Nepal’s economic and social development is being hampered by inadequate energy supply. To address this, the Upper Arun Hydro-Electric Limited (UAHEL), a subsidiary of the Nepal Electricity Authority (NEA), presents to construct the Upper Arun Hydroelectric Project (UAHEP or Project), with an installed capacity of 1,040 MW, on the Arun River in the Bhotkhola and Makalu rural municipalities of Sankhuwasabha District, in Koshi Province of Nepal. Environmental...
See More

DETAILS

  • 2024/01/31

  • Board Report

  • 187653

  • 1

  • Nepal,

  • South Asia,

  • 2024/02/10

  • Disclosed

  • Nepal - Upper Arun Hydroelectric Project : Environmental and Social Impact Assessment Study - Executive Summary

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

World Bank.

Nepal - Upper Arun Hydroelectric Project : Environmental and Social Impact Assessment Study - Executive Summary (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099020924111015760

This document is being processed or is not available.