DETAILS
-
2023/03/03
-
Implementation Status and Results Report
-
ISR55032
-
2023/03/03
-
Disclosed
-
Disclosable Version of the ISR - Water Security in the Dry Corridor of Honduras - P169901 - Sequence No : 06
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 67
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Albrecht,Martin Benedikt.
Disclosable Version of the ISR - Water Security in the Dry Corridor of Honduras - P169901 - Sequence No : 06 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099033503032343960