FOREST CONSERVATION AND SUSTAINABILITY IN THE HEART OF THE COLOMBIAN AMAZON PROJECT – TF018478 PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice: Dec 09, 2015 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Colombia : Forest Conservation and Sustainability in the Heart of the Colombian Amazon PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2017-08-04 2019-07-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144271 GPN Date: Project Name: Forest Conservation and Sustainability in the Heart of the Colombian Amazon Loan / Credit No: TF / 18478, TF / A5789 Executing Agency(ies): NATURAL HERITAGE FUND FOR BIODIVERSITY AND AREAS WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-18003-CW-DIR / Component 1 - Protected Construcción Cabaña - Adquisición 2017-06- 2017-06- 2017-07- 2017-12- TF / 18478 Areas Management and Posterior Direct 29,200.00 27,614.48 Firmado Punto de Control en el directa 13 27 18 30 Financial Sustainability PNNSCH - Sector el Guamo CO-PNF-17813-CW-RFB / Construcción de un Component 1 - Protected Solicitud de Single Stage - 2018-01- 2018-02- 2018-09- modulo del centro de TF / 18478 Areas Management and Posterior Limited 208,929.00 181,366.41 Firmado cotizaciones One Envelope 15 20 28 investigación ubicado en Financial Sustainability Puerto Abeja - PNN Chiribiquete CO-PNF-31996-CW-RFB / Adecuación Sede Regional de San José del Guaviare Component 1 - Protected Solicitud de Single Stage - 2017-11- 2018-01- 2018-07- (Se excluye el tramite de TF / 18478 Areas Management and Posterior Limited 123,963.00 0.00 Cancelado cotizaciones One Envelope 25 20 19 licencia de demolición y Financial Sustainability construcción, estimadas en USD1.5000) GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-17981-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2017-03- 2017-05- 2017-12- Compra motores fuera de TF / 18478 Governance, Management Posterior Limited 21,482.00 11,124.04 Firmado cotizaciones One Envelope 17 24 20 borda PPI - 2017 and Monitoring CO-PNF-17822-GO-RFQ / DC-compra de hadware y Component 2 - Forest Solicitud de Single Stage - 2017-08- 2017-09- 2017-10- software CDS, para el TF / 18478 Governance, Management Posterior Limited 88,889.00 92,226.96 Firmado cotizaciones One Envelope 08 13 31 fortalecimiento del sistema and Monitoring de información ambiental CO-PNF-31988-GO-DIR / Component 2 - Forest Adquisición 2016-12- 2016-12- 2017-01- 2017-12- Adquisicion Imágenes de TF / 18478 Governance, Management Posterior Direct 62,963.00 57,631.70 Firmado directa 15 16 19 20 SR, equipos, software and Monitoring CO-PNF-54221-GO-RFQ / Un Motor Peque Peque Component 2 - Forest Solicitud de Single Stage - En 2018-04- 2018-05- 2018-10- 6,5HP cinco chalecos full TF / 18478 Governance, Management Posterior Limited 900.00 0.00 cotizaciones One Envelope ejecución 25 29 30 thottle, secado rapido 40 and Monitoring por ciento, para adulto. CO-PNF-54227-GO-RFQ / Elementos de ferreteria: Ocho (8) timbos en plástico resistente con Component 2 - Forest tapa, con capacidad de 20 Solicitud de Single Stage - En 2018-04- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 550.00 0.00 gls para el manejo de cotizaciones One Envelope ejecución 29 05 30 and Monitoring gasolina Cinco (5) carpas para lluvia Un kit de herramientas y un kit de repuestos básicos para motor pq pq Component 2 - Forest CO-PNF-54228-GO-RFQ / Solicitud de Single Stage - En 2018-04- 2018-06- 2018-09- TF / 18478 Governance, Management Posterior Limited 150.00 0.00 adquisición de un GPS cotizaciones One Envelope ejecución 30 11 26 and Monitoring CO-PNF-54229-GO-RFQ / Un agrabadora de voz, Component 2 - Forest tipo periodista, digital, Solicitud de Single Stage - En 2018-05- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 1,700.00 0.00 mp3 usb px440 4GB cotizaciones One Envelope ejecución 01 12 30 and Monitoring Dos camaras D5500 kit 18-55mm CO-PNF-54329-GO-RFQ / Component 2 - Forest Adquisición de 250 cajas Solicitud de Single Stage - 2018-04- 2018-06- 2018-12- TF / 18478 Governance, Management Posterior Limited 8,570.00 8,368.56 Firmado para muestras de 25 x 10 cotizaciones One Envelope 30 12 31 and Monitoring x 5 cms con tapa, en madera. CO-PNF-66548-GO-RFQ / ADQUISICIÓN DE EQUIPOS CÓMPUTO Y PERIFERICOS PARA Component 2 - Forest FORTALECIMIENTO DEL Solicitud de Single Stage - 2018-07- 2018-08- 2018-10- TF / 18478 Governance, Management Posterior Open - National 88,889.00 48,183.51 Firmado SIG. CORPORACIÓN cotizaciones One Envelope 03 16 18 and Monitoring PARA EL DESARROLLO SOSTENIBLE DEL NORTE Y ORIENTE AMAZÓNICO - CDA CO-PNF-41763-GO-RFQ / Adquisición de imágenes Component 3 - Sectoral Solicitud de Single Stage - 2018-01- 2018-03- 2018-09- de sensores remotos TF / 18478 Programs for Sustainable Posterior Limited 53,571.00 0.00 Cancelado cotizaciones One Envelope 28 25 21 (imagines satélitales, Landscape Management fotógrafas aéreas, radar y drones) CO-PNF-54230-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2018-05- 2018-06- 2018-10- Radio y antena para el TF / 18478 Governance, Management Posterior Limited 2,150.00 0.00 Cancelado cotizaciones One Envelope 01 19 30 Rdo Mirití and Monitoring CO-PNF-17798-GO-RFQ / Adquisición e instalación Component 1 - Protected Solicitud de Single Stage - 2017-07- 2017-09- 2017-10- de equipos para garantizar TF / 18478 Areas Management and Posterior Limited 5,556.00 0.00 Cancelado cotizaciones One Envelope 26 06 06 la radiocomunicación de Financial Sustainability las Nuevas sedes del PNNSCH CO-PNF-17807-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2017-08- 2017-09- 2017-12- Adquisición Equipos y TF / 18478 Governance, Management Posterior Limited 6,926.00 0.00 Cancelado cotizaciones One Envelope 01 06 05 Software - 2017 - IDEAM and Monitoring CO-PNF-38838-GO-RFQ / Component 2 - Forest Computadores portátiles, Solicitud de Single Stage - 2018-01- 2018-03- 2018-09- TF / 18478 Governance, Management Posterior Limited 6,071.00 0.00 Cancelado grabadoras de voz y cotizaciones One Envelope 20 17 13 and Monitoring cámaras CO-PNF-65527-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - Ejecución 2018-07- 2018-08- 2018-12- Adquisición de canoa de TF / 18478 Governance, Management Posterior Limited 1,100.00 0.00 cotizaciones One Envelope pendiente 17 30 14 madera. and Monitoring CO-PNF-66788-GO-DIR / Adquisición de imágenes satelitales de muy alta resolución de las constelaciones PlanetScope, Component 3 - Sectoral DigitalGlobe, SkySat y/o Adquisición 2018-07- 2018-07- 2018-08- 2019-08- TF / 18478 Programs for Sustainable Posterior Direct 51,724.00 47,379.00 Firmado RapidEye hasta que se directa 16 21 27 26 Landscape Management complete el valor total definido en este contrato, con un precio unitario por km2 y por tipo de imagen de acuerdo CO-PNF-75475-GO-CP / Adquisición de muebles Component 2 - Forest para la exibición de las Prácticas Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- TF / 18478 Governance, Management Posterior Limited 6,071.00 5,398.18 Firmado colecciones de madera con comerciales One Envelope 20 25 12 18 01 31 and Monitoring usos pedagogicos en diferentes regiones del país CO-PNF-78385-GO-CP / ADQUISICIÓN DE Component 1 - Protected Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- CAMARAS TF / 18478 Areas Management and Posterior Open - National 3,679.00 0.00 comerciales One Envelope pendiente 09 14 01 08 22 22 FOTOGRAFICAS Y DOS Financial Sustainability GPS PNN- LA PAYA Y ALTO FRAGUA CO-PNF-78398-GO-CP / 5 kit campo: Carpa, aislante, Component 1 - Protected Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- estufa, linterna, morral, TF / 18478 Areas Management and Posterior Open - National 3,571.00 0.00 comerciales One Envelope pendiente 18 23 08 15 27 31 cantimplora, PNN Alto Financial Sustainability Fragua y SFFPMOIA. CO-PNF-78409-GO-RFQ / Adquisición de Bote y motor fuera de borda para 12 personas con Equipo de Salvamento para apoyar Component 3 - Sectoral las actividades de Solicitud de Single Stage - Ejecución 2018-10- 2018-11- 2019-01- TF / A5789 Programs for Sustainable Posterior Open - National 18,000.00 0.00 implementación de los cotizaciones One Envelope pendiente 16 27 28 Landscape Management acuerdos de conservación, restauración y no deforestación, en el departamento de Caquetá - CORPOAMAZONIA Page 1 CO-PNF-78416-GO-CP / Elaboración y entrega de 100 kits (Bolsas ecologicas, calendario ambiental, Component 3 - Sectoral Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-02- agenda informativa, esfero TF / A5789 Programs for Sustainable Posterior Open - National 536.00 0.00 comerciales One Envelope pendiente 22 27 17 24 07 05 ecologico, camibuso tipo Landscape Management polo, gorra y capa) para el evento de suscripción de acuerdos de conservación CO-PNF-78419-GO-CP / Dotación Sede Mesa Ramsar. Component 3 - Sectoral Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- (2 computadoras, 1 TF / A5789 Programs for Sustainable Posterior Open - National 3,786.00 0.00 comerciales One Envelope pendiente 25 30 14 21 27 27 teléfono, 2 escritorios, 2 Landscape Management estantes, 30 sillas, 1 tablero, 1 video beam y 1 impresora) CO-PNF-81065-GO-CP / Adquisición de reactivos para el procesamiento de muestras biológicas de Component 2 - Forest peces, sangre y cabello Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- TF / 18478 Governance, Management Posterior Open - National 7,143.00 0.00 (125 muestras de pecese comerciales One Envelope pendiente 25 30 15 21 06 16 and Monitoring para ser analizadas, 200 muestras de sangre y 200 muestras de cabello), para detectar la presencia de mercurio CO-PNF-78408-GO-RFQ / Adquisición de computadores portátiles, computadores de Escritorio Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2018-11- 2019-01- 2019-03- + licencias Ofimáticas y TF / A5789 Programs for Sustainable Posterior Open - National 28,214.00 0.00 cotizaciones One Envelope pendiente 27 11 14 de Antivirus, Impresora Landscape Management Multifuncional con tóner de repuestos, Videobeam, GPS y Table - CORPOAMAZONIA y CDA CO-PNF-78414-GO-CP / Adquisición de 3 Component 3 - Sectoral Prácticas Single Stage - Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-03- motocicletas (4 tiempos, TF / A5789 Programs for Sustainable Posterior Open - National 12,857.00 0.00 comerciales One Envelope pendiente 15 20 11 18 03 08 cilindraje 125cc, encendido Landscape Management eléctrico y pedal - CDA. CO-PNF-78379-GO-RFQ / ADQUISICIÓN DE COMPUTADORES PORTATILES, DE MESA, UPS, DISCOS DUROS Component 1 - Protected EXTERNOS Y UN VIDEO Solicitud de Single Stage - Ejecución 2018-11- 2019-01- 2019-03- TF / 18478 Areas Management and Posterior Open - National 35,000.00 0.00 BEAM Y OTROS cotizaciones One Envelope pendiente 27 12 15 Financial Sustainability ELEMENTOS (CAMARAS TV) -PNN PARA CHIBIRIQUETE, LA PAYA Y ALTO FRAGUA, ACILAP Y CHURUMBELOS CO-PNF-78388-GO-CP / Component 1 - Protected ADQUISICIÓN DE 2 Prácticas Single Stage - Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-02- TF / 18478 Areas Management and Posterior Open - National 7,143.00 0.00 MOTOCICLETAS PNN comerciales One Envelope pendiente 15 20 11 18 26 28 Financial Sustainability ALTO FRAGUA CO-PNF-81083-GO-CP / Component 2 - Forest Prácticas Single Stage - Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-03- Stand para la conservación TF / 18478 Governance, Management Posterior Open - National 5,357.00 0.00 comerciales One Envelope pendiente 22 27 13 20 03 05 de las muestras de and Monitoring madera CO-PNF-85470-GO-RFQ / Adquisición de sillas y Component 2 - Forest muebles para las salas de Solicitud de Single Stage - Ejecución 2018-11- 2019-01- 2019-03- TF / 18478 Governance, Management Posterior Open - National 18,929.00 0.00 reuniones, salas de juntas cotizaciones One Envelope pendiente 27 22 30 and Monitoring y auditorio en CORPOAMAZONIA. CO-PNF-85487-GO-CP / Component 1 - Protected Adquisición de 1 Prácticas Single Stage - Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-02- TF / 18478 Areas Management and Posterior Open - National 2,000.00 0.00 motocicletas PNN Serranía comerciales One Envelope pendiente 22 27 18 25 15 28 Financial Sustainability de Churumbelos CO-PNF-89870-GO-CP / Adquisición de materiales Component 3 - Sectoral para la construcción de Prácticas Single Stage - Ejecución 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-05- TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 una balsa flotantes para comerciales One Envelope pendiente 10 15 29 05 15 16 Landscape Management labores de control y vigilancia en el área del Ramsar. CO-PNF-89601-GO-DIR / Adquisición imágenes de Component 2 - Forest Adquisición Ejecución 2019-01- 2019-02- 2019-02- 2020-01- Sensores Remotos: TF / A5789 Governance, Management Posterior Direct 47,464.00 0.00 directa pendiente 28 02 15 15 Procalculo - Prosis. and Monitoring IDEAM - 2019 CO-PNF-99140-GO-CP / Component 2 - Forest Adquisición de un Motor 4 Prácticas Single Stage - Ejecución 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- TF / 18478 Governance, Management Posterior Open - National 4,516.00 0.00 tiempos de 20 H.P. y 3 comerciales One Envelope pendiente 01 06 22 29 01 15 and Monitoring Hélices. CO-PNF-99144-GO-CP / Component 1 - Protected Adquisición de dos Prácticas Single Stage - Ejecución 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- TF / 18478 Areas Management and Posterior Open - National 4,516.00 0.00 computadores portátiles y comerciales One Envelope pendiente 01 06 21 28 05 31 Financial Sustainability un computador de escritorio CO-PNF-103501-GO-CP / Compra de teléfonos fijos Component 1 - Protected IP para ser instalados en Prácticas Single Stage - Ejecución 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-08- TF / 18478 Areas Management and Posterior Open - National 645.00 0.00 cada una de las oficina de comerciales One Envelope pendiente 15 20 03 10 24 23 Financial Sustainability coordinaciones de áreas y proyectos CO-PNF-109167-GO-CP / Adquisición equipos implementación estrategia de comunicación y difusión Component 1 - Protected (Cámaras fotográficas, Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Areas Management and Posterior Open - National 17,581.00 0.00 grabadoras de audio, comerciales One Envelope pendiente 25 30 14 21 31 01 Financial Sustainability micrófonos semi profesionales y profesionales, tripode profesional, tarjeta de memoria de 128 GB) CO-PNF-109168-GO-RFQ / Adquisición de Component 1 - Protected motocicletas como apoyo a Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 23,226.00 0.00 las actividades de PVC cotizaciones One Envelope pendiente 30 17 17 Financial Sustainability áreas protegidas nacionales, sedes locales y regionales CDA y CAZ CO-PNF-109170-GO-RFQ / Kit de campo y kit de herramientas, áreas Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- protegidas del SPNN, TF / 18478 Areas Management and Posterior Open - National 24,194.00 0.00 cotizaciones One Envelope pendiente 30 17 17 APR, Sitios Ramsar y Financial Sustainability zonas donde se desarrollará inventario forestal. CO-PNF-109172-GO-CP / Adquisición de Drones como instrumentos de Component 1 - Protected registro, control y Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 4,516.00 0.00 seguimiento de los comerciales One Envelope pendiente 25 30 14 21 04 04 Financial Sustainability recursos Naturales de la RFP y áreas protegidas regionales y nacionales del área del Proyecto. CO-PNF-109174-GO-CP / Component 2 - Forest Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- Adquisición e instalación TF / 18478 Governance, Management Posterior Open - National 5,806.00 0.00 comerciales One Envelope pendiente 25 30 14 21 31 01 aires acondicionados and Monitoring CO-PNF-109313-GO-RFQ / Adquisición equipos fortalecimiento sistema de información ambiental SISA - SIGAE, en la CDA: SERVIDOR NAS Component 2 - Forest Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- HPE StoreEasy 1860, TF / 18478 Governance, Management Posterior Open - National 51,613.00 0.00 cotizaciones One Envelope pendiente 30 27 31 DISCOS DUROS HPE and Monitoring 2.4TB SAS, SWITCH ADMINISTRABLE, COMPUTADOR TIPO PC TODO EN UNO, LICENCIAS, ACD-GOV 1- 24 Device 3 YR Initial S CO-PNF-109327-GO-RFQ / Botes en Aluminio tipo Arawana como apoyo a las actividades de PVC áreas Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- protegidas nacionales, TF / 18478 Areas Management and Posterior Open - National 74,839.00 0.00 cotizaciones One Envelope pendiente 30 19 19 sedes locales y regionales Financial Sustainability CDA y CAZ y fortalecimiento resguardos del área del Proyecto CO-PNF-109328-GO-RFQ / Motores fuera de borda Motor Fuera de Borda Pata Corta 40 HP, como Component 1 - Protected apoyo a las actividades de Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 49,677.00 0.00 PVC áreas protegidas cotizaciones One Envelope pendiente 30 17 17 Financial Sustainability nacionales, sedes locales y regionales CDA y CAZ, y fortalecimiento resguardos indígenas. Page 2 CO-PNF-109332-GO-RFQ / Adquisición materiales para fortalecimiendo chagras de los grupos de mujeres de los resguardo Component 2 - Forest Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- de Medio y Bajo rio TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 comerciales One Envelope pendiente 25 30 14 21 31 01 Caquetá. (Costales, and Monitoring cuchillos cocina, metros de angeo, valdes aluminio, timbos para almacenar alimentos, guantes, tapabocas, machetes mediano CO-PNF-109334-GO-CP / Adquisición de bienes para fortalecimiendo chagras de los grupos de mujeres de Component 2 - Forest los resguardo de Medio y Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 Bajo rio Caquetá (Tina comerciales One Envelope pendiente 25 30 14 21 31 01 and Monitoring Grande, Platones grandes de dos orejas, Ollas No. 60 y 40, pailas grandes para fariña, molinos) CO-PNF-109336-GO-RFQ / Kit materiales y bienes de seguridad alimentaria para fortalecimiento de las familias que hacer parte Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- de la Asociación TF / 18478 Programs for Sustainable Posterior Open - National 32,258.00 0.00 cotizaciones One Envelope pendiente 30 18 18 Campesina ACEFIN y Landscape Management conforman el Ramsar EFI, Jaula para aves, malla, palas, machetes, grapas, limas, semillas de pangoger (tomate, cilant CO-PNF-109338-GO-CP / Adquisición de herramientas diferenciales que permitan el Component 3 - Sectoral movimiento de grandes Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 6,452.00 0.00 volúmenes y pesos, comerciales One Envelope pendiente 25 30 14 21 31 01 Landscape Management herramientas de corte de madera de corte fino y combustible para el funcionamiento de las herramientas. CO-PNF-109339-GO-CP / Adquisición de deshidratador solar para fruta fresca con capacidad de 50 kg, para el Component 3 - Sectoral Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- fortalecimiento de la TF / 18478 Programs for Sustainable Posterior Open - National 19,355.00 0.00 comerciales One Envelope pendiente 25 30 14 21 31 01 iniciativa de manejo Landscape Management sostenible y transformación de la palma de Asai de la Comunidad Indígena Santa Lucia en Leticia - Amazonas. CO-PNF-109344-GO-CP / Elementos de ferreteria Component 1 - Protected para mantenimiento Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- TF / 18478 Areas Management and Posterior Open - National 11,290.00 0.00 correctivo de la cubierta y comerciales One Envelope pendiente 25 30 14 21 31 30 Financial Sustainability cielo raso de la sede operativa PNN La Paya CO-PNF-103496-GO-CP / Component 1 - Protected Adquisición equipos de Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-08- TF / 18478 Areas Management and Posterior Open - National 48,397.00 0.00 cómputo e impresoras y cotizaciones One Envelope pendiente 22 15 14 Financial Sustainability licencias CO-PNF-109340-GO-CP / Adquisición equipos para el fortalecimiento de la iniciativa de manejo sostenible y transformación Component 3 - Sectoral de la palma de Asai de la Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 9,677.00 0.00 Comunidad Indígena Santa comerciales One Envelope pendiente 25 30 14 21 31 01 Landscape Management Lucia en Leticia - Amazonas como despulpadoras, licuadores , empacadoras, y demas equipos que se requiere CO-PNF-85459-GO-RFQ / Adquisición e instalación de un sistema de video Component 2 - Forest conferencia video-wall, Solicitud de Single Stage - Ejecución 2019-05- 2019-07- 2019-09- TF / 18478 Governance, Management Posterior Open - National 41,935.00 0.00 monitor industrial, cotizaciones One Envelope pendiente 11 06 12 and Monitoring monitores led, compatible con sistema Lync de Microsoft en Corpoamazonia CO-PNF-109169-GO-CP / Dotación de muebles de oficina y enseres de las sedes de los parques, sedes CDA y CAZ y sitios Component 1 - Protected Ramsar para el Solicitud de Single Stage - Ejecución 2019-05- 2019-07- 2019-08- TF / 18478 Areas Management and Posterior Open - National 32,258.00 0.00 fortalecimiento operativo a cotizaciones One Envelope pendiente 07 02 31 Financial Sustainability nivel local y regional: Muebles, escritorios, sillas ergonómicas y sillas auditorio, Mesas, Estantes, archivos, never CO-PNF-109165-GO-CP / Component 1 - Protected Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- Adquisición de GPS y TF / 18478 Areas Management and Posterior Open - National 15,484.00 0.00 comerciales One Envelope pendiente 25 30 14 28 07 08 cámaras trampa Financial Sustainability CO-PNF-109163-GO-RFQ / Adquisición de equipos tecnológicos, licencias y estaciones de trabajo para el fortalecimiento de las Component 1 - Protected sedes administrativas de Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 92,065.00 0.00 PNN, Dto de Putumayo cotizaciones One Envelope pendiente 30 14 31 Financial Sustainability Orito, Churumbelos y La paya, Dto Caquetá ,Alto fragua y Serrania Chiribiquete. Adicionalmente regionales CO-PNF-123099-GO-CP / Adquisición materiales e insumos para la Component 3 - Sectoral Prácticas Single Stage - Ejecución 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- construcción de las TF / A5789 Programs for Sustainable Posterior Open - National 6,452.00 0.00 comerciales One Envelope pendiente 26 31 14 21 30 29 cabañas de control y Landscape Management vigilancia en el sitio Ramsar Estrella Fluvial del Inírida - EFI CO-PNF-123101-GO-CP / Adquisición de una balsa para labores de control y vigilancia, en el sector de Component 3 - Sectoral Loretoyacú que Prácticas Single Stage - Ejecución 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Open - National 9,677.00 0.00 contribuya al comerciales One Envelope pendiente 26 31 14 21 30 29 Landscape Management fortalecimiento de la autoridad ambiental en el área Ramsar Tarapoto, entre Corpoamazonia y autoridades indígenas. CO-PNF-123105-GO-CP / Adquisición e instalación de repuestos para el Component 1 - Protected mantenimiento del bote Prácticas Single Stage - Ejecución 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- TF / A5789 Areas Management and Posterior Open - National 4,839.00 0.00 del PNNSCH, como apoyo comerciales One Envelope pendiente 26 31 14 21 30 29 Financial Sustainability a la actividades de PVC del Sector dfe Cartagena del Chairá, Caquetá. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-34495-NC-RFQ / Acopio de material audiovisual y reproducción de los vídeos generados como material Component 3 - Sectoral de capacitación de los Solicitud de Single Stage - 2017-11- 2017-11- 2017-12- TF / 18478 Programs for Sustainable Posterior Limited 3,703.00 3,486.90 Firmado talleres de la propuesta de cotizaciones One Envelope 06 29 20 Landscape Management la Gobernación del Guaviare - Frenar frontera agrícola (Unidades Ambientales para la Paz y la Prestación de servicio) CO-PNF-41744-NC-RFQ / Perfilar, tallar y preparar Component 2 - Forest las muestras de madera Solicitud de Single Stage - 2018-01- 2018-02- 2018-08- TF / 18478 Governance, Management Posterior Limited 8,571.00 0.00 Cancelado provenientes del Amazonas cotizaciones One Envelope 03 28 27 and Monitoring para el desarrollo de las colecciones de madera. CO-PNF-41765-NC-RFQ / Prestación de servicios de Component 3 - Sectoral Solicitud de Single Stage - 2018-01- 2018-02- 2018-08- medios audiovisuales para TF / 18478 Programs for Sustainable Posterior Limited 3,571.00 0.00 Cancelado cotizaciones One Envelope 03 28 27 generación de mensajes a Landscape Management distintos sectores Page 3 CO-PNF-71703-NC-RFQ / Adquisición e instalación de la Red Electrica para la Sede San Jose del Component 1 - Protected Solicitud de Single Stage - Ejecución 2018-04- 2018-08- 2018-11- Guaviare (centros de TF / 18478 Areas Management and Posterior Limited 16,667.00 0.00 cotizaciones One Envelope pendiente 29 21 22 transformación de energía Financial Sustainability eléctrica, tipo poste sobre un apoyo de hormigón de 750 kgf de carga de rotura. CO-PNF-75477-NC-CP / Diagramación e impresión de 500 cuadernillos Component 2 - Forest Prácticas Single Stage - Ejecución 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- explicativos del TF / 18478 Governance, Management Posterior Limited 3,570.00 0.00 comerciales One Envelope pendiente 20 25 10 17 01 31 conocimiento local de las and Monitoring maderas que acompaña las diferentes colecciones CO-PNF-78410-NC-CP / Contratación de actividades de divulgación y comunicación de los Component 3 - Sectoral avances y resultados Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-03- TF / A5789 Programs for Sustainable Posterior Limited 7,143.00 0.00 (Programas radiales x 15 comerciales One Envelope pendiente 18 23 08 15 27 29 Landscape Management minutos semanales - 8 capsulas informáticas - elaboración y emisión de 8 cuñas radiales - CORPOAMAZONIA CO-PNF-78417-NC-CP / Impresión de Vallas informativas con base Component 3 - Sectoral Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- cercha metalica 6*3mts TF / A5789 Programs for Sustainable Posterior Open - National 357.00 0.00 comerciales One Envelope pendiente 19 24 07 14 23 30 laminada con diseño Landscape Management acorde al proyecto e instalada en sitio indicado por la CDA CO-PNF-78420-NC-CP / Diseño, impresión de Component 3 - Sectoral Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- vallas, folletos en las 5 TF / A5789 Programs for Sustainable Posterior Open - National 7,286.00 0.00 comerciales One Envelope pendiente 22 27 12 19 29 25 áreas priorizadas por CDA Landscape Management y Mesa Ramsar. CO-PNF-81067-NC-CP / Diagramación e impresión Component 2 - Forest Prácticas Single Stage - Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- de cartillas sobre TF / 18478 Governance, Management Posterior Open - National 17,857.00 0.00 comerciales One Envelope pendiente 26 31 15 22 06 08 recuperación de semillas and Monitoring de las chagras en Mirití CO-PNF-78415-NC-CP / Desarrollo de actividades de divulgación y comunicación de los Component 3 - Sectoral avances y resultados en la Prácticas Single Stage - Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- TF / A5789 Programs for Sustainable Posterior Limited 1,000.00 0.00 suscripción e comerciales One Envelope pendiente 14 19 04 11 22 23 Landscape Management implementación de los acuerdos de conservación, restauración y no deforestación ( Programas radiales) CDA. CO-PNF-89855-NC-RFQ / Component 3 - Sectoral Contratación Transporte Solicitud de Single Stage - Ejecución 2019-01- 2019-02- 2020-02- TF / A5789 Programs for Sustainable Posterior Limited 18,571.00 0.00 Fluvial desplazamiento cotizaciones One Envelope pendiente 15 20 19 Landscape Management comunidad EFI. CO-PNF-89883-NC-CP / Construcción de una balsa flotante para labores de control y vigilancia en la entrada a Caño Bocón, Component 3 - Sectoral Prácticas Single Stage - Ejecución 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- que permita el TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 comerciales One Envelope pendiente 10 24 07 19 01 03 fortalecimiento de la Landscape Management autoridad ambiental en el área del Ramsar, entre CDA y acuerdo con las autoridades indígenas de ejercer este control. CO-PNF-89850-NC-CDD / Talleres y reuniones Component 1 - Protected consulta previa Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / A5789 Areas Management and Posterior Limited 53,571.00 0.00 comunidades indígenas cotizaciones One Envelope pendiente 20 17 31 Financial Sustainability vecinas del Area Protegida Regional del bajo Caguan -CORPOAMAZONIA. CO-PNF-89851-NC-CDD / Talleres, reuniones, asambleas de resguardos y recorridos, desarrollo Component 2 - Forest planes de trabajo que se Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / 18478 Governance, Management Posterior Limited 37,143.00 0.00 convinieron en el marco cotizaciones One Envelope pendiente 20 17 31 and Monitoring de la consulta previa de la primera ampliación del PNN SCH con los resguardos del medio río Caquetá. CO-PNF-89852-NC-CDD / Talleres institucionales y con ATICOYA, para socialización PM y concertación acciones plan Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- de trabajo, gastos de viaje TF / A5789 Programs for Sustainable Posterior Limited 19,996.00 0.00 cotizaciones One Envelope pendiente 20 17 31 y desplazamiento Landscape Management Planeación y Seguimiento, proceso de socialización, ajuste e implementación del Plan de Manejo - Tarapoto. CO-PNF-89853-NC-CDD / Talleres y reuniones planeación, seguimiento y desarrollo del plan de Component 3 - Sectoral trabajo y construcción del Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / A5789 Programs for Sustainable Posterior Limited 14,643.00 0.00 REM, en el marco de los cotizaciones One Envelope pendiente 20 17 31 Landscape Management acuerdos de consulta con el Resguardo Itilla, para la segunda ampliación del PNN SCH. CO-PNF-89798-NC-CDD / Talleres, reuniones, comités técnicos, operativos Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- y coordinación, recorridos TF / A5789 Areas Management and Posterior Limited 62,066.00 0.00 cotizaciones One Envelope pendiente 20 17 31 cumplimiento acuerdos de Financial Sustainability uso y manejo con PNN Paya. CO-PNF-99133-NC-CP / Impresión del Plan de manejo del Ramsar EFI y Component 3 - Sectoral divulgación a las Prácticas Single Stage - Ejecución 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-07- TF / A5789 Programs for Sustainable Posterior Open - National 13,226.00 0.00 comunidades locales de la comerciales One Envelope pendiente 01 06 22 29 05 04 Landscape Management EFI y entidades gubernamentales y ONG vinculadas. CO-PNF-103502-NC-RFQ / Adquisición de los servicios de digitalización de mas de 2.400.000 folios Component 1 - Protected almacenados en GRM y Solicitud de Single Stage - Ejecución 2019-03- 2019-05- 2019-11- TF / 18478 Areas Management and Posterior Open - National 41,935.00 0.00 en el archivo físico de la cotizaciones One Envelope pendiente 18 01 29 Financial Sustainability entidad, y cargue de la información a la nube y/o lugar de repositorio que disponga la entidad. CO-PNF-109175-NC-CP / ADECUACIÓN CENTRO DE DATOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA, 50 PUNTOS DE RED DE Component 2 - Forest DATOS CATEGORÍA 6 Y Prácticas Single Stage - Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 14,839.00 0.00 ENERGÍA REGULADA comerciales One Envelope pendiente 25 30 14 21 31 01 and Monitoring (INSTALADOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA y SISTEMA DE AIRE ACONDICIONADO 24.000 BTU CO-PNF-109317-NC-RFQ / Análisis de maderas para definir la trazabilidad del Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-07- productos promisorios en TF / 18478 Programs for Sustainable Posterior Open - National 29,032.00 0.00 cotizaciones One Envelope pendiente 30 28 31 el sector de Capricho, en Landscape Management el marco del Programa de Foresteria Comunitaria. CO-PNF-109346-NC-RFQ / Elaboración e impresión de Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-04- 2019-06- 2019-10- piezas comunicativas, TF / 18478 Areas Management and Posterior Open - National 38,710.00 0.00 cotizaciones One Envelope pendiente 30 17 14 material y actividades de Financial Sustainability divulgación CO-PNF-109349-NC-CP / Component 4 - Project Trasmisión de cuñas en Coordination, Prácticas Single Stage - Ejecución 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2020-01- programas radiales en el TF / A5789 Posterior Open - National 3,226.00 0.00 Management, Monitoring comerciales One Envelope pendiente 14 19 03 10 20 16 marco de las actividades and Evaluation (M&E) del Proyecto. CONSULTING FIRMS Activity Reference No. Actual Short List and Opening of Combined Loan / Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Credit No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual Page 4 CO-PNF-17962-CS-LCS / Component 4 - Project Consultoria que adelante Selección Coordination, 2017-08- 2017-08- 2017-09- 2017-09- 2017-09- 2017-09- 2017-11- la Auditoría Externa al TF / 18478 Posterior basada en el Open - National 16,667.00 0.00 En ejecución 2017-08-01 Management, Monitoring 01 15 14 15 20 30 29 Proyecto Corazón de la menor costo and Evaluation (M&E) Amazonia - 2017 CO-PNF-17980-CS-QCBS / Component 1 - Protected Selección Consultoría para analisis 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2018-02- TF / 18478 Areas Management and Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-02-15 económico financiero del 01 31 30 07 19 10 05 Financial Sustainability calidad y costo PNN Chiribiquete FPN C1 CO-PNF-20949-CS-QCBS / Consultoría para la Identificación de áreas Component 3 - Sectoral Selección susceptibles para la 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2018-03- TF / 18478 Programs for Sustainable Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-08-30 implementación de 13 23 23 30 10 21 21 Landscape Management calidad y costo compensaciones por pérdida de la biodiversidad en la jurisdicción de CDA. Component 4 - Project CO-PNF-41773-CS-LCS / Selección Coordination, 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2018-09- 2018-11- Auditoría externa al TF / 18478 Posterior basada en el Open - National 15,714.00 0.00 Cancelado 2018-02-20 Management, Monitoring 13 26 24 23 28 01 30 proyecto año 2018 menor costo and Evaluation (M&E) CO-PNF-17957-CS-LCS / Consultoría para la elaboración de una Guía Component 3 - Sectoral Selección para el manejo ambiental 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-12- 2018-05- TF / 18478 Programs for Sustainable Posterior basada en el Open - National 92,593.00 0.00 Cancelado 2017-09-01 para la construcción, 15 29 30 07 17 01 30 Landscape Management menor costo mantenimiento, rehabilitación y mejoramiento de vías de tercer orden. CO-PNF-17956-CS-QCBS / Evaluación ambiental Component 3 - Sectoral Selección estratégica de iniciativas 2017-09- 2017-09- 2017-11- 2017-11- 2017-11- 2017-12- 2018-08- TF / 18478 Programs for Sustainable Posterior basada en Open - National 103,704.00 0.00 Cancelado 2017-08-15 sectoriales (nacional y 14 25 09 14 20 04 01 Landscape Management calidad y costo territorial) en municipios arco de deforestación. CO-PNF-54338-CS-CQS / CONSULTORÍA PARA LLEVAR A CABO LA Selección ELABORACIÓN DE LA Component 3 - Sectoral basada en 2018-05- 2018-06- 2018-07- 2018-09- 2019-06- EVALUACIÓN TF / 18478 Programs for Sustainable Posterior Open - National 250,000.00 0.00 En ejecución 2018-04-25 calificaciones de 16 29 29 02 30 AMBIENTAL Landscape Management consultores ESTRATÉGICA REGIONAL DEL ARCO NOROCCIDENTAL AMAZÓNICO" CO-PNF-54334-CS-QCBS / ELABORACIÓN DE LA GUÍA AMBIENTAL PARA LA IMPLEMENTACIÓN Component 3 - Sectoral Selección 2018-06- 2018-06- 2018-07- 2018-08- 2018-08- 2018-08- 2019-04- DEL CONPES 3857 DE TF / 18478 Programs for Sustainable Posterior basada en Open - National 92,595.00 0.00 En ejecución 2018-05-15 05 21 21 01 20 30 30 2016 LINEAMIENTOS DE Landscape Management calidad y costo POLÍTICA PARA LA GESTIÓN DE LA RED TERCIARIA CO-PNF-21283-CS-QCBS / Component 2 - Forest Selección Consultoría para 2017-09- 2017-11- 2017-11- 2017-12- 2018-02- 2018-03- 2018-09- TF / 18478 Governance, Management Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-09-04 fortalecimiento del sistema 18 01 29 29 02 09 05 and Monitoring calidad y costo de información SIGAE CO-PNF-17816-CS-QCBS / Fortalecimiento del SISA - Component 2 - Forest Selección 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2018-05- Monitoreo para la TF / 18478 Governance, Management Posterior basada en Open - National 51,852.00 0.00 Cancelado 2017-08-08 23 06 06 11 23 07 06 trazabilidad de la madera and Monitoring calidad y costo - Corpoamazonia CO-PNF-75480-CS-CQS / Desarrollar una expedición científica en la ventana Mesay en el sector sur del Selección Component 1 - Protected Parque. Que a su vez basada en Ejecución 2018-10- 2018-11- 2018-12- 2019-01- 2019-11- TF / 18478 Areas Management and Posterior Open - National 83,071.00 0.00 2018-09-20 identifique oportunidades y calificaciones de pendiente 11 23 23 17 20 Financial Sustainability aporte elementos técnicos consultores que fortalezcan las líneas de investigación y el Programa de Monitoreo CO-PNF-103506-CS-QCBS Component 1 - Protected Selección / Elaboración del modelo Ejecución 2019-06- 2019-07- 2019-09- 2019-09- 2019-10- 2019-10- 2020-04- TF / A5789 Areas Management and Posterior basada en Open - National 137,742.00 0.00 2019-06-14 de datos para el Sistema pendiente 28 22 06 15 06 26 26 Financial Sustainability calidad y costo Integrado de Gestión. INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Credit No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-17988-CS-INDV / Profesional para la Component 3 - Sectoral 2017-02- 2017-03- 2017-03- 2017-12- coordinación y desarrollo TF / 18478 Programs for Sustainable Posterior Individual Limited 26,667.00 25,174.80 Firmado 2017-02-15 22 01 16 20 de las actividades del Landscape Management resultado 3.2 - 2017 CO-PNF-17984-CS-INDV / Consultoria para coordinar Component 3 - Sectoral la ruta de ampliación de 2017-02- 2017-03- 2017-03- 2017-12- TF / 18478 Programs for Sustainable Posterior Individual Limited 22,407.00 21,264.54 Finalizado 2017-02-15 PNN SCH en los 22 01 16 20 Landscape Management departamentos de Guaviare y Caqueta CO-PNF-17966-CS-INDV / Consultoría para preparar un documento de Component 4 - Project caracterización Coordination, 2017-07- 2017-07- 2017-08- 2017-09- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado 2017-07-19 demográfica, económica y Management, Monitoring 24 31 11 11 del estado legal del and Evaluation (M&E) territorio para el polígono de intervención del GEF 6. CO-PNF-17967-CS-INDV / Consultoría para Identificar y definir el esquema conceptual y Component 4 - Project metodológico necesario Coordination, 2017-07- 2017-07- 2017-08- 2017-09- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Firmado 2017-07-19 para organizar una red de Management, Monitoring 24 31 14 13 sitios intensivos de and Evaluation (M&E) monitoreo que genere información científica sobre el papel de los bosques naturales de la Amazonía. CO-PNF-18001-CS-INDV / Component 1 - Protected 2017-07- 2017-08- 2017-09- 2017-10- Interventoria adecuación TF / 18478 Areas Management and Posterior Individual Limited 12,393.00 11,699.49 Firmado 2017-07-21 26 16 20 10 sede San José del Financial Sustainability Guaviare CO-PNF-18004-CS-INDV / Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-12- Profesionales SIG - CDA TF / 18478 Programs for Sustainable Posterior Individual Open 14,815.00 14,038.40 Finalizado 2017-06-13 01 22 26 20 Ordenamiento - 2017 Landscape Management CO-PNF-21090-CS-INDV / Consultor para la generación de cartografía de las actuaciones Component 3 - Sectoral 2017-08- 2017-08- 2017-08- 2017-10- adelantadas en el marco TF / 18478 Programs for Sustainable Posterior Individual Direct 4,074.00 3,337.07 Finalizado 2017-08-01 04 11 22 21 de la estrategia integral Landscape Management de control de la deforestación y la implementación de los acuerdos de paz. CO-PNF-21094-CS-INDV / Profesional para Component 2 - Forest seguimiento de actividades 2017-08- 2017-08- 2017-09- 2017-12- TF / 18478 Governance, Management Posterior Individual Open 8,000.00 22,657.32 Firmado 2017-08-01 técnicas y ejecución del 18 25 04 28 and Monitoring componente de monitoreo. Segundo semestre. CO-PNF-21481-CS-INDV / Consultoría para la generación de la cartografía de las actuaciones adelantadas en Component 3 - Sectoral 2017-09- 2017-10- 2017-10- 2018-01- el marco de la Estrategia TF / 18478 Programs for Sustainable Posterior Individual Limited 4,444.00 4,203.84 Firmado 2017-09-05 10 01 22 20 Integral de Control de la Landscape Management Deforestación en el Municipio de Calamar, El Retorno, San Vicente, Solano y Cartagena del Chairá. CO-PNF-17977-CS-CDS / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest 2017-02- 2017-02- 2017-03- 2017-12- adelante el procesamiento TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 3,426.57 Finalizado 2017-02-15 18 21 04 20 de imágenes y reporte de and Monitoring alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-17991-CS-CDS / Component 2 - Forest Profesional para 2017-03- 2017-03- 2017-04- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 18,864.00 5,754.08 Finalizado 2017-02-15 coordinación y desarrollo 11 25 29 20 and Monitoring PPI PNN - 2017 Page 5 CO-PNF-26455-CS-INDV / Profesional especializado en sistemas de Component 2 - Forest información geográfica, 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,572.67 Finalizado 2017-01-13 sensores remotos, y 27 03 15 20 and Monitoring monitoreo de recursos naturales encargados en control Temático de Calidad - SYMBC - 2017 CO-PNF-26462-CS-INDV / Administración, Component 2 - Forest 2017-01- 2017-01- 2017-02- 2017-12- actualización y operación TF / 18478 Governance, Management Posterior Individual Direct 38,400.00 36,441.45 Finalizado 2017-01-09 23 30 15 20 de la plataforma and Monitoring tecnologica del SMBYC CO-PNF-26465-CS-INDV / Component 2 - Forest Experto en monitoreo 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 36,000.00 34,163.86 Finalizado 2017-01-09 ,reporte y verificación - 25 02 15 20 and Monitoring MVR del SMBYC - 2017 CO-PNF-26466-CS-INDV / Profesional experto en estructurador de Información, que apoyara Component 2 - Forest la generación, 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 21,778.00 20,512.97 Finalizado 2017-01-09 estandarización y 25 02 15 20 and Monitoring documentación de la información geográfica de deforestacion a nivel nacional y subnacional - 2017 CO-PNF-26464-CS-INDV / Profesional en ciencias naturales especializado en la Gestión de Áreas Component 3 - Sectoral 2017-01- 2017-02- 2017-03- 2017-09- Protegidas, como apoyo a TF / 18478 Programs for Sustainable Posterior Individual Direct 20,370.00 19,302.80 Firmado 2017-01-10 20 10 17 13 la Corporación para el Landscape Management Desarrollo Sostenible del Nor Oriente Amazónico- CDA - 2017 CO-PNF-26467-CS-INDV / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest adelante el procesamiento 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado 2017-01-09 de imágenes y reporte de 25 02 15 20 and Monitoring alertas tempranos de deforestacion CORPOAMAZONIA- Caqueta - 2017 Component 2 - Forest CO-PNF-26459-CS-INDV / 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 40,889.00 38,745.98 Finalizado 2017-01-09 Lider Temático de Carbono 25 02 15 20 and Monitoring CO-PNF-26461-CS-INDV / Component 1 - Protected 2017-01- 2017-02- 2017-02- 2017-12- Enlace PNN Serranía de TF / 18478 Areas Management and Posterior Individual Direct 30,531.00 28,822.63 Firmado 2017-01-09 25 02 15 20 Chiribiquete PNN - 2017 Financial Sustainability Component 4 - Project CO-PNF-26458-CS-INDV / Coordination, 2017-01- 2017-02- 2017-02- 2017-12- Profesional seguimiento - TF / 18478 Posterior Individual Direct 40,422.00 38,360.53 Firmado 2017-01-09 Management, Monitoring 26 03 23 20 2017 and Evaluation (M&E) CO-PNF-26463-CS-INDV / Component 4 - Project GEF 6. Consolidación Coordination, 2016-10- 2016-10- 2016-11- 2016-12- plan de adquisiciones, TF / 18478 Posterior Individual Direct 1,019.00 1,923.08 Firmado 2016-10-01 Management, Monitoring 17 23 02 30 elaboración manual and Evaluation (M&E) operativo, borrador acuerdo interinstitucional Component 4 - Project CO-PNF-31993-CS-INDV / Coordination, 2017-01- 2017-01- 2017-02- 2017-12- Especialista financiero - TF / 18478 Posterior Individual Direct 27,685.00 26,195.80 Firmado 2017-01-02 Management, Monitoring 10 15 23 20 2017 VF and Evaluation (M&E) CO-PNF-32008-CS-INDV / Profesional para seguimiento de actividades Component 2 - Forest 2017-01- 2017-01- 2017-02- 2017-12- administrativas y TF / 18478 Governance, Management Posterior Individual Direct 24,000.00 22,775.90 Finalizado 2017-01-02 12 17 15 20 financieras del componente and Monitoring de Monitoreo de Bosques y Carbono Component 4 - Project CO-PNF-31987-CS-INDV / Coordination, 2017-01- 2017-01- 2017-02- 2017-12- Coordinador general del TF / 18478 Posterior Individual Direct 52,311.00 49,643.04 Finalizado 2017-01-20 Management, Monitoring 25 30 23 02 proyecto - 2017 and Evaluation (M&E) Component 4 - Project CO-PNF-31985-CS-INDV / Coordination, 2016-12- 2017-01- 2017-01- 2017-12- Asistente administrativo - TF / 18478 Posterior Individual Direct 9,333.00 4,296.36 Firmado 2016-12-29 Management, Monitoring 31 01 04 20 2017 and Evaluation (M&E) CO-PNF-31995-CS-INDV / Profesional en ciencias Component 2 - Forest naturales para seguimiento 2017-01- 2017-01- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 14,000.00 22,775.90 Firmado 2017-01-02 de actividades técnicas y 07 12 15 20 and Monitoring ejecucion del componente de Monitoreo - 2017 CO-PNF-31983-CS-INDV / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest 2017-01- 2017-01- 2017-01- 2017-12- adelante el procesamiento TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado 2017-01-02 07 12 19 20 de imágenes y reporte de and Monitoring alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-31984-CS-INDV / Profesional Component 2 - Forest acompañamiento 2017-04- 2017-04- 2017-05- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 11,852.00 11,188.80 Firmado 2017-03-28 resguardos indigenas plan 07 12 15 20 and Monitoring cultural de ordenamiento y manejo y sistematización de chagras 2017 CO-PNF-32010-CS-INDV / Component 1 - Protected 2017-01- 2017-01- 2017-02- 2017-12- Profesional Administrativo TF / 18478 Areas Management and Posterior Individual Direct 21,400.00 20,687.55 Firmado 2017-01-01 11 16 15 20 PNN_DTAM - 2017 Financial Sustainability CO-PNF-34497-CS-INDV / Profesional SIG PNNSCH, Brindar los apoyos técnicos en sistemas de información geográfica Component 1 - Protected 2017-11- 2017-11- 2017-12- 2018-08- para la generación de TF / 18478 Areas Management and Posterior Individual Direct 8,587.00 21,005.57 Firmado 2017-11-15 19 24 08 10 insumos cartográficos, Financial Sustainability análisis espaciales y elaboración de aportes técnicos al equipo involucrado en el proyecto GEF y la DTAM Component 4 - Project CO-PNF-17963-CS-INDV / Coordination, 2017-08- 2017-08- 2017-09- 2018-09- Especialista de TF / 18478 Posterior Individual Limited 44,444.00 42,062.40 Firmado 2017-07-26 Management, Monitoring 19 24 01 01 Adquisiciones - 2017 and Evaluation (M&E) CO-PNF-17979-CS-INDV / Component 1 - Protected 2017-02- 2017-03- 2017-03- 2017-12- Profesional SIG PNNSCH TF / 18478 Areas Management and Posterior Individual Limited 22,131.00 20,974.49 Finalizado 2017-02-15 22 01 16 20 - 2017 Financial Sustainability CO-PNF-34457-CS-INDV / Experto análisis de conectividad ecosístemica- Formular una metodología Component 3 - Sectoral 2017-11- 2017-12- 2018-01- 2018-05- homologada para realizar TF / 18478 Programs for Sustainable Posterior Individual Limited 17,778.00 16,984.80 Firmado 2017-11-15 30 14 02 30 los estudios de Landscape Management conectividad ecológica del paisaje regional , subregional y local. CO-PNF-17997-CS-CDS / Consultoria Generacion de Component 2 - Forest Selección 2017-07- 2017-09- 2018-01- información de campo TF / 18478 Governance, Management Posterior directa de Direct 83,988.00 81,192.17 Firmado 2017-06-13 23 03 31 relacionada con el and Monitoring consultores monitoreo del Carbono CO-PNF-26457-CS-INDV / Profesional en ciencias Component 3 - Sectoral naturales especializado en 2017-03- 2017-03- 2017-04- 2017-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 25,000.00 23,689.80 Finalizado 2017-03-02 la Gestión de Áreas 18 28 18 20 Landscape Management Protegidas, como apoyo a Corpoamazonía CO-PNF-26460-CS-INDV / Profesional especializado en sistema de informacion Component 2 - Forest geográfica, sensores 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,536.32 Finalizado 2017-01-17 remotos / monitoreo de 31 05 15 20 and Monitoring recursos naturales que lidera el procesamiento digital de imagenes - 2017 CO-PNF-26456-CS-INDV / Component 3 - Sectoral 2017-01- 2017-02- 2017-02- 2017-12- Experto en Áreas TF / 18478 Programs for Sustainable Posterior Individual Direct 30,531.00 28,822.63 Finalizado 2017-01-09 25 02 23 20 Protegidas PNN - 2017 Landscape Management CO-PNF-34496-CS-INDV / Component 1 - Protected 2017-11- 2017-11- 2017-12- 2018-09- Interventoria centro de TF / 18478 Areas Management and Posterior Individual Limited 21,667.00 20,247.80 Firmado 2017-11-06 21 26 11 07 investigación Puerto Abeja Financial Sustainability Page 6 CO-PNF-38842-CS-INDV / Component 1 - Protected PNN-Profesional de enlace 2017-12- 2017-12- 2018-01- 2018-06- TF / 18478 Areas Management and Posterior Individual Direct 15,750.00 15,419.57 Firmado 2017-11-30 entre PNN DTAM y áreas 10 15 03 30 Financial Sustainability protegidas-2018 CO-PNF-38845-CS-INDV / Líder junior en Component 2 - Forest procesamiento digital para 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 26,503.00 25,825.93 Firmado 2017-11-30 capacitación y 10 15 03 20 and Monitoring transferencia del SMBYC a autoridades ambientales - 2018 CO-PNF-38849-CS-INDV / Profesional especializado en sistema de información Component 2 - Forest geográfica, sensores 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 42,591.00 41,308.83 Firmado 2017-11-30 remotos / monitoreo de 10 15 03 20 and Monitoring recursos naturales que lidera el procesamiento digital de imágenes - 2018 CO-PNF-38851-CS-INDV / Component 2 - Forest Experto en Monitoreo, 2017-12- 2018-01- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Limited 37,144.00 22,261.68 Firmado 2017-11-30 Reporte y Verificación - 30 04 21 20 and Monitoring MVR -2018 CO-PNF-38854-CS-INDV / Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- Líder Temático en TF / 18478 Governance, Management Posterior Individual Direct 39,429.00 38,780.21 Firmado 2017-11-30 10 15 03 20 Carbono-2018 and Monitoring CO-PNF-38855-CS-INDV / Profesional especializado en SIG, sensores remotos, Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- y monitoreo de recursos TF / 18478 Governance, Management Posterior Individual Direct 32,057.00 31,462.68 Firmado 2017-11-30 10 15 03 20 naturales encargados en and Monitoring control Temático de Calidad - SYMBC- 2018- CO-PNF-38857-CS-INDV / COORDINADOR Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- DESARROLLO DE TF / 18478 Governance, Management Posterior Individual Direct 33,364.00 33,010.89 Firmado 2017-11-30 10 15 03 20 PLANES DE PUEBLOS and Monitoring INDÍGENAS- 2018 CO-PNF-38860-CS-INDV / PROFESIONAL Component 2 - Forest FORMULACIÓN PLAN 2017-12- 2017-12- 2018-01- 2018-11- TF / 18478 Governance, Management Posterior Individual Direct 19,643.00 19,319.85 Firmado 2017-11-30 CULTURAL DE MANEJO 10 15 03 20 and Monitoring Y SISTEMATIZACION DE CHAGRAS- 2018 CO-PNF-38868-CS-INDV / Component 2 - Forest Consultoría para el diseño 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-11-30 del diplomado gobernanza 07 12 02 30 and Monitoring y gobierno propio CO-PNF-38870-CS-INDV / Consultoría para el diseño del componente pedagógico Component 2 - Forest y didáctico de los 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,758.00 Firmado 2017-11-30 diplomados para la 10 17 02 30 and Monitoring formación en gobernanza indígena y diálogo de saberes CO-PNF-38986-CS-INDV / Consultoría para el Component 2 - Forest diseño de una plataforma 2017-12- 2017-12- 2018-01- 2018-04- TF / 18478 Governance, Management Posterior Individual Direct 16,071.00 15,734.25 Firmado 2017-12-01 para la formación en 11 18 02 26 and Monitoring gobernanza indígena y gestión del conocimiento de los bosques CO-PNF-38990-CS-INDV / Consultoria para el diseño Component 2 - Forest del diplomado en proyectos 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-12-01 productivos y alternativas 11 18 02 30 and Monitoring locales generadoras de ingresos. CO-PNF-38991-CS-INDV / Consultoría para el diseño Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-05- del diplomado en TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-12-01 11 18 02 30 estrategias para la and Monitoring convivencia y el buen vivir. CO-PNF-38995-CS-INDV / Profesional CDA Ruta Declaratoria 2018- Liderar en representación de la CDA el proceso de Component 3 - Sectoral 2017-12- 2017-12- 2018-01- 2018-12- implementación de la ruta TF / 18478 Programs for Sustainable Posterior Individual Direct 11,464.00 11,764.65 Firmado 2017-12-01 11 18 02 20 declaratoria de nuevas Landscape Management áreas protegidas regionales y la gestión de las prioridades y estrategias de conservación existentes en el departame CO-PNF-39001-CS-INDV / Profesional de apoyo para Component 3 - Sectoral la implementación de 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 33,017.00 32,324.44 Firmado 2017-12-01 acuerdos con el sector de 11 18 02 20 Landscape Management infraestructura e hidrocarburos CO-PNF-39002-CS-INDV / Consultoria jurídica para Component 3 - Sectoral la inclusión de corredores 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 42,857.00 41,958.00 Firmado 2017-12-04 de conectividad ecológica 14 21 02 20 Landscape Management como determinante ambiental en evaluación de proyectos Component 4 - Project CO-PNF-39009-CS-INDV / Coordination, 2017-12- 2017-12- 2018-01- 2018-12- Profesional de seguimiento TF / 18478 Posterior Individual Direct 41,704.00 40,829.33 Firmado 2017-12-01 Management, Monitoring 11 16 02 20 y monitoreo- 2018 and Evaluation (M&E) Component 4 - Project CO-PNF-39010-CS-INDV / Coordination, 2017-12- 2017-12- 2018-01- 2018-12- Coordinación general del TF / 18478 Posterior Individual Direct 57,857.00 56,784.24 Firmado 2017-12-01 Management, Monitoring 11 16 04 20 proyecto- 2018 and Evaluation (M&E) Component 4 - Project CO-PNF-39014-CS-INDV / Coordination, 2017-12- 2017-12- 2018-01- 2018-12- Especialista financiera- TF / 18478 Posterior Individual Direct 32,036.00 31,508.92 Firmado 2017-12-01 Management, Monitoring 11 16 02 20 2018 and Evaluation (M&E) CO-PNF-43099-CS-INDV / Consultoría para la elaboración de los procedimientos que le compete adelantar a la Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- CDA, en materia de TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 17,491.32 Firmado 2018-01-16 24 14 21 21 evaluación y seguimiento Landscape Management ambiental y ejercicio de control y vigilancia de intervención en el Departamento del Guaviare CO-PNF-43106-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a CORMACARENA, en Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- materia de evaluación y TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 17,491.32 Firmado 2018-01-16 24 14 21 21 seguimiento ambiental y Landscape Management ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Sur del Me CO-PNF-43111-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a CORPOAMAZONIA, en Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- materia de evaluación y TF / 18478 Programs for Sustainable Posterior Individual Limited 17,769.00 17,491.32 Firmado 2018-01-16 24 14 21 21 seguimiento ambiental y Landscape Management ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Putumayo CO-PNF-41751-CS-INDV / Consultoría para la elaboración de un estudio Component 3 - Sectoral de caracterización del 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 2017-12-29 potencial de producción y 03 24 28 29 Landscape Management mercadeo de especies maderables y no maderables de bosque. CO-PNF-41752-CS-INDV / Consultoría para el diseño del arreglo institucional Component 3 - Sectoral (roles de autoridades 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 2017-12-29 ambientales y territoriales, 03 24 28 29 Landscape Management organizaciones sociales) para el fomento del manejo forestal sostenible Page 7 CO-PNF-41749-CS-INDV / Consultoría para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-05- evaluación de TF / 18478 Programs for Sustainable Posterior Individual Limited 6,429.00 0.00 Cancelado 2017-12-29 03 17 21 22 prefactibilidad de una Landscape Management iniciativa de manejo diversificado del bosque CO-PNF-55711-CS-INDV / servicios profesionales para realizar la caracterización Component 4 - Project biofísica de los motores Coordination, 2018-05- 2018-05- 2018-06- 2018-10- TF / 18478 Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-26 de fragmentación, agentes, Management, Monitoring 01 22 26 26 causas directas y énfasis and Evaluation (M&E) en causas subyacentes a nivel regional. CO-PNF-55712-CS-INDV / Realizar la caracterización social de los motores de fragmentación, agentes, causas directas y énfasis Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- en causas subyacentes a TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 26 nivel regional y la Landscape Management identificación de oportunidades para atenuar los riesgos frente a la fragmentación y potenciar las fortaleza CO-PNF-55713-CS-INDV / Servicios profesionales para aplicar herramientas de análisis espacial e interpretación de Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- coberturas de la tierra, TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 25 para realizar el control de Landscape Management calidad de la interpretación de coberturas de la tierra según metodología Corine Land Cover, de acuerdo a los p CO-PNF-55714-CS-INDV / Prestar los servicios profesionales para realizar la gestión, análisis y modelación de la Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- información TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 25 georreferenciada, para Landscape Management realizar el análisis de conectividad y motores de fragmentación con énfasis en causas subyacentes a nivel regional. CO-PNF-54326-CS-CDS / Component 4 - Project Selección AUDITORIA EXTERNA Coordination, 2018-06- 2018-08- 2018-11- TF / 18478 Posterior directa de Direct 12,600.00 0.00 En ejecución 2018-05-24 PARA EL PROYECTO Management, Monitoring 03 16 30 consultores GEF-CA AÑO 2018 and Evaluation (M&E) CO-PNF-62961-CS-INDV / Liderar la implementación de la estrategia de Component 1 - Protected comunicaciones de Ejecución 2018-07- 2018-08- 2018-08- 2019-07- TF / 18478 Areas Management and Posterior Individual Limited 24,643.00 0.00 2018-07-13 HERENCIA COLOMBIA pendiente 18 01 22 13 Financial Sustainability como un factor estratégico al momento de consolidad esta iniciativa de país CO-PNF-63402-CS-INDV / Coordinar, orientar y liderar la implementación Component 3 - Sectoral 2018-07- 2018-07- 2018-08- 2019-08- de los acuerdos de TF / 18478 Programs for Sustainable Posterior Individual Limited 28,965.00 27,140.40 Firmado 2018-07-02 07 21 13 12 conservación, restauración Landscape Management y no deforestación - CORPOAMAZONIA CO-PNF-63403-CS-INDV / Coordinar, orientar y Component 3 - Sectoral liderar la implementación Ejecución 2018-07- 2018-08- 2018-08- 2019-02- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,500.00 0.00 2018-07-13 de los acuerdos de pendiente 18 01 29 25 Landscape Management conservación, restauración y no deforestación - CDA CO-PNF-17965-CS-INDV / Consultoria para realizar Component 4 - Project la Misión de Evaluación Coordination, 2018-05- 2018-05- 2018-06- 2018-07- TF / 18478 Posterior Individual Open 16,071.00 0.00 Cancelado 2018-04-08 de Medio Término del Management, Monitoring 04 19 02 02 Proyecto GEF Corazón de and Evaluation (M&E) la Amazonia CO-PNF-38992-CS-INDV / Coordinación editorial y diseño, edición y diagramación- Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-06- estructuración de la TF / 18478 Governance, Management Posterior Individual Limited 14,286.00 0.00 Cancelado 2017-12-01 07 21 19 19 plataforma intercultural and Monitoring para la formación de gobernanza indígena y diálogo de saberes. CO-PNF-54443-CS-INDV / Profesional en mercadeo, comercio exterior, ciencias económicas o carreras afines que formule la Component 3 - Sectoral Ejecución 2018-09- 2018-09- 2018-10- 2019-05- estrategia de mercadeo y TF / 18478 Programs for Sustainable Posterior Individual Limited 14,814.00 0.00 2018-08-30 pendiente 04 25 30 01 de encadenamiento Landscape Management productivo de maderables y no maderables priorizados en el área de jurisdicción de ASOCAPRICHO. CO-PNF-54442-CS-INDV / Profesional en biólogía o carreras afines que Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- realicela caracterización TF / 18478 Programs for Sustainable Posterior Individual Limited 14,444.00 12,600.90 Firmado 2018-08-16 21 11 16 17 faunística y sitios de Landscape Management ecoturismo en las veredas de jurisdicción de ASOCAPRICO. CO-PNF-55709-CS-INDV / Profesional en comunicación social que genere contenidos para los Component 4 - Project distintos medios de Coordination, 2018-08- 2018-08- 2018-09- 2019-08- TF / 18478 Posterior Individual Limited 25,715.00 17,447.40 Firmado 2018-08-16 comunicación, en el marco Management, Monitoring 21 28 13 30 de la estrategia de and Evaluation (M&E) comunicación local de Visión Amazonia, que permitan mostrar avances y resultados del Proyecto. CO-PNF-55710-CS-INDV / Formulación de escenarios de gobernanza para el manejo integrado de estrategias de conservación Component 1 - Protected Ejecución 2018-08- 2018-09- 2018-10- 2019-05- y producción sostenible, en TF / 18478 Areas Management and Posterior Individual Limited 14,285.00 0.00 2018-08-15 pendiente 20 05 03 21 el ámbito de los mosaicos Financial Sustainability Corazón de la Amazonia y Piedemonte, definidos por Herencia Colombia, a partir de la caracterización terr CO-PNF-41747-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 2017-12-29 03 17 21 21 de proyectos de la red Landscape Management básica/modos y logística del Plan Maestro de Transporte Intermodal. CO-PNF-41748-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 2017-12-29 03 24 28 28 de proyectos de la red de Landscape Management integración/modos logística del Plan Maestro de Transporte intermodal. CO-PNF-41755-CS-INDV / Análisis actualizado del estado de la conectividad Component 3 - Sectoral ecosistémica Andes- 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 Amazonia y Orinoquia, 03 24 28 28 Landscape Management útil para la generación de alertas y la comunicación incidente con autorid CO-PNF-21088-CS-INDV / Experto en SIG - Análisis espacial para el ordenamiento ambiental Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-11- territorial dirigida a TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado 2017-08-01 08 23 04 18 prevenir deforestación y Landscape Management aportar a la conectividad ecosistémica. Municipio de Miraflores. CO-PNF-20986-CS-INDV / Profesional en SIG - Interpretación de imágenes Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-11- satelitales como insumo TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado 2017-08-01 08 23 04 18 para el ordenamiento Landscape Management ambiental territorial. Municipio de Miraflores Page 8 CO-PNF-41772-CS-INDV / Elaboración de diseños Component 3 - Sectoral novedosos de ingeniería 2018-08- 2018-09- 2018-10- 2019-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,844.75 Firmado 2018-08-23 para pasos de fauna y 28 18 23 21 Landscape Management señalización vial, en red vial de la Amazonia CO-PNF-41771-CS-INDV / Identificación y valoración de impactos, costos y Component 3 - Sectoral beneficios socio-económicos 2018-08- 2018-09- 2018-10- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,842.13 Firmado 2018-08-22 de las vías priorizadas en 27 17 22 20 Landscape Management los departamentos del Guaviare, Caquetá y sur del Meta. CO-PNF-41770-CS-INDV / Diseño de indicadores para valoración de impactos de la red vial terciaria, Component 3 - Sectoral formulación de planes de 2018-08- 2018-09- 2018-10- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Firmado 2018-08-23 mejoramiento de la 28 18 23 21 Landscape Management conectividad e integridad ecosistémicas y diseño de pasos de fauna y señalética en infraestructura verde CO-PNF-41768-CS-INDV / Valoración de impactos de proyectos viales (carreteros Component 3 - Sectoral y fluviales) en la 2018-08- 2018-09- 2018-10- 2019-03- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Firmado 2018-08-16 Amazonia colombiana, con 21 11 16 15 Landscape Management énfasis en deforestación, cambios de uso, mercado de tierras y economías locales CO-PNF-41767-CS-INDV / Análisis espacial de Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- conglomerados viales e TF / 18478 Programs for Sustainable Posterior Individual Limited 16,071.00 10,320.05 Firmado 2018-08-23 28 18 23 21 impactos ambientales y Landscape Management sociales. CO-PNF-41764-CS-INDV / Análisis territorial y ambiental de la inversión pública en vías de segundo y tercer orden, Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- realizada por la nación, el TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,842.13 Firmado 2018-08-22 27 17 22 20 departamento y los Landscape Management municipios, en el sur del Meta y el Departamento del Caquetá, en el periodo 2014-2020 CO-PNF-64186-CS-INDV / Liderar la continuidad en la operación del componente de monitoreo del carbono del SMBYC, Component 2 - Forest 2018-07- 2018-08- 2018-08- 2019-01- que permita la generación TF / 18478 Governance, Management Posterior Individual Limited 19,286.00 0.00 Cancelado 2018-07-12 17 01 26 26 de información temática de and Monitoring monitoreo de los bosques, estimaciones de contenidos y flujos de carbono y estimaciones de emisiones producto de CO-PNF-41753-CS-INDV / Diseño y aplicación de una metodología homologada para realizar Component 3 - Sectoral los estudio de conectividad 2018-01- 2018-01- 2018-02- 2018-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,143.00 0.00 Cancelado 2017-12-29 ecológica el paisaje (tanto 03 24 28 27 Landscape Management estructural como funcional) en tres ámbitos de alcance: regional (Amazonía colombiana), subregional y local. CO-PNF-41754-CS-INDV / Caracterización sociocultural de los motores, agentes, causas Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-06- directas y causas TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 03 24 28 28 subyacentes de Landscape Management fragmentación de la conectividad ecosistémica, a nivel regional, e identificar oportunidades par CO-PNF-41743-CS-INDV / Realizar la interlocución con las comunidades indígenas, establecer Component 2 - Forest mecanismos de 2018-01- 2018-01- 2018-02- 2018-07- TF / 18478 Governance, Management Posterior Individual Limited 5,357.00 0.00 Cancelado 2017-12-29 relacionamiento y realizar 13 20 17 17 and Monitoring el acompañamiento en campo para el desarrollo de las investigaciones locales que darán los insumos para los diplomados CO-PNF-41757-CS-INDV / Caracterización biofísica de los motores de Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-06- fragmentación, agentes, TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 03 24 28 28 causas directas y énfasis Landscape Management en causas subyacentes, a nivel regional. CO-PNF-41766-CS-INDV / Análisis jurídico de los proyectos de Component 3 - Sectoral construcción,mantenimiento 2018-02- 2018-02- 2018-04- 2018-09- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 0.00 Cancelado 2018-01-31 y recuperación y de lso 05 26 02 29 Landscape Management procedimientos de licenciamiento de proyectos viales CO-PNF-41758-CS-INDV / Control de calidad de la interpretación de coberturas de la tierra, de las áreas priorizadas por Component 3 - Sectoral la Mesa Técnica Ambiental 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 para la Formulación de 03 24 28 28 Landscape Management Recomendaciones sobre Infraestructura y Actividades Sectoriales en la Amazonia, de acuerdo con los protocolos CO-PNF-41762-CS-INDV / Diseñar una estrategia de comunicación lúdico- pedagógica y desarrollar Component 3 - Sectoral herramientas audiovisuales Ejecución 2018-07- 2018-08- 2018-09- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Limited 5,357.00 0.00 2018-07-20 y piezas comunicativas pendiente 25 15 19 20 Landscape Management para la difusión de los resultados de los análisis de conectividad y fragmentación de ecosistemas CO-PNF-62962-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, 2018-10- 2018-10- 2018-11- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-10-01 con base en las 06 20 10 08 Financial Sustainability condiciones de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-71707-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, Ejecución 2018-08- 2018-09- 2018-10- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 2018-08-16 con base en las pendiente 21 11 16 28 Financial Sustainability condiciones de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-75459-CS-CDS / Profesional para la generación de la versión Component 2 - Forest Selección 2018-09- 2018-11- 2019-01- 1.0 del mapa actualizado TF / 18478 Governance, Management Posterior directa de Direct 7,500.00 6,785.10 Firmado 2018-09-20 30 01 31 de coberturas de la tierra and Monitoring consultores a escala 1:1000.000 - IDEAM - JAVIER ESPEJO CO-PNF-75469-CS-INDV / Prestar los servicios profesionales para realizar Component 2 - Forest Ejecución 2018-09- 2018-10- 2018-11- 2019-01- la actualización de TF / 18478 Governance, Management Posterior Individual Limited 4,821.00 0.00 2018-09-20 pendiente 25 10 01 31 coberturas de la tierra a and Monitoring escala 1:100.000 para la región de la Amazonia, CO-PNF-75474-CS-INDV / Intérprete para el análisis multitemporal de accesos terrestres, asentamientos, pistas y aeropuertos en Component 2 - Forest Ejecución 2018-09- 2018-10- 2018-11- 2019-02- áreas seleccionadas TF / 18478 Governance, Management Posterior Individual Limited 6,429.00 0.00 2018-09-20 pendiente 25 10 01 28 complementarias de los and Monitoring departamentos de Caquetá, Sur del Meta, Guaviare, Putumayo, Amazonas, Vaupés y Guainía IDEAM Page 9 CO-PNF-75479-CS-INDV / Diseñar y diagramar los contenidos visuales y las Component 4 - Project piezas de comunicación y Coordination, 2018-09- 2018-10- 2018-11- 2019-10- divulgación que se TF / 18478 Posterior Individual Limited 17,143.00 15,241.92 Firmado 2018-09-20 Management, Monitoring 25 12 01 31 requieran para presentar and Evaluation (M&E) los informes y resultados que se generen en la implementación del Proyecto. CO-PNF-78406-CS-INDV / Estudios y documentación Component 1 - Protected Ejecución 2018-10- 2018-11- 2018-12- 2019-04- técnica de la nueva Área TF / A5789 Areas Management and Posterior Individual Limited 8,571.00 0.00 2018-10-15 pendiente 20 10 06 08 Protegida Regional Bajo Financial Sustainability Caguán - CORPOAMAZONIA CO-PNF-78407-CS-INDV / Estudios y documentación Component 1 - Protected técnica de la nueva Área Ejecución 2018-10- 2018-11- 2018-12- 2019-04- TF / A5789 Areas Management and Posterior Individual Limited 12,143.00 0.00 2018-10-15 Protegida Regional Páramo pendiente 20 10 06 05 Financial Sustainability de Miraflores - Picachos - CORPOAMAZONIA CO-PNF-78421-CS-INDV / Consultoría en ecoturismo que formule la estrategia de turismo y realice 3 Component 3 - Sectoral talleres con la comunidad Ejecución 2018-10- 2018-11- 2018-11- 2019-03- TF / A5789 Programs for Sustainable Posterior Individual Limited 7,143.00 0.00 2018-10-18 para su concertación. en pendiente 23 07 28 29 Landscape Management el marco de la línea sistemas producción no tradicionales (ecoturismo) del Plan de Manejo CO-PNF-81059-CS-INDV / Formular un plan de acción para la implementación del Sistema de Información de Component 2 - Forest Ejecución 2018-10- 2018-11- 2018-12- 2019-01- Seguimiento Ambiental TF / 18478 Governance, Management Posterior Individual Limited 3,571.00 0.00 2018-10-25 pendiente 30 14 03 03 SISA en CDA, con base and Monitoring en el diagnóstico de la infraestructura tecnológica y de los procedimientos de gestión de la información de la entidad CO-PNF-81061-CS-INDV / Lineamientos de política pública ambiental para la actualización de los Component 2 - Forest 2018-10- 2018-11- 2018-12- 2019-03- instrumentos de TF / 18478 Governance, Management Posterior Individual Limited 9,643.00 9,947.39 Firmado 2018-10-25 30 13 05 05 ordenamiento territorial, and Monitoring en cumplimiento en cumplimiento de la sentencia 4360 de 2018. CO-PNF-81066-CS-INDV / Elaboración de guión, Component 2 - Forest Ejecución 2018-10- 2018-11- 2018-12- 2019-01- toma de imágenes y TF / 18478 Governance, Management Posterior Individual Limited 2,857.00 0.00 2018-10-25 pendiente 30 15 13 14 edición un video sobre and Monitoring gestión de conocimiento de los bosques CO-PNF-81062-CS-INDV / Consolidación y actualización del PBOT de San José del Guaviare, de Component 2 - Forest Ejecución 2018-11- 2018-12- 2018-12- 2019-07- conformidad con los TF / 18478 Governance, Management Posterior Individual Direct 8,750.00 0.00 2018-11-14 pendiente 24 05 24 22 lineamiento definidos por and Monitoring el MADS para el cumplimiento de la STC 4360 de 2018. Deyanira Vanegas CO-PNF-81064-CS-INDV / Sistematización de la implementación y los Component 2 - Forest Ejecución 2018-11- 2018-12- 2018-12- 2019-02- resultados de los Planes TF / 18478 Governance, Management Posterior Individual Direct 3,786.00 0.00 2018-11-13 pendiente 23 04 24 24 de Pueblos Indígenas- and Monitoring KATTERINE BETANCOURT GARCÍA CO-PNF-85473-CS-INDV / Revisión y conceptualización de los planes de ordenamiento Component 2 - Forest Ejecución 2018-11- 2018-12- 2019-01- 2019-06- territorial (Departamental TF / 18478 Governance, Management Posterior Individual Limited 16,071.00 0.00 2018-11-22 pendiente 27 18 22 21 y municipales), en la and Monitoring etapa de concertación entre la CDA, alcaldias y gobernación del Guavaire. CO-PNF-89582-CS-INDV / Component 4 - Project Coordinación general del Coordination, Ejecución 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 61,329.00 0.00 2018-12-14 proyecto- 2019. Doris Management, Monitoring pendiente 24 27 02 31 Ochoa Jaramillo - and Evaluation (M&E) Miembro UCP CO-PNF-89585-CS-INDV / Component 4 - Project Profesional de seguimiento Coordination, Ejecución 2018-12- 2018-12- 2019-01- 2019-12- y monitoreo- 2019. Luz TF / 18478 Posterior Individual Direct 44,209.00 0.00 2018-12-14 Management, Monitoring pendiente 24 27 02 31 Adriana Rodriguez Porras and Evaluation (M&E) - Miembro UCP CO-PNF-89586-CS-INDV / Component 4 - Project Especialista financiera- Coordination, Ejecución 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 33,958.00 0.00 2018-12-14 2019. Doris Fajardo Management, Monitoring pendiente 24 27 02 31 Rodriguez - Miembro UCP and Evaluation (M&E) CO-PNF-89587-CS-INDV / Component 4 - Project Especialista de Coordination, Ejecución 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 45,429.00 0.00 2018-12-14 Adquisiciones - 2019. Management, Monitoring pendiente 24 27 02 31 Fredy Mojica - Miembro and Evaluation (M&E) UCP CO-PNF-89588-CS-INDV / Consultoría jurídica y gestión interinstitucional de apoyo a los procesos Component 3 - Sectoral que requieran las Ejecución 2018-12- 2018-12- 2019-01- 2019-07- TF / 18478 Programs for Sustainable Posterior Individual Direct 22,714.00 0.00 2018-12-14 entidades SINA en el pendiente 24 27 02 01 Landscape Management cumplimiento de la Sentencia y concreción de acuerdos sectoriales. Eugenia Ponce de León - Miembro UCP CO-PNF-89589-CS-INDV / Profesional de Enlace Component 3 - Sectoral Ejecución 2018-12- 2018-12- 2019-01- 2019-12- DTAM - 5 áreas TF / A5789 Programs for Sustainable Posterior Individual Direct 36,429.00 0.00 2018-12-14 pendiente 24 27 02 31 protegidas. Maria Cristina Landscape Management Pacheco - Miembro UCP CO-PNF-89590-CS-INDV / Profesional de apoyo para la implementación de Component 3 - Sectoral Ejecución 2018-12- 2018-12- 2019-01- 2019-12- acuerdos con el sector de TF / A5789 Programs for Sustainable Posterior Individual Direct 34,998.00 0.00 2018-12-14 pendiente 24 27 02 31 infraestructura vial. Landscape Management Camilo Rodríguez Pava - Miembro UCP CO-PNF-89591-CS-INDV / Profesional que coordine y oriente la implementación de los acuerdos de Component 3 - Sectoral conservación, restauración Ejecución 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 23,571.00 0.00 2018-12-14 y no deforestación en las pendiente 24 27 02 31 Landscape Management áreas de intervención priorizadas por la CDA. Gina Fernanda Vera - Miembro UCP CO-PNF-89592-CS-INDV / Profesional Especializado Áreas Protegidas de enlace Component 1 - Protected Ejecución 2018-12- 2018-12- 2019-01- 2019-12- CDA - Mesa TF / A5789 Areas Management and Posterior Individual Direct 24,304.00 0.00 2018-12-14 pendiente 24 27 02 31 Interinstitucional - Financial Sustainability Comunidades Guaviare. Arelis Arciniegas. CO-PNF-89593-CS-INDV / Profesional para el acompañamiento a los resguardos indígenas en el Component 3 - Sectoral Ejecución 2018-12- 2018-12- 2019-01- 2019-06- manejo y sistematización TF / A5789 Programs for Sustainable Posterior Individual Direct 9,464.00 0.00 2018-12-14 pendiente 24 27 02 01 de las iniciativas de Landscape Management Chagras que desarrollen los grupos de mujeres. Katterine Betancourt. CO-PNF-89594-CS-INDV / Profesional apoyo plan de Component 2 - Forest Ejecución 2018-12- 2018-12- 2019-01- 2019-04- manejo resguardos del TF / 18478 Governance, Management Posterior Individual Direct 4,543.00 0.00 2018-12-14 pendiente 24 27 02 01 medio Caquetá. Erick and Monitoring López Vanegas CO-PNF-89595-CS-INDV / Líder junior en procesamiento digital para Component 2 - Forest Ejecución 2018-12- 2018-12- 2019-01- 2019-12- capacitación y TF / 18478 Governance, Management Posterior Individual Direct 28,114.00 0.00 2018-12-14 pendiente 24 27 02 31 transferencia del SMBYC and Monitoring a autoridades ambientales - 2019. Juan Carlos Rubiano. Page 10 CO-PNF-89596-CS-INDV / Profesional especializado en sistema de información geográfica, sensores Component 2 - Forest Ejecución 2018-12- 2018-12- 2019-01- 2019-12- remotos / monitoreo de TF / 18478 Governance, Management Posterior Individual Direct 45,171.00 0.00 2018-12-14 pendiente 24 27 02 31 recursos naturales que and Monitoring lidera el procesamiento digital de imágenes - 2019. Gustavo Galindo CO-PNF-89597-CS-INDV / Experto en Monitoreo, Component 2 - Forest Ejecución 2018-12- 2018-12- 2019-01- 2019-12- Reporte y Verificación - TF / 18478 Governance, Management Posterior Individual Direct 39,000.00 0.00 2018-12-14 pendiente 24 27 02 31 MVR -2019. José Julian and Monitoring González CO-PNF-89598-CS-INDV / Profesional especializado en SIG, sensores remotos, Component 2 - Forest y monitoreo de recursos 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 33,986.00 30,806.15 Firmado 2018-12-14 naturales encargados en 24 27 02 31 and Monitoring control Temático de Calidad - SYMBC- 2019. Katherine Vergara CO-PNF-89599-CS-INDV / Profesional en Manejo de Sistemas de Información Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-12- que Genere las Alertas TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Firmado 2018-12-14 24 27 02 31 Tempranas de and Monitoring Deforestación - PDI 1 - 2019. Cristian Forero. CO-PNF-89600-CS-INDV / Profesional en Manejo de Component 2 - Forest Sistemas de Información 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Firmado 2018-12-14 que Genere las Alertas 24 27 02 31 and Monitoring Tempranas de Deforestación - PDI 2 - 2019. Diana Lara. CO-PNF-89769-CS-INDV / Profesionales de apoyo al monitoreo de efectividad Component 2 - Forest Ejecución 2019-01- 2019-01- 2019-02- 2020-01- en la reducción de la TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 2018-12-27 pendiente 01 09 04 30 deforestación y análisis de and Monitoring conectividad a nivel de paisaje. MDF1 CO-PNF-89775-CS-INDV / Profesionales de apoyo al monitoreo de efectividad Component 2 - Forest Ejecución 2019-01- 2019-01- 2019-02- 2020-01- en la reducción de la TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 2018-12-27 pendiente 01 03 04 31 deforestación y análisis de and Monitoring conectividad a nivel de paisaje. MDF2 Component 4 - Project CO-PNF-89777-CS-INDV / Coordination, 2018-12- 2019-01- 2019-01- 2020-01- Profesional apoyo TF / 18478 Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-12-14 Management, Monitoring 19 08 16 15 adquisiciones and Evaluation (M&E) CO-PNF-89780-CS-INDV / Profesional de seguimiento Component 3 - Sectoral Ejecución 2019-01- 2019-01- 2019-02- 2020-01- y apoyo a la planeación y TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 0.00 2018-12-27 pendiente 01 15 04 31 ejecución operativa Landscape Management regional (Guaviare) CO-PNF-89782-CS-INDV / Profesional apoyo a la Component 3 - Sectoral gestión territorial y de Ejecución 2018-12- 2019-01- 2019-02- 2020-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 0.00 2018-12-20 seguimiento a la pendiente 25 08 04 31 Landscape Management planeación y ejecución operativa regional (Caquetá). CO-PNF-89786-CS-INDV / Profesional que generé información espacial para Component 3 - Sectoral Ejecución 2018-12- 2019-01- 2019-02- 2020-01- la implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 17,143.00 0.00 2018-12-20 pendiente 25 09 04 31 acuerdos de conservación, Landscape Management restauración y no deforestación - CAZ CO-PNF-89788-CS-INDV / Profesional para coordinar y facilitar la implementación de los Component 3 - Sectoral planes de trabajo definidos Ejecución 2018-12- 2019-01- 2019-02- 2020-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 27,636.00 0.00 2018-12-20 con los resguardos pendiente 25 09 04 31 Landscape Management Indígenas vecinos del PNNSCH y los que suscribieron los acuerdos de voluntades con el PNN La Paya. CO-PNF-89790-CS-INDV / Profesional para realizar Component 1 - Protected Ejecución 2018-12- 2019-01- 2019-02- 2020-01- el enlace técnico para la TF / A5789 Areas Management and Posterior Individual Limited 15,714.00 0.00 2018-12-20 pendiente 25 09 04 02 gestión comunitaria del Financial Sustainability APR Bajo Caguán CO-PNF-89793-CS-INDV / Profesional Apoyo proceso Component 1 - Protected formulación de plan de Ejecución 2018-12- 2019-01- 2019-02- 2020-01- TF / A5789 Areas Management and Posterior Individual Limited 21,429.00 0.00 2018-12-20 manejo de la nueva APR pendiente 25 10 04 31 Financial Sustainability Páramo de Miraflores - Picachos CO-PNF-89794-CS-INDV / CORPOAMAZONIA: Component 3 - Sectoral Ejecución 2018-12- 2019-01- 2019-02- 2020-01- Consultor Asesoría TF / A5789 Programs for Sustainable Posterior Individual Limited 42,857.00 0.00 2018-12-20 pendiente 25 10 04 31 Montaje del modelo Landscape Management integrado de desarrollo forestal. CO-PNF-96464-CS-INDV / Profesional que realice los estudios técnicos para la declaración de reservas Component 1 - Protected Ejecución 2019-02- 2019-03- 2019-03- 2019-09- naturales de la sociedad TF / A5789 Areas Management and Posterior Individual Limited 9,677.00 0.00 2019-02-15 pendiente 20 01 08 04 civil en el área de Financial Sustainability amortiguamiento del APR Páramo de Mirafores Picachos CO-PNF-96466-CS-INDV / Profesional que incorporé los lineamientos de OT del MADS, la CDA y Gobernación del Guaviare, Component 3 - Sectoral en los OT municipales de Ejecución 2019-02- 2019-02- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 2019-01-29 Retorno, Calamar, pendiente 03 18 01 30 Landscape Management Miraflores y Depto del Guaviare y complemente planes de acción con acciones de mitigación al cc y control a la defores CO-PNF-96467-CS-INDV / Profesional que incorporé los ajustes cartográficos en los OT municipales de Retorno, Calamar, Component 3 - Sectoral Miraflores y Depto del Ejecución 2019-02- 2019-02- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 2019-01-29 Guaviare y complemente pendiente 03 18 01 30 Landscape Management planes de acción con acciones de mitigación al cc y control a la deforestación, en cumplimiento de la Sentencia. CO-PNF-96470-CS-INDV / Profesional de Apoyo gestión técnica, operativa Component 3 - Sectoral Ejecución 2019-02- 2019-02- 2019-03- 2019-09- y comunitaria de TF / A5789 Programs for Sustainable Posterior Individual Limited 9,677.00 0.00 2019-01-29 pendiente 03 20 08 04 actividades de control y Landscape Management vigilancia de Corpoamazonia en Ramsar Tarapoto. CO-PNF-99123-CS-INDV / Coordinar el proceso de asesoría técnica a municipios, gobernaciones, Component 3 - Sectoral CDS y organizaciones de Ejecución 2019-02- 2019-03- 2019-03- 2020-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 25,807.00 0.00 2019-02-18 apoyo, para llevar a pendiente 23 07 20 15 Landscape Management término el ajuste excepcional de los POT, de conformidad con lo ordenado en la Sentencia STC 4360-2018. CO-PNF-99124-CS-INDV / Diseñar e implementar la estrategia de coordinación y concertación con las autoridades territoriales, Component 3 - Sectoral Ejecución 2019-02- 2019-03- 2019-03- 2020-01- sectoriales y ambientales, TF / 18478 Programs for Sustainable Posterior Individual Direct 25,807.00 0.00 2019-02-18 pendiente 28 12 20 20 para el ajuste excepcional Landscape Management de los POT de 15 municipios de la Amazonia colombiana. César Augusto Rey Angel Page 11 CO-PNF-99126-CS-INDV / Profesional Especializado que Lidere el proceso de comunicación y gestión del Component 4 - Project conocimiento de la Coordination, Ejecución 2019-02- 2019-03- 2019-03- 2020-03- Iniciativa GEF Corazón de TF / 18478 Posterior Individual Direct 34,839.00 0.00 2019-02-18 Management, Monitoring pendiente 28 12 18 17 la Amazonia, entre las and Evaluation (M&E) entidades socias y actores interesados a nivel nacional y regional . Marcela Rodríguez Salguero CO-PNF-99128-CS-INDV / Diseñar y desarrollar los contenidos gráficos multiformato requeridos Component 4 - Project para la implementación de Coordination, Ejecución 2019-02- 2019-03- 2019-03- 2020-03- TF / 18478 Posterior Individual Direct 30,968.00 0.00 2019-02-18 la Estrategia de Management, Monitoring pendiente 28 12 21 20 comunicaciones y gestión and Evaluation (M&E) del conocimiento de la Iniciativa.. Andrés Urquina Sánchez CO-PNF-99129-CS-INDV / Experto que facilite los talleres que se definan Component 3 - Sectoral con la Mesa Ramsar EFI Ejecución 2019-02- 2019-03- 2019-03- 2020-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 3,629.00 0.00 2019-02-18 en aspectos legales y pendiente 23 08 20 17 Landscape Management normativos, aprovechamiento de recursos naturales y otros temas CO-PNF-99131-CS-INDV / Experto que facilite los talleres que se definan Component 3 - Sectoral Ejecución 2019-02- 2019-03- 2019-03- 2020-01- con ATICOYA, en aspectos TF / A5789 Programs for Sustainable Posterior Individual Limited 5,806.00 0.00 2019-02-18 pendiente 23 08 20 15 legales y normativos, Landscape Management aprovechamiento de recursos naturales y otros temas CO-PNF-99135-CS-INDV / Prestar sus servicios profesionales para apoyar la ejecución de los procesos de adquisiciones y Component 4 - Project contrataciones que se Coordination, 2019-02- 2019-03- 2019-03- 2020-02- TF / 18478 Posterior Individual Direct 23,226.00 22,889.52 Firmado 2019-02-15 requieran de acuerdo con Management, Monitoring 21 01 01 29 lo establecido en el and Evaluation (M&E) Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las CO-PNF-99138-CS-INDV / Formular recomendaciones respecto de las acciones prioritarias para la prevención y la mitigación Component 3 - Sectoral de impactos de los Ejecución 2019-02- 2019-03- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,000.00 0.00 2019-02-15 proyectos de pendiente 20 05 15 30 Landscape Management infraestructura de transporte (vial y fluvial), con base en la parametrización de modelos de deforestación en áreas seleccion CO-PNF-103416-CS-INDV / Gestionar información y aportar criterios y documentos técnicos para la incorporación del Component 3 - Sectoral Ejecución 2019-03- 2019-04- 2019-04- 2019-10- manejo forestal sostenible TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 2019-03-15 pendiente 20 03 10 07 y la ordenación forestal Landscape Management de las Corporaciones en los POT de los 15 municipios citados por la Corte en la Sentencia STC 4360. CO-PNF-103421-CS-INDV / Generar y procesar información para análisis asociados a la variabilidad Component 3 - Sectoral y adaptación al cambio Ejecución 2019-03- 2019-04- 2019-05- 2019-10- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 2019-03-15 climático para los 15 pendiente 20 03 01 28 Landscape Management municipios citados de manera expresa por la Corte en la Sentencia STC 4360. CO-PNF-103492-CS-INDV / Gestionar información y aportar criterios y documentos técnicos asociados a la Component 3 - Sectoral consolidacion y manejo de Ejecución 2019-03- 2019-04- 2019-04- 2019-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 2019-03-15 la estructura ecológica pendiente 20 03 15 14 Landscape Management principal, manejo adecuado del suelo, restauración y uso de la biodiversidad, para incorporarlos en los POT de los 15 municipi CO-PNF-103495-CS-INDV / Apoyar la elaboración de documentos técnicos de las determinantes ambientales asociadas a la reducción a Component 3 - Sectoral cero deforestación y la Ejecución 2019-03- 2019-04- 2019-04- 2019-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 7,742.00 0.00 2019-03-15 adaptación al cambio pendiente 20 02 15 14 Landscape Management climático de las Corporaciones y realizar la evaluación de los POT de los municipios del Guaviare, en cu CO-PNF-103503-CS-INDV / Profesional que generé información espacial para Component 3 - Sectoral Ejecución 2019-04- 2019-04- 2019-05- 2020-01- la implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 13,065.00 0.00 2019-04-01 pendiente 06 19 03 31 acuerdos de conservación, Landscape Management restauración y no deforestación CO-PNF-103505-CS-INDV / Diseño de un Sistema integrado de gestión Component 1 - Protected administrativa, financiera Ejecución 2019-03- 2019-04- 2019-04- 2019-08- TF / A5789 Areas Management and Posterior Individual Limited 17,419.00 0.00 2019-03-15 y técnica para FPN: pendiente 29 03 15 14 Financial Sustainability levantamiento de requerimientos internos y externos. CO-PNF-109350-CS-INDV Component 3 - Sectoral / Diseño participativo de Ejecución 2019-05- 2019-05- 2019-06- 2019-09- TF / 18478 Programs for Sustainable Posterior Individual Open 4,839.00 0.00 2019-04-25 una estrategia de pendiente 14 28 14 11 Landscape Management comunicaciones para ASOCAPRICHO Component 4 - Project CO-PNF-109352-CS-INDV Coordination, Ejecución 2019-05- 2019-06- 2019-07- 2020-03- / Especialista de TF / 18478 Posterior Individual Open 27,355.00 0.00 2019-04-25 Management, Monitoring pendiente 29 19 10 03 Adquisiciones - 2019 and Evaluation (M&E) CO-PNF-113781-CS-INDV / Profesional que oriente técnicamente los procesos de coordinación institucional y concertación Component 3 - Sectoral social necesarios para el Ejecución 2019-05- 2019-05- 2019-06- 2020-06- TF / A5789 Programs for Sustainable Posterior Individual Limited 27,097.00 0.00 2019-05-13 establecimiento y pendiente 21 31 07 06 Landscape Management mantenimiento de los acuerdos de conservación, restauración y no deforestación, en las áreas definidas por CORPOAMAZ CO-PNF-118099-CS-CDS / Profesional de apoyo CORPOAMAZONIA para Component 3 - Sectoral Selección Ejecución 2019-06- 2019-07- 2020-01- la incorporación de TF / A5789 Programs for Sustainable Posterior directa de Direct 9,232.00 0.00 2019-06-10 pendiente 20 23 19 criterios ambientales para Landscape Management consultores proyectos de red vial terciarias- Jairo Cárdenas CO-PNF-118100-CS-CDS / Profesional de apoyo CDA para la incorporación de Component 3 - Sectoral Selección Ejecución 2019-06- 2019-07- 2020-01- criterios ambientales para TF / A5789 Programs for Sustainable Posterior directa de Direct 9,232.00 0.00 2019-06-10 pendiente 20 19 15 proyectos de red vial Landscape Management consultores terciarias. - Enrique Caballero CO-PNF-118102-CS-CDS / Component 4 - Project Selección Coordinación General del Coordination, Ejecución 2019-06- 2019-07- 2020-07- TF / A5789 Posterior directa de Direct 54,194.00 0.00 2019-06-07 proyecto - Luz Adriana Management, Monitoring pendiente 17 17 15 consultores Rodríguez and Evaluation (M&E) CO-PNF-118103-CS-CDS / Component 4 - Project Selección Especialista de Coordination, Ejecución 2019-06- 2019-07- 2020-07- TF / A5789 Posterior directa de Direct 34,839.00 0.00 2019-06-07 adquisiciones- Viviana Management, Monitoring pendiente 17 17 15 consultores Sánchez Quintero and Evaluation (M&E) CO-PNF-118104-CS-INDV / Orientar los procesos de planificación, ordenamiento Component 3 - Sectoral y gestión de turismo de Ejecución 2019-06- 2019-07- 2019-07- 2020-07- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,419.00 0.00 2019-06-14 naturaleza en las áreas pendiente 19 03 19 17 Landscape Management seleccionadas de la jurisdicción de la CDA, Guaviare Page 12 CO-PNF-118105-CS-INDV Component 4 - Project / Profesional de Coordination, Ejecución 2019-06- 2019-07- 2019-07- 2020-07- TF / A5789 Posterior Individual Limited 38,710.00 0.00 2019-06-14 seguimiento, monitoreo y Management, Monitoring pendiente 19 03 19 17 evaluación del proyecto and Evaluation (M&E) CO-PNF-118107-CS-INDV / Construir y desarrollar una guía de investigación preestructurada en Component 3 - Sectoral Ejecución 2019-06- 2019-07- 2019-07- 2019-09- educación, gestión y TF / A5789 Programs for Sustainable Posterior Individual Limited 5,161.00 0.00 2019-06-14 pendiente 19 03 19 18 conservación de uso Landscape Management sostenible del territorio siguiendo los lineamientos pedagógicos ONDAS CO-PNF-118108-CS-INDV / Consultor social de la Component 4 - Project evaluación de medio Coordination, Ejecución 2019-06- 2019-06- 2019-07- 2019-10- término de la iniciativa TF / A5789 Posterior Individual Limited 9,677.00 0.00 2019-06-07 Management, Monitoring pendiente 12 26 12 11 Conservación de bosques y and Evaluation (M&E) sostenibilidad en el corazón de la amazonia CO-PNF-118109-CS-INDV / Consultor financiero de Component 4 - Project la evaluación de medio Coordination, Ejecución 2019-06- 2019-07- 2019-07- 2019-10- término de la Iniciativa TF / A5789 Posterior Individual Limited 9,677.00 0.00 2019-06-14 Management, Monitoring pendiente 19 03 19 18 Conservación de bosques and Evaluation (M&E) y sostenibilidad en el Corazón de la Amazonia CO-PNF-75462-CS-INDV / Analista espacial para la revisión, corrección, Component 2 - Forest complementación y Ejecución 2018-09- 2018-10- 2018-11- 2019-03- TF / A5789 Governance, Management Posterior Individual Limited 6,429.00 0.00 2018-09-20 unificación de la pendiente 25 16 13 15 and Monitoring información de accesibilidad, interpretada en la Amazonía colombiana- IDEAM CO-PNF-118114-CS-CDS / Consolidación y actualización de los Esquemas de Ordenamiento Territorial Component 3 - Sectoral Selección de El Retorno, Calamar y Ejecución 2019-06- 2019-07- 2019-12- TF / A5789 Programs for Sustainable Posterior directa de Direct 12,097.00 0.00 2019-06-14 Miraflores, de conformidad pendiente 24 24 23 Landscape Management consultores con los lineamientos definidos por el MADS para el cumplimiento de la STC 4360 de 2018 y coordinar con las Alcaldías de El Retorn CO-PNF-81085-CS-INDV / Planificación, ordenamiento Component 3 - Sectoral y gestión del turismo de Ejecución 2019-06- 2019-07- 2019-07- 2020-06- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,679.00 0.00 2019-06-14 naturaleza, en áreas pendiente 19 05 26 19 Landscape Management seleccionadas de la jurisdicción de CDA. CO-PNF-113782-CS-CDS / AUDITORIA EXTERNA DEL PROYECTO "CONSERVACIÓN DE BOSQUES Y Component 4 - Project Selección SOSTENIBILIDAD EN EL Coordination, Ejecución 2019-07- 2019-08- 2020-02- TF / A5789 Posterior directa de Direct 28,525.00 0.00 2019-06-03 CORAZÓN DE LA Management, Monitoring pendiente 24 08 04 consultores AMAZONIA" BAJO EL and Evaluation (M&E) (P144271- TF018478) Y FINANCIACIÓN ADICIONAL (P158003- TF0A5789) CO-PNF-123087-CS-CDS / Realizar la compilación, armonización e integración de todos los documentos que conforman los Component 3 - Sectoral Selección Ejecución 2019-08- 2019-08- 2019-11- esquemas de ordenamiento, TF / A5789 Programs for Sustainable Posterior directa de Direct 4,839.00 0.00 2019-07-26 pendiente 05 26 21 EOT (General, urbano y Landscape Management consultores rural) de acuerdo a la norma y redacción requerida para los EOTy los requisitos de la CDA. Leidy Bernal Vargas CO-PNF-123091-CS-INDV / Liderar y desarrollar el proceso de construcción y validación social, institucional y técnica a Component 1 - Protected Ejecución 2019-07- 2019-08- 2019-08- 2020-08- nivel local y regional para TF / A5789 Areas Management and Posterior Individual Limited 27,097.00 0.00 2019-07-26 pendiente 31 15 29 28 la declaración del APR Financial Sustainability Bajo Caguán, y oriente las acciones a desarrollar en el PNR Miraflores Picachos, Caquetá. CO-PNF-123093-CS-INDV / Facilitar y gestionar como enlace técnico y operativo local, los Component 1 - Protected procesos que se adelante Ejecución 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Posterior Individual Limited 15,484.00 0.00 2019-07-26 en la ruta declaratoria del pendiente 31 15 29 28 Financial Sustainability APR de Bajo Caguán, Caquetá, con las comunidades (productores e indígenas) y actores institucionales. CO-PNF-123094-CS-INDV Component 4 - Project / Consultor que lidere la Coordination, Ejecución 2019-07- 2019-08- 2019-08- 2019-12- evaluación de medio TF / A5789 Posterior Individual Limited 15,484.00 0.00 2019-07-26 Management, Monitoring pendiente 31 14 28 27 término de GEF Corazón and Evaluation (M&E) de la Amazonia. CO-PNF-123097-CS-INDV / Construcción Estrategia de difusión y divulgación Component 3 - Sectoral Sitio Ramsar Estrella Ejecución 2019-07- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 0.00 2019-07-26 Fluvial del Inírida - EFI, pendiente 31 14 28 27 Landscape Management con la Mesa Ramsar EFI y articulada a la Estrategia de Comunicaciones de GEF CA. CO-PNF-123107-CS-INDV / Realizar la sustentación técnica y apoyo del proceso de construcción y Component 1 - Protected validación social e Ejecución 2019-07- 2019-08- 2019-08- 2019-12- TF / A5789 Areas Management and Posterior Individual Limited 7,742.00 0.00 2019-07-26 institucional para la pendiente 31 14 28 27 Financial Sustainability declaratoria de la nueva área protegida regional en el de departamento del Guaviare en Jurisdicción de la CDA. CO-PNF-123080-CS-CDS / Coordinar la revisión y ajuste del esquema de ordenamiento del municipio de Miraflores en Component 3 - Sectoral Selección todos sus componentes Ejecución 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,774.00 0.00 2019-07-26 conforme con los pendiente 05 26 22 Landscape Management consultores lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 CO-PNF-123079-CS-CDS / Profesional que sistematice la experiencia y documente Component 4 - Project la implementación del Selección Coordination, Ejecución 2019-08- 2019-08- 2020-08- proyecto GEF Corazón de TF / A5789 Posterior directa de Direct 21,290.00 0.00 2019-07-26 Management, Monitoring pendiente 05 26 25 la Amazonia y realice consultores and Evaluation (M&E) seguimiento a la aplicación de los instrumentos de salvaguardas sociales. CO-PNF-123077-CS-CDS / Profesional para el acompañamiento a los resguardos indígenas en el Component 3 - Sectoral Selección Ejecución 2019-08- 2019-08- 2020-01- desarrollo y TF / A5789 Programs for Sustainable Posterior directa de Direct 19,355.00 0.00 2019-07-26 pendiente 05 26 24 sistematización de las Landscape Management consultores iniciativas de Chagras que desarrollen los grupos de mujeres. Katterine Betancourt CO-PNF-123086-CS-CDS / Elaborar la revisión y ajuste del componente rural de los esquemas de ordenamiento de los Component 3 - Sectoral Selección municipios de El Retorno Ejecución 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,290.00 0.00 2019-07-26 y Calamar conforme con pendiente 05 26 25 Landscape Management consultores los lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la Page 13 CO-PNF-123084-CS-CDS / Coordinar la revisión y ajuste de los esquemas de ordenamiento de los municipios de El Retorno Component 3 - Sectoral Selección y Calamar y elaborar el Ejecución 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,774.00 0.00 2019-07-26 componente general, pendiente 05 26 25 Landscape Management consultores conforme con los lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumpl CO-PNF-123088-CS-CDS / Realizar la revisión y ajuste de los documentos del Plan Departamental de Ordenamiento Territorial - Component 3 - Sectoral Selección PDOT, acorde a los Ejecución 2019-08- 2019-08- 2019-10- TF / A5789 Programs for Sustainable Posterior directa de Direct 4,516.00 0.00 2019-07-26 lineamientos nacionales pendiente 05 26 25 Landscape Management consultores (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 y garan Page 14