This Volume was produced under the Nigeria Electrification Access Program Development (NEAPD) Technical Assistance project for Kaduna Electric, which provides electricity services to the States of Kaduna, Kebbi, Sokoto and Zamfara in North West Nigeria. The Volume is combined by two reports: a GIS-based Least- Cost Plan and a related Investment Prospectus. Together, they present a technically sound electrification and investment plan for the achievement of universal access to electricity services in the Kaduna Electric service area by 2030. Both the Geospatial Plan and the Investment Prospectus were produced in close collaboration with Kaduna Electric, and the NEAPD project also strengthened the utility’s capacity through training for the geospatial mapping of the electricity infrastructure and for distribution planning with GIS tools. The Least-Cost Plan provides a geospatial and quantitative frame for the design and detailing of a well-coordinatedand harmonized implementation program for grid and off-grid electrification over a fifteen-yeartimeframe (2015–2030). Building on the findings of the geospatial plan and a rapid readiness assessment, the Investment Prospectus proposes a year-by-year electrification program up to 2030 (including connections for schools and clinics) and details the investment needs, financing gaps and possible sources of funding with a focus on the first five years of implementation. While the analysis and recommendations presented in this Volume reflect and respond to the operatingcontext and specific characteristics of Kaduna Electric utility, they also provide an input for the completion of the bold sector reform launched by the Federal Government of Nigeria in 2010. While highlighting the make or break challenges for scaling up access in the Kaduna Electric service area, the Volume also provides a roadmap for expanding access across the country in an efficient, effective, and timely manner.
Details
-
Document Date
2016/11/10
-
Document Type
Working Paper
-
Report Number
112802
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2017/02/15
-
Disclosure Status
Disclosed
-
Doc Name
Achieving universal access in the Kaduna electric service area
-
Keywords
grid access;coverage area;education and health;access to electricity service;Board of Executive Directors;access to energy service;millennium development goal;grid line;rural area;Solar Home System;medium voltage;average cost;electricity access;data collection phase;cost of grid;grid extension;household demand;grid connection;geographic information system;source of funding;diesel fuel cost;hours of operation;polio eradication effort;primarily due;number of beneficiaries;solar power system;technical assistance program;detailed engineering design;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Achieving universal access in the Kaduna electric service area (English). Washington, D.C. : World Bank Group. https://documents.worldbank.org/curated/en/782491487138851242/Achieving-universal-access-in-the-Kaduna-electric-service-area