Skip to Main Navigation

India - North Eastern Region Power System Improvement Project : Environmental Assessment (Vol. 10 of 8) : Environment Assessment Report for Transmission and Distribution Network in Lunglei and Lawngtlai Districts of Mizoram (English)

The development objective of the North Eastern Region Power System Improvement Project for India is to increase the delivery of electricity at the boundaries of the power distribution network in the participating states in the north eastern region. Some of the negative impacts and mitigation measures include: (1) setback of dwellings to overhead line route designed in accordance with permitted level of power frequency and the regulation of supervision...
See More

DETAILS

  • 2022/07/29

  • Environmental Assessment

  • SFG5890

  • 10

  • 8 (See all volumes)

  • India,

  • South Asia,

  • 2022/07/29

  • Disclosed

  • Environment Assessment Report for Transmission and Distribution Network in Lunglei and Lawngtlai Districts of Mizoram

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Borrowing Agency.

India - North Eastern Region Power System Improvement Project : Environmental Assessment (Vol. 10 of 8) : Environment Assessment Report for Transmission and Distribution Network in Lunglei and Lawngtlai Districts of Mizoram (English). India : Borrowing Agency. http://documents.worldbank.org/curated/en/099600007292261682

This document is being processed or is not available.