Documentos e Relatórios

Pesquisar/Buscar documentos


  

APRIMORAR POR:

Especificação do período do documento

Exibir mais +
Exibir mais +
Exibir mais +
  • Mostrando 1 - 20 of 3808 resultados
  • Mostrar resultados em grupos de
  • 10
  • 20
  • 50
Fazer download para Excel [x]
Disclosable Version of the ISR - Benin Cities Support Project PAURAD - P122950 - Sequence No : 11 (Inglês)

Situação da implementação e relatório dos resultados ISR34563 DEC 14, 2018

Beddies,Sabine W. Disclosed

India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)

Plano de Aquisições STEP15417 DEC 13, 2018

Mukdev Singh,Ashok Kumar Disclosed

Pakistan - SOUTH ASIA- P154036- Disaster and Climate Resilience Improvement Project - Procurement Plan (Inglês)

Plano de Aquisições STEP15358 DEC 12, 2018

Kh. Ajaz Ahmad Trunboo Disclosed

Pakistan - SOUTH ASIA- P110099- Water Sector Capacity Building and Advisory Services Project (WCAP) - Procurement Plan (Inglês)

Plano de Aquisições STEP15351 DEC 11, 2018

Muhammad Akhtar Bhatti Disclosed

Disclosable Version of the ISR - ODRA RIVER BASIN FLOOD PROTECTION - P086768 - Sequence No : 22 (Inglês)

Situação da implementação e relatório dos resultados ISR34667 DEC 11, 2018

Rohde,Andreas Disclosed

India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)

Plano de Aquisições STEP15344 DEC 11, 2018

Jagdish Kumar Sharma Disclosed

2018-19 Audit Report - SAWI : Audit Report Financial Year 2018-19 (Inglês)

Documento de auditoria AUD0018039 DEC 10, 2018

Vemuri,Vinaya Vittal Disclosed

ERC_DOH_Audit Report_Eng. 2017-2018 (Inglês)

Documento de auditoria AUD0018065 DEC 10, 2018

Win,Wut Yi Disclosed

Disclosable Version of the ISR - PK-Sindh Barrages Improvement Project - P131324 - Sequence No : 07 (Inglês)

Situação da implementação e relatório dos resultados ISR35005 DEC 07, 2018

Konishi,Toru Disclosed

India - SOUTH ASIA- P154990- Jhelum and Tawi Flood Recovery Project - Procurement Plan (Inglês)

Plano de Aquisições STEP15196 DEC 06, 2018

WASEEM BASHIR DEV Disclosed

Disclosable Version of the ISR - Ibadan Urban Flood Management Project - P130840 - Sequence No : 09 (Inglês)

Situação da implementação e relatório dos resultados ISR35027 DEC 05, 2018

Reid,Robert Curle Jesse Disclosed

India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment (Vol. 2) : Executive Summary (Inglês)

The objective of the West Bengal Major Irrigation and Flood Management Project for India is to rejuvenate and rehabilitate irrigation existing irrigation network for sustainable development in DVC area and management of floods in Lower Damodar Sub-Basin in West Bengal. ... Exibir mais +

Avaliação Ambiental SFG4887 DEC 04, 2018

Chase,India Coreen Disclosed

India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment : Environmental and Social Impact Assessment Report (Inglês)

The objective of the West Bengal Major Irrigation and Flood Management Project for India is to rejuvenate and rehabilitate irrigation existing irrigation network for sustainable development in DVC area and management of floods in Lower Damodar Sub-Basin in West Bengal. ... Exibir mais +

Avaliação Ambiental SFG4887 DEC 04, 2018

Chase,India Coreen Disclosed

India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment (Vol. 2) : নির্বাহী সারসংক্ষেপ (Bengalês)

The objective of the West Bengal Major Irrigation and Flood Management Project for India is to rejuvenate and rehabilitate irrigation existing irrigation network for sustainable development in DVC area and management of floods in Lower Damodar Sub-Basin in West Bengal. ... Exibir mais +

Avaliação Ambiental SFG4887 DEC 04, 2018

Disclosed

Disclosable Restructuring Paper - Preparation of Strategic Program for Climate Resilience - P159600 (Inglês)

Documento do projeto RES34871 DEC 03, 2018

Tshering,Dechen Disclosed

India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment : Environmental and Social Management Framework (Inglês)

The objective of the Rajasthan Road Sector Modernization Project for India is to assist the public works department, Rajasthan to improve the quality, connectivity, and management of its road network. some of the negative impacts include: (i) loss of vegetation and impacts on flora and fauna; (ii) removal of excess excavated materials from the canals and its inappropriate dumping which may affect nearby agriculture field and waterbody; (iii) dust and air pollution from flying of dried up excavated earth; (iv) extraction of borrow earth can disrupt natural drainage, vegetation and resulting in accelerated erosion and leading to water stagnation, ponding and pollution; (v) fish migration in water courses may be restricted; (vi) rise of water table leading to water logging; (vii) impact on soil quality and River Bed sediments; (viii) inappropriate dumping of excavated material which may affect nearby agricultural areas; (ix) dredging will increase chances of sedimentation at downstream; (x) disposal of desilted material; (xi) loss of land or properties and livelihood; shelter due to land taking; (xi) less silt deposited on land affecting fertility; (xii) disposal of debris from dismantling structures and spoil; (xiii) soil quality degradation due to excess use of Fertilizer and pesticide; (xiv) pollution from overstocking and overfeeding; (xv) risk of cultivation of exotic species that may impact native populations; (xvi) work safety and human health risks; (xvii) environmental damage from accidental release of toxic, infectious, or otherwise harmful material from construction site during flooding; Some of the mitigation measures include: (i) ensure that materials required for construction are of specified quality and are only procured from authorized suppliers; (ii) dispose toxic and non-biodegradable wastes at locations specified by the government / local body; (iii) avoid felling of existing trees in the embankment, work place or camp sites; (iv) adopting prescribed safety practices during handling of equipment, manual labour, handling of pesticides, etc; (v) spray or sprinkling of water to minimize dust pollution; (vi) proper maintenance of vehicles shall be ensured out to avoid any leakage of oil or grease; (vii) ensuring proper health-check-ups of all laborers employed at the project site; (viii) provision of adequate sanitation, washing, lighting, cooking and dormitory facilities; (ix) appropriate arrangements such as usage of concrete base drip pans to avoid spills during fueling/oil change; (x) prohibition on disposal of sewage and sullage into any water body or open land; (xi) contractor will provide and enforce the use of appropriate personal protective equipment (PPE) such as safety boots, rain coats, hand gloves, earplugs and nose masks; (xii) organize awareness programs on environmental resource management; (xiii) regular inspection, tuning, and maintenance of transport vehicles; (xiv) use of machinery and vehicles with properly tuned to avoid the exhaust emissions; (xv) restriction of public access to construction sites through appropriate measures such as fencing, barricading, caution tape, etc.; (xvi) repair and maintain damaged sections of the road located at project site throughout the construction period; (xvii) contractor will regularly remove and dispose construction waste such as metal scrap, wood chippings, rubber seals, nails, etc. for disposal at approved dumpsites. ... Exibir mais +

Avaliação Ambiental SFG4888 DEC 01, 2018

Disclosed

Disclosable Version of the ISR - Studies for Sustainable Flood Management - P145391 - Sequence No : 07 (Inglês)

Situação da implementação e relatório dos resultados ISR34733 NOV 30, 2018

Stoutjesdijk,Joop Disclosed

India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)

Plano de Aquisições STEP14852 NOV 27, 2018

S.C. Sharma Disclosed

India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)

Plano de Aquisições STEP14851 NOV 27, 2018

Mukdev Singh,Ashok Kumar Disclosed

Disclosable Version of the ISR - Ningbo Sustainable Urbanization Project - P149485 - Sequence No : 05 (Inglês)

Situação da implementação e relatório dos resultados ISR34315 NOV 27, 2018

Fang,Wanli Disclosed

Título Data do documento Relatório Nº. Qualquer tipo de documento Also available in
Disclosable Version of the ISR - Benin Cities Support Project PAURAD - P122950 - Sequence No : 11 (Inglês)
Exibir mais +
DEC 14, 2018 ISR34563 Situação da implementação e relatório dos resultados
India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)
Exibir mais +
DEC 13, 2018 STEP15417 Plano de Aquisições
Pakistan - SOUTH ASIA- P154036- Disaster and Climate Resilience Improvement Project - Procurement Plan (Inglês)
Exibir mais +
DEC 12, 2018 STEP15358 Plano de Aquisições
Pakistan - SOUTH ASIA- P110099- Water Sector Capacity Building and Advisory Services Project (WCAP) - Procurement Plan (Inglês)
Exibir mais +
DEC 11, 2018 STEP15351 Plano de Aquisições
Disclosable Version of the ISR - ODRA RIVER BASIN FLOOD PROTECTION - P086768 - Sequence No : 22 (Inglês)
Exibir mais +
DEC 11, 2018 ISR34667 Situação da implementação e relatório dos resultados
India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)
Exibir mais +
DEC 11, 2018 STEP15344 Plano de Aquisições
2018-19 Audit Report - SAWI : Audit Report Financial Year 2018-19 (Inglês)
Exibir mais +
DEC 10, 2018 AUD0018039 Documento de auditoria
ERC_DOH_Audit Report_Eng. 2017-2018 (Inglês)
Exibir mais +
DEC 10, 2018 AUD0018065 Documento de auditoria
Disclosable Version of the ISR - PK-Sindh Barrages Improvement Project - P131324 - Sequence No : 07 (Inglês)
Exibir mais +
DEC 07, 2018 ISR35005 Situação da implementação e relatório dos resultados
India - SOUTH ASIA- P154990- Jhelum and Tawi Flood Recovery Project - Procurement Plan (Inglês)
Exibir mais +
DEC 06, 2018 STEP15196 Plano de Aquisições
Disclosable Version of the ISR - Ibadan Urban Flood Management Project - P130840 - Sequence No : 09 (Inglês)
Exibir mais +
DEC 05, 2018 ISR35027 Situação da implementação e relatório dos resultados
India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment (Vol. 2) : Executive Summary (Inglês)
Exibir mais +
DEC 04, 2018 SFG4887 Avaliação Ambiental
India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment : Environmental and Social Impact Assessment Report (Inglês)
Exibir mais +
DEC 04, 2018 SFG4887 Avaliação Ambiental
India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment (Vol. 2) : নির্বাহী সারসংক্ষেপ (Bengalês)
Exibir mais +
DEC 04, 2018 SFG4887 Avaliação Ambiental
Disclosable Restructuring Paper - Preparation of Strategic Program for Climate Resilience - P159600 (Inglês)
Exibir mais +
DEC 03, 2018 RES34871 Documento do projeto
India - West Bengal Major Irrigation and Flood Management Project : Environmental Assessment : Environmental and Social Management Framework (Inglês)
Exibir mais +
DEC 01, 2018 SFG4888 Avaliação Ambiental
Disclosable Version of the ISR - Studies for Sustainable Flood Management - P145391 - Sequence No : 07 (Inglês)
Exibir mais +
NOV 30, 2018 ISR34733 Situação da implementação e relatório dos resultados
India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)
Exibir mais +
NOV 27, 2018 STEP14852 Plano de Aquisições
India - SOUTH ASIA- P122770- IN Uttar Pradesh Water Sector Restructuring Project Phase 2 - Procurement Plan (Inglês)
Exibir mais +
NOV 27, 2018 STEP14851 Plano de Aquisições
Disclosable Version of the ISR - Ningbo Sustainable Urbanization Project - P149485 - Sequence No : 05 (Inglês)
Exibir mais +
NOV 27, 2018 ISR34315 Situação da implementação e relatório dos resultados