The objective of the Reduction and Phaseout of Pfos in Priority Sectors Project is to reduce PFOS in selected sectors and enterprises in China in a sustainable manner. Some of the negative impacts and mitigation measures include: it is necessary to timely maintain equipment and vehicles, to keep them in good condition. The implementing institutions are the construction institution and NHVS, and the supervising and managing institution is Shenyang Emergency Management Bureau; use designated areas and restricted areas to discard and discharge wastes, and use slide rails to transport wastes safely from the upper floors to the lower floors; when sawing, cutting, grinding, polishing and chiseling, workers should use proper protective appliances and fastening methods; keep the passageway unimpeded, and avoid heavy machinery running on scattered waste; use temporary fall prevention measures (e.g., handrails and toe boards) around the edges of scaffolds and other surfaces for work high above the ground, so as to prevent material from slipping off; ensure that personnel wear eye-catching vests to increase visibility when working or walking in heavy machinery operation areas, and train workers to make eye contact with equipment operators before approaching vehicles in operation; and use waste-specific personal protective equipment (including respirators, protective clothing, gloves and glasses) based on the results of the health and safety assessment. The implementing institution is the construction institution, and the supervising and managing institution is Shenyang Emergency Management Bureau.
Details
-
Author
Borrowing Agency
-
Document Date
2021/11/24
-
Document Type
Environmental Assessment
-
Report Number
SFG7011
-
Volume No
2
-
Total Volume(s)
3
-
Country
-
Region
-
Disclosure Date
2021/11/30
-
Disclosure Status
Disclosed
-
Doc Name
Environmental Assessment : Environmental and Social Management Plan for Waysmos Fire Suppression-Project
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Borrowing Agency
China - Reduction and Phaseout of Pfos in Priority Sectors Project : Environmental Assessment (Vol. 2) : Environmental Assessment : Environmental and Social Management Plan for Waysmos Fire Suppression-Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099711202102212306/P1529590c981f30570ad430c7844575c9b7