Stakeholder Engagement Plan (SEP) - Railway Improvement and Safety for Egypt - P175137 (English)

Details

  • Author

    Borrowing Agency

  • Document Date

    2020/12/22

  • Document Type

    Stakeholder Engagement Plan

  • Volume No

    1

  • Country

    Egypt, Arab Republic of

  • Region

    Middle East and North Africa,

  • Disclosure Date

    2020/12/22

  • Disclosure Status

    Disclosed

  • Doc Name

    Stakeholder Engagement Plan (SEP) - Railway Improvement and Safety for Egypt - P175137

  • Keywords

    public consultation; central traffic control; Environmental and Social Impact Assessment; Environmental and Social Management Framework; stakeholder engagement; community health and safety; environmental and social assessments; small groups of household; traditional means of communication; consultation activity; climate change mitigation; person with disability; people with disability; project affected persons; means of transportation; social and environmental; consultations with stakeholders; capacity building need; improved communication; rehabilitation of road; code of conduct; citizen satisfaction survey; participation of stakeholder; lack of facilities; construction site; grievance mechanism; Child care; train station; vulnerable group; railway corridor; railway line; construction work; land issue; radio program; railway track; railway network; focus group; public place; urban cities; site visits; social media; employment opportunities; stakeholder identification; employment opportunity; mitigation measure; agricultural land; land take; awareness campaign; corrective action; national railway; positive impact; civil works; child labor; personal safety; awareness raising; safety performance; train driver; safe asset; operational efficiency; project approval; reference source; rail corridor; public policy; land property; agricultural directorate; rural settlement; job opportunity; land acquisition; Land Registry; train track; job opportunities; rail station; consulting engineer; railway safety; geographic scope; land area; safety measure; female participation; informant interviews; land usage; resettlement process; local resident; fuel use; technical expert; Train Line; household level; rural area; remote village; several times; national stakeholder; social concern; impact analysis; storage area; project construction; affected communities; major hazard; traffic bottleneck; dense population; land use; construction contractor; railway service; coffee shops; satisfactory manner; video conference; shop owner; field observation; wait area; fruit tree; business opportunity; local contractor; socioeconomic impact; land plot; rent payment; collected data; social distance; local area; two-way communication; agricultural crop; long hour; road cutting; road work; international cooperation; bulletin board; government sector; smaller number; street vendor; safety program; private company; land transport; local entities; management function; precautionary approach; power supply; construction material; social standard; potential tenderers; field visits; non-governmental organization; civil society; public domain; good information; community construction; access road; building ventilation; rail operation; physical location; commercial activity; surrounding community; local control; stakeholder analysis; waste generation; safe crossing; temporary labor; future study; adequate training; community engagement

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

Citation

Borrowing Agency

Stakeholder Engagement Plan (SEP) - Railway Improvement and Safety for Egypt - P175137 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/105571608676108485/Stakeholder-Engagement-Plan-SEP-Railway-Improvement-and-Safety-for-Egypt-P175137