The proposed project would help Pakistan increase its domestic oil production through expansion of output from the Toot field; assist OGDC in strengthening its capabilities in the effective conduct of oil operations; and provide the means for evaluating the potential of the recently discovered Dhodak field and preparing for its rapid exploitation. Major project components include: the drilling of eight wells and provision of surface facilities at Toot; logistic support (heavy road transport equipment and a cargo aircraft) for OGDC; a seismic survey and reserve evaluation at Dhodak; provision of instructors and equipment for the Oil & Gas Training Institute; and management and accounting consultancy services for OGDC. The project carries the risks normally associated with an oil development project.
Details
-
Document Date
1978/11/30
-
Document Type
Staff Appraisal Report
-
Report Number
1889
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/06/18
-
Disclosure Status
Disclosed
-
Doc Name
Pakistan - Toot Oil and Gas Development Project
-
Keywords
Drilling; Natural gas; Petroleum; Petroleum exploration; Production; Seismic surveys; Wells
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Pakistan - Toot Oil and Gas Development Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/108851468145158664/Pakistan-Toot-Oil-and-Gas-Development-Project