Skip to Main Navigation

Philippines - Additional Financing for Rural Power Project : environmental assessment : Initial environmental examination checklist for CEBECO Power Substation Project in Brgy, Tapun, Dalaguete, and Cebu (English)

The objective of the Additional Financing for Rural Power Project for Philippines is to render better and effective to its consumer members, establishes the 10 MVA power sub-station to primarily solve the problem of power shortage. Negative measures include: loss of vegetation due to land clearing and backfilling, disturbance of wildlife within the influence area due to noise and other construction activities, generation of soil waste, air pollution, increase in the incidence of crime and accidents, erosion from exposed cuts and landslides due to earthmoving and excavation activities, and pollution of nearby water body due to improper disposal of construction wastes. Mitigation measures include: (a) set-up temporary disposal mechanism within the construction area and properly dispose the generated solid wastes; (b) limit land clearing as much as possible; (c) provide temporary fencing to vegetation that will be retained; (d) re-establish or stimulate the habitat of affected wildlife in another suitable area; (e) segregation of recyclable materials; and (f) schedule noise construction activities during day time.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

T&M Consultancy and Allied Services

Philippines - Additional Financing for Rural Power Project : environmental assessment : Initial environmental examination checklist for CEBECO Power Substation Project in Brgy, Tapun, Dalaguete, and Cebu (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/104941468095056378/Initial-environmental-examination-checklist-for-CEBECO-Power-Substation-Project-in-Brgy-Tapun-Dalaguete-and-Cebu