DETAILS
-
2022/10/02
-
Implementation Status and Results Report
-
ISR53208
-
2022/10/02
-
Disclosed
-
Disclosable Version of the ISR - Maldives: PFM Systems Strengthening Project - P145317 - Sequence No : 16
DOWNLOADS
COMPLETE REPORT
Official version of document (may contain signatures, etc)
-
Total Downloads** : 53
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Cole,Winston Percy Onipede.
Disclosable Version of the ISR - Maldives: PFM Systems Strengthening Project - P145317 - Sequence No : 16 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/099920010022286932