Documentos e Relatórios

Pesquisar/Buscar documentos


  

APRIMORAR POR:

Especificação do período do documento

Exibir mais +
Exibir mais +
Exibir mais +
  • Mostrando 1 - 20 of 22772 resultados
  • Mostrar resultados em grupos de
  • 10
  • 20
  • 50
Fazer download para Excel [x]
Vietnam/EAST ASIA AND PACIFIC- P110693- Vietnam New Model University Project - Procurement Plan (Inglês)

Plano de Aquisições STEP11035 JUL 17, 2018

Disclosed

Uganda/AFRICA- P145037- Agriculture Cluster Development Project - Procurement Plan (Inglês)

Plano de Aquisições STEP11036 JUL 17, 2018

Stephen Ojangole Disclosed

Disclosable Version of the ISR - EG-Ain Sokhna Power Project - P100047 - Sequence No : 19 (Inglês)

Situação da implementação e relatório dos resultados ISR32909 JUL 17, 2018

Hallouda,Mohab Awad Mokhtar Disclosed

Brazil/LATIN AMERICA AND CARIBBEAN- P088966- BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project - Procurement Plan (Inglês)

Plano de Aquisições STEP11043 JUL 17, 2018

Disclosed

Indonesia/EAST ASIA AND PACIFIC- P096532- Dam Operational Improvement and Safety - Procurement Plan (Inglês)

Plano de Aquisições STEP10984 JUL 16, 2018

Iman Ramdhani Disclosed

Nepal/SOUTH ASIA- P155969- Earthquake Housing Reconstruction Project - Procurement Plan (Inglês)

Plano de Aquisições STEP10985 JUL 16, 2018

Disclosed

China - Gansu Rural-Urban Integration Project : environmental assessment (Vol. 2) : Atmospheric and noise prediction (Inglês)

The development objective of the Gansu Rural-Urban Integration Infrastructure Project for China is to provide residents in select areas of Wuwei municipality and Linxia County with expanded all-weather access to rural and urban areas. ... Exibir mais +

Avaliação Ambiental SFG4497 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (Inglês)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... Exibir mais +

Avaliação Ambiental SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (Inglês)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... Exibir mais +

Avaliação Ambiental SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (Inglês)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... Exibir mais +

Avaliação Ambiental SFG4504 JUL 16, 2018

Disclosed

Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (Inglês)

The development objective of Business Models for Private Sector-led Mini-grid Energy Access Project for Nepal is to increase electricity delivery from renewable energy mini-grids by mobilizing private energy service company (ESCO). ... Exibir mais +

Avaliação Ambiental SFG4505 JUL 16, 2018

Disclosed

LN8153-P114138- 2nd Water Conservation -Shanxi Audit Report 2017-Public (Inglês)

Documento de auditoria AUD0013919 JUL 15, 2018

Wang,Yan-000180350 Disclosed

Disclosable Version of the ISR - Burundi Landscape Restoration and Resilience Project - P160613 - Sequence No : 01 (Inglês)

Situação da implementação e relatório dos resultados ISR33048 JUL 13, 2018

Agostini,Paola Disclosed

West Bank and Gaza/MIDDLE EAST AND NORTH AFRICA- P150991- GZ-Integrated Cities and Urban Development Project - Procurement Plan (Inglês)

Plano de Aquisições STEP10928 JUL 12, 2018

Ahmed Zayed Disclosed

AZ P110679 ISWMP Audit Report 2017 (Inglês)

Documento de auditoria AUD0013801 JUL 12, 2018

Jamalov,Tural Disclosed

Nigeria/AFRICA- P096572- THIRD NATIONAL FADAMA DEVELOPMENT PROJECT (FADAMA III) - Procurement Plan (Inglês)

Plano de Aquisições STEP10863 JUL 11, 2018

JOSEPH, OMOTAYO ADEWUMI Disclosed

The shifting natural wealth of nations : the role of market orientation (Inglês)

This paper explores the effect of market orientation on (known) natural resource wealth using a novel dataset of world-wide major hydrocarbon and mineral discoveries. ... Exibir mais +

Documento de trabalho sobre pesquisa de políticas WPS8520 JUL 11, 2018

Arezki,Rabah; van der Ploeg,Frederick; Toscani,Frederik Disclosed

Pakistan/SOUTH ASIA- P158099- PK: Punjab Tourism for Economic Growth Project - Procurement Plan (Inglês)

Plano de Aquisições STEP10840 JUL 10, 2018

Disclosed

Bangladesh/SOUTH ASIA- P120843- BD Private Sector Development - Procurement Plan (Inglês)

Plano de Aquisições STEP10822 JUL 10, 2018

A.N.M. Safiqul Islam Disclosed

Mozambique/AFRICA- P162621- National Statistics and Data for Development - Procurement Plan (Inglês)

Plano de Aquisições STEP10842 JUL 10, 2018

Disclosed

Título Data do documento Relatório Nº. Qualquer tipo de documento Also available in
Vietnam/EAST ASIA AND PACIFIC- P110693- Vietnam New Model University Project - Procurement Plan (Inglês)
Exibir mais +
JUL 17, 2018 STEP11035 Plano de Aquisições
Uganda/AFRICA- P145037- Agriculture Cluster Development Project - Procurement Plan (Inglês)
Exibir mais +
JUL 17, 2018 STEP11036 Plano de Aquisições
Disclosable Version of the ISR - EG-Ain Sokhna Power Project - P100047 - Sequence No : 19 (Inglês)
Exibir mais +
JUL 17, 2018 ISR32909 Situação da implementação e relatório dos resultados
Brazil/LATIN AMERICA AND CARIBBEAN- P088966- BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project - Procurement Plan (Inglês)
Exibir mais +
JUL 17, 2018 STEP11043 Plano de Aquisições
Indonesia/EAST ASIA AND PACIFIC- P096532- Dam Operational Improvement and Safety - Procurement Plan (Inglês)
Exibir mais +
JUL 16, 2018 STEP10984 Plano de Aquisições
Nepal/SOUTH ASIA- P155969- Earthquake Housing Reconstruction Project - Procurement Plan (Inglês)
Exibir mais +
JUL 16, 2018 STEP10985 Plano de Aquisições
China - Gansu Rural-Urban Integration Project : environmental assessment (Vol. 2) : Atmospheric and noise prediction (Inglês)
Exibir mais +
JUL 16, 2018 SFG4497 Avaliação Ambiental
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (Inglês)
Exibir mais +
JUL 16, 2018 SFG4504 Avaliação Ambiental
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (Inglês)
Exibir mais +
JUL 16, 2018 SFG4504 Avaliação Ambiental
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (Inglês)
Exibir mais +
JUL 16, 2018 SFG4504 Avaliação Ambiental
Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (Inglês)
Exibir mais +
JUL 16, 2018 SFG4505 Avaliação Ambiental
LN8153-P114138- 2nd Water Conservation -Shanxi Audit Report 2017-Public (Inglês)
Exibir mais +
JUL 15, 2018 AUD0013919 Documento de auditoria
Disclosable Version of the ISR - Burundi Landscape Restoration and Resilience Project - P160613 - Sequence No : 01 (Inglês)
Exibir mais +
JUL 13, 2018 ISR33048 Situação da implementação e relatório dos resultados
West Bank and Gaza/MIDDLE EAST AND NORTH AFRICA- P150991- GZ-Integrated Cities and Urban Development Project - Procurement Plan (Inglês)
Exibir mais +
JUL 12, 2018 STEP10928 Plano de Aquisições
AZ P110679 ISWMP Audit Report 2017 (Inglês)
Exibir mais +
JUL 12, 2018 AUD0013801 Documento de auditoria
Nigeria/AFRICA- P096572- THIRD NATIONAL FADAMA DEVELOPMENT PROJECT (FADAMA III) - Procurement Plan (Inglês)
Exibir mais +
JUL 11, 2018 STEP10863 Plano de Aquisições
The shifting natural wealth of nations : the role of market orientation (Inglês)
Exibir mais +
JUL 11, 2018 WPS8520 Documento de trabalho sobre pesquisa de políticas
Pakistan/SOUTH ASIA- P158099- PK: Punjab Tourism for Economic Growth Project - Procurement Plan (Inglês)
Exibir mais +
JUL 10, 2018 STEP10840 Plano de Aquisições
Bangladesh/SOUTH ASIA- P120843- BD Private Sector Development - Procurement Plan (Inglês)
Exibir mais +
JUL 10, 2018 STEP10822 Plano de Aquisições
Mozambique/AFRICA- P162621- National Statistics and Data for Development - Procurement Plan (Inglês)
Exibir mais +
JUL 10, 2018 STEP10842 Plano de Aquisições