Details
-
Author
-
Document Date
2020/05/25
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR41686
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/05/25
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - China: Liaoning Safe and Sustainable Urban Water Supply Project - P158713 - Sequence No : 05
-
Keywords
sustainable urban water supply; quality of water supply service; asset management system; water quality monitoring; water supply utility; Non Revenue water; water supply company; low water supply; energy efficiency improvement; Investment Project Financing; water utility; management improvement; institutional strengthening; water utilities; winter season; facilities procurement; loan disbursement; water system; operation risk; risk category; water selling; water company; hydraulic network; booster pumps; counterpart fund; water meter; data recording; health standards; operational improvement; response time; operational efficiency; urban construction; water global
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Li,Xiaokai
Disclosable Version of the ISR - China: Liaoning Safe and Sustainable Urban Water Supply Project - P158713 - Sequence No : 05 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/120841590395755845/Disclosable-Version-of-the-ISR-China-Liaoning-Safe-and-Sustainable-Urban-Water-Supply-Project-P158713-Sequence-No-05