Uganda - Irrigation for Climate Resilience Project : Resettlement Plan (Vol. 3) : Sectional Resettlement Action Plan for Kabuyanda Main Pipeline, Isingiro District : Addendum No. 2 (English)

The development objective of the Irrigation for Climate Resilience Project for Uganda is to focus on increasing agricultural productivity and institutional capacity for irrigation service delivery in targeted areas of Uganda. Some of the negative impacts are include: (i) land used for residence partially affected, limited loss; (ii) Land and assets used for residence severely affected; (iii) partially or fully affected buildings and structures; (iv) entire structures are affected or partially affected; (v) loss of public structures, loss of land; (vi) crops affected by land acquisition or temporary acquisition or easement; (vii) temporary acquisition; (viii) loss of cultural property; (ix) loss of trees; and (x) loss of crops or trees. Some of the mitigation measures include: (i) cash compensation for affected land at replacement value; (ii) land for land replacement or compensation in cash according to PAP’s choice; (iii) cash or in-kind compensation for affected building and other fixed assets at replacement cost; (iv) cash or in-kind compensation; (v) compensation to owners or operators as agreed by the management of the institutions; (vi) livelihood restoration assistance; (vii) cash compensation for any assets affected; (viii) relocation assistance for moving of asset to a secure site; (ix) replacement of trees in another area within the forest reserve outside the project site; and (x) cash compensation for developments on the land.

Details

  • Author

    Borrowing Agency

  • Document Date

    2021/12/31

  • Document Type

    Resettlement Plan

  • Report Number

    SFG5158

  • Volume No

    3

  • Total Volume(s)

    2

  • Country

    Uganda,

  • Region

    Africa East,

  • Disclosure Date

    2022/02/24

  • Disclosure Status

    Disclosed

  • Doc Name

    Sectional Resettlement Action Plan for Kabuyanda Main Pipeline, Isingiro District : Addendum No. 2

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Borrowing Agency

Uganda - Irrigation for Climate Resilience Project : Resettlement Plan (Vol. 3) : Sectional Resettlement Action Plan for Kabuyanda Main Pipeline, Isingiro District : Addendum No. 2 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099410002252218137/P1638360001e470f10ab380690be8da6441