Skip to Main Navigation

Argentina - Matanza-Riachuelo Basin (MRB) Sustainable Development Project : environmental assessment (Vol. 3) : Environmental Impact Study for Riachuelo Plant Subfluvial Outfall Operational Stage (English)

The main objective of the Matanza-Riachuelo Basin (MRB) Sustainable Development project of Argentina is to improve the environmental quality of the Matanza Riachuelo Basin. The Integral Environmental Sanitation Plan (PISA) establishes these strategic goals: (1) Improve Quality of Life; (2) Recompose the Environment (water, air, soil) and (3) Prevent damage with a reasonable and reasonable degree of prediction. The general objective of the EIA is to ensure an adequate definition and implementation of the Curtidor Industrial Park Project (PIC), through the establishment of management measures that allow the activities to be carried out with the least possible adverse environmental and social impacts while at the same time seeking to achieve the maximization of the benefits associated with the execution of the project. In this context, and as part of compliance with the applicable legislation, it will allow the determination of the environmental suitability for the industrial use of the property selected for the construction of the PIC.

Details

  • Author

    Borrowing Agency

  • Document Date

    2021/08/31

  • Document Type

    Environmental Assessment

  • Report Number

    SFG1551

  • Volume No

    3

  • Total Volume(s)

    2

  • Country

    Argentina,

  • Region

    Latin America & Caribbean,

  • Disclosure Date

    2021/12/16

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental Impact Study for Riachuelo Plant Subfluvial Outfall Operational Stage

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Borrowing Agency

Argentina - Matanza-Riachuelo Basin (MRB) Sustainable Development Project : environmental assessment (Vol. 3) : Environmental Impact Study for Riachuelo Plant Subfluvial Outfall Operational Stage (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099332012232129787/P10568002c0a3c0760ac7f0a0286a920b1a