DETAILS
-
2024/12/16
-
Implementation Status and Results Report
-
ISR01986
-
2024/12/16
-
Disclosed
-
Disclosable Version of the ISR - Improving Connectivity and Urban Infrastructure in Cabo Verde - P178644 - Sequence No : 2
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 45
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Philippe Neves.
Disclosable Version of the ISR - Improving Connectivity and Urban Infrastructure in Cabo Verde - P178644 - Sequence No : 2 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099121624072028596