The Global Electrification Platform (GEP) 3.0 : Optimization of Centralized Grid Generation and Estimated Emissions Associated with the Achievement of SDG7 (English)

The Global Electrification Platform (GEP), an initiative by the World Bank to standardize and simplify the use of geospatial tools for least-cost electrification planning, was originally launched in November 2019 (GEP 1.0), followed by an update in September 2021 (GEP 2.0) that refined the modelling of mini grid systems and introduced estimation of non-residential electricity demand. The high-level technology and investment breakdown allow users to...
See More

DETAILS

  • 2024/07/15

  • Report

  • 192584

  • 1

  • World,

  • Other,

  • 2024/07/16

  • Disclosed

  • The Global Electrification Platform (GEP) 3.0 : Optimization of Centralized Grid Generation and Estimated Emissions Associated with the Achievement of SDG7

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

World Bank.

The Global Electrification Platform (GEP) 3.0 : Optimization of Centralized Grid Generation and Estimated Emissions Associated with the Achievement of SDG7 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099071524185017983

This document is being processed or is not available.