229.461 1229.449 1229.439 1229.438 1229.440 1229.442 1229.445 1229.450 1229.455 1229.462 1229.470 1229.478 1229.488 1229.499 1229.511 1229.523 1229.535 1229.546 1229.558 1229.570 1229.581 1229.593 1229.605 1229.617 1229.628 1229.640 1229.652 1229.663 1229.675 1229.687 1229.698 1229.710 1229.722 1229.734 1229.745 1229.757 1229.768 1229.777 1229.784 1229.788 1229.791 1229.790 1229.786 1229.780 1229.772 1229.762 1229.749 1229.814 1229.830 1229.846 1229.864 1229.884 1229.904 1229.926 1229.949 1229.973 1229.998 1230.024 1230.050 1230.076 1230.102 1230.127 1230.153 1230.179 1230.205 1230.231 1230.257 1230.283 1230.309 1230.335 1230.360 1230.386 1230.412 1230.438 1230.464 1230.490 1230.516 1230.542 1230.568 1230.593 1230.619 1230.645 1230.671 1230.697 1230.723 1230.749 1230.775 1230.800 1230.826 1230.852 1230.878 1230.904 1230.930 1230.956 1230.982 1231.008 1231.033 1231.059 1231.085 1231.111 1231.137 1231.163 1231.189 1231.215 1231.241 1231.266 1231.292 1231.318 1231.344 1231.370 1231.396 1231.422 1231.448 1231.474 1231.499 1231.525 1231.551 1231.577 1231.603 1231.629 1231.655 1231.681 1231.707 1231.732 1231.758 1231.784 1229.787 1229.800 1234.958 1234.931 1234.905 1234.879 1234.852 1234.826 1234.799 1234.773 1234.747 1234.720 1234.694 1234.668 1234.641 1234.615 1234.589 1234.562 1234.536 1234.509 1234.483 1234.457 1234.430 1234.404 1234.378 1234.351 1234.325 1234.299 1234.272 1234.246 1234.219 1234.193 1234.167 1234.141 1234.115 1234.089 1234.064 1234.039 1234.014 1233.989 1233.964 1233.940 1233.916 1233.892 1233.868 1233.845 1233.822 1233.799 1233.776 1233.753 1233.731 1233.709 1233.687 1233.665 1233.644 1233.623 1233.602 1233.581 1233.560 1233.540 1233.520 1233.500 1233.480 1233.460 1233.440 1233.421 1233.401 1233.381 1233.361 1233.342 1233.322 1233.302 1233.282 1233.262 1233.243 1233.223 1233.203 1233.183 1233.164 1233.144 1233.124 1233.104 1233.085 1233.065 1233.045 1233.025 1233.005 1232.986 1232.966 1232.946 1232.926 1232.907 1232.887 1232.867 1232.847 1232.828 1232.808 1232.788 1232.768 1232.748 1232.729 1232.709 1232.689 1232.669 1232.650 1232.630 1232.610 1232.590 1232.571 1232.551 1232.531 1232.511 1232.492 1232.472 1232.452 1232.432 1232.411 1232.391 1232.370 1232.348 1232.327 1232.305 1232.282 1232.260 1232.237 1232.214 1234.984 1232.166 1232.142 1232.118 1232.093 1232.068 1232.043 1232.017 1231.991 1231.965 1231.939 1231.914 1231.888 1231.862 1231.836 1231.810 1236.408 1236.398 1236.388 1236.378 1236.368 1236.358 1236.348 1236.339 1236.329 1236.319 1236.309 1236.299 1236.289 1236.279 1236.269 1236.259 1236.249 1236.239 1236.229 1235.010 1236.219 1236.209 1236.199 1236.189 1236.179 1236.168 1236.157 1236.146 1236.134 1236.122 1236.109 1236.096 1236.082 1236.068 1236.054 1236.039 1236.024 1236.008 1235.992 1235.976 1235.959 1235.942 1235.924 1235.906 1235.887 1235.869 1235.849 1235.830 1235.809 1235.789 1235.768 1235.747 1235.725 1235.703 1235.680 1235.657 1235.634 1235.610 1235.586 1235.561 1235.536 1235.511 1235.485 1235.458 1235.432 1235.406 1235.379 1235.353 1235.327 1235.300 1235.274 1235.248 1235.221 1235.195 1235.169 1235.142 1235.116 1235.089 1235.063 1235.037 1232.190 1237.819 1237.806 1237.795 1237.784 1237.775 1237.766 1237.759 1237.751 1237.833 1237.735 1237.727 1237.719 1237.711 1237.703 1237.695 1237.687 1237.679 1237.671 1237.663 1237.655 1237.647 1237.639 1237.632 1237.624 1237.616 1237.608 1237.600 1237.592 1237.584 1237.576 1237.568 1237.560 1237.552 1237.544 1237.536 1237.528 1237.520 1237.512 1237.505 1237.497 1237.489 1237.481 1237.473 1237.465 1237.457 1237.449 1237.441 1237.433 1237.425 1237.417 1237.409 1237.401 1237.393 1237.385 1237.378 1237.370 1237.362 1237.354 1237.346 1237.338 1237.330 1237.322 1237.314 1237.306 1237.298 1237.290 1237.282 1237.274 1237.266 1237.258 1237.251 1237.243 1237.235 1237.227 1237.219 1237.211 1237.203 1237.195 1237.187 1237.179 1237.171 1237.162 1237.154 1237.145 1237.137 1237.128 1237.119 1237.110 1237.101 1237.092 1237.083 1237.073 1237.064 1237.054 1237.045 1237.035 1237.025 1237.015 1237.005 1236.995 1236.985 1236.975 1236.965 1236.955 1236.945 1236.935 1236.925 1236.916 1236.906 1236.896 1236.886 1236.876 1236.866 1236.856 1236.846 1236.836 1236.826 1236.816 1236.806 1236.796 1236.786 1236.776 1236.766 1236.756 1236.746 1236.736 1236.727 1236.717 1236.707 1236.697 1236.687 1236.677 1236.667 1236.657 1236.647 1236.637 1236.627 1236.617 1236.607 1236.597 1236.587 1236.577 1236.567 1236.557 1236.547 1236.538 1236.528 1236.518 1236.508 1236.498 1236.488 1236.478 1236.468 1236.458 1236.448 1236.438 1236.428 1236.418 1237.848 1237.863 1237.881 1237.899 1237.918 1237.938 1237.959 1237.982 1238.005 1238.030 1238.056 1238.082 1238.110 1238.139 1238.169 1238.198 1238.228 1238.258 1238.287 1238.317 1238.347 1238.376 1238.406 1238.435 1238.465 1238.495 1238.524 1238.554 1238.584 1238.613 1238.643 1238.673 1238.702 1238.732 1238.761 1238.791 1238.820 1238.849 1238.878 1238.906 1238.935 1238.963 1238.991 1239.018 1239.046 1239.073 1239.100 1239.126 1239.153 1239.179 1239.205 1239.231 1239.256 1239.281 1239.306 1239.331 1239.356 1239.380 1239.404 1239.428 1239.475 1239.498 1239.521 1239.543 1239.566 1239.588 1239.610 1239.632 1239.653 1239.674 1239.695 1239.716 1239.737 1239.757 1239.777 1239.797 1239.818 1239.838 1239.858 1237.743 1239.451 1244.250 1244.228 1244.205 1244.182 1244.158 1244.134 1244.109 1244.084 1244.058 1244.031 1244.004 1243.977 1243.950 1243.923 1243.896 1243.869 1243.842 1243.815 1243.788 1243.761 1243.734 1243.707 1243.680 1243.653 1243.626 1243.599 1243.572 1243.545 1243.518 1243.491 1243.464 1243.437 1243.410 1243.383 1243.356 1243.329 1243.302 1243.275 1243.248 1243.221 1243.194 1243.167 1243.140 1243.113 1243.086 1243.059 1243.032 1243.005 1242.978 1242.951 1242.924 1242.897 1242.870 1242.843 1242.816 1242.789 1242.762 1242.735 1242.708 1242.681 1242.654 1242.627 1242.600 1242.573 1242.546 1242.519 1242.492 1242.465 1242.438 1242.411 1242.384 1242.357 1242.331 1242.304 1242.277 1242.250 1242.223 1242.196 1242.169 1242.142 1242.115 1242.088 1242.061 1242.034 1242.007 1241.980 1241.953 1241.927 1241.901 1241.876 1241.851 1241.826 1241.802 1241.778 1241.755 1241.732 1241.710 1241.687 1241.666 1241.644 1241.623 1241.603 1241.582 1241.563 1241.543 1241.524 1241.506 1241.487 1241.469 1241.452 1241.435 1241.418 1241.401 1241.384 1241.367 1241.349 1241.332 1241.315 1241.298 1241.281 1241.264 1241.247 1241.230 1241.213 1241.196 1241.178 1241.161 1241.144 1241.127 1241.110 1241.093 1241.076 1241.059 1241.042 1241.025 1241.007 1240.990 1240.973 1240.956 1240.939 1240.922 1240.905 1240.888 1240.871 1240.854 1240.837 1240.819 1240.802 1240.785 1240.768 1240.751 1240.734 1240.717 1240.700 1240.682 1240.665 1240.647 1240.629 1240.611 1240.593 1240.575 1240.556 1240.538 1240.519 1240.500 1240.481 1240.462 1240.442 1240.423 1240.403 1240.383 1240.363 1240.343 1240.323 1240.302 1240.282 1240.262 1240.242 1240.222 1240.201 1240.181 1240.161 1240.141 1240.121 1240.100 1240.080 1240.060 1240.040 1240.020 1239.999 1239.979 1239.959 1239.939 1239.919 1239.898 1239.878 1244.293 1244.313 1244.333 1244.353 1244.371 1244.390 1244.407 1244.425 1244.441 1244.457 1244.473 1244.488 1244.503 1244.516 1244.530 1244.543 1244.555 1244.567 1244.578 1244.589 1244.599 1244.610 1244.620 1244.631 1244.642 1244.652 1244.663 1244.673 1244.684 1244.695 1244.705 1244.716 1244.726 1244.737 1244.748 1244.758 1244.769 1244.779 1244.790 1244.801 1244.811 1244.822 1244.832 1244.843 1244.854 1244.864 1244.875 1244.885 1244.896 1244.907 1244.917 1244.928 1244.938 1244.949 1244.960 1244.970 1244.981 1244.993 1245.004 1245.016 1245.028 1245.040 1245.052 1245.064 1245.077 1245.090 1245.103 1245.117 1245.130 1245.144 1245.158 1245.172 1245.186 1245.201 1245.216 1245.231 1245.246 1245.262 1245.277 1245.293 1244.272 1245.501 1245.929 1245.908 1245.887 1245.866 1245.844 1245.823 1245.802 1245.781 1245.760 1245.738 1245.717 1245.309 1245.326 1245.342 1245.359 1245.376 1245.393 1245.410 1245.428 1245.446 1245.464 1245.482 1245.951 1245.519 1245.538 1245.557 1245.576 1245.596 1245.616 1245.636 1245.656 1245.676 1245.697 47+400 47+200 47+100 47+000 46+900 46+800 47+600 47+500 STOP B101 47+300 1225 45+500 45+700 45+400 45+300 45+200 45+100 45+000 44+900 44+800 44+700 44+600 45+800 45+900 46+000 46+100 46+200 46+300 45+600 46+500 46+600 46+700 B101 46+400 44+500 44+100 42+500 42+600 42+700 42+800 42+900 43+000 43+200 43+300 43+400 43+500 44+400 43+100 44+300 44+200 42+400 44+000 43+900 43+800 43+700 43+600 B101 0+900 1+000 1+100 1+200 1+300 1+400 1+500 40+200 0+800 0+700 0+000 0+100 0+200 0+300 0+400 0+500 0+600 40+400 41+700 41+600 41+900 42+000 42+100 42+200 42+300 B101 STOP 1230 1235 1240 41+800 41+500 41+400 41+300 41+200 41+100 41+000 40+900 40+800 40+700 40+600 40+500 40+300 39+100 B101 40+100 40+000 39+900 39+800 39+700 39+600 39+500 39+400 39+300 39+200 38+000 38+100 38+200 38+300 38+400 38+500 38+600 38+700 38+800 38+900 39+000 1235 B101 35+700 35+800 35+900 36+000 36+100 36+200 36+300 36+400 36+500 36+600 36+700 36+800 36+900 37+000 37+100 35+600 37+200 37+300 37+400 37+900 37+600 37+700 37+800 37+500 1+045,285 3+100 3+068,455 3+000 R=-225 2+917,230 2+900 2+800 R=300 2+768,505 2+700 R=-460 2+678,538 2+600 2+500 2+463,714 2+400 2+300 R=310 2+239,903 2+200 2+100 2+000 1+937,093 1+900 1+800 R=-125 1+750,607 1+700 1+662,753 1+600 1+500 1+400 R=-600 1+352,112 1+300 1+200 1+100 3+166,518 1+000 0+900 R=770 0+894,964 0+800 0+700 0+694,527 0+600 R=-480 0+539,682 0+500 RECTA R=377 0+458,234 0+400 3+200 R=-400 STOP 0+300 0+134,415 0+100 0+040,314 R=430 RECTA 0+200 R=377 0+308,149 1+600 1+400 1+500 32+800 32+900 33+000 33+100 33+200 33+300 33+400 33+500 33+600 33+700 33+800 33+900 34+000 34+100 34+200 1+300 34+400 34+500 34+600 34+700 34+800 34+900 35+000 35+100 35+200 35+300 35+400 35+500 B101 STOP 1240 1245 1+200 1+100 1+000 0+900 0+800 0+700 0+600 0+500 0+400 0+300 0+000 0+100 0+200 34+300 B101 32+700 32+600 32+500 1245 R=430 1350 B101 OFFICES FOR B101 1350 VEHICLES STOP GATE 1217.390 1217.431 1217.473 1217.514 1217.555 1217.598 1217.641 1217.686 1217.733 1217.780 1217.829 1217.879 1217.930 1217.982 1218.034 1218.087 1218.139 1218.192 1218.244 1218.297 1218.349 1218.402 1218.454 1218.506 1218.557 1218.607 1218.655 1218.703 1218.749 1218.795 1218.839 1218.882 1218.925 1218.968 1219.011 1219.054 1219.096 1219.139 1219.182 1219.225 1219.267 1219.310 1219.353 1219.397 1219.441 1219.486 1219.531 1219.577 1219.623 1219.670 1219.717 1219.765 1219.812 1219.860 1219.908 1219.955 1220.003 1220.050 1220.098 1220.146 1220.193 1220.241 1220.288 1220.336 1220.384 1220.431 1220.479 1220.526 1220.574 1220.622 1217.349 1220.717 1220.764 1220.812 1220.860 1220.907 1220.955 1221.002 1221.050 1221.098 1221.145 1221.193 1221.240 1221.288 1221.880 1223.358 1223.328 1223.298 1223.268 1223.238 1223.208 1223.178 1223.148 1223.118 1223.088 1223.058 1223.028 1222.998 1222.969 1222.939 1222.909 1222.879 1222.849 1222.819 1222.789 1222.759 1222.729 1222.699 1222.669 1222.639 1222.609 1222.579 1222.549 1222.519 1222.489 1222.459 1222.429 1222.399 1222.369 1222.339 1222.308 1222.276 1222.242 1222.206 1222.169 1222.129 1222.088 1222.045 1222.001 1221.954 1221.907 1221.336 1221.383 1221.431 1221.478 1221.526 1221.574 1221.621 1221.669 1221.716 1221.764 1221.812 1217.308 1217.267 1217.225 1217.184 1217.143 1217.102 1217.060 1217.019 1216.978 1216.937 1221.859 1216.896 1216.854 1216.813 1216.772 1216.731 1216.689 1216.648 1216.607 1216.566 1216.525 1216.483 1216.442 1216.401 1216.360 1216.318 1216.277 1216.236 1216.195 1216.154 1216.112 1216.071 1216.033 1215.997 1215.965 1215.935 1215.908 1215.885 1215.865 1215.847 1215.832 1215.818 1215.804 1215.790 1215.776 1215.762 1215.748 1215.734 1215.720 1215.706 1215.692 1215.678 1215.664 1215.650 1215.636 1215.622 1215.608 1215.594 1215.580 1215.566 1215.552 1215.538 1215.523 1215.509 1215.495 1215.481 1215.467 1215.453 1215.439 1215.425 1215.411 1215.397 1215.383 1215.369 1215.355 1215.341 1215.327 1215.313 1215.299 1215.285 1215.271 1215.257 1215.243 1215.229 1215.215 1220.669 1215.201 1220 B101 49+900 47+700 47+800 47+900 48+000 48+100 48+200 48+300 48+400 48+500 48+600 48+700 48+800 48+900 49+000 49+100 49+200 49+300 49+400 49+500 49+600 49+700 49+800 1215 2+400 2+500 1250 2+300 2+200 2+100 2+000 1+900 1+800 1+700 1255 STOP 3+900 3+800 3+700 3+600 3+500 3+400 3+300 3+200 3+100 3+000 2+900 2+800 2+700 2+600 1345 1340 1335 1215.187 1215.172 1215.158 1215.144 1215.130 1215.116 1215.102 1215.088 1215.074 1215.060 1215.045 1215.030 1215.014 1214.997 1214.980 1214.962 1214.943 1214.924 1214.904 1214.884 1214.863 1214.841 1214.818 1214.795 1214.772 1214.747 1214.722 1214.696 1214.670 1214.643 1214.616 1214.589 1214.562 1214.535 1214.509 1214.482 1214.455 1214.428 1214.401 1214.374 1214.347 1214.320 1214.293 1214.266 1214.239 1214.212 1214.185 1214.158 1214.131 1214.104 1214.077 1214.051 1214.024 1213.997 1213.970 1213.943 1213.916 1213.889 1213.862 1213.835 1213.808 1213.781 1213.755 1213.730 1213.706 1213.683 1213.661 1213.641 1213.621 1213.603 1213.586 1213.569 1213.553 1213.536 1213.519 1213.502 1213.486 1213.469 1213.452 1213.435 1213.419 1213.402 1213.385 1213.368 1213.352 1213.335 1213.318 1213.301 1213.285 1213.268 1213.251 1213.235 1213.218 1213.201 1213.184 1213.168 1213.151 1213.134 1213.117 1213.101 1213.084 1213.067 1213.050 1213.034 1213.017 1210.469 1210.504 1210.540 1210.575 1210.610 1210.645 1210.681 1210.716 1210.750 1210.785 1210.819 1210.852 1210.885 1210.917 1210.949 1210.981 1211.012 1211.042 1211.073 1211.102 1211.131 1211.160 1211.188 1211.216 1211.244 1211.271 1211.297 1211.323 1211.348 1211.373 1211.398 1211.422 1211.446 1211.469 1211.492 1211.514 1211.536 1211.557 1211.578 1211.598 1211.618 1211.638 1211.657 1211.675 1211.693 1211.711 1211.728 1211.745 1211.762 1211.778 1211.795 1211.812 1211.829 1211.845 1211.862 1211.879 1211.896 1211.912 1211.929 1211.946 1211.963 1211.979 1211.996 1212.013 1212.029 1212.046 1212.063 1212.080 1212.096 1212.113 1212.130 1212.147 1212.163 1212.180 1212.197 1212.214 1212.230 1212.247 1212.264 1212.281 1212.297 1212.314 1212.331 1212.347 1212.364 1212.381 1212.398 1212.414 1212.431 1212.448 1212.465 1212.481 1212.498 1212.515 1212.532 1212.548 1212.565 1212.582 1212.599 1212.615 1212.632 1212.649 1212.665 1212.682 1212.699 1212.716 1212.732 1212.749 1212.766 1212.783 1212.799 1212.816 1212.833 1212.850 1212.866 1212.883 1212.900 1212.917 1212.933 1212.950 1212.967 1212.983 1213.000 48571P 48572P CTRA 1330.15 1330.21 LINEA 48573P 1330.32 48574P CA 1330.37 48575P 48576P 1330.38 48577P 1330.40 48578P 48579P 1330.27 1330.26 48580P 1330.19 48581P 1330.08 48582P 48583P 1330.04 48584P 1329.89 48585P 1329.96 48586P 1330.06 48587P 1330.10 1330.12 48588P 48589P 48590P 1329.94 48591P 1329.91 48592P 1329.82 48593P 1329.80 1329.51 48594P 1329.56 48595P 48596P 1329.64 1329.85 48597P 1329.83 48598P 1329.74 48599P 1329.66 48600P 48601P 1329.60 1329.45 48602P 1329.59 48603P 48604P 1329.55 1329.38 48605P 1329.47 48606P 1329.37 48607P 48608P 1329.31 1329.22 48609P 1329.27 48610P 48611P 1329.34 48612P 1329.19 48613P 48614P 1329.26 48615P 48616P 1329.18 1329.14 48617P 1329.00 48618P 48619P 1329.07 48620P 1329.05 48621P 1329.01 48622P 48623P 1328.92 1328.95 48624P 48625P 1328.93 48626P 1328.91 48627P 48628P 1328.78 1328.85 48629P 1328.76 48630P 48631P 1328.69 1328.70 48632P 1328.74 48633P 48634P 1328.82 1328.73 48635P 48636P 48637P 1328.62 1328.57 48638P 1328.42 48639P 48640P 1328.46 48641P 1328.40 48642P 48643P 1328.25 1328.31 48644P 1328.19 48645P 48646P 1328.16 48647P 1328.05 48648P 48649P 1328.06 48650P 1328.15 48651P 1327.93 48652P 48653P 1327.90 1328.01 48654P 48655P 1327.88 52+200 B101 52+100 52+000 51+900 51+800 51+700 1210 51+500 51+400 51+300 51+200 51+100 51+000 50+900 50+800 50+700 50+600 50+500 50+400 50+300 50+200 50+100 50+000 51+600 FOR 4+000 KGOTLA VEHICLES OFFICES GATE GATE 1330 1208.618 1208.642 1208.666 1208.713 1208.737 1208.783 1208.821 1208.847 1208.856 1208.863 1208.867 1208.866 1208.861 1208.854 1208.845 1208.799 1208.790 1208.772 1208.763 1208.754 1208.745 1208.736 1208.726 1208.717 1208.708 1208.699 1208.690 1208.681 1208.776 1208.782 1208.787 1208.793 1208.798 1208.803 1208.808 1208.813 1208.818 1208.822 1208.825 1208.829 1208.831 1208.834 1208.836 1208.837 1208.838 1208.839 1208.835 1208.832 1208.830 1208.827 1208.823 1208.820 1208.815 1208.811 1208.806 1208.800 1208.794 1208.788 1208.781 1208.774 1208.767 1208.760 1208.753 1208.746 1208.739 1208.732 1208.725 1208.718 1208.711 1208.704 1208.697 1208.689 1208.682 1208.675 1208.668 1208.661 1208.654 1208.647 1208.640 1208.633 1208.626 1208.619 1208.612 1208.605 1208.598 1208.591 1208.584 1208.577 1208.570 1208.563 1208.555 1208.548 1208.541 1208.534 1208.527 1208.520 1208.513 1208.506 1208.499 1208.492 1208.485 1208.478 1208.471 1208.464 1208.457 1208.450 1208.443 1208.436 1208.429 1208.422 1208.417 1208.414 1208.413 1208.416 1208.421 1208.427 1208.435 1208.444 1208.453 1208.462 1208.480 1208.489 1208.498 1208.507 1208.517 1208.526 1208.535 1208.544 1208.553 1208.562 1208.571 1208.580 1208.590 1208.599 1208.608 1208.617 1208.635 1208.644 1208.653 1208.663 1208.672 1210.434 1210.398 1210.363 1210.328 1210.293 1210.257 1210.222 1210.187 1210.152 1210.116 1210.081 1210.046 1210.011 1209.975 1209.940 1209.905 1209.870 1209.834 1209.799 1209.764 1209.729 1209.693 1209.658 1209.623 1209.588 1209.552 1209.517 1209.482 1209.447 1209.411 1209.376 1209.341 1209.306 1209.270 1209.235 1209.200 1209.165 1209.129 1209.094 1209.059 1209.024 1208.988 1208.953 1208.918 1208.882 1208.847 1208.812 1208.777 1208.741 1208.706 1208.671 1208.636 1208.600 1208.565 1208.531 1208.501 1208.460 1208.442 1208.448 1208.459 1208.477 1208.500 1208.524 1208.547 1208.571 1208.595 54+000 54+100 54+300 B101 54+400 53+000 53+100 53+600 53+700 53+800 53+900 54+200 53+500 53+400 53+300 53+200 52+90052+300 52+600 52+500 52+400 B101 52+700 52+800 1327.08 48668P 48669P 1327.12 48670P 1326.88 1326.89 48671P 1326.97 48672P 48667P 1326.72 48674P 1326.62 48675P 1326.57 48676P 1326.32 D-PASO1 1326.40 1326.92 PASO 1327.09 48666P 1327.27 48665P 1327.43 48664P 48663P 1327.50 48662P 1327.60 48661P 1327.53 48660P 1327.51 48659P 1327.67 CTRA 1327.79 48658P 48657P 1327.69 LINEA 48673P 48656P 1208.653 1208.648 1208.643 1208.637 1208.632 1208.627 1208.621 1208.616 1208.611 1208.605 1208.600 1208.595 1208.589 1208.584 1208.579 1208.573 1208.568 1208.562 1208.557 1208.552 1208.546 1208.541 1208.536 1208.531 1208.527 1208.525 1208.524 1208.659 1208.664 1208.669 1208.675 1208.686 1208.528 STOP 1208.771 1208.766 1208.760 1208.755 1208.750 1208.744 1208.739 1208.734 1208.728 1208.691 1208.696 1208.702 1208.707 1208.712 1208.718 1208.680 1208.723 1205 VEHICLES STOP B101 56+800 56+700 56+600 56+500 56+400 56+300 56+200 56+100 56+000 55+900 55+800 55+700 55+600 55+500 55+400 55+300 55+200 55+100 55+000 54+900 54+800 54+700 54+600 54+500 1+300 1+200 1+100 1+000 0+900 0+800 0+700 0+600 0+500 0+400 0+300 0+200 0+100 0+000 KGOTLA OFFICES FOR PEOPLE GATE GATE 1205 B101 59+100 59+000 58+900 58+800 58+700 58+600 58+500 58+400 58+300 58+200 58+100 58+000 57+900 57+800 57+700 57+600 57+500 57+400 57+300 57+200 57+100 57+000 56+900 B101 61+500 61+400 61+300 61+200 61+100 61+000 60+900 60+800 60+700 60+600 60+500 60+400 60+300 60+200 60+100 60+000 59+900 59+800 59+700 1205 B101 59+600 59+500 59+400 59+300 59+200 1205 7+400 7+600 7+500 1200 B101 63+800 63+700 63+600 63+500 63+400 63+300 63+200 63+100 63+000 62+900 62+800 62+700 62+600 62+500 62+400 62+300 62+200 62+100 62+000 61+900 61+800 61+700 61+600 60 11+500 1165 1170 1175 STOP B101 12+500 12+400 12+300 12+200 12+100 12+000 11+900 11+800 11+700 11+600 10+800 10+100 9+200 9+300 9+400 9+500 9+600 9+700 9+800 9+900 10+000 10+200 10+300 10+400 10+500 10+600 10+700 1180 10+900 11+000 11+100 11+200 11+300 11+400 STOP B101 1175 9+1007+200 7+000 7+100 6+900 7+300 7+700 7+800 7+900 8+000 8+100 8+200 8+300 8+400 8+500 8+600 8+700 8+800 8+900 9+000 B101 1180 1175 6+8005+600 1175 6+700 1165 1180 B101 STOP 6+600 6+500 6+400 6+300 6+200 6+100 6+000 5+900 5+800 5+700 4+600 5+500 5+400 5+300 5+200 5+100 5+000 4+900 4+800 4+700 1170 1185.00 60 B101 STOP 4+500 4+400 4+300 4+200 4+100 4+000 3+900 3+800 3+700 3+600 3+500 3+400 3+300 3+200 3+100 3+000 2+900 2+800 2+700 2+600 2+400 2+300 2+200 1185 2+500 2+100 1190 B101 STOP 66+200 66+100 66+000 65+900 65+800 65+700 2+000 1+900 1+800 1+700 1+600 1+500 1+400 1+300 1+200 1+100 1+000 0+900 0+200 0+100 0+000 1195 1200 65+600 65+500 65+400 65+300 65+200 65+100 65+000 64+900 64+800 64+700 64+600 64+500 64+400 64+300 64+200 64+100 64+000 63+900 B101 15+600 15+300 15+400 15+500 15+200 15+700 B101 1165 13+300 13+700 13+900 14+000 14+100 14+200 14+300 14+400 14+500 14+600 14+700 14+800 14+900 15+000 15+100 12+900 B101 1165 1160 1170 12+600 12+700 12+800 13+600 13+500 13+400 13+000 13+200 13+100 13+800 STOP 60 FOR OFICCE KGOTLA 0+400 0+500 0+600 0+700 0+800 0+900 1+000 1+100 1+200 0+000 0+100 0+200 66+300 66+400 66+500 66+600 66+700 STOP B101 1190 1185 1195 PEOPLE 0+300 GATE GATE VEHICLES 19+500 1160 1155 B101 STOP 20+200 20+100 20+000 19+900 19+800 19+700 19+600 19+400 19+300 19+200 19+100 19+000 18+900 18+800 18+700 18+600 18+500 18+400 18+300 18+200 18+100 18+000 17+900 1165 VEHICLES 1155 1160 STOP B101 17+800 17+700 17+600 17+500 17+400 17+300 17+200 17+100 17+000 16+900 16+800 16+700 16+600 16+500 16+400 16+300 16+200 16+100 16+000 15+900 15+800 0+200 0+100 0+000 OFFICES FOR GATE 60 B101 STOP 61+300 61+200 61+100 61+000 60+900 60+800 60+700 1120 60 0+000 1120 1130 B101 60+600 60+500 60+400 60+300 60+200 60+100 60+000 59+900 59+800 1125 VEHICLES 59+600 59+500 59+400 59+300 59+200 59+100 59+000 58+900 58+800 58+700 58+600 58+500 58+400 58+300 58+200 0+500 0+400 0+300 0+200 0+100 OFFICES STOP KGOTLA FOR 59+700 GATE GATE 57+400 55+900 56+000 56+100 56+200 56+300 56+400 56+500 56+600 56+700 56+800 56+900 57+000 57+100 57+200 57+300 57+500 57+600 57+700 57+800 57+900 58+000 58+100 B101 1140 1130 1135 55+800 55+700 55+600 55+500 55+400 B101 1140 24+100 24+200 24+300 24+400 24+500 24+000 24+700 24+800 B101 1155 1150 1145 23+900 23+800 23+700 23+600 23+500 24+600 23+300 23+400 60 23+200 1160 1165 23+100 23+000 22+900 22+800 22+700 22+600 22+500 22+400 22+300 22+200 22+100 22+000 21+900 21+800 21+700 21+600 21+500 21+400 21+300 21+200 21+100 21+000 B101 20+700 20+800 1155 20+900 20+500 20+400 20+300 1160 20+600 54+500 55+300 55+200 55+100 55+000 54+900 54+800 54+700 54+600 B101 54+400 54+300 53+700 53+800 53+900 54+000 54+100 54+200 53+500 B101 53+600 51+700 53+400 53+300 53+200 53+100 53+000 52+900 52+800 1145 52+600 52+500 52+400 52+300 52+200 52+100 52+000 51+900 52+700 51+800 51+500 51+600 49+200 1150 STOP 51+400 51+300 51+200 51+100 51+000 50+900 50+800 50+700 50+600 50+500 50+400 50+300 50+200 50+100 50+000 49+900 49+800 49+700 49+600 49+500 49+400 49+300 B101 49+100 49+000 48+900 48+800 46+700 48+700 48+600 48+500 48+400 1150 46+600 46+500 STOP 45+800 B101 1145 STOP 46+400 46+300 46+200 46+100 46+000 45+900 45+300 45+700 45+600 45+500 45+400 0+000 44+100 44+200 44+300 44+400 44+500 44+600 44+700 44+800 44+900 45+000 45+100 45+200 42+300 43+000 1145 B101 44+000 43+900 43+800 43+700 43+600 43+500 43+400 43+300 43+200 41+900 42+000 42+100 42+200 43+100 42+400 42+900 42+600 42+700 42+800 42+500 1145 B101 41+80041+700 41+600 41+500 41+400 41+300 1150 39+600 39+400 39+300 39+200 39+100 39+000 39+500 60 34+000 33+900 34+500 1160 B101 STOP 34+700 34+600 34+400 34+300 34+200 34+100 33+800 33+700 33+600 33+500 33+400 33+300 33+200 33+100 33+000 32+900 32+800 32+700 32+60060 1155 B101 32+500 32+400 32+300 32+200 32+100 32+000 31+900 31+800 31+700 31+600 31+500 31+400 31+300 31+200 31+100 31+000 30+500 30+800 30+700 30+600 30+400 30+900 1160 30+200 30+100 30+000 29+900 29+800 29+700 29+600 29+500 29+400 29+300 29+200 29+100 29+000 28+900 28+800 28+700 28+600 28+500 28+400 28+300 28+200 1160 B101 30+300 27+900 28+000 28+100 27+800 27+700 27+600 27+500 27+400 27+300 27+200 27+100 27+000 26+900 26+800 26+700 26+600 26+500 26+400 26+300 26+200 26+100 26+000 25+900 B101 1155 1150 25+800STOP 25+500 25+400 25+300 25+200 25+100 25+000 24+900 0+300 0+200 0+100 0+000 OFFICES FOR 25+600 25+700 B101 STOP 1155 VEHICLES GATE STOP FOR 1150 PEOPLE 1145 1135 1140 B101 48+300 48+200 48+100 48+000 47+900 47+800 47+700 47+600 47+500 47+400 47+300 47+200 47+100 47+000 46+900 46+800 1+300 1+600 1+500 1+400 1+200 1+100 1+000 0+900 0+800 0+700 0+600 0+500 0+400 0+300 OFFICES KGOTLA VEHICLES GATE GATE 1145 0+200 0+100 40+900 1150 B101 41+200 41+100 41+000 39+700 40+800 40+700 40+600 40+500 40+400 40+300 40+200 40+100 40+000 39+900 39+800 37+300 1155 1150 B101 STOP 38+900 38+800 38+700 38+600 38+500 38+400 38+300 38+200 38+100 38+000 37+900 37+800 37+700 37+600 37+500 37+400 STOP STOP 1155 VEHICLES B101 37+200 37+100 37+000 36+900 36+800 36+700 36+600 36+500 36+400 36+300 36+200 36+100 36+000 35+900 35+800 35+700 35+600 35+500 35+400 35+300 35+200 35+100 35+000 0+700 0+600 0+500 0+400 0+300 0+200 0+100 0+000 KGOTLA OFFICES FOR GATE GATE 34+900 34+800 1160 B101 B101-4-44 SH 49+ EE 000 T7 1 OLD PAP SH SHEET 75 ADDITIONAL PAPXref .\XREF\CA1532_P2_GRID-1M_B101-4.dwg EE T7 2 SHEET 74 B101 52+000 50 +0 SHEET 73 AVOIDED PAP 00 51+000 WRONGLY CAPTURED PAP B101-4 CONSU TANT SCA E NTS DATE DRAW NG N M O ROADS DEPARTMENT O O G W VT T TLE AFFECTED ASSETS B 101 4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT OPRC FOR DES GN PR VATE BAG 0026 REHAB L TAT ON MPROVEMENT ROUT NE AND PER OD C MA NTENANCE WORKS OF MN SEPTEMBER 2017 MA N ROADS B101 4 SHEET GABORONE PACKAGE 2 ROAD SECT ONS B101 1 TO B101 4 FROM RAKHUNA TO MABULE O AP 71 H D G TAL F LE NAME M OF B101-4-47 B101 B101 11 45 u 51+600 51+700 51+800 51+900 52+000 52+100 52+200 52+300 u u u B101-4-45 B101-4-46 51+797 B101 B101 u u u u u u u u u u u 52+300 52+400 52+500 52+600 52+700 52+800 52+900 53+000 u u u u u u u u TSATS1144.680 MASWEU MASWEU TSA I 1144.718 TSI MASWEU KHUMOILE B101-4-48 52+870 11 45 B101_4_74 OLD PAP SHEET 74 SHEET 75 SHEET 76 SHEET 77 ADDITIONAL PAP B101 51+000 52+000 53+000 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 72 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 38 OF 44 B101 B101 SUSAN u u u TSIANG u u u u u u u u u u u u u u 53+000 53+100 53+200 53+300 53+400 53+500 53+600 53+700 u u u u u u u u u u u u u u u u 53+399 B101_4_75 B101_4_76 B101_4_77 B101 B101 PETER BOGALE SUSAN TSIANG u u u u u u 53+700 53+800 53+900 54+000 54+100 54+200 54+300 54+400 u u u u u u u u u u OLD PAP ADDITIONAL PAP SHEET 76 SHEET 77 SHEET 78 SHEET 79 53+000 54+000 55+000 AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 73 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 39 OF 44 B101 B101 u u u u u u u 54+400 54+500 54+600 54+700 54+800 54+900 55+000 55+100 u u u u u u u u u u u u u u u u u u u u u u u u u MARIAM BOGALE 1141.820 MARIAM BOGALE 1141.752 MARIAM BOGALE 1141.828 MARIAM BOGALE 1141.745 B101_4_78 B101-4-50 B101 B101 u u u u u u u u u u 55+200 55+300 55+400 55+500 55+600 55+700 55+800 55+100 1140 u u u u u PALET KEPAL SWE B101-4-49 ETSW E OLD PAP ADDITIONAL PAP SHEET 78 SHEET 79 SHEET 80 SHEET 81 AVOIDED PAP 54+000 55+000 56+000 WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 74 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 40 OF 44 B101-4-51 B101 B101 1140 u u u 1140 55+800 55+900 u 56+500 1140 1140 u u 56+000 u u u u 56+100 u u u u u 56+200 56+400 56+300 KEPALE TSWE 55+969 40 11 1140 B101-4-52 B101 B101 u u u u u u u u u u u u u u u 56+800 56+900 u u 56+700 57+000 56+600 57+100 56+500 u 57+200 u u u u u u u u u 35 11 SHEET 83 82 SHEET SHEET 80 SHEET 81 57+000 58+ 0 00 55+000 56+000 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 75 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 41 OF 44 - 4 _7 9 B101 57+600 57+500 57+7 00 00 57+4 1130 B101-4-53 1130 57+8 00 B101 00 57+3 B101 57+9 00 00 57+2 30 11 B101 B101 u u u u u 57+900 58+000 58+100 58+200 58+300 58+400 58+500 58+600 30 57+999 11 58+531 OLD PAP SHEET 83 T 82 SHE ADDITIONAL PAP SHEE 0 58+0 ET 8 4 57+00 00 B101 AVOIDED PAP SHE ET 8 5 59+0 00 WRONGLY CAPTURED PAP B101-4 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 76 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 42 OF 44 11 25 B101 B101 11 u u u u u u 25 58+600 58+700 58+800 58+900 59+000 59+100 59+200 59+300 u u u u u u 59+088 59+262 25 1120 11 112 0 11 20 112 0 112 B101 B101 0 1120 11 20 59+300 59+400 59+500 59+600 59+700 59+800 59+900 60+000 60 u u u u u u u u u u u u u u u 59+547 1120 SHE ET 8 58+0 00 B10 1 4 OLD PAP SHE ET 8 59+0 5 ADDITIONAL PAP 00 SHE ET 8 B101-4 6 SHEET 87 AVOIDED PAP 60+0 00 0+000 WRONGLY CAPTURED PAP B101-4-AR6 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE APPROVED BY: AP 77 (AT A3 SHEET SIZE) DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 43 OF 44 B1 01 112 0 0 112 B101 11 20 60+ 000 60+700 B101-4-54 60+600 u u u u u 60+500 u u u B101-4-55 60+400 STOP 60+1 00 60+300 0+000 60+200 STOP u 60+280 u u u u 0+ 10 u 0 u u u 112 0 11 0 2 0 112 B101 B101-4-56 u u u u u u u 112 61+100 61+200 61+300 0 60+700 60+800 1120 60+900 61+000 60 11 1120 20 u u u u u STOP u u u u STOP u u B101-4-57 B101-4-58 20 B101-4-80 11 112 0 SHE Final Axis OLD PAP ET 8 CH 61+345.042 5 59+0 00 SHE SHEE T 88 ADDITIONAL PAP ET 8 6 61+00 0 87 SHEET 60+0 AVOIDED PAP 0+000 00 Mabule WRONGLY CAPTURED PAP B101-4-AR6 CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 78 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a1.dwg 44 (2) OF 44 APPENDIX 3. AFFECTED ASSETS MAPPING 79 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN X= X= 3 3 56 56 80 90 0 0 B101-1-3 0+300 0+200 0+400 0+300 B101-1-2 B101-1-4 R=377 0+308,149 RECTA 0+400 0+200 B101-1-1 RECTA 0+134,415 R=430 0 0 30 20 72 72 71 71 Y= Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 1 OF35 80 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101-1 0+600 -5 0+600 1350 1 00 172 7 Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 2 OF 35 81 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0+694,527 RECTA R=-480 B101_1_54 0+700 0+700 B101_1_55 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 2a OF 35 82 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101_1_56 0+900 0+800 0+900 0+800 0+900 B101_1_57 B101-1-6 RECTA R=770 B101_1_58 0+894,964 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 3 OF 35 83 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101_1_59 X= 35 75 B101 00 1+200 1+200 B10 1_1 _60 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 4 OF35 84 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN X= 35 76 2 00 SHEET B101_1_59 X= 35 75 B101 00 1+200 1+200 1+300 B10 1_1 _60 1+300 B101 -1-7 3 SHEET 00 717 71 Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 5 OF 35 85 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 2+100 2+100 1 01 -1-08 B 2+000 2+000 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 6 OF 35 86 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 2+300 _61 2+300 B101_1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 7 OF35 87 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN -11 1- 1 5 EET 10 10 1-1- B 5 00 2+ B10 2+ 50 0 0 9 -1- 01 B1 RE C R= TA 31 0 2+ 46 3,7 14 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 8 OF35 88 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN +7 00 2 00 2 2+7 1 -1-1 B10 R= -46 RE 0 CT A OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 9 OF 35 89 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN -13 05 +768,5 00 1-1 2 R=3 60 R=-4 B10 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 10 OF 35 90 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 7 1 _ 1_ 5 1 10 -1 B -1 0 90 01 R R= =- 30 2+ 22 0 5 B1 2+ 2+ 91 90 4 7 0 ,2 30 -1 -1 01 B1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 11 OF 35 91 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN -17 B101-1 3+100 3+100 RECTA 3+068,455 R=-225 62 B101_1_ B101_1_72 0 90 8 35 X= 16 00 3+0 00 -1- 3+0 01 B1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 12 OF35 92 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 4+30 0 4+300 60 9 35 X= RECT R=100 A 0 4+284 ,577 00 33 7 17 Y= 0 4+20 4+200 00 95 35 X= 20 B101-1- 0 20 4+100 73 71 Y= 4+100 0 40 59 SHEET 3 6 X= B101 4+000 4+000 0 10 73 ET 7 71 Y= SHE 00 93 35 X= B101-1-19 3+900 3+900 B101-1-18 3+800 3+800 R=1000 3+765,795 RECTA 3+700 3+700 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 13 OF 35 93 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 60 73 71 Y= 1 B10 00 4+7 0 0 4+7 00 99 35 X= R= -63 RE 0 CT 4+6 A SHEET 8 65,1 06 00 4+6 4+6 00 RE 22 CT R= A 0 640 4 50 +58 73 1,1 24 1-1- 71 Y= 00 21 98 B10 35 X= 1-1- B10 0 4+50 4+50 R=640 0E R CTA 4+50 0,877 9 3,18 4+44 REC TA 1355 80 R=-11 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 14 OF 35 94 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 4+900 4+900 R=-4 75 REC 4+83 TA 9,82 0 0 4+80 4+80 -1-23 0 B101 ET 7 SHE 2 5,32 4+74 REC TA 30 R=-6 0 60 73 71 Y= 1 B10 00 4+7 00 4+7 00 99 35 X= R= -63 RE 0 CT 4+6 A SHEET 8 65,1 06 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 15 OF 35 95 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN R=900 5+131,294 RECTA 5+100 5+100 RECTA R=-475 5+045, 886 B101-1-26 5+000 5+000 B101-1-24 4+900 4+900 R=-4 75 RECT 4+83 A 9,82 0 0 4+80 4+80 -1-23 0 B101 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 16 OF 35 96 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 5+500 5+500 200 74 71 Y= SHEET 8 B101 5+400 0 B101_1_70 30 5+400 60 3 X= 0 10 0 74 20 71 Y= 60 3 X= T9 SHEE 5+300 RECTA 5+300 5+300,219 R=900 B101-1-25 B101_1_69 5+200 5+200 94 R=900 5+131,2 RECTA 5+100 5+100 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 17 OF 35 97 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 00 06 36 X= 0 5+80 5+80 0 0 40 74 71 Y= 5+700 5+700 0 50 60 3 X= 3 00 74 71 B101_1_73 Y= 5+600 5+600 60 13 R=1100 5+541,488 RECTA 00 04 36 X= 5+500 5+500 200 74 71 Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 18 OF 35 98 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN T9 SHEE 28 1-1- 1365 R=-5 0 RE 0 B10 CTA 6+1 34,9 06 1 B10 0 80 0 0 0 36 6+1 X= 6+1 00 0 60 10 74 SHEET 71 Y= 00 6+0 6+0 00 7 -1-2 00 07 36 X= 1 B10 RE CT R=11 A 00 5+9 26,8 42 0 0 45 00 7 71 5+9 Y= 5+90 0 0 60 0 36 X= 0 5+80 5+80 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 19 OF 35 99 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN -29 B101-1 30 6+242,6 RECTA R=-500 0 6+20 0 6+20 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 20 OF 35 100 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101_1_75 10 SHEET 00 13 36 X= 6+800 B101 6+800 B101-1-31 00 0 10 12 5 17 36 7 Y= X= SHEET 11 13 70 RECTA 6+717,720 R=-500 6+700 6+700 R=-500 RECTA 6+624,1 60 6+600 6+600 B101_1_74 6+500 6+500 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 21 OF35 101 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 00 15 36 X= 0 40 75 71 Y= 7+100 R=-1800 RECTA 7+103,107 7+100 B101-1-30 RECTA 7+047,377 R=-1000 0 30 75 71 Y= 7+000 7+000 00 14 36 X= R=-100 0 R=440 6+953,8 53 6+900 6+900 0 0 7 52 71 Y= R=440 6+873,515 RECTA B101_1_75 10 SHEET 00 13 36 X= 6+800 B101 6+800 B101-1-31 00 0 10 12 75 71 36 Y= X= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 22 OF 35 102 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 34 B101-1- R=-1170 7+569,067 RECTA SHEET 11 7+500 7+500 B101 0 70 75 71 Y= RECTA R=-1800 7+458,394 SHEE T 12 1375 B101-1-33 7+400 7+400 0 60 75 71 Y= 00 16 36 75 13 X= B101-1-32 7+300 7+300 500 75 71 Y= 7+200 7+200 0 50 1 36 X= 00 54 7 17 Y= 7+100 R=-1800 RECTA 7+103,107 7+100 B101-1-30 RECTA 7+047,377 R=-1000 3 00 75 71 Y= 7+000 7+000 00 14 36 X= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 23 OF35 103 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 0 7+90 7+90 0 0 7+80 7+80 -1-36 1-1-35 B101 B10 R=50 00 R=-11 70 7+72 6,528 0 7+70 7+70 0 4 7+600 B101-1-3 7+600 7 R=-1170 7+569,06 RECTA SHEET 11 7+500 7+500 B101 7 00 75 71 Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 24 OF 35 104 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 40 76 71 Y= SHEE T 12 8+200 8+200 B101 00 19 36 X= -1-40 00 0 30 1-39 18 6 17 36 7 X= Y= B101 B101- SHEE T 13 8+100 8+100 0 8+000 1-37 8+00 B101- 8 -1-3 A 7+957,803 B101 RECT 00 R=50 0 0 7+90 7+90 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 25 OF35 105 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 00 21 0 36 8+70 X= 8+700 -1-44 B101 0 80 76 71 Y= 983 00 8+632, R=-25 RECTA 0 8+600 8+60 00 67 7 17 3 Y= -1-4 B101 0 8+500 8+50 0 60 76 71 Y= -1-42 00 20 36 X= 0 8+400 8+40 B101 0 50 76 71 Y= 0 8+300 8+30 -1-41 B101 0 40 76 71 Y= SHEE T 12 0 8+200 8+20 B101 0 90 1 36 X= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 26 OF35 106 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN SHE ET 1 4 0 8+80 8+80 0 900 76 71 Y= 00 21 0 36 8+70 X= 8+70 0 -1-44 B101 0 80 76 71 Y= 2,9 83 0 8+63 R=-250 A RECT 0 0 8+60 8+60 7 00 76 71 -1-43 Y= B101 0 0 8+50 8+50 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 27 OF 35 107 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1380 RE CT R= A -800 9+35 4,3 00 0 9+30 9+30 0 559 0 9+258, R=-80 A RECT -1-47 B101 9+200 0 9+20 199 A 9+123, RECT 0 R=150 9+100 0 9+10 -46 01-1 B1 4,3 39 00 9+01 R=15 A RECT 0 9+00 0 9+00 45 1-1- B10 RE R=-25 CTA 00 8+94 44 5,1 SHEE 13 T 0 8+90 1 8+90 B10 0 00 70 7 17 Y= SHE ET 1 4 0 8+80 8+800 0 90 76 71 Y= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 28 OF 35 108 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN R= -24 R= 0 15 0 1 0+ 22 5,0 02 10+ 200 8 B101-1-4 63 _ 1_ 00 01 82 B1 71 7 Y= 0+100 STOP 0+000 0+000 0+100 00 00 10+1 10+1 R= 150 R= -40 10+ 0 73, 0 944 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 29 OF 35 109 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101-1-52 10+500 B101-1-51 B101-1-50 10+400 B101-1-49 10+400 RECTA 10+349,299 R=-240 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 30 OF 35 110 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 10+800 00 10+8 86 18,1 0+7 310 1 R= A CT RE 700 10+ 64 _1_01 B1 700 10+ RE CT R= A -31 10+ 0 58,1 6 12 10+6 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 31 OF 35 111 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 00 79 71 Y= B101_1_66 11+100 11+100 B101_1_65 RECTA R=2005 11+057,257 0 8 13 SHEET 16 0 00 3 36 X= 11+000 R=2005 10+977,177 RECTA B101 11+000 00 29 36 X= OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 32 OF35 112 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN RECTA 11+249,067 B101_1_67 11+200 11+200 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 33 OF35 113 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 11+ 700 00 B101_1_68 11+7 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 34 OF35 114 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 11+900 13 138 8 13 5 85 5 1-53 R=-31 0 RECTA 11+82 8,533 B101- OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-1 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-1 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-1-2-OCTOBER17.dwg 35 OF35 115 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN R=- 20.000 R=1 100 1 .000 5 138 B10 1-2- 02 u u u u u u B10 u u 1-2- u u 03 u u u 11+894,15 u RECTA u u 6 u u 5 u u 38 1u u u 0+10 u 0 u u u u B10 B10 u u u 1-2- u u 1-2- 01 4 0 1385 13 5 8 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 1 OF17 116 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u u u u u u u u u 0+30 u 0 u u u u u u u u u u B10 u u u 1-2- u u u 05 u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 2 OF 17 117 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u u u u u B1 u u 01 u u -2 u u 0 06 - u 138 u u u u u u u u u u 0+ u 60 u 0 u u u u u u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 3 OF17 118 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN R=500.000 1+441.988 Straight line u u 0 1+60 u u u u u u u u u u 1+400 1+500 u u u u u u u u u B101 B101 02_31 B101_ OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 4 OF 17 119 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1+ 72 4.3 0 7 Str 500. R a = i g ht 00 line 0 u u u u u 00 u +7 1 u u u u u u u u u 0 1+60 10 1 _ 02_30 B OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 5 OF 17 120 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1+ 87 5.9 54 S R aig = u -92 ht lin tr 5.0 e u 00 u u u u 0 u 90 u 1+ u u u u u u u u 0 u 0 +8 1 u u u 9 _2 u _02 01 u B1 u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 6 OF 17 121 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 2+170. 1 R=-925.00 24 Straig ht line 0 2+300 2+200 2_28 B101_0 0 2+10 B101 00 2+0 2_28 B101_0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 7 OF 17 122 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 2+422 .064 Straigh R=-74 line 0.000 t u u u u u u u u u u u u u 2+400 u u u u u u u u u u u u u u u u u 8 _ 02_1 B 1 0 1 _02_28 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 8 OF 17 123 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN R=-740.000 R=-1500.000 1370 1370 u u u u u u u u u u u u u u u 2+600 2+500 2+700 u u u u u u u u u u u u u u 1370 u 2+500 B101_02_19 70 0 137 13 70 13 02_18 B101_ OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 9 OF 17 124 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1370 2+800 2+900 3+100 B101 1370 70 3+000 13 0 7 13 B101_02_20 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 10 OF 17 125 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 3+400 70 13 3+300 3+200 3+100 1370 21 _02_ B101 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 11 OF 17 126 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101 _02_ 22 B101 u _02_ u 32 u u u u u u u u u u u 3+700 u u u u u u u u u u u u u u u u 3+80 u u 0 u B10 1-2-u 07 13 70 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 12 OF 17 127 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B10 _02 1 _23 u u B101- u 70 C 2-09 13 BT u u B101-2-10 u 0 4+0 0 u u u B10 C 1-2- u 1370 BT 16 u u 0 1370 137 u u 4+100 C 70 B10 70 C BT 13 1370 u -2-0 1 13 BT u 8 70 13 u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 14 OF 17 128 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 13 70 1370 B101_2 B101_2_26 B101_2 _24 _25 u u u u u u u u u u u u 4+200 4+300 C BT u u u u u u u u u u u 70 u 13 B101 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 15 OF 17 129 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101_2_27 B101-2-11 u u u u u u u u u u u u 4+500 u u u u u u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 16 OF 17 130 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN KGOTLA GATE 0 FOR PEOPLE 10 0+ B10 1-2- B10 12 1-2- u u B10 13 u 1-2- u u 4+600 14 u u u u C u 4+700 u BT u C BT u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 17 OF 17 131 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1 5 5+1 2- 00 1 - 0 1 B OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 18 132 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101 _02_ 22 B101 u _02_ u 32 u u u u u u u u u u u 3+700 u u u u u u u u u u u u u u u u 3+80 u u 0 u B10 u 1-2- 07 13 70 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-2 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER MAIN ROADS. B101-2 2017 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-2 october17.dwg 13 OF 17 133 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN HP u u u u u u u u u u u u u u 0+300 0+400 u u u u u u u u u u u u u u B101-4- 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 1 OF 58 134 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 6+1 9 4_5 00 01- B1 0 117 6+2 00 B1 01 6+3 00 6+4 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 2 OF 58 135 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 6+6 00 HP 6+7 00 - 4 -02 B1 01 6+8 00 5 7 11 5 117 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 3 OF 58 136 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u 3 -4-0 6+9 u 0 0 1 B10 LP u B1 01 u u 00 7+0 u 7+1 00 7+2 00 1175 75 11 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 4 OF 58 137 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 7+ 90 0 1180 8+ 00 0 B1 01 -4- 04 8+ 10 0 8+ 20 0 LP u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 5 OF 58 138 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 8+ 20 0 LP u 8+ 30 0 B1 01 8+ 40 0 HP 9 48 8+ 8+ 8+ 50 84 0 B1 9 01 -4 _6 10 B 0 1_ 4_ 81 8+ 60 0 8+ 70 0 LP 8+ 00 8 8+ 83 1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 6 OF 58 139 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 8+ 70 0 LP 8+ 80 8+ 0 83 1 HP 8+ 90 LP 0 10B -4- 1 05 10B -4- 1 06 9+ 00 0 B1 01 9+ 00 1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 7 OF 58 140 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 9+ 10 0 B1 9+ 01 20 0 -4- 07 HP 9+ 30 0 1180 80 11 9+ 40 0 9+ 50 0 9+ 60 0 B1 01 -4- 08 9+ 70 0 B1 01 4_ 08 9+ 00 8 LP 9+ 90 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 8 OF 58 141 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN STO P 10 +2 P STO 00 10 +3 00 B1 01 -4 61 _ 10 +4 0 0 B1 01 10 +5 0 0 10 +6 00 10 68 + 5 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 9 OF 58 142 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 10 +6 85 10 +7 0 0 10 +8 0 0 B1 75 11 01 -4- 11 09 75 10 +9 00 LP 1.0 m 10 B 1- 11 30 B1 +0 m 00 _8 4 01 5 - 4_ 86 HP 11 +1 00 B1 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 10 OF 58 143 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 11 +7 00 11 11+ +880 000 B10 1 1170 B101_4 STOP _62 11+900 1170 0 117 12+000 1170 1170 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 11 OF 58 144 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B10 1-4_ 6 3 B1 12+ 01- 100 4-1 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 12 OF58 145 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 12 +3 01 0 0 -4- 11 B1 0 1-4 _6 4 B1 01 -4_ 12 +4 84 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 13 OF 58 146 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 13+ 100 B10 1-4 -1 2 u u u B10 13+2 B10 1 u 00 u u 1_4 u u _65 u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 14 OF 58 147 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 13+ 500 101 B - 4 u - 1 u 3 u u u u u u 13+ u 600 B10 u 1-4 u -1 u 4 u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 15 OF 58 148 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u u B u u 10 u u 1 - u 4- u 1 u 5 u u u B 1 u 10 3 + u 70 1 0 u 4- - u u 1 6 u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 16 OF 58 149 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u 5 116 u 4+ 1 60 0 B1 01 101 B u -17 -4 u 14 u +7 00 u u u u 14+ 800 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 17 OF 58 150 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B 10 u 1 16+ u - 4 888 u - 1 u 8 u u 1 u 6+ 00 9 u B 1 u 1 0 u -4_ u u 6 u 6 u u u B u 10 u 1 - 4 u - 1 u 9 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 19 OF 58 151 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 17 + HP 38 2 B1 01 -4- 20 u u u u u u u u 17+ u 400 u u B1 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 19 OF 58 152 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 01 u - u - 4 u 21 u u B u 10 u 18 1 +1 - u 4 0 0 - u 2 B 2 u 101 u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 20 OF 58 153 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B101-4-23 19+800 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 21 OF58 154 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 0 1 2 - 0+ 4 6 - 00 4 2 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 22 OF 58 155 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 20 +9 0 0 B1 60 B 01 10 11 1 -4_ 67 B1 u 1-0 -2 4 u 21 5 +0 00 u 21 +1 0 0 u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 23 OF 58 156 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 1 0 - 4 -2 22 6 +0 00 1165 B1 1 0 -4 27 - 22 +1 B 1 00 01 -4 -2 8 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 24 OF 56 157 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u u u u u B u u 1 0 u 1- u 4 u - u 2 22 9 u +4 u 0 0 u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 25OF 58 158 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 0 115 27 00 + 0 B1 27 0 +1 1 00 -4- 30 u u u u u 27 +2 00 B 10 1 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 26 OF 58 159 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 28 +6 u 00 B1 01 u LP u u B 101 u -4 -3 1 u 28 +7 0 0 u u u 28 80 + 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 27 OF58 160 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 28 +9 86 HP B1 01 -4 -3 2 29 10 + 0 LP 29 +2 00 29 +3 00 B1 01 33 4- 0 1- B1 29 +4 00 29 +5 0 0 29 +6 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 28 OF 58 161 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 01 -4 -3 4 B1 01_ 4_6 8 B1 01_ 4_8 B1 2 01_ 4_8 3 33+ 900 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 29 OF 56 162 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 34 +0 72 34+ 100 B1 01 4- - 35 B1 1 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 30 OF 58 163 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 34 + B 300 1 0 1 -4 - 3 6 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 31 OF 58 164 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 34+6 00 101 B 60 - 4 - 3 7 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 32 OF 58 165 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 10 B 1- 35 4 +5 -3 00 35 8 +6 00 B1 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 33 OF 58 166 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 01 -4 -8 7 HP +4 36 00 36 +5 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 34 OF 58 167 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 1145 HP B101 -4-39 42+40 0 42+ 500 B10 1 42+ 600 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 35 OF 58 168 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 45+200 B101-4-4 0 45+300 B101 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 36 OF 58 169 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 45 +6 00 B1 01 -4 -4 1 45 4 +7 7000 0 u 1145 B1 01- 4_6 9 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 37 OF 58 170 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u u u LP +4 47 u 0 0 B1 u 01 u u u u 47 50 + 0 u 4_7 1 u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 38 OF 58 171 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 50+137 STOP HP 50+200 50+30 50+100 0 B101 B101 -4-42 50+ 400 50+ 500 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 39 OF 58 172 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 50+ 500 LP 50 50+ 11 50 600 11 115 115 0 0 50 11 50+ HP 700 115 0 1150 50+ 800 0 115 50+ 900 B1 01 -4- 43 B1 01 51+ 000 51+ 100 E PH HO MA OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 40 OF 58 173 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 115 0 HP 1150 50+8 00 1150 50+9 00 B1 01 -4- 43 B1 01 51+0 00 B1 01 -4- 44 51+1 00 E PH HO 51+2 MA 00 51+3 00 4_7 2 51+4 00 E PIL HEE LA PIL KEELHAOP MA K 51+5 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 41 OF 58 174 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 51+ 400 E PIL H EE LA PIL KEELHAOP MA K LP 51+ 500 B1 1-4 0 -45 51+ 600 B1 01 4_7 3 51+ 97 7 +7 00 51 HP 51+ 800 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 42 OF 58 175 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 51+ 900 B1 01 -4- 46 52+ 0 00 LP B1 1-4 0 52+ -47 00 1 HP 52+ 200 1145 52+ MASW EU 300 B1 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 43 OF 58 176 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 11 45 EU SW MA B10 1_4 _74 52+ 400 u u u SI ATTSI TS S A44 .71 8 u T 11 EU SW MA 0 .68 44 11 EU SW MA u LP u u 52+ u 500 u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 44 OF 58 177 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN SI ATTSI TS A TS .718 1144 WEU MAS .680 1144 WEU MAS LP B1 52+ 01 600 -4- 48 52+ 700 52 +8 70 HP 52+ 800 52+ 900 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 45 OF 58 178 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 13 1144.4 OILE KHUM 13 1144.4 ILE KHUMO 52+ 900 53+ 000 B10 1_4 B1 _75 01 53+ 100 LP 53+ 200 53+ 300 53 HP +3 9 9 53+ 400 58 1142.8 ILE KHUMO 67 1142.8 OILE KHUM 53+ 500 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 46 OF 58 179 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 53+ 700 01 .540 B1 AN TSIA NG 1142 01 .83 SUS LP u 19 u 53+ NG 1142 .244 800 SUS AN TSIA u 53+ 00 9 B10 54+ 000 1_4 _76 54+ 100 .924 1141 NG TSIA AN SUS 69 .893 1141 ALE BOG R .37 PETE 16 .556 1141 NG TSIA AN SUS .559 1141 ALE BOG R PETE OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 47 OF 58 180 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 54+ 100 HP .924 1141 NG TSIA N SUSA 9 76 .893 1141 ALE BOG R PETE 1 6.3 ALE 1141 .559 SUSA N TSIA NG 1141 .556 BOG R PETE 54+ 00 2 54+ 300 B10 1_4 _77 54+ 400 B1 01 54+ 500 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 49 OF 58 181 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 54+ 600 B10 _4_ 1 78 LP 54+ 700 u 54+ 800 54+ 900 55+ 000 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 49 OF 58 182 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 01 -4- 9 4 55+ 100 B1 01 HP 55+ 200 55+ 300 E 55+ W TS 400 LE PA KE 55+ 500 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 50 OF 58 183 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN E SW ET P AL KE 55+ 500 55+ 6 LP 00 55+ 700 B1 E 01 W -4- TS LE 0 5 PA KE 55+ 800 114 0 B1 01 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 51 OF 58 184 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN E W TS LE PA KE HP 55+ 969 55+ 00 9 56+ 000 1140 40 11 56+ 100 114 0 114 0 4 0 11 56+ B1 200 01 -4- 51 56+ 300 56 +4 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 52 OF 58 185 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 56 +6 00 56 +7 00 56 +8 00 1135 56 +9 00 B1 01 -4- 52 57 +0 00 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 52 OF 58 186 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN 56 +7 00 56 +8 00 1135 56 +9 00 B1 01 00 +0 57 -4- 2 5 57 +1 00 57 +2 00 B10 1 B10 1-4 -53 57 +3 00 57 +4 00 00 57+5 B1 01 57+700 57+600 _7 -4 57+800 11 30 1130 9 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 54 OF 58 187 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN STOP 60+10 0 B10 1-4 4 -5 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 54a OF 58 188 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN u u B1 01 u 60 -4- u 00 +6 55 u u u u u u u u 60 +7 00 B1 01 1120 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 55 OF 58 189 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN STO P 60 +9 00 B1 1-4 0 u -56 u LP u 61 +0 u 00 u STO P u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 56 OF 58 190 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN LP STO P B1 1-4 0 u u -57 u u u u u u u u u u u u u u u u u u u 61 u u 10 + u 0 OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 57 OF 58 191 OPRC PACKAGE 2 B101 RAKHUNA-TLHARESELEELE-PITSANE-PHITSHANE MOLOPO-MABULE ROAD ABBREVIATED RESETTLEMENT PLAN B1 01 -4- 58 u u 60 u B1 u 01 u u +3 0 61 -4- u 0 80 u u u u u u u u OLD PAP ADDITIONAL PAP AVOIDED PAP WRONGLY CAPTURED PAP CONSULTANT: SCALE: NTS DATE: DRAWING Nº: EMPLOYER: ROADS DEPARTMENT PROJECT: CONTRACTING ENTITY: DRAWN BY: VT TITLE: AFFECTED ASSETS B-101-4 OUTPUT AND PERFORMANCE BASED ROAD CONTRACT (OPRC) FOR DESIGN, PRIVATE BAG: 0026 REHABILITATION/IMPROVEMENT, ROUTINE AND PERIODIC MAINTENANCE WORKS OF: CHECKED BY: MN SEPTEMBER 2017 MAIN ROADS. B101-4 SHEET: GABORONE PACKAGE 2 - ROAD SECTIONS B101-1 TO B101-4 FROM RAKHUNA TO MABULE (AT A3 SHEET SIZE) APPROVED BY: AP DIGITAL FILE NAME: Affected Assets Mapping B101-4 rev 3a.dwg 58 OF 58 192 Appendix 4 approval letter by National museum  letter  193 194 Appendix 5 Budget confirmation letter by Road  Department  195 196