Details
-
Author
-
Document Date
2020/12/24
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR42356
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/12/24
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - ODRA-VISTULA FLOOD MANAGEMENT PROJECT - P147460 - Sequence No : 12
-
Keywords
construction of flood embankment; Investment Project Financing; impact of flood; institutional strengthening; flash flood; contract management; tender process; operation risk; risk category; citizen feedback; water global
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Uwimbabazi,Berina
Disclosable Version of the ISR - ODRA-VISTULA FLOOD MANAGEMENT PROJECT - P147460 - Sequence No : 12 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/105661608818213648/Disclosable-Version-of-the-ISR-ODRA-VISTULA-FLOOD-MANAGEMENT-PROJECT-P147460-Sequence-No-12