Skip to Main Navigation

Botswana - Integrated Transport Project (English)

Ratings for the Integrated Transport Project for Botswana were as follows: outcome was moderately satisfactory, Bank performance was moderately unsatisfactory, and monitoring and evaluation (M and E) quality was negligible. Some lessons learned included: capacity development for the client should be better integrated into the project design to ensure that the client can institutionalize the relevant training and adequately take over new systems post...
See More

DETAILS

  • 2023/02/28

  • Implementation Completion and Results Report

  • ICR5871

  • 1

  • Botswana,

  • Eastern and Southern Africa,

  • 2023/02/27

  • Disclosed

  • Botswana - Integrated Transport Project

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

World Bank.

Botswana - Integrated Transport Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099213502272315065

This document is being processed or is not available.