Details
-
Document Date
2009/09/15
-
Document Type
Project Information Document
-
Report Number
AB4418
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Disclosure Status
Disclosed
-
Doc Name
Kenya - Electricity Expansion Project
-
Keywords
Environmental and Social Management Framework;investment need;geothermal generation;transmission and distribution network;Environmental and Social Impact;Access to Electricity;electricity sector;rural area;international good practice;foreign exchange rate;international oil price;quality of supply;regional power trade;power sector development;Electricity Sector Reform;geothermal power capacity;kv transmission line;private operator;regulatory environment;electricity service;productive potential;annual sale;health clinic;supply side;geothermal capacity;power industry;safeguard policy;project costing;energy cost;public power;supply cost;geographical distribution;health clinics;community center;Safeguard Policies;market center;distribution line;rural town;grid access;geographic area;financing source;load growth;energy specialist;distribution component;investment program;electricity grid;retail tariff;financial sustainability;open access;transmission company;industry restructuring;transmission network;Investment Support;parallel financing;geothermal area;concessional financing;electricity connection;development partner;demand growth;generation expansion;power supply;environmental challenge;resource scarcity;social exclusion;addressing poverty;electrification program;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Kenya - Electricity Expansion Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/109951468047736823/Kenya-Electricity-Expansion-Project