Documentos e Relat�rios

Pesquisar/Buscar documentos


  

APRIMORAR POR:

Especifica��o do per�odo do documento

Exibir mais +
Exibir mais +
  • Mostrando 1 - 20 of 29 resultados
  • Mostrar resultados em grupos de
  • 10
  • 20
  • 50
Fazer download para Excel [x]
Disclosable Version of the ISR - Vietnam Managing Natural Hazards Project - P118783 - Sequence No : 13 (Inglês)

Situação da implementação e relatório dos resultados ISR37738 JUL 08, 2019

Pillai,Poonam Disclosed

Disclosable Restructuring Paper - Vietnam Managing Natural Hazards Project - P118783 (Inglês)

The objective of the Managing Natural Hazards Project is to increase the resilience of people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's National Disaster Prevention, Response and Mitigation Strategy Towards 2020. ... Exibir mais +

Documento do projeto RES36350 MAR 27, 2019

Pillai,Poonam Disclosed

Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 12 (Inglês)

Situação da implementação e relatório dos resultados ISR33554 JAN 07, 2019

Pillai,Poonam Disclosed

Resilience in a Changing Climate Cryosphere Monitoring and Management in Bhutan : Technical Note (Inglês)

The present report provides a cryosphere perspective on Bhutan’s water resources, monitoring needs, and climate services. Main concerns are with glaciers, snow, permafrost, and related cold climate conditions. ... Exibir mais +

Report 133253 AUG 25, 2018

Pillai,Poonam Disclosed

City Resilience in the Mekong Delta : SOC TRANG Resilience Assessment - Technical Study (Inglês)

Soc Trang city has been formed at the hybrid intersection of canals and roads and is incorporated with the coastal sand dune morphology surrounded by a constantly transformed productive landscape. ... Exibir mais +

Report 134592 JUN 30, 2018

Tuan, Vu Anh; Vu, Linh; Herawati Ross,Inneke; Payne,Geoffrey K.; Pillai,Poonam; Hoang,Hoa Thi; Carrigan,Aileen Marie; Tran,Yen Hoang; Block,John Richard Dalton; Rajagopal,Champaka Tirumala; Wilderspin,Ian Furniss; Gadgil,Gauri Uday; Nguyen,Long Thanh; Singh,Gayatri; Tran,Hai Yen; Salat,Serge; Nguyen,Dzung Huy; Nguyen, Hieu Disclosed

Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 11 (Inglês)

Situação da implementação e relatório dos resultados ISR31867 MAY 18, 2018

Pillai,Poonam Disclosed

Improving lead time for tropical cyclone forecasting : review of operational practices and implications for Bangladesh (Inglês)

Bangladesh is one of the most densely populated countries in the world. Owing to its low-lying topography, dense river network, location, and climate, it is exposed to a range of water and climate-related hazards. ... Exibir mais +

Documento de Trabalho 126068 JAN 01, 2018

Sobel,Adam Harrison; Pillai,Poonam Disclosed

Flood risk management in Dhaka : a case for eco-engineering approaches and institutional reform (Inglês)

The main objective of this study is to propose recommendations for addressing flood risks in Greater Dhaka. This is based on an analysis of flood risks facing the city, historical analysis of decision-making about flood risk management, and institutional and political economy analysis. ... Exibir mais +

123888 JAN 01, 2018

Pillai,Poonam; Khan,Malik Fida Abdullah; Siercke,Guillermo A. Disclosed

Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 10 (Inglês)

Situação da implementação e relatório dos resultados ISR30103 NOV 29, 2017

Pillai,Poonam Disclosed

Bangladesh - Bangladesh Weather and Climate Services Regional Project : P150220 - Implementation Status Results Report : Sequence 02 (Inglês)

Situação da implementação e relatório dos resultados ISR27956 MAY 23, 2017

Pillai,Poonam Disclosed

Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 08 (Inglês)

Situação da implementação e relatório dos resultados ISR24998 DEC 21, 2016

Pillai,Poonam Disclosed

Bhutan - Hydromet Services and Disaster Resilience Regional project : P154477 - Implementation Status Results Report : Sequence 01 (Inglês)

Situação da implementação e relatório dos resultados ISR26421 DEC 20, 2016

Pillai,Poonam Disclosed

Bangladesh - Bangladesh Weather and Climate Services Regional Project : P150220 - Implementation Status Results Report : Sequence 01 (Inglês)

Situação da implementação e relatório dos resultados ISR25281 OCT 21, 2016

Pillai,Poonam Disclosed

Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 07 (Inglês)

Situação da implementação e relatório dos resultados ISR23026 MAY 05, 2016

Pillai,Poonam

Strengthening Agro-Met Services in Bhutan (Inglês)

Agriculture is the dominant sector in Bhutan, providing livelihood, income, and employment to approximately 55 percent of the population. The majority of famers are subsistence farmers with average land holdings ranging from 1 to 4 acres. ... Exibir mais +

Report 133255 JAN 01, 2016

Abawi,Yahya; Pillai,Poonam; Tshering,Dechen; Wang,Sonam Disclosed

Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 06 (Inglês)

Situação da implementação e relatório dos resultados ISR21869 DEC 29, 2015

Pillai,Poonam

Moderinizing weather, water, and climate services : a road map for Bhutan (Inglês)

Documento de Trabalho 98534 JUL 21, 2015

Pillai,Poonam; Tshering,Dechen Disclosed

Note on green growth for Bhutan (Inglês)

Bhutan has recently made significant progress in sustaining economic growth and reducing poverty. Bhutan also has valuable deposits of primary materials including dolomite, lime stone, gypsum, quartzite, stone, and marble, which are useful for fabrication of other materials. ... Exibir mais +

Documento de Trabalho 90413 JUL 31, 2014

Narain, Urvashi; Toman, Michael; Jiang, Zhiyun; Dawes, Winston; Magrath, William B.; Lokanc, Martin; Mittal, Rohit; Dogra, Pyush; Wang, Shenhua; Pillai, Poonam; Khalil, Abedalrazq; Karki, Pravin Disclosed

Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 03 (Inglês)

Situação da implementação e relatório dos resultados ISR14661 JUN 29, 2014

Pillai,Poonam

Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 02 (Inglês)

Situação da implementação e relatório dos resultados ISR11561 DEC 31, 2013

Pillai,Poonam

T�tulo Data do documento Relat�rio N�. Qualquer tipo de documento Also available in
Disclosable Version of the ISR - Vietnam Managing Natural Hazards Project - P118783 - Sequence No : 13 (Inglês)
Exibir mais +
JUL 08, 2019 ISR37738 Situação da implementação e relatório dos resultados
Disclosable Restructuring Paper - Vietnam Managing Natural Hazards Project - P118783 (Inglês)
Exibir mais +
MAR 27, 2019 RES36350 Documento do projeto
Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 12 (Inglês)
Exibir mais +
JAN 07, 2019 ISR33554 Situação da implementação e relatório dos resultados
Resilience in a Changing Climate Cryosphere Monitoring and Management in Bhutan : Technical Note (Inglês)
Exibir mais +
AUG 25, 2018 133253 Report
City Resilience in the Mekong Delta : SOC TRANG Resilience Assessment - Technical Study (Inglês)
Exibir mais +
JUN 30, 2018 134592 Report
Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 11 (Inglês)
Exibir mais +
MAY 18, 2018 ISR31867 Situação da implementação e relatório dos resultados
Improving lead time for tropical cyclone forecasting : review of operational practices and implications for Bangladesh (Inglês)
Exibir mais +
JAN 01, 2018 126068 Documento de Trabalho
Flood risk management in Dhaka : a case for eco-engineering approaches and institutional reform (Inglês)
Exibir mais +
JAN 01, 2018 123888
Disclosable Version of the ISR - Vietnam - Managing Natural Hazards Project - P118783 - Sequence No : 10 (Inglês)
Exibir mais +
NOV 29, 2017 ISR30103 Situação da implementação e relatório dos resultados
Bangladesh - Bangladesh Weather and Climate Services Regional Project : P150220 - Implementation Status Results Report : Sequence 02 (Inglês)
Exibir mais +
MAY 23, 2017 ISR27956 Situação da implementação e relatório dos resultados
Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 08 (Inglês)
Exibir mais +
DEC 21, 2016 ISR24998 Situação da implementação e relatório dos resultados
Bhutan - Hydromet Services and Disaster Resilience Regional project : P154477 - Implementation Status Results Report : Sequence 01 (Inglês)
Exibir mais +
DEC 20, 2016 ISR26421 Situação da implementação e relatório dos resultados
Bangladesh - Bangladesh Weather and Climate Services Regional Project : P150220 - Implementation Status Results Report : Sequence 01 (Inglês)
Exibir mais +
OCT 21, 2016 ISR25281 Situação da implementação e relatório dos resultados
Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 07 (Inglês)
Exibir mais +
MAY 05, 2016 ISR23026 Situação da implementação e relatório dos resultados
Strengthening Agro-Met Services in Bhutan (Inglês)
Exibir mais +
JAN 01, 2016 133255 Report
Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 06 (Inglês)
Exibir mais +
DEC 29, 2015 ISR21869 Situação da implementação e relatório dos resultados
Moderinizing weather, water, and climate services : a road map for Bhutan (Inglês)
Exibir mais +
JUL 21, 2015 98534 Documento de Trabalho
Note on green growth for Bhutan (Inglês)
Exibir mais +
JUL 31, 2014 90413 Documento de Trabalho
Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 03 (Inglês)
Exibir mais +
JUN 29, 2014 ISR14661 Situação da implementação e relatório dos resultados
Nepal - Building Resilience to Climate Related Hazards : P127508 - Implementation Status Results Report : Sequence 02 (Inglês)
Exibir mais +
DEC 31, 2013 ISR11561 Situação da implementação e relatório dos resultados